I'm still waiting on the invoice for IV fee. Has anyone been waiting several weeks as well? Le sigh....

USCIS

03/28/2014 - I-130 mailed to Chicago Lockbox

04/07/2014 - USCIS Received I-130 form

04/08/2014 - I-130 NOA1 and transferred to California Service Center (email) (11 days)

04/17/2014 - Received NOA1 in the mail from California Service Center (hardcopy) (8 days)

04/24/2014 - I-130 Approved NOA2 (case number updated on the website 4:50pm) (17 days)

05/20/2014 - Received NOA2 in the mail from California Service Center (hardcopy) (27 days)

NVC

06/09/2014 - Case number, INN, BNN Received (21 days)

06/09/2014 - DS-261 available and completed (21 days)

06/09/2014 - AOS fee invoice and paid (21 days)

08/13/2014 - IV fee invoice and paid (65 days)

08/28/2014 - AOS Package sent to NVC

09/03/2014 - DS-260 online form completed

09/08/2014 - AOS Package delivered to NVC

09/08/2014 - AOS Package Scanned

09/10/2014 - IV Package sent to NVC

09/15/2014 - IV Package Scanned

11/17/2014 - Called NVC was told a supervisor is reviewing my case and it could take up to 42 days :(

11/19/2014 - Called NVC and was informed that expedite request was approved. Waiting for NVC to review and send paperwork to Sydney.

11/20/2014 - Website shows AOS N/A N/A which means it's possibly accepted. (Unconfirmed)

11/20/2014 - Called NVC and was informed of Case Complete!!

Medical - Scheduled for Dec 16th 2014

Interview

12/3/2014 - Email received with interview appointment for December 9th 2014

12/9/2014 - Interview went well but not approved because of birth certificate name change. Approval after fingerprint police form.

12/30/2014 - Medical and police check sent to embassy

Visa issued Jan 5th 2015 :D

5.5 months in NVC

8.5 months total

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Japan
Timeline

I'm still waiting on the invoice for IV fee. Has anyone been waiting several weeks as well? Le sigh....

Not the IV fee invoice, but I have been waiting for almost 2 weeks for the AOS fee invoice and the DS-261. It seems, as many members have mentioned, that there is a backlog at the NVC.

Edited by Skiwallker

01/21/14 ~ Sent I-130
01/26/14 ~ NOA1 (txt)
01/30/14 ~ NOA1 (letter) VSC Priority Date 01/22/14
06/25/14 ~ NOA2 (txt)

07/02/14 ~ NVC Received Case
07/16/14 ~ NVC Case Number Assigned
07/31/14 ~ DS-261 Available
07/31/14 ~ DS-261 Completed
08/02/14 ~ AOS Bill Invoiced
08/02/14 ~ AOS Bill Paid
08/04/14 ~ Sent AOS Package
08/07/14 ~ AOS Package Scanned
09/04/14 ~ DS-261 Approved

09/08/14 ~ Sent IV Package (With AOS Cover-letter)

09/10/14 ~ IV Bill Invoiced
09/10/14 ~ IV Bill Paid

09/10/14 ~ IV Package Scanned

09/11/14 ~ DS-260 Available

09/11/14 ~ DS-260 Completed

10/17/14 ~ Case Complete

01/08/15 ~ Entry into the US

10/10/16 ~ Mailed I-751 to CSC

10/31/14 ~ NOA1 (letter)

Link to comment
Share on other sites

Not the IV fee invoice, but I have been waiting for almost 2 weeks for the AOS fee invoice and the DS-261. It seems, as many members have mentioned, that there is a backlog at the NVC.

same here... I've been checking it every day but no luck.

I'm praying and hoping that this week finally i'll be able to pay for it and do the ds 261

(F) USCIS

19 February 2014 - Sent I-130

20 February 2014 - Received at Texas Service Center

24 February 2014 - NOA 1

29 May 2014 - I-130 Approval/NOA2

05 June 2014 - Case shipped to NVC

(F) NVC

01 July 2014 - Case received

14 July 2014 - Case Number, IIN, and BIN assigned

29 July 2014 - DS -261 Available and complete

02 August 2014 - AOS Bill invoiced and paid

04 August 2014 - AOS Bill "PAID" status

04 August 2014 - AOS Package sent

06 August 2014 - AOS Package scanned at NVC

02 September 2014 - Expedite Request sent

09 September 2014 - IV Package sent with AOS Cover

12 September 2014 - IV Package scanned at NVC

10 September 2014 - Expedite Request under review e-mail

11 September 2014 - IV Bill invoiced and paid

12 September 2014 - IV Bill "PAID" status

14 September 2014 - DS-260 Completed online

16 September 2014 - Expedite request approved

15.October.2014 - Case complete

XX.XX.2014 - Interview scheduled

(F) Embassy

XX.XX.2014 - Medical

XX.XX.2014 - Interview

XX.XX.2014 - Visa in hand

XX.XX.2014 - POE

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Mexico
Timeline

You can't use any kind of swear word :lol:

I knew that what I didn't know is that it is considered a swear word!!! Who knew??? Lol. ;)

First Met: June-13 - 2003

Marriage : January-26-2012

I-130 Sent : May-31-2013

I-130 NOA1 : June-05-2013

NOA 2: April-08 - 2014

Case shipped to NVC: April-16 - 2014

10 months in USCIS

NVC:

Case received: April - 28 - 2014

Case number & IIN: May - 22 - 2014

DS-261 available & completed: May - 30 - 2014

DS-261 scanned June - 03 - 2014

AOS fee paid: June - 02 - 2014

AOS fee shows as paid: June - 04 - 2014

AOS packet sent: June - 09 - 2014

AOS scanned: June - 17 - 2014

AOS APPROVED WITHOUT A CHECKLIST THANKS TO SAYLIN & HER WIKI: July - 29 - 2014

IV fee invoiced & paid: July - 29 - 2014

IV fee shows as paid: July - 30 - 2014

IV packet sent: August - 4 - 2014

DS-260 Completed: August - 6 -2014

IV packet scanned in NVC's system August - 13 - 2014

CASE COMPLETE: Oct - 09 - 2014

Interview Scheduled: Oct - 16 - 2014

Interview Date: Nov - 14 - 2014

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Mexico
Timeline

I'm still waiting on the invoice for IV fee. Has anyone been waiting several weeks as well? Le sigh....

Yes, I waited for several days to receive the IV fee which I received today around noon, buuuut still can't pay it but it was good new cuz I should be able to pay within the next few days. But as you can see in my signature it has been more than 30 bizness days since I filled out the DS-261 but hang in there some people have had better luck than me recently

First Met: June-13 - 2003

Marriage : January-26-2012

I-130 Sent : May-31-2013

I-130 NOA1 : June-05-2013

NOA 2: April-08 - 2014

Case shipped to NVC: April-16 - 2014

10 months in USCIS

NVC:

Case received: April - 28 - 2014

Case number & IIN: May - 22 - 2014

DS-261 available & completed: May - 30 - 2014

DS-261 scanned June - 03 - 2014

AOS fee paid: June - 02 - 2014

AOS fee shows as paid: June - 04 - 2014

AOS packet sent: June - 09 - 2014

AOS scanned: June - 17 - 2014

AOS APPROVED WITHOUT A CHECKLIST THANKS TO SAYLIN & HER WIKI: July - 29 - 2014

IV fee invoiced & paid: July - 29 - 2014

IV fee shows as paid: July - 30 - 2014

IV packet sent: August - 4 - 2014

DS-260 Completed: August - 6 -2014

IV packet scanned in NVC's system August - 13 - 2014

CASE COMPLETE: Oct - 09 - 2014

Interview Scheduled: Oct - 16 - 2014

Interview Date: Nov - 14 - 2014

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Finland
Timeline

I agree that if calling helps you feel like you have some control and gives you peace of mind, then by all means dial away :goofy:

For me personally, the days pass quicker when I keep myself busy with other things. The days I called, I had knots in my stomach and I watched the clock tick by until they opened the phone lines. I ignored my children as I sat on hold for fear I would miss them picking up the call. I didn't like how it made me feel to be hurried off the line at the end of the long wait. I do think it can be beneficial to call at key points (ie 30 business days when you are waiting for invoices / possible checklists or interview dates as the sooner you know the quicker you can act) but other than that, I see no benefit in calling every day.

me neither. I remember that NVC had posted a bulletin announcing that due to increase in approved I-130 petitions there is just going to be a longer waiting period. You can't really control that, and calling everyday just makes more work for everyone which means longer waiting periods. Everyone wants to go through fast, but it's like traffic jams on the highway, pushing ahead or making a fuss doesn't make it better and won't get you out faster.

Edited by nellivi4
Link to comment
Share on other sites

Case complete!!!!!

smiley-bounce016.gifsmiley-bounce016.gifsmiley-bounce016.gif

We received a checklist in error on June 13th, and they finally removed it!(Business day 31). Don't lose hope for those who are still waiting, it's hard but you can all make it through!! :lol: Going to celebrate this weekend! This bloody journey is almost over!!

Congratulations!

I'm the USC petitioner. My wife is British (now a USC!!!), generally awesome, and amazingly patient.

CR-1

 

USCIS:

09/09/2013 PD
09/10/2013 NOA1
02/25/2014 TRANSFER NSC
03/25/2014 NOA2
03/28/2014 NVC SHIPPED

NVC:
04/11/2014 NVC RECEIVED
05/09/2014 NVC CASE # ASSIGNED
05/15/2014 AOS/IV FEES INVOICED
05/16/2014 AOS/IV FEES PAID
05/19/2014 AOS/IV FEES CLEARED BANK ACCOUNT
05/20/2014 AOS/IV FEES SHOWING PAID
05/22/2014 DS-260 SUBMITTED
05/23/2014 AOS/IV SHIPPED
05/29/2014 AOS/IV DELIVERED
06/03/2014 AOS/IV SCANNED
07/10/2014 IV ACCEPTED
07/15/2014 AOS CHECKLIST
07/16/2014 AOS CHECKLIST SHIPPED
07/18/2014 AOS CHECKLIST DELIVERED
07/22/2014 AOS CHECKLIST SCANNED

09/11/2014 CASE COMPLETE
10/03/2014 INTERVIEW SCHEDULED (11/21/2014)
10/07/2014 INTERVIEW LETTER RECEIVED

10/15/2014 CEAC: IN TRANSIT
 
EMBASSY:
10/08/2014 MEDICAL
10/17/2014 CEAC: READY
10/17/2014 REQUEST INTERVIEW RESCHEDULE WITH EMBASSY
10/23/2014 CEAC: READY STATUS DATE UPDATED
10/25/2014 INTERVIEW RESCHEDULED (10/31/2014)
10/31/2014 INTERVIEW: APPROVED!
10/31/2014 CEAC: ADMINISTRATIVE PROCESSING
10/31/2014 CEAC: ISSUED
11/03/2014 COURIER EMAIL
11/04/2014 VISA IN HAND
 
POE:
11/04/2014 ELIS: IMMIGRATION FEE PAID
11/27/2014 POE: JFK
12/03/2014 ELIS: RECEIVED
12/12/2014 ELIS: OPTIMIZED
12/12/2014 IOE: ACCEPTED
12/15/2014 IOE: PRODUCING
12/16/2014 APPLY FOR SSN CARD
12/18/2014 ELIS: CLOSED
12/18/2014 IOE: MAILED
12/19/2014 IOE: DELIVERED
12/22/2014 RECEIVED SSN CARD
ROC
Spoiler
08/29/2016 90 DAY WINDOW OPENS
09/14/2016 I-751 PACKET MAILED TO VSC
09/15/2016 I-751 PACKET RECEIVED
09/16/2016 NOA DATE
09/20/2016 CHECK CASHED
09/22/2016 NOA RECEIVED
10/01/2016 BIOMETRICS NOTICE DATE
10/07/2016 BIOMETRICS NOTICE RECEIVED
10/17/2016 BIOMETRICS
08/15/2017 APPROVAL NOTICE DATE
08/19/2017 APPROVAL NOTICE RECEIVED
08/21/2017 CARD BEING PRODUCED
08/24/2017 CARD MAILED
08/26/2017 CARD ARRIVED

N-400

Spoiler
03/27/2018 FILED ONLINE
03/27/2018 PAYMENT POSTED
03/27/2018 NOA
03/31/2018 BIOMETRICS SCHEDULED
04/17/2018 BIOMETRICS
02/22/2019 INTERVIEW SCHEDULED
04/04/2019 INTERVIEW: APPROVED!
04/25/2019 OATH

 

Link to comment
Share on other sites

I think most people get either a false checklist or a real checklist once their AOS is reviewed. If you get an email that says "Checklist" in the subject line, just take a deep breath, open it and read carefully. As long as they are not asking for something specific, it should be a false checklist. In my case I got a real checklist the day after my AOS was reviewed. I also received a false checklist the day after my IV docs were reviewed (meaning they were approved).

So, in my experience you won't have to wait too long after they review to hear if you have a real checklist so you can respond quickly. (I actually rang every day the week mine was reviewed and then received it the next morning, so I didn't save myself any time by calling NVC about it and just drove myself crazy sitting on hold every day) If I were you, I would just try to sit back and relax and wait for an email. Having said that, who knows what NVC is doing 99% of the time so we can never be sure how long it takes for them to send the email, so if you are happy to call and put up with the waiting and the snarky operators, by all means go for it!

I am not too sure how many people get their AOS reviewed/approved without either a false or real checklist (in that case no news would mean good news) Perhaps someone who has had that happen can comment?

Or there are people like us, who got a false checklist and thought the we were all set and then 2 days later got a real checklist. Lucky us, we got both.

NOA1: APRIL 23, 2013

SHIPPED TO NEBRASKA: NOV 27, 2013

NOA2: JAN 27, 2014

NVC: MARCH 16, 2014

CASE #: APRIL 15, 2014

AOS FEE PAID: APRIL 26, 2014

IV FEE PAID: MAY 1, 2014

DS-261: MAY 5, 2014

AOS/IV PACKAGE RECEIVED @ NVC: MAY 8, 2014

AOS FALSE CHECKLIST: JUNE 6, 2014

AOS CHECKLIST: JUNE 7, 2014

AOS CHECKLIST SCANNED: jUNE 16, 2014

CASE COMPLETE: jULY 24, 2014

INTERVIEW DATE RECEIVED: jULY 30, 2014

INTERVIEW DATE: SEPTEMBER 2, 2014

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Thank you so much, I hope you get a CC soon.

Thanks samreen, I wish the same for you! You are so positive throughout all of this and you even know you have daunting task of waiting a long time for an interview and dealing with AP. You are so strong!

I don't even think about AP. My mind wouldn't accept that it can happen to us. We have no reason of the normal reasons they have for putting a person in AP. Male petetioner, same age, part of the family, arranged marriage, no criminal record etc. Dear God don't let that happen. And as for my being strong, if there is one thing this process teaches u that's strength and patience. But Thankyou for the kind words and wishes :)

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Link to comment
Share on other sites

Case complete!!!!!

smiley-bounce016.gifsmiley-bounce016.gifsmiley-bounce016.gif

We received a checklist in error on June 13th, and they finally removed it!(Business day 31). Don't lose hope for those who are still waiting, it's hard but you can all make it through!! :lol: Going to celebrate this weekend! This bloody journey is almost over!!

Yay!!!! Very happy for you. A checklist error is purely maddening. Congratulations for making it through it!!

NOA1: APRIL 23, 2013

SHIPPED TO NEBRASKA: NOV 27, 2013

NOA2: JAN 27, 2014

NVC: MARCH 16, 2014

CASE #: APRIL 15, 2014

AOS FEE PAID: APRIL 26, 2014

IV FEE PAID: MAY 1, 2014

DS-261: MAY 5, 2014

AOS/IV PACKAGE RECEIVED @ NVC: MAY 8, 2014

AOS FALSE CHECKLIST: JUNE 6, 2014

AOS CHECKLIST: JUNE 7, 2014

AOS CHECKLIST SCANNED: jUNE 16, 2014

CASE COMPLETE: jULY 24, 2014

INTERVIEW DATE RECEIVED: jULY 30, 2014

INTERVIEW DATE: SEPTEMBER 2, 2014

Link to comment
Share on other sites

My DS-261 just openend up, whoohoo!

Does anyone know if you should include a middle name in the 'given name' part?

Awesome !

We are still waiting for ours to open up !

takes way to long......

My DS-261 just openend up, whoohoo!

Does anyone know if you should include a middle name in the 'given name' part?

Awesome !

We are still waiting for ours to open up !

takes way to long......

LIVING ABROAD

11-03-2010

MARRIED

05-25-2012

USCIS

12-11-2013: NOA1

06-17-2014: NOA 2 Approved

06-25-2014: NOA2 Hard Copy Received

06-25-2014: Shipped to NVC

NVC

07-09-2014: Case Received NVC

07-18-2014: Case Number + IIN Assigned (called NVC)

08-05-2014: DS-261 available and completed

08-07-2014: AOS fee invoiced and paid

08-08-2014: AOS Package shipped to NVC ( picked up by DHL)

08-09-2014: AOS fee shows as "paid"

08-11-2014: AOS delivered to NVC

08-12-2014: AOS scanned in

08-20-2014: IV bill invoiced and paid

08-21-2014: IV Fee shows "paid"

08-21-2014: DS-260 available

08-22-2014: IV Package shipped to NVC ( picked up by DHL)

08-22-2014: DS-260 completed online

08-25-2014: IV Package delivered to NVC

08-27-2014: IV scanned in

10-10-2014: Case completed

12-02-2014: Medical

12-09-2014: Interview

Link to comment
Share on other sites

Today is 30 business days exactly since my AOS checklist response was received by NVC. I just checked and my AOS fee is changed to N/A.

Great news!

NOA1: APRIL 23, 2013

SHIPPED TO NEBRASKA: NOV 27, 2013

NOA2: JAN 27, 2014

NVC: MARCH 16, 2014

CASE #: APRIL 15, 2014

AOS FEE PAID: APRIL 26, 2014

IV FEE PAID: MAY 1, 2014

DS-261: MAY 5, 2014

AOS/IV PACKAGE RECEIVED @ NVC: MAY 8, 2014

AOS FALSE CHECKLIST: JUNE 6, 2014

AOS CHECKLIST: JUNE 7, 2014

AOS CHECKLIST SCANNED: jUNE 16, 2014

CASE COMPLETE: jULY 24, 2014

INTERVIEW DATE RECEIVED: jULY 30, 2014

INTERVIEW DATE: SEPTEMBER 2, 2014

Link to comment
Share on other sites

Your wife just tweeted me and told me the great news!!! YAY!!!!!

Thanks! About time! Right?! ;)

Finally! Congratulations!

Cheers!!

WOW! Congrats to you and your spouse! Thank you for all of the help here on VJ!

Thanks! No problem. Will be sticking around for a bit! ;) I will probably go missing once we are back in the states. I have time to make up at the sea and disney! :rofl:

Fantastic news!!! :dancing::dancing: :joy:

That looks very positive!!!!

Cheers!

I was just chatting with your wife !!!!! SO now I'll say it to you !!!!!!!

CONGRATS !!!!!!!!!

Now go to sleep !! Its late in England !

Thank you!

Just woke up to a message from the awesome immigration liaison in my senator's office - CASE COMPLETE!!!

Checklist docs were scanned into NVC on June 11.

That's brilliant! Congratulations mate! So glad you finally received case complete!

I-130 STAGE
-------------------------------
16th May 2013- I-130 PD Date
30th Dec 2013- Transferred to TSC
13th Mar 2014- I-130 Approved
20th Mar 2014- Cased shipped to NVC.


NVC STAGE
--------------------------------
28th Mar 14 Case received at NVC
28th Apr 14 Case # & IIN assigned

13th May 14 AOS package scanned into the system
14th May 14 DS260 available/completed.
20th May 14 IV package scanned into the system

12th June 14 AOS checklist- NVC error-

13th June 14 Supervisor review, said she would remove it when spoke to her. (Up to 30 business days).

28th July 14 CASE COMPLETE!!!!

19th August 2014- Medical

5th September 2014- Interview @ London

05th Sep 2014-Interview

05th Sep 2014- APPROVED! Visa Status Issued same day!

10th Sep 2014- Visa in hand

18th September 2014- POE ORLANDO FL! DISNEY!! :dancing:

Link to comment
Share on other sites

CONGRATULATIONS!!! Your wife beat you to it on telling me on Facebook :P Glad you got AMAZING news to start your week off with a bang!

(I'd add some dancing emoticons, but I think you very much covered it in your post :P)

I never got a false (nor real :P) checklist for either of my packages. And even though it was 3 years ago, false checklists were still happening then.

Cheers! You can't shake me from leaving though ;). Until I can beat you from the States. Thanks for speaking to my insane wife.. Sorry about her abnormal amount of energy she's had lately.. :P

Congrats! Did she tweet the good news? I don't think I saw her tweet (or I'm blocked for behaving badly? LOL)?

Cheers! She did I think? It's how her and Bdrew communicate lol. I'm sure you will go through her tweets and see them :P

Oh finally, congratulations!!! So incredibly happy for you!! :dancing::dance::dancing:

Thank you! How's life treating you now? :)

Congrats, happy when heard this from you. Mine maybe next week :)

Thank you! Your good news is coming!

YAY! I came on here just for this.... I just had a feeling that today was going to be your day! How exciting! Just in time for interview scheduling!!! :dancing:

Thanks! All the best to you! P.S. on your expedite request, we sent one last Thursday. My wife received a "your request is under review" 5 days later. I've notice the time scales vary when you do get a response. We never received another e-mail after that, but when she called on the Friday the agent on the phone told her the expedite was denied. LOL. So they will know about it. :)

Having a strong and supporting spouse makes all the difference in this world. During the worst times, their mettle shines brighter than the bravest soldiers in the battlefield. Make sure you communicate your appreciation to your wife every now and then. We men tend to be retarded in this department.

Really glad you finally got that absurdly overdue CC. I would have felt guilty if I had beat you to it.

Babysitting baboons can be risky. bdrew got the short end of that stick. Luckily, she was tenacious enough to make things right in spite of NVC.

Cheers! Are you going to be calling soon? :).

desnvc.jpg

That's brilliant!!! Thanks! :)

Thanks you Stackeria and PCOZ :)

Good luck to all those who are still waiting this week! Hope you all get good news! :)

I-130 STAGE
-------------------------------
16th May 2013- I-130 PD Date
30th Dec 2013- Transferred to TSC
13th Mar 2014- I-130 Approved
20th Mar 2014- Cased shipped to NVC.


NVC STAGE
--------------------------------
28th Mar 14 Case received at NVC
28th Apr 14 Case # & IIN assigned

13th May 14 AOS package scanned into the system
14th May 14 DS260 available/completed.
20th May 14 IV package scanned into the system

12th June 14 AOS checklist- NVC error-

13th June 14 Supervisor review, said she would remove it when spoke to her. (Up to 30 business days).

28th July 14 CASE COMPLETE!!!!

19th August 2014- Medical

5th September 2014- Interview @ London

05th Sep 2014-Interview

05th Sep 2014- APPROVED! Visa Status Issued same day!

10th Sep 2014- Visa in hand

18th September 2014- POE ORLANDO FL! DISNEY!! :dancing:

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...