Very true, my excuse is I've been ill and really don't feel like doing much but sitting but I'll try to do that tonight. Thank you for reminding me. :)(F) (L) (F)

Hope you feel better soon my dear!!

USCIS

12-09-2013: NOA1

05-29-2014: NOA2- I-130 Approved!!!

NVC

06-04-2014: I-130 shipped from TSC to NVC

06-13-2014: Arrived at NVC

07-01-2014: Case # and IIN assigned

07-17-2014: D-261 submitted

07-18-2014: AOS fee invoiced

07-18-2014: AOS fee paid

07-18-2014: AOS package sent (call me crazy!!!)

07-21-2014: AOS package arrived to NVC (confirmed by FedEx)

07-22-2014: AOS bill showed "Paid"

07-22-2014: AOS package scanned by NVC (originally told July 23rd, but the 60 day letter said July 22nd, confirmed by NVC)

09-02-2014: DS-261 reviewed/accepted (notified by calling NVC on 09-05-2014)

09-08-2014: IV fee invoiced/paid

08-28-2014: IV package sent

08-29-2014: IV package arrived at NVC

09-02-2014: IV package scanned by NVC

09-15-2014: AOS package reviewed/accepted

09-19-2014: DS-260 completed

10-25-2014: Case Complete! (11/1/14 would be 60 days) Confirmed by phone on 10-27-2014

10-31-2014: Interview scheduled

11-25-2014: Medical

12-01-2014: Interview

12-19-2014: Visa Received

12-29-2014: POE in Atlanta, GA!!!

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

And as I said to someone else earlier this morning, take what these phone Agents say with a grain of salt. They're not the ones reviewing the documents, so they really don't know.

I hate those agents for checklist they are taking 30 business days just to review one document it is horrible to wait again 5 months in NVC.then wait for interview.

NOA 1

Oct 15,2013 - Applied case

Oct 16 ,2013 - Received NOA 1 number

March 7 , 2014 - Transfer To TSC

April 3, 2014 - Approved NOA 1

April 7 ,2014- Shipped to NVC :dancing:

NOA 2

April 16,2014 - NVC received the case. :dancing:

May 15,2014-NVC number and INN . :dance::dance:

May 20,2014 - In process AOS and IV fees.

May21,2014- Status paid for AOS :thumbs:

May 22,2014 - Status paid for IV :thumbs:

May 27,2014 - Completed DS260 form

May 29,2014 - AOS and IV packet sent

May 30,2014- AOS and IV packet delivered thru Fedex.

June 3,2014- Received both packages (Scanned into the system)

July 11.2014- Reviewed both packages.

July 11,2014 - IV package accepted and AOS checklist

July 11,2014 - AOS checklist received (Scanned into system)

July 18,2014-AOS 2nd checklist received (Scanned into system)

Aug 4,2014 -Case completed(By phone).. :dance: :energy:

Aug 8,2014- Got an official email for CC.

Aug 15,2014 - Interview sedule

Sep 16,2014 - Interview date. :no::rolleyes::dance::dance::energy::whistle::whistle::jest::jest::jest::jest:

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

Do you know what an outlier is?

You have to read a little bit more into this stuff. Just because one person gets a case complete and they have a scanned date way past everyone else's in their signature does not mean that is the scan date that the NVC is working on. You have to read more posts in here, when you see a trend, that's how you can tell what date they are working on.

I just don't want you or anyone else to get their hopes up or start getting really frustrated that NVC skipped 15 days worth of scan dates.

FOr me now to even come here I feel so bad becz It is been since so long in NVC and can't wait anymore.I got checklist now again have to wait that is too much to wait 30 business days for one document (checklist) to revie......

NOA 1

Oct 15,2013 - Applied case

Oct 16 ,2013 - Received NOA 1 number

March 7 , 2014 - Transfer To TSC

April 3, 2014 - Approved NOA 1

April 7 ,2014- Shipped to NVC :dancing:

NOA 2

April 16,2014 - NVC received the case. :dancing:

May 15,2014-NVC number and INN . :dance::dance:

May 20,2014 - In process AOS and IV fees.

May21,2014- Status paid for AOS :thumbs:

May 22,2014 - Status paid for IV :thumbs:

May 27,2014 - Completed DS260 form

May 29,2014 - AOS and IV packet sent

May 30,2014- AOS and IV packet delivered thru Fedex.

June 3,2014- Received both packages (Scanned into the system)

July 11.2014- Reviewed both packages.

July 11,2014 - IV package accepted and AOS checklist

July 11,2014 - AOS checklist received (Scanned into system)

July 18,2014-AOS 2nd checklist received (Scanned into system)

Aug 4,2014 -Case completed(By phone).. :dance: :energy:

Aug 8,2014- Got an official email for CC.

Aug 15,2014 - Interview sedule

Sep 16,2014 - Interview date. :no::rolleyes::dance::dance::energy::whistle::whistle::jest::jest::jest::jest:

Link to comment
Share on other sites

Filed: IR-5 Country: Canada
Timeline

FOr me now to even come here I feel so bad becz It is been since so long in NVC and can't wait anymore.I got checklist now again have to wait that is too much to wait 30 business days for one document (checklist) to revie......

We feel your pain. Our NAO2 is of January 29th. NVC received last checklist reply in their system on June 11th and it is past 30 business days but they have not reviewed it. Stay strong and hang in there.

Jag

NOA1 29th July 2013

NOA2 29th Jan 2014

Recd by NVC 17th March 2014

NVC Received : 2014-03-17

Received I-864 2014-03-19

Pay I-864 Bill 2014-03-19

Receive I-864 Package : 2014-03-25

Completed I-864 : 2014-03-28

Receive IV Bill : 2014-03-27

Pay IV Bill : 2014-03-27

Emailed IV docs: April 03 2014

Resent AOS and IV: 11 April 2014

Check list AOS: 2014 -04 - 30

Response Checklist: 2014.04-30

Case Complete for one application: June 04, 2014

Checklist for 2nd applicant: June 04, 2014 - NVC lost the email sent on April 30th. After 3 supervisors conversation asked to resend the same email sent earlier.

Checklist response sent: June 10, 2014

Checklist response received at NVC: June 11, 2014

Case complete for 2nd applicant:July 31, 2014

Interview scheduled on: August 15, 2014

Medical: August 29, 2014

Interview date: September 17, 2014

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

We feel your pain. Our NAO2 is of January 29th. NVC received last checklist reply in their system on June 11th and it is past 30 business days but they have not reviewed it. Stay strong and hang in there.

Jag

Thanks a lot.....

NOA 1

Oct 15,2013 - Applied case

Oct 16 ,2013 - Received NOA 1 number

March 7 , 2014 - Transfer To TSC

April 3, 2014 - Approved NOA 1

April 7 ,2014- Shipped to NVC :dancing:

NOA 2

April 16,2014 - NVC received the case. :dancing:

May 15,2014-NVC number and INN . :dance::dance:

May 20,2014 - In process AOS and IV fees.

May21,2014- Status paid for AOS :thumbs:

May 22,2014 - Status paid for IV :thumbs:

May 27,2014 - Completed DS260 form

May 29,2014 - AOS and IV packet sent

May 30,2014- AOS and IV packet delivered thru Fedex.

June 3,2014- Received both packages (Scanned into the system)

July 11.2014- Reviewed both packages.

July 11,2014 - IV package accepted and AOS checklist

July 11,2014 - AOS checklist received (Scanned into system)

July 18,2014-AOS 2nd checklist received (Scanned into system)

Aug 4,2014 -Case completed(By phone).. :dance: :energy:

Aug 8,2014- Got an official email for CC.

Aug 15,2014 - Interview sedule

Sep 16,2014 - Interview date. :no::rolleyes::dance::dance::energy::whistle::whistle::jest::jest::jest::jest:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Chile
Timeline

Just got off with NVC and my AOS was scanned on July 23! So excited to get to start one set of "30 business day" waits! Of course my DS-261 has not been scanned/entered ;(

USCIS

12-09-2013: NOA1

05-29-2014: NOA2- I-130 Approved!!!

NVC

06-04-2014: I-130 shipped from TSC to NVC

06-13-2014: Arrived at NVC

07-01-2014: Case # and IIN assigned

07-17-2014: D-261 submitted

07-18-2014: AOS fee invoiced

07-18-2014: AOS fee paid

07-18-2014: AOS package sent (call me crazy!!!)

07-21-2014: AOS package arrived to NVC (confirmed by FedEx)

07-22-2014: AOS bill showed "Paid"

07-22-2014: AOS package scanned by NVC (originally told July 23rd, but the 60 day letter said July 22nd, confirmed by NVC)

09-02-2014: DS-261 reviewed/accepted (notified by calling NVC on 09-05-2014)

09-08-2014: IV fee invoiced/paid

08-28-2014: IV package sent

08-29-2014: IV package arrived at NVC

09-02-2014: IV package scanned by NVC

09-15-2014: AOS package reviewed/accepted

09-19-2014: DS-260 completed

10-25-2014: Case Complete! (11/1/14 would be 60 days) Confirmed by phone on 10-27-2014

10-31-2014: Interview scheduled

11-25-2014: Medical

12-01-2014: Interview

12-19-2014: Visa Received

12-29-2014: POE in Atlanta, GA!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

Just got off with NVC and my AOS was scanned on July 23! So excited to get to start one set of "30 business day" waits! Of course my DS-261 has not been scanned/entered ;(

Hey, congrats!

I'm still in the begging of the process at NVC (I'll call later to see if they have my case already), but my plan is to have everything done and do just like you, sent the packages ASAP!!!

Good luck with your process! :)

12/05/2013 Got married

CR1 Visa process
12/26/2013 NOA1 date
07/07/2014 NOA2 date (7 loooong months).
07/10/2014 left USCIS
07/22 arrived at NVC
07/31 Case# assigned
08/01 AOS Bill invoiced and DS 261
08/02 AOS bill paid and DS 261 completed
08/05 AOS bill shows PAID in the ceac website
08/13 AOS package sent
08/18 AOS package delivered (USPS website track number)
09/11 IV Bill invoiced
09/12 IV bill shows PAID
09/12 DS 260 completed
09/12 IV package sent
09/18 IV package received (rep. told this date but the 60 days waiting letter says 09/16).
10/17 - AOS checklist. Tax transcripst 2013 missing (husband thought W2s were enough)
10/21 - Checklist scanned
12/12 - Case Complete!!!!!!!!!!! thank God!
01/06/2015 - Medicals
01/12/2015 - Interview date ((It was Feb 27th but due to a cancellation they rescheduled to Jan 21!!!!!) - VISA APPROVED!!! Interview review on my timeline. :)
01/15/2015 - Visa in hand
01/22/2015 - POE (Los Angeles)!!!!!!!!

I-751 Removal of Conditions

11/03/2016 - Package sent

11/09/2016 - Check deposited and NOA 1 received

11/04/2016 - NOA 1 Date
12/08/2016 - Biometric Appt.

"God is always with us"

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Canada
Timeline

FOr me now to even come here I feel so bad becz It is been since so long in NVC and can't wait anymore.I got checklist now again have to wait that is too much to wait 30 business days for one document (checklist) to revie......

If it makes you feel better, your timeline is not that bad. :star:

Your NOA1 is 12 days after mine, and you're still ahead of me at the NVC stage even though you've received a checklist. :yes:

I haven't delayed anything or haven't received a checklist, but my timeline is not as fast as yours. :bonk:

You got your IV fee invoice really fast! Do you have a lawyer? :huh2:

Naturalization

N-400 Sent: Aug 22, 2017

NOA: Aug 24, 2017

Biometrics: Sept 22, 2017

Interview: Oct 22, 2018 (Approved)

Oath Ceremony: Oct 23, 2018

 

Removing Conditions

I-751 Sent: Aug 22, 2016

NOA1: Aug 25, 2016

Biometrics: Oct 12, 2016

Interview: Oct 22, 2018 (Approved)

 

I-130 Application

NOA1: Oct 4, 2013

NOA2: Apr 11, 2014

NVC Received: Apr 30

Case Number: May 23

DS-261 / AOS Fee: June 5

AOS Package (Scan): June 16

IV Fee: July 18

IV Package (Scan): July 25

DS-260 Form: July 25

AOS Package (Accepted): July 29

Case Complete: Sept 16

Medical Exam: Oct 16

Interview: Nov 10

Visa Received: Nov 19

POE: Nov 20, 2014

 

Link to comment
Share on other sites

Filed: Other Country: India
Timeline

If it makes you feel better, your timeline is not that bad. :star:

Your NOA1 is 12 days after mine, and you're still ahead of me at the NVC stage even though you've received a checklist. :yes:

I haven't delayed anything or haven't received a checklist, but my timeline is not as fast as yours. :bonk:

You got your IV fee invoice really fast! Do you have a lawyer? :huh2:

Yes,I do have a lawyer that's why I paid both fees together..

NOA 1

Oct 15,2013 - Applied case

Oct 16 ,2013 - Received NOA 1 number

March 7 , 2014 - Transfer To TSC

April 3, 2014 - Approved NOA 1

April 7 ,2014- Shipped to NVC :dancing:

NOA 2

April 16,2014 - NVC received the case. :dancing:

May 15,2014-NVC number and INN . :dance::dance:

May 20,2014 - In process AOS and IV fees.

May21,2014- Status paid for AOS :thumbs:

May 22,2014 - Status paid for IV :thumbs:

May 27,2014 - Completed DS260 form

May 29,2014 - AOS and IV packet sent

May 30,2014- AOS and IV packet delivered thru Fedex.

June 3,2014- Received both packages (Scanned into the system)

July 11.2014- Reviewed both packages.

July 11,2014 - IV package accepted and AOS checklist

July 11,2014 - AOS checklist received (Scanned into system)

July 18,2014-AOS 2nd checklist received (Scanned into system)

Aug 4,2014 -Case completed(By phone).. :dance: :energy:

Aug 8,2014- Got an official email for CC.

Aug 15,2014 - Interview sedule

Sep 16,2014 - Interview date. :no::rolleyes::dance::dance::energy::whistle::whistle::jest::jest::jest::jest:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Chile
Timeline

Hey, congrats!

I'm still in the begging of the process at NVC (I'll call later to see if they have my case already), but my plan is to have everything done and do just like you, sent the packages ASAP!!!

Good luck with your process! :)

Same to you!!!

USCIS

12-09-2013: NOA1

05-29-2014: NOA2- I-130 Approved!!!

NVC

06-04-2014: I-130 shipped from TSC to NVC

06-13-2014: Arrived at NVC

07-01-2014: Case # and IIN assigned

07-17-2014: D-261 submitted

07-18-2014: AOS fee invoiced

07-18-2014: AOS fee paid

07-18-2014: AOS package sent (call me crazy!!!)

07-21-2014: AOS package arrived to NVC (confirmed by FedEx)

07-22-2014: AOS bill showed "Paid"

07-22-2014: AOS package scanned by NVC (originally told July 23rd, but the 60 day letter said July 22nd, confirmed by NVC)

09-02-2014: DS-261 reviewed/accepted (notified by calling NVC on 09-05-2014)

09-08-2014: IV fee invoiced/paid

08-28-2014: IV package sent

08-29-2014: IV package arrived at NVC

09-02-2014: IV package scanned by NVC

09-15-2014: AOS package reviewed/accepted

09-19-2014: DS-260 completed

10-25-2014: Case Complete! (11/1/14 would be 60 days) Confirmed by phone on 10-27-2014

10-31-2014: Interview scheduled

11-25-2014: Medical

12-01-2014: Interview

12-19-2014: Visa Received

12-29-2014: POE in Atlanta, GA!!!

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Canada
Timeline

Yes,I do have a lawyer that's why I paid both fees together..

Good for you! I wish I had a lawyer. I got screwed and it cost me 40 days waiting for the IV fee invoice because I was too cheap to hire a lawyer. :wacko: It was my second time getting screwed. :dead: I got screwed for the first time when I got transferred to NSC. :bonk:

I'm just curious. You got a checklist on the AOS package. You probably mentioned this on here before, but what was the reason for the checklist again? :huh2:

Naturalization

N-400 Sent: Aug 22, 2017

NOA: Aug 24, 2017

Biometrics: Sept 22, 2017

Interview: Oct 22, 2018 (Approved)

Oath Ceremony: Oct 23, 2018

 

Removing Conditions

I-751 Sent: Aug 22, 2016

NOA1: Aug 25, 2016

Biometrics: Oct 12, 2016

Interview: Oct 22, 2018 (Approved)

 

I-130 Application

NOA1: Oct 4, 2013

NOA2: Apr 11, 2014

NVC Received: Apr 30

Case Number: May 23

DS-261 / AOS Fee: June 5

AOS Package (Scan): June 16

IV Fee: July 18

IV Package (Scan): July 25

DS-260 Form: July 25

AOS Package (Accepted): July 29

Case Complete: Sept 16

Medical Exam: Oct 16

Interview: Nov 10

Visa Received: Nov 19

POE: Nov 20, 2014

 

Link to comment
Share on other sites

Just got off the phone with NVC. I had to redial about 100 times to get through but the hold time was "short" at about 22 minutes.

They scanned my AOS checklist response on 07/22, "only" 2 business days after receiving it.

30 business days from 07/22 is 09/03... :clock:

I'm the USC petitioner. My wife is British (now a USC!!!), generally awesome, and amazingly patient.

CR-1

 

USCIS:

09/09/2013 PD
09/10/2013 NOA1
02/25/2014 TRANSFER NSC
03/25/2014 NOA2
03/28/2014 NVC SHIPPED

NVC:
04/11/2014 NVC RECEIVED
05/09/2014 NVC CASE # ASSIGNED
05/15/2014 AOS/IV FEES INVOICED
05/16/2014 AOS/IV FEES PAID
05/19/2014 AOS/IV FEES CLEARED BANK ACCOUNT
05/20/2014 AOS/IV FEES SHOWING PAID
05/22/2014 DS-260 SUBMITTED
05/23/2014 AOS/IV SHIPPED
05/29/2014 AOS/IV DELIVERED
06/03/2014 AOS/IV SCANNED
07/10/2014 IV ACCEPTED
07/15/2014 AOS CHECKLIST
07/16/2014 AOS CHECKLIST SHIPPED
07/18/2014 AOS CHECKLIST DELIVERED
07/22/2014 AOS CHECKLIST SCANNED

09/11/2014 CASE COMPLETE
10/03/2014 INTERVIEW SCHEDULED (11/21/2014)
10/07/2014 INTERVIEW LETTER RECEIVED

10/15/2014 CEAC: IN TRANSIT
 
EMBASSY:
10/08/2014 MEDICAL
10/17/2014 CEAC: READY
10/17/2014 REQUEST INTERVIEW RESCHEDULE WITH EMBASSY
10/23/2014 CEAC: READY STATUS DATE UPDATED
10/25/2014 INTERVIEW RESCHEDULED (10/31/2014)
10/31/2014 INTERVIEW: APPROVED!
10/31/2014 CEAC: ADMINISTRATIVE PROCESSING
10/31/2014 CEAC: ISSUED
11/03/2014 COURIER EMAIL
11/04/2014 VISA IN HAND
 
POE:
11/04/2014 ELIS: IMMIGRATION FEE PAID
11/27/2014 POE: JFK
12/03/2014 ELIS: RECEIVED
12/12/2014 ELIS: OPTIMIZED
12/12/2014 IOE: ACCEPTED
12/15/2014 IOE: PRODUCING
12/16/2014 APPLY FOR SSN CARD
12/18/2014 ELIS: CLOSED
12/18/2014 IOE: MAILED
12/19/2014 IOE: DELIVERED
12/22/2014 RECEIVED SSN CARD
ROC
Spoiler
08/29/2016 90 DAY WINDOW OPENS
09/14/2016 I-751 PACKET MAILED TO VSC
09/15/2016 I-751 PACKET RECEIVED
09/16/2016 NOA DATE
09/20/2016 CHECK CASHED
09/22/2016 NOA RECEIVED
10/01/2016 BIOMETRICS NOTICE DATE
10/07/2016 BIOMETRICS NOTICE RECEIVED
10/17/2016 BIOMETRICS
08/15/2017 APPROVAL NOTICE DATE
08/19/2017 APPROVAL NOTICE RECEIVED
08/21/2017 CARD BEING PRODUCED
08/24/2017 CARD MAILED
08/26/2017 CARD ARRIVED

N-400

Spoiler
03/27/2018 FILED ONLINE
03/27/2018 PAYMENT POSTED
03/27/2018 NOA
03/31/2018 BIOMETRICS SCHEDULED
04/17/2018 BIOMETRICS
02/22/2019 INTERVIEW SCHEDULED
04/04/2019 INTERVIEW: APPROVED!
04/25/2019 OATH

 

Link to comment
Share on other sites

Can some one please answer me. my i130 was approved on 22july . i just wonder how would i know if my case is been shifted to nvc? becaz till now i did not get any email .how long it takes to shift the case to nvc? i know abt case number which takes 1 month.but im confused abt shifting of my case to nvc :unsure:

Citizenship Timeline:

 

Service Center : Online  |  CIS Office : Philadelphia  |  Date Filed : 2018-08-23  |  NOA Date : 2018-08-24  |  Bio. Appt. : 2018-09-20  |  Interview Date : 4th April  (scheduled on 25th feb) |  RFE: 25th April. Approved : MAY 15/ In line for Oath 17th MaY |  Oath Ceremony :30th MaY

 

USCIS

13-12-2013 - Sent i-130 received

17-12-2013 - NOA1 hard copy

06-06-2014-I-130 RFE

13-06-2014 - RFE hard copy

25-06-2014 - RFE sent

01-07-2014 - RFE response review email received

22-07-2014 - NOA2 (approved in 221 days)

30-07-2014=i-130 Sent to NVC

NVC

12-08-2014 - NVC received the case

22-08-2014 - NVC case number assigned

23-08-2014 - I-864(AOS) Bill Generated

25-08-2014 - DS-261 completed online

25-08-2014 -AOS Bill paid ($ 88)

26-08-2014--AOS bill appeared as PAID

29-08-2014 - Sent I-864(AOS) Package (via USPS Certified Mail)

02-09-2014 - AOS Package Received and scanned at NVC

26-09-2014 --IV bill invoiced and paid

02-10-2014 --Iv package sent via usps

06-10-2014 --Iv package Received and scanned at nvc

08-10-2014--DS-260 completed online

14-11-2014--- checklist (AOS)

17-11-2014---- checklist sent via USPS

19-11-2014 checklist received at nvc

12-02-2015--- checklist (IV-police certificate)

17-02-2015 checklist received at nvc

11-03-2015 Case Complete

25-03-2015 - Interview scheduled

Consulate
16-04-2015 - Medical
19-05-2015 - Interview (approved) but put me on AP for no reason.

20-09-2015-Visa Issued at CEAC website
21-09-2015 - Visa in hand
01-10-2015 - POE

11-01-2016- Received 10 years green card

Link to comment
Share on other sites

Can some one please answer me. my i130 was approved on 22july . i just wonder how would i know if my case is been shifted to nvc? becaz till now i did not get any email .how long it takes to shift the case to nvc? i know abt case number which takes 1 month.but im confused abt shifting of my case to nvc :unsure:

Hello and welcome to the NVC phase of the process.

You should read the first post of this thread and the wiki linked from it. It's full of useful information that will help answer most of your questions!

I'm the USC petitioner. My wife is British (now a USC!!!), generally awesome, and amazingly patient.

CR-1

 

USCIS:

09/09/2013 PD
09/10/2013 NOA1
02/25/2014 TRANSFER NSC
03/25/2014 NOA2
03/28/2014 NVC SHIPPED

NVC:
04/11/2014 NVC RECEIVED
05/09/2014 NVC CASE # ASSIGNED
05/15/2014 AOS/IV FEES INVOICED
05/16/2014 AOS/IV FEES PAID
05/19/2014 AOS/IV FEES CLEARED BANK ACCOUNT
05/20/2014 AOS/IV FEES SHOWING PAID
05/22/2014 DS-260 SUBMITTED
05/23/2014 AOS/IV SHIPPED
05/29/2014 AOS/IV DELIVERED
06/03/2014 AOS/IV SCANNED
07/10/2014 IV ACCEPTED
07/15/2014 AOS CHECKLIST
07/16/2014 AOS CHECKLIST SHIPPED
07/18/2014 AOS CHECKLIST DELIVERED
07/22/2014 AOS CHECKLIST SCANNED

09/11/2014 CASE COMPLETE
10/03/2014 INTERVIEW SCHEDULED (11/21/2014)
10/07/2014 INTERVIEW LETTER RECEIVED

10/15/2014 CEAC: IN TRANSIT
 
EMBASSY:
10/08/2014 MEDICAL
10/17/2014 CEAC: READY
10/17/2014 REQUEST INTERVIEW RESCHEDULE WITH EMBASSY
10/23/2014 CEAC: READY STATUS DATE UPDATED
10/25/2014 INTERVIEW RESCHEDULED (10/31/2014)
10/31/2014 INTERVIEW: APPROVED!
10/31/2014 CEAC: ADMINISTRATIVE PROCESSING
10/31/2014 CEAC: ISSUED
11/03/2014 COURIER EMAIL
11/04/2014 VISA IN HAND
 
POE:
11/04/2014 ELIS: IMMIGRATION FEE PAID
11/27/2014 POE: JFK
12/03/2014 ELIS: RECEIVED
12/12/2014 ELIS: OPTIMIZED
12/12/2014 IOE: ACCEPTED
12/15/2014 IOE: PRODUCING
12/16/2014 APPLY FOR SSN CARD
12/18/2014 ELIS: CLOSED
12/18/2014 IOE: MAILED
12/19/2014 IOE: DELIVERED
12/22/2014 RECEIVED SSN CARD
ROC
Spoiler
08/29/2016 90 DAY WINDOW OPENS
09/14/2016 I-751 PACKET MAILED TO VSC
09/15/2016 I-751 PACKET RECEIVED
09/16/2016 NOA DATE
09/20/2016 CHECK CASHED
09/22/2016 NOA RECEIVED
10/01/2016 BIOMETRICS NOTICE DATE
10/07/2016 BIOMETRICS NOTICE RECEIVED
10/17/2016 BIOMETRICS
08/15/2017 APPROVAL NOTICE DATE
08/19/2017 APPROVAL NOTICE RECEIVED
08/21/2017 CARD BEING PRODUCED
08/24/2017 CARD MAILED
08/26/2017 CARD ARRIVED

N-400

Spoiler
03/27/2018 FILED ONLINE
03/27/2018 PAYMENT POSTED
03/27/2018 NOA
03/31/2018 BIOMETRICS SCHEDULED
04/17/2018 BIOMETRICS
02/22/2019 INTERVIEW SCHEDULED
04/04/2019 INTERVIEW: APPROVED!
04/25/2019 OATH

 

Link to comment
Share on other sites

Hello and welcome to the NVC phase of the process.

You should read the first post of this thread and the wiki linked from it. It's full of useful information that will help answer most of your questions!

i already read that page. it was really very useful . but i did not find the answer of my confusion

Citizenship Timeline:

 

Service Center : Online  |  CIS Office : Philadelphia  |  Date Filed : 2018-08-23  |  NOA Date : 2018-08-24  |  Bio. Appt. : 2018-09-20  |  Interview Date : 4th April  (scheduled on 25th feb) |  RFE: 25th April. Approved : MAY 15/ In line for Oath 17th MaY |  Oath Ceremony :30th MaY

 

USCIS

13-12-2013 - Sent i-130 received

17-12-2013 - NOA1 hard copy

06-06-2014-I-130 RFE

13-06-2014 - RFE hard copy

25-06-2014 - RFE sent

01-07-2014 - RFE response review email received

22-07-2014 - NOA2 (approved in 221 days)

30-07-2014=i-130 Sent to NVC

NVC

12-08-2014 - NVC received the case

22-08-2014 - NVC case number assigned

23-08-2014 - I-864(AOS) Bill Generated

25-08-2014 - DS-261 completed online

25-08-2014 -AOS Bill paid ($ 88)

26-08-2014--AOS bill appeared as PAID

29-08-2014 - Sent I-864(AOS) Package (via USPS Certified Mail)

02-09-2014 - AOS Package Received and scanned at NVC

26-09-2014 --IV bill invoiced and paid

02-10-2014 --Iv package sent via usps

06-10-2014 --Iv package Received and scanned at nvc

08-10-2014--DS-260 completed online

14-11-2014--- checklist (AOS)

17-11-2014---- checklist sent via USPS

19-11-2014 checklist received at nvc

12-02-2015--- checklist (IV-police certificate)

17-02-2015 checklist received at nvc

11-03-2015 Case Complete

25-03-2015 - Interview scheduled

Consulate
16-04-2015 - Medical
19-05-2015 - Interview (approved) but put me on AP for no reason.

20-09-2015-Visa Issued at CEAC website
21-09-2015 - Visa in hand
01-10-2015 - POE

11-01-2016- Received 10 years green card

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...