Jump to content

1,554 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

Thanks but the email I received did not have this information, and there was no pdf file attached. It seems like they used different formats to communicate about case complete, including no email at all (since my wife did not get anything!).

I corrected myself in a subsequent post. The CC email does not have an actual CC date. You have to call NVC to find that.

IR-1/CR-1 Visa
Service Center : National Benefits Center; Consulate : Mumbai, India; Marriage (if applicable): 2013-07-05
USCIS
I-130 Sent : 2013-07-20; I-130 NOA1 : 2013-07-26; I-130 Transferred to CSC: 2014-01-13; I-130 Approved: 2014-01-22
NVC
NVC Received: 2014-02-03; AOS Bill Shows PAID: 2014-03-19
NVC Case # and IIN Assigned: 2014-03-11; AOS Package Delivered: 2014-03-21;
Submitted/Completed DS-261 online: 2014-03-12; AOS Package Touched: 2014-03-25;
Receive & Pay AOS Bill : 2014-03-13; AOS Package Approved: 2014-04-08
AOS Package Mailed (USPS Priority): 2014-03-18;
IV Bill:
Receive & Pay IV Bill: 2014-03-24; False Checklist for Civil Documents: 2014-04-07
IV Bill Shows PAID: 2014-03-26; Case Completed at NVC: 2014-04-16;
IV Package Mailed (USPS Priority): 2014-03-26; Case Complete Email Received: 2014-04-23
IV Package Received by NVC: 2014-03-31; Interview scheduled: 2014-05-01;
IV Package Touched: 2014-04-03 (still in review); IL Email Received: 2014-05-01
DS-260 Available/Completed/Submitted: 2014-03-27
Consulate: Mumbai
Fingerprinting & Photo: 2014-05-09 Medicals: 2014-05-19
Interview: 2014-06-04 Visa Approved CEAC Website Status "Issued": 2014-06-05
USCIS ELIS Fee Paid: 2014-06-08 Passport w/Visa Received: 2014-06-09
POE (LAX): 2014-07-20 SS# Received: 2014-07-28
Actual GC received 2014-08-30
CA ID Received: 2014-09-02.
First job in USA (yeeeh!!!) starting: 2014-09-22
Taking driving lessons....!!!!

ROC
Application Sent: 2016-04-26
NOA1:2016-04-28
Biometrics: 2016-06-02 (early walk-in on May 31st)

ROC Approval Email and Online Status Change - 2016-11-07
Google Doc for April 2016 filers: https://docs.google.com/spreadsheets/d/12Mb-ALcbwQbYafLj4vFaEMjSGD-wfjtrycs3ul8QlUo/edit?pref=2&pli=1#gid=0

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted (edited)

So hubby's interview went ok but we are now in AP. He had everything the NVC requested but apparently there is some other document having to do with marital status that he needed from some government agency there. This is frustrating to me because I went on NVC website under country specific and the only thing that was listed there was about the police clearance.

So he was able to go get this document this afternoon. But he is only allowed to take it back to the embassy tomorrow between 4 and 4:30. Really? A half hour window? And on a Friday no less!! Ugh!!! I'm pretty disgusted right now.

After 14 months of waiting and jumping thru hoops now this!!!!! I can't wait til this bs is over!

And I was thinking we would be so happy and relieved today. And here we are still stressed out!

What more could they want from us? They had our ORIGINAL marriage cert!!!!!!!!!!

The lady at the embassy told him it may still be possible to get the visa next week but they don't do anything quickly there so I'm not holding my breath!

Sorry for the rant. I'm just pi$$ed off! :(

Once he submits the document tomorrow, your visa will be approved. I give you my guarantee :) :)

Edited by bkghosh

IR-1/CR-1 Visa
Service Center : National Benefits Center; Consulate : Mumbai, India; Marriage (if applicable): 2013-07-05
USCIS
I-130 Sent : 2013-07-20; I-130 NOA1 : 2013-07-26; I-130 Transferred to CSC: 2014-01-13; I-130 Approved: 2014-01-22
NVC
NVC Received: 2014-02-03; AOS Bill Shows PAID: 2014-03-19
NVC Case # and IIN Assigned: 2014-03-11; AOS Package Delivered: 2014-03-21;
Submitted/Completed DS-261 online: 2014-03-12; AOS Package Touched: 2014-03-25;
Receive & Pay AOS Bill : 2014-03-13; AOS Package Approved: 2014-04-08
AOS Package Mailed (USPS Priority): 2014-03-18;
IV Bill:
Receive & Pay IV Bill: 2014-03-24; False Checklist for Civil Documents: 2014-04-07
IV Bill Shows PAID: 2014-03-26; Case Completed at NVC: 2014-04-16;
IV Package Mailed (USPS Priority): 2014-03-26; Case Complete Email Received: 2014-04-23
IV Package Received by NVC: 2014-03-31; Interview scheduled: 2014-05-01;
IV Package Touched: 2014-04-03 (still in review); IL Email Received: 2014-05-01
DS-260 Available/Completed/Submitted: 2014-03-27
Consulate: Mumbai
Fingerprinting & Photo: 2014-05-09 Medicals: 2014-05-19
Interview: 2014-06-04 Visa Approved CEAC Website Status "Issued": 2014-06-05
USCIS ELIS Fee Paid: 2014-06-08 Passport w/Visa Received: 2014-06-09
POE (LAX): 2014-07-20 SS# Received: 2014-07-28
Actual GC received 2014-08-30
CA ID Received: 2014-09-02.
First job in USA (yeeeh!!!) starting: 2014-09-22
Taking driving lessons....!!!!

ROC
Application Sent: 2016-04-26
NOA1:2016-04-28
Biometrics: 2016-06-02 (early walk-in on May 31st)

ROC Approval Email and Online Status Change - 2016-11-07
Google Doc for April 2016 filers: https://docs.google.com/spreadsheets/d/12Mb-ALcbwQbYafLj4vFaEMjSGD-wfjtrycs3ul8QlUo/edit?pref=2&pli=1#gid=0

Posted

So hubby's interview went ok but we are now in AP. He had everything the NVC requested but apparently there is some other document having to do with marital status that he needed from some government agency there. This is frustrating to me because I went on NVC website under country specific and the only thing that was listed there was about the police clearance.

So he was able to go get this document this afternoon. But he is only allowed to take it back to the embassy tomorrow between 4 and 4:30. Really? A half hour window? And on a Friday no less!! Ugh!!! I'm pretty disgusted right now.

After 14 months of waiting and jumping thru hoops now this!!!!! I can't wait til this bs is over!

And I was thinking we would be so happy and relieved today. And here we are still stressed out!

What more could they want from us? They had our ORIGINAL marriage cert!!!!!!!!!!

The lady at the embassy told him it may still be possible to get the visa next week but they don't do anything quickly there so I'm not holding my breath!

Sorry for the rant. I'm just pi$$ed off! :(

Very frustrating!!! I'm so sorry! I hope you get some good news tomorrow.

N-400 May 2017 Google Doc

Full timeline- 

 

Filed from abroad- Costa Rica

NOA1- NOA2: 316 days

Jan 12, 2013: Married!!
Mar 19, 2013: NOA1

Jan 28, 2014: I-130 approved

NVC- Green Card in Hand: 189 days

Feb 3, 2014: TSC sends case to NVC
April 14: Real checklist for AOS (saying tax number was incorrect when it wasn't)
April 30: Another AOS checklist, for proof of employment (which was already sent)
May 1: Checklist for IV- certified marriage certificate (even though I sent a certified one originally)
July 1: INTERVIEW!!! - APPROVED!
July 16: POE through Miami
July 22: SSN card in the mail
August 30, 2014: Green card arrives in the mail!!!
 
ROC: 366 days
April 27, 2016: Sent 300 page ROC packet to VSC via overnight mail
May 16: Check shown as charged online, received NOA 1 dated April 29
June 20, 2016- Biometrics
April 28, 2017: Approval
May 4, 2017: Approval letter arrived
May 15, 2017: GC arrives in mail
 
N-400: 190 days
May 8: Sent packet to Dallas Lockbox
May 12: NOA 1, Credit card charged
June 7: Biometrics
June 16: "In line"
Oct 2: Interview letter arrives (online status still says ''in line'')
Oct 31: Interview- Approved!
Nov 13: Oath ceremony!  Applied for passport & registered to vote on site.
Nov 22: Passport arrives (paid for expedited service and overnight delivery)
 
Journey complete! A total of 1701 days or 4 years, 7 months and 26 days.
Posted

Ohhh heyyyy...come in and visit us. In fact, sttay awhile. Want some coffee? I'll get my espresso machine ready. :lol:

Girrrrrrrrrrrrrl, I need a bucket of espresso after this nightmare! I can't wait to join the graduating "class" of the interview thread!

5/21/2016: Mailed I-751 packet to CSC

5/23/2016: NOA1

7/29/2016: Biometrics Appointment

11/22/2016: I-751 Approved!

oprahbees.gif

Filed: IR-1/CR-1 Visa Country: Bulgaria
Timeline
Posted

Once he submits the document tomorrow, your visa will be approved. I give you my guarantee :) :)

I hope your right!! I still want to see his handsome face on the 21st. That's the only thing that keeps me going some days, his love. Thanks for your support. :).

01/05/06-Met

04/01/13-Married

USCIS

04/15/13-PD

11/15/13-Transfered To NSC

12/11/13-NOA2

NVC

01/07/14- Received

02/06/14-Case and IIN #'s assigned

02/10/14-DS-261 available and filled out

02/11/14-Paid AOS fee

02/18/14-Sent AOS packet via Express Mail

02/19/14-NVC received AOS packet

02/26/14-IV invoice available and paid

03/03/14- IV bill shows paid-mailed IV package via Express Mail

03/04/14-IV package received

03/09/14-DS-260 submitted

03/14/14-False checklist for IV package

03/24/14- Real checklist

04/02/14-NVC received checklist response

04/18/14-CASE COMPLETE!!!!!!!!!!

06/05/14-Interview In Sofia BG

06/09/14 -Visa Approved!!!!!!!!

06/11/14-Visa in hand

06/21/14-POE

Filed: IR-1/CR-1 Visa Country: Bulgaria
Timeline
Posted

Very frustrating!!! I'm so sorry! I hope you get some good news tomorrow.

Thanks. I hope so too! I know you feel my pain after all the bs you and your hubby have been through in this process. I thought the worst was over. By the time the interview come you kinda feel like your home free but NOPE!!! Anything can happen!

01/05/06-Met

04/01/13-Married

USCIS

04/15/13-PD

11/15/13-Transfered To NSC

12/11/13-NOA2

NVC

01/07/14- Received

02/06/14-Case and IIN #'s assigned

02/10/14-DS-261 available and filled out

02/11/14-Paid AOS fee

02/18/14-Sent AOS packet via Express Mail

02/19/14-NVC received AOS packet

02/26/14-IV invoice available and paid

03/03/14- IV bill shows paid-mailed IV package via Express Mail

03/04/14-IV package received

03/09/14-DS-260 submitted

03/14/14-False checklist for IV package

03/24/14- Real checklist

04/02/14-NVC received checklist response

04/18/14-CASE COMPLETE!!!!!!!!!!

06/05/14-Interview In Sofia BG

06/09/14 -Visa Approved!!!!!!!!

06/11/14-Visa in hand

06/21/14-POE

Filed: IR-1/CR-1 Visa Country: Bulgaria
Timeline
Posted

Its okay to rant and let go some steam! Thats the reason we are here and as one. Hope everything works out for you asap.

Thanks so much!

01/05/06-Met

04/01/13-Married

USCIS

04/15/13-PD

11/15/13-Transfered To NSC

12/11/13-NOA2

NVC

01/07/14- Received

02/06/14-Case and IIN #'s assigned

02/10/14-DS-261 available and filled out

02/11/14-Paid AOS fee

02/18/14-Sent AOS packet via Express Mail

02/19/14-NVC received AOS packet

02/26/14-IV invoice available and paid

03/03/14- IV bill shows paid-mailed IV package via Express Mail

03/04/14-IV package received

03/09/14-DS-260 submitted

03/14/14-False checklist for IV package

03/24/14- Real checklist

04/02/14-NVC received checklist response

04/18/14-CASE COMPLETE!!!!!!!!!!

06/05/14-Interview In Sofia BG

06/09/14 -Visa Approved!!!!!!!!

06/11/14-Visa in hand

06/21/14-POE

Posted

Filled out the form

I haven't been on VJ for a bit because it was making me so anxious about our case. Plus the new baby and all the expenses. I'm slowly losing my mind.

But we're almost done. I just hope that nothing goes wrong during the interview.

Married in Texas Sept. 16, 2013

Sent I-130 Nov. 3, 2013

Received NOA1 (email) Dec. 19, 2013

Requested Expedite Jan. 2, 2014

Approved Expedite Jan. 4, 2014

Case sent to NVC Jan. 15, 2014

Received NOA1 (mail) Jan. 22, 2014

NVC Received Case Jan. 27, 2014

Received NOA2 (mail) Feb. 25, 2014

NVC Assigned Case Number Mar. 11, 2014

Paid AOS Fee Mar. 29, 2014

Paid IV Fee Mar. 29, 2014

Submitted DS-260 Apr. 4, 2014

Mailed in IV packet Apr. 8, 2014

Submitted AOS packet Forgot the date

Case complete May 31, 2014

Medical Jun. 26, 2014

Interview Jul. 8, 2014

POE (LAX) Sept. 16, 2014

Paid ELIS May 16, 2015

Received GC May 23, 2015

I-751 Receipt Date July 5, 2016

ROC NOA July 15, 2016

I-751 Biometrics Aug. 5, 2016

ROC Approved Sept. 18, 2017
Received GC Sept. 25, 2017
 

CR1 Spousal Visa Guide

 

TBErp8.png
 
 
YEP0m5.png


 

Filed: Citizen (apr) Country: Nigeria
Timeline
Posted

Thanks dwheels, you've been very helpful, I wish

I could pay you back, one more question, is this the e-mail to use lagosIV@state.gov, and do I get an auto response after that. How long do they take to reply the email

Yes thats the embassy email and yes you get an auto response. usually they respond within 24 to 48 hrs.

And no need to thank me or pay me back accept to live life happliy and enjoy each other

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

When does the CEAC update status from 'in NVC' to 'In Transit' ?

Is it after they send it to DHL or before that?

I have seen two packages with June 4 and June 5 to Mumbai,India but CEAC page shows 'in NVC'

Does this mean interview date is provided first and then the package is shipped to the embassy? I am trying to figure out which one comes first.

USCIS

5/11/2013: NOA 1-130

2/21/2014: I-130 Approved

NVC Stage

3/17/2014: NVC received case

4/16/2014: NVC case number assigned

4/23/2014: DS-261 Submitted Online

4/24/2014: AOS bill generated and paid

4/29/2014: AOS bill shows PAID

4/30/2014: IV bill generated and paid

5/2/2014: NVC receives AOS Package

5/5/2014: IV bill shows PAID

5/7/2014: NVC receives IV Package

5/8/2014: DS-260 Completed and submitted

5/30/2014: Case Complete !!

6/5/2014: CC Email Received

6/11/2014: Interview Date Scheduled

7/17/2014: Interview Date at Mumbai

Filed: Citizen (apr) Country: Nigeria
Timeline
Posted

Dwheeels, any experience or memories of vietnam?

Vietnam seems to always wait until last minute I swear. Just hang on.

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Filed: IR-1/CR-1 Visa Country: Vietnam
Timeline
Posted

Wooooot!! Thats what I like to hear!

IR-1/CR-1 Visa Event Date

USCIS:

Service Center : Texas Service Center

Consulate : Ho Chi Minh, Vietnam

02-09-2012: Marriage

15-03-2013: I-130 NOA1

06-11-2013: Transfer date to TSC

09-01-2014: NOA2 (I-130)

29-01-2014: Shipped to NVC (I-130)

NVC:

06-02-2014: NVC received case

13-03-2014: Case Number assigned

13-03-2014: IIN Number assigned. Email addresses given

17-03-2014: DS-261 Available and submitted to NVC

18-03-2014: AOS invoice available on portal; AOS paid. "IN PROCESS"

20-03-2014: AOS shows "PAID"

24-03-2014: AOS/I-864 packet express mailed to NVC

01-04-2014: AOS packet arrived at NVC

27-03-2014: IV invoice available on portal; IV invoice paid. "IN PROCESS"

31-03-2014: IV invoice shows "PAID"

01-04-2014: DS-260 submitted

26-04-2014: IV Packet express mailed to NVC

01-05-2014: IV Packet received by NVC

21-05-2014: Case Complete

07-08-2014: Interview Scheduled

02-07-2014: Medical Completed

Filed: Citizen (apr) Country: Nigeria
Timeline
Posted

Does this mean interview date is provided first and then the package is shipped to the embassy? I am trying to figure out which one comes first.

Case Complete =====>NVC schedules Interview=====>Casefile shipped to Embassy

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Filed: IR-1/CR-1 Visa Country: Peru
Timeline
Posted (edited)

Once CEAC status changes to ISSUED, how long does the passport usually take to arrive at the DHL in the same city?

I missed your good news post ekec. Congratulations on your husband's visa approval!! :dancing: :joy:

I can hardly wait for my wife's!

Edited by Fabian&Rossy

Our journey to happiness: (click "show" to see our timeline)


05/05/12 - Wedding day!

USCIS

06/07/13 - Mailed I-130
06/10/13 - NOA1
12/19/13 - First text/email for case transfer
12/26/13 - Received hard copy transfer notice: Texas Service Center

01/21/14 - NOA2 Approval text/email
01/25/14 - Received hard copy of approved I-797
01/29/14 - Text/email advising TSC shipped case to DOS

NVC
02/06/14 - NVC received our case file.
03/13/14 - Case number, IIN and BIN assigned
03/17/14 - DS-261 completed. Email Confirmation received
03/18/14 - Received email to pay AOS fee. Invoiced and paid (in process)
03/19/14 - Requested NVC to "join" wife's and daughter's cases
03/20/14 - AOS status "PAID" for wife
03/26/14 - AOS status "PAID" for daughter
03/26/14 - AOS packets sent
03/28/14 - IV available and paid for both wife and daughter (in process)
04/01/14 - IV shows "PAID", DS-260 available
04/05/14 - DS-260 complete and submitted
04/07/14 - Civil docs arrived via DHL from my wife. IV packets sent (Finally!!)
04/14/14 - False checklist for IV packet (wife and daughter)
04/15/14 - Confirmed AOS approved (did not ask for specific approval date) - IV packets in system

04/25/14 - CASE COMPLETE (wife and daughter) :dance:

04/30/14 - Interview scheduled (yay!!)

05/02/14 - Received e-mail with P4 letters

05/07/14 - NVC shipped case files to Lima Embassy via DHL. CEAC status "In transit"

05/09/14 - DHL delivered case files to Embassy. CEAC status "Ready"

Embassy (Lima, PE)

06/09/14 - Medical Exam. 4pm appointment

06/24/14 - Interview appointment @8am Visa approved!!! Bananeyessss.gifBananezorro.gif

06/25/14 - CEAC status "Issued"

06/28/14 - Visa in hand

08/05/14 - POE !! smiley-happy093.gif

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...