Filed: IR-5 Country: Canada
Timeline

Did they request you to send it electronically??? or did you just send it like that?

Our case is being processed electronically. Lisa and Octavio wanted to see my wife's email of April 30th as NVC database was missing these emails and had asked to forward them. They confirmed receipt to her while she was still on phone with them but could not help as the original email was missising. She was asked to resubmit I-864 to NVCElectronic which she did.

My wife called ( 5 minutes ago) NVC to find if her first email in their system of a June 11th has been reviewed. Mia from NVC told her that it has not been reviewed as of now. It is 30 business days for this document for review but I guess they are taking more than 30 business days to review. Mia told that NVC is working overtime and the documents are being reviewed till 8 PM on working days and also on Saturdays.

NOA1 29th July 2013

NOA2 29th Jan 2014

Recd by NVC 17th March 2014

NVC Received : 2014-03-17

Received I-864 2014-03-19

Pay I-864 Bill 2014-03-19

Receive I-864 Package : 2014-03-25

Completed I-864 : 2014-03-28

Receive IV Bill : 2014-03-27

Pay IV Bill : 2014-03-27

Emailed IV docs: April 03 2014

Resent AOS and IV: 11 April 2014

Check list AOS: 2014 -04 - 30

Response Checklist: 2014.04-30

Case Complete for one application: June 04, 2014

Checklist for 2nd applicant: June 04, 2014 - NVC lost the email sent on April 30th. After 3 supervisors conversation asked to resend the same email sent earlier.

Checklist response sent: June 10, 2014

Checklist response received at NVC: June 11, 2014

Case complete for 2nd applicant:July 31, 2014

Interview scheduled on: August 15, 2014

Medical: August 29, 2014

Interview date: September 17, 2014

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I just called and spoke with Don at NVC.. i got a case complete as of yesterday. I CAN'T BELIEVE IT. I told him to reconfirm that i had a case complete!

The NVC Site doesnt show n/a for AOS yet.

just in time for a sept interview :) grats

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

just in time for a sept interview :) grats

Thanks! seems like they are reviewing all packages once they get to the first scanned date. I had two packages waiting, June 11th and June 20th. They probably reviewed both when they got to June 11th document.

07-09-13 - Application received at Chicago Lockbox NOA1

01-03-14 - Transfer notice to Nebraska

01-06-14 - Application received at Nebraska

03-13-14 - NOA2 notification

03-25-14 - NVC received case

04-24-14 - Case number and IIN received over the phone

05-02-14 - Paid AOS Fees

05-06-14 - Sent AOS package

05-07-14 - AOS Fees showed up as paid

05-08-14 - AOS package received at NVC (Scanned on may 8th)

05-08-14 - IV Bill showed up and paid

05-12-14 - Sent IV package overnight

05-13-14 - IV package received at NVC (Scanned on may 15th)

06-05-14 - AOS Checklist for not having N/A written for "Place of Residence" (checklist info received over the phone).

06-09-14 - AOS Checklist - I864EZ delivered today.

06-11-14 - I864EZ got scanned today.

06-13-14 - Sent original marriage and birth certificate out to NVC. (Received at NVC 06-16-14)

06-16-14 - received fake checklist asking for 864ez and marriage certificate

06-20-14 - Marriage and Birth certificate scanned

07-23-14 - Case complete (Talked to Don at NVC on 7/24) -- Received CC email 7/30

08-01-14 - Interview date assigned (Sept 9th)

08-05-14 - Received Interview Letter via email

09-10-14 - Visa Approved

09-11-14 - Paid the extortion fees

Link to comment
Share on other sites

Filed: Country: Mexico
Timeline

I just called and spoke with Don at NVC.. i got a case complete as of yesterday. I CAN'T BELIEVE IT. I told him to reconfirm that i had a case complete!

The NVC Site doesnt show n/a for AOS yet.

Congratulations!!

USCIS

9/23/2013: Sent I-130 petition to Chicago Lockbox through UPS
9/25/2013: I-130 delivered by UPS (Priority Date)

9/26/2013: NOA1

3/04/2014: Transferred to NSC

4/17/2014: NOA2

4/23/2014: Case shipped to NVC

NVC

5/05/2014: Case arrived at NVC

5/29/2014: Case number and IIN received

6/06/2014: DS-261 available and completed

6/09/2014: AOS fee invoiced and paid

6/10/2014: AOS fee shows as "paid"

6/16/2014: Date NVC is going by for DS-261 because I "re-opened" it

6/24/2014: AOS package sent

7/02/2014: AOS package scanned in

8/14/2014: AOS package approved (false checklist email for DS-261)
8/19/2014: DS-261 accepted

8/21/2014: IV fee invoiced and paid

8/22/2014: DS-260 available

8/25/2014: DS-260 submitted

8/25/2014: IV package sent

8/28/2014: IV package scanned

10/23/2014: CASE COMPLETE

CONSULATE
11/03/2014: Interview scheduled

12/01/2014: Medical and biometrics appointments

12/02/2014: Interview
12/02/2014: APPROVED!!!

I-751

11/21/2016: I-751 package sent to CSC

11/28/2016: NOA I-797

12/02/2016: Biometrics appointment issued

12/22/2016: Biometrics appointment

Link to comment
Share on other sites

Filed: IR-5 Country: Canada
Timeline

Thanks! seems like they are reviewing all packages once they get to the first scanned date. I had two packages waiting, June 11th and June 20th. They probably reviewed both when they got to June 11th document.

Congratulations and it is a good news that are reviewing all scanned messages. This seems to be an improvement in their reviewing process.

NOA1 29th July 2013

NOA2 29th Jan 2014

Recd by NVC 17th March 2014

NVC Received : 2014-03-17

Received I-864 2014-03-19

Pay I-864 Bill 2014-03-19

Receive I-864 Package : 2014-03-25

Completed I-864 : 2014-03-28

Receive IV Bill : 2014-03-27

Pay IV Bill : 2014-03-27

Emailed IV docs: April 03 2014

Resent AOS and IV: 11 April 2014

Check list AOS: 2014 -04 - 30

Response Checklist: 2014.04-30

Case Complete for one application: June 04, 2014

Checklist for 2nd applicant: June 04, 2014 - NVC lost the email sent on April 30th. After 3 supervisors conversation asked to resend the same email sent earlier.

Checklist response sent: June 10, 2014

Checklist response received at NVC: June 11, 2014

Case complete for 2nd applicant:July 31, 2014

Interview scheduled on: August 15, 2014

Medical: August 29, 2014

Interview date: September 17, 2014

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

I just called and spoke with Don at NVC.. i got a case complete as of yesterday. I CAN'T BELIEVE IT. I told him to reconfirm that i had a case complete!

The NVC Site doesnt show n/a for AOS yet.

Wow u did snail mail and they were reviewed at the same time! That's an improvement!! Maybe Nvc is getting back to it's old timelines!! Hopefully!

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Link to comment
Share on other sites

Filed: Timeline

Hi Everyone,

Just got off the phone with Paige at NVC.

Case number assigned july 10th and I called on July 11th to get this info and gave our emails. I thought the 30 days started from case number assigned to receive the email with the next steps? Am I wrong here? We still have not been able to fill out DS-261 or AOS fee

She told me that as of today my case has been "inputed to process info" and that I can expect the email any time in the next 20 days from Today!!! Is this what others experienced or is this a sign of their backlog and delays to come?

I also asked about the computer crash issue and she said eveything is fine and the systems are running fine. She acted as tho she didnt know about the computer crash.

Thanks all! Im still reading the posts from today, there was a lot of chatter :dancing:

Service Center : California Service Center

Consulate : Chile

Marriage: 2014-03-07 Together for 4.5 years

I-130 NOA1 : 2014-06-02

I-130 Approved : 2014-06-16, 14 days from NOA1

NVC Received : 2014-06-25

Case Number Assigned: 2014-07-10

DS-261 / AOS Bill : 2014-07-25

Submit DS-261: 2014-07-26

Pay AOS Bill : 2014-07-29

NVC scanned AOS :2014-08-06

NVC scanned IV: 2014-08-20 Sent before paying IV Bill

DS-260/IV Bill: ??

Link to comment
Share on other sites

They're called votes (and are liked to one's reputation that you can view on your profile), and people don't use them as they should (or what I think they should be used for anyways). It's not like a Facebook like where you like someone's status. It's more of a "hey, this person gave good advice" sort of deal. But whatever :P

:wow: I always wondered what that "vote this post up" was for. Ha ha. I never clicked on it because I didn't know what it did. :rofl::rofl: Now I am going to totally abuse it!

USCIS
18 June 2013 - Sent I-130
21 June 2013 - NOA1

18 Dec 2013 - Transferred to Nebraska

6 March 2014 - I-130 Approval/NOA2

NVC
18 March 2014 - Case received

28 April 2014 - DS -261 Available and complete

28 April 2014 - AOS Bill invoiced and paid

1 May 2014 - IV Bill invoiced and paid

2 May 2014 - AOS Package sent

6 May 2014 - DS-260 Completed online

9 May 2014 - AOS Package scanned at NVC

15 May 2014 - IV Package sent

22 May 2014 - IV Package scanned at NVC

6 June 2014 - Received AOS checklist

10 June 2014 - Posted AOS checklist response

20 June 2014 - AOS checklist scanned at NVC

24 June 2014 - False checklist for AOS checklist received (IV package approved)

26 August 2014 - Case complete via supervisor review over the phone, AOS fee changed to "N/A" on CEAC website

10 September 2014 - Interview scheduled

12 September 2014 - Paperwork "In Transit" on CEAC website

Embassy
15 September 2014 - Medical

15 September 2014 - Paperwork arrived at embassy (according to DHL tracking)

19 September 2014 - Paperwork "Ready" on CEAC website
7 October 2014 - Interview - VISA APPROVED!!!

9 October 2014 - Visa in hand
22 January 2015 - POE LAX

Link to comment
Share on other sites

Someone had an interview in Pakistan yesterday. They were approved, but the member mentioned the Consukate officer kept commenting on how slow their computer system was going.

A member in Taiwan was told yesterday that the system was down and while approved, there was nothing they could do on their end to issue the visa at this time as a result. A member in Australia reported no issue from their interview yesterday (they were approved).

Oh wow! You mean we might get throught this whole process and then they can't even print the darn visa? I imagine the consulate will start saying "What 30 business days to get your passport returned with a visa". For goodness sake!

Edited by Amanda4964

USCIS
18 June 2013 - Sent I-130
21 June 2013 - NOA1

18 Dec 2013 - Transferred to Nebraska

6 March 2014 - I-130 Approval/NOA2

NVC
18 March 2014 - Case received

28 April 2014 - DS -261 Available and complete

28 April 2014 - AOS Bill invoiced and paid

1 May 2014 - IV Bill invoiced and paid

2 May 2014 - AOS Package sent

6 May 2014 - DS-260 Completed online

9 May 2014 - AOS Package scanned at NVC

15 May 2014 - IV Package sent

22 May 2014 - IV Package scanned at NVC

6 June 2014 - Received AOS checklist

10 June 2014 - Posted AOS checklist response

20 June 2014 - AOS checklist scanned at NVC

24 June 2014 - False checklist for AOS checklist received (IV package approved)

26 August 2014 - Case complete via supervisor review over the phone, AOS fee changed to "N/A" on CEAC website

10 September 2014 - Interview scheduled

12 September 2014 - Paperwork "In Transit" on CEAC website

Embassy
15 September 2014 - Medical

15 September 2014 - Paperwork arrived at embassy (according to DHL tracking)

19 September 2014 - Paperwork "Ready" on CEAC website
7 October 2014 - Interview - VISA APPROVED!!!

9 October 2014 - Visa in hand
22 January 2015 - POE LAX

Link to comment
Share on other sites

Filed: Lift. Cond. (pnd) Country: India
Timeline

I just called and spoke with Don at NVC.. i got a case complete as of yesterday. I CAN'T BELIEVE IT. I told him to reconfirm that i had a case complete!

The NVC Site doesnt show n/a for AOS yet.

Congrats bro.. so happy for you!

05-18 Got Married in Mumbai, India



07-11 Mailed i-130 petition


07-17 Received Form I-797C. MSC#


01-03 Case transferred to NSC


03-11 I-130 approved



Total time in USCIS: 8.0 months



03-17 Case recieved at NVC


04-24 Filled out DS 261


05-11 Mailed AOS package


05-17 Mailed IV package


05-19 AOS "scanned" date


05-23 IV package "scanned" date


06-18 Received checklist on AOS


06-19 Mailed checklist response


06-25 IV docs accepted. False checklist on AOS


06-26 new AOS scan date.



"30 business days" will be up on August 7



Approximate time spent at NVC: 5.5 months

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Scotland
Timeline

Hi Everyone,

Just got off the phone with Paige at NVC.

Case number assigned july 10th and I called on July 11th to get this info and gave our emails. I thought the 30 days started from case number assigned to receive the email with the next steps? Am I wrong here? We still have not been able to fill out DS-261 or AOS fee

She told me that as of today my case has been "inputed to process info" and that I can expect the email any time in the next 20 days from Today!!! Is this what others experienced or is this a sign of their backlog and delays to come?

I also asked about the computer crash issue and she said eveything is fine and the systems are running fine. She acted as tho she didnt know about the computer crash.

Thanks all! Im still reading the posts from today, there was a lot of chatter :dancing:

Our case number was assigned July 3rd and we were in the same pattern until sometime last week. You can still count from the day the case number was assigned. Our emails came on the 21st, the DS-261 had become available on the 20th and the AOS fee became payable this morning.

I am the USC Petitioner. My wonderful wife Laura is from Scotland.

10.27.2013 ~ Married

01.23.2014 ~ I-130 sent

01.29.2014 ~ NOA1

06.02.2014 ~ APPROVED!!! NOA2

06.05.2014 ~ Shipped to NVC

06.13.2014 ~ Case received by NVC

07.03.2014 ~ Case number assigned by NVC

07.21.2014 ~ Submitted DS-261

07.24.2014 ~ AoS Invoice available, paid

07.25.2014 ~ AoS Invoice shows paid

07.30.2014 ~ AoS package mailed USPS Priority

07.31.2014 ~ Checked CEAC website 47 times

08.01.2014 ~ USPS tracking shows AoS delivered

09.17.2014 ~ IV invoice available

Link to comment
Share on other sites

CASE COMPLETE!

:goofy:

Congratulations!!! :dancing::dancing::dancing:

Yayyyu case completeeeee!!!! As of today july 24th 2014!!!! Last scanned date 06/13

WooHoo!!!! I hope mine comes next week!!! :dancing::dancing::dancing:

Received Green Card Today......I will post the back of the card tomorrow....

so many amazing security features it takes a while to edit all the personal data.

My thoughts and prayers are with all the VJ family.

Keep fighting the good fight.

Be strong for your spouse.

Remind them often of the beautiful times you have shared

and the ones that are yet to come.

Your bonds of love are being strengthened during this difficult time

in ways you don't even realize.

Keep your eyes on the prize and build each other up.

photogreen1.jpg

That is a beautiful, beautiful thing. Wonderful, congratulations!!!

First, congrats!!!!

Second, did you pay the $165 Immigrant Extortion Fee before POE or after?

:rofl::rofl: :rofl: :rofl: EXTORTION fee :rofl::rofl::rofl::rofl::rofl:

I just called and spoke with Don at NVC.. i got a case complete as of yesterday. I CAN'T BELIEVE IT. I told him to reconfirm that i had a case complete!

The NVC Site doesnt show n/a for AOS yet.

WOW!!! That is awesome!! It is encouraging to see my "checklist buddies" getting CCs. :dancing::dancing: :joy:

USCIS
18 June 2013 - Sent I-130
21 June 2013 - NOA1

18 Dec 2013 - Transferred to Nebraska

6 March 2014 - I-130 Approval/NOA2

NVC
18 March 2014 - Case received

28 April 2014 - DS -261 Available and complete

28 April 2014 - AOS Bill invoiced and paid

1 May 2014 - IV Bill invoiced and paid

2 May 2014 - AOS Package sent

6 May 2014 - DS-260 Completed online

9 May 2014 - AOS Package scanned at NVC

15 May 2014 - IV Package sent

22 May 2014 - IV Package scanned at NVC

6 June 2014 - Received AOS checklist

10 June 2014 - Posted AOS checklist response

20 June 2014 - AOS checklist scanned at NVC

24 June 2014 - False checklist for AOS checklist received (IV package approved)

26 August 2014 - Case complete via supervisor review over the phone, AOS fee changed to "N/A" on CEAC website

10 September 2014 - Interview scheduled

12 September 2014 - Paperwork "In Transit" on CEAC website

Embassy
15 September 2014 - Medical

15 September 2014 - Paperwork arrived at embassy (according to DHL tracking)

19 September 2014 - Paperwork "Ready" on CEAC website
7 October 2014 - Interview - VISA APPROVED!!!

9 October 2014 - Visa in hand
22 January 2015 - POE LAX

Link to comment
Share on other sites

Hello i wanna discuss about something. Do you think we'll get checklisted if I only submitted 1 letter of employment and pay stubs from my first job only? I got my second job but I am new and just started this month so I can't get yet. Do you think it's necessary to send it if ever i can get my letter of employment from my other job because Im planning to send it with the cover letter. Im bothered because I dont want to get a checklist because of this. Do you think it's possible to send it before they'll scan our case so it's there and no need for them to issue us a checklist? Or maybe can we just call to nvc and fax to them a letter of explanation including a copy of my first pay stub. Because i've read not to send additional documents if NVC didn't ask for it because it will just complicate the case. Your answers will be a major relief to me and my wife. Thank you!

NVC

06/20/2014 - case received

07/03/2014 - case number and IIN assigned

07/18/2014 - DS-261 Completed

07/19/2014 - AOS fee invoiced and paid

07/24/2014 - AOS Packet Scanned in

08/22/2014 - IV fee invoiced and paid

08/25/2014 - DS-260 Completed

08/27/2014 - IV Packet Scanned in

10/24/2014 - CASE COMPLETE‼️?

11/06/2014 - Medical - DONE❗️

12/01/2014 - Interview @ 6:15am - APPROVED and VISA ISSUED❗️❗️❗️❗️

12/03/2014 - passport ready for pick up

12/08/2014 - Passport with VISA in hand?

12/20/2014 - POE

Link to comment
Share on other sites

Hello i wanna discuss about something. Do you think we'll get checklisted if I only submitted 1 letter of employment and pay stubs from my first job only? I got my second job but I am new and just started this month so I can't get yet. Do you think it's necessary to send it if ever i can get my letter of employment from my other job because Im planning to send it with the cover letter. Im bothered because I dont want to get a checklist because of this. Do you think it's possible to send it before they'll scan our case so it's there and no need for them to issue us a checklist? Or maybe can we just call to nvc and fax to them a letter of explanation including a copy of my first pay stub. Because i've read not to send additional documents if NVC didn't ask for it because it will just complicate the case. Your answers will be a major relief to me and my wife. Thank you!

And btw just got off the phone with NVC and she just told me that they are already reviewing our case. Advised me to just send a letter of explanation and a copy of just one pay stub for them to verify that I am working. It's just a follow up application according to her and I don't need to wait anything, just send it before they make a decision so we'll be good?

NVC

06/20/2014 - case received

07/03/2014 - case number and IIN assigned

07/18/2014 - DS-261 Completed

07/19/2014 - AOS fee invoiced and paid

07/24/2014 - AOS Packet Scanned in

08/22/2014 - IV fee invoiced and paid

08/25/2014 - DS-260 Completed

08/27/2014 - IV Packet Scanned in

10/24/2014 - CASE COMPLETE‼️?

11/06/2014 - Medical - DONE❗️

12/01/2014 - Interview @ 6:15am - APPROVED and VISA ISSUED❗️❗️❗️❗️

12/03/2014 - passport ready for pick up

12/08/2014 - Passport with VISA in hand?

12/20/2014 - POE

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...