Can anyone else chime in here? Baltoro claims he did not fill out a DS-261 yet still got his IV fees. Is that even possible??? The IV fees are dependent on your DS-261 being reviewed and accepted from what the wiki says.

They probably had an attorney if both fees were available at the same time, and that is also why they did not need to submit the DS-261. Applicants without an attorney must submit the form.

Our Visa Journey(s)

K-1 Visa
01/15/2013 - Sent I-129F overnight via Fedex
07/17/2013 - Sent to London
*** Abandoned K1 Visa route due to wedding plans that could NOT be changed**

07/27/2013 - Married in TX!!

CR-1 Visa
09/12/2013 - Sent I-130 overnight via Fedex
09/18/2013 - NOA1 - E-mail and text - Sent to NBC Overland Park
03/03/2014 - Case Transferred to CSC
03/27/2014 - NOA2 - E-mail and text - APPROVED!!!
04/04/2014 - NVC Received

05/05/2014 - Case Number & IIN Assigned

05/08/2014 - Submitted DS-261

05/10/2014 - AOS Available/Paid/Sent Package

05/13/2014 - AOS Package Received/Fee withdrawn (Scanned on 5/15) - Happy bday to me! :)

05/14/2014 - AOS Shows as PAID

05/19/2014 - IV Available/Paid/Sent Package

05/20/2014 - IV Fee withdrawn/Shows as PAID/DS-260 Available & Submitted

05/21/2014 - IV Package Received (Scanned on 5/23)

06/13/2014 - AOS Approved

06/26/2014 - CASE COMPLETE!!! (Confirmed by call, AOS changed to N/A)

07/10/2014 - Interview date assigned!!!! (August 19th)

07/11/2014 - Received Interview letter via e-mail

07/21/2014 - Hubby's medical (Passed!)/E-mail sent to embassy requesting earlier date

07/23/2014 - Interview rescheduled!!

08/04/2014 - INTERVIEW IN LONDON!! - APPROVED!!!!! :luv:

08/12/2014 - VISA IN HAND!!

08/30/2014 - POE in Houston!!

352 days from filing to POE

*Full timeline in profile

Removal of Conditions (I-751)

07/07/2016 - Sent I-751 overnight via USPS

07/08/2016 - CSC received & NOA1

07/21/2016 - Biometrics letter received
07/25/2016 - Walk-in Biometrics Appt (Org. appt - 8/2)

"Love knows not distance; it hath no continent; its eyes are for the stars."

- Gilbert Parker

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Baltoro, did you have an attorney?

Can anyone else chime in here? Baltoro claims he did not fill out a DS-261 yet still got his IV fees. Is that even possible??? The IV fees are dependent on your DS-261 being reviewed and accepted from what the wiki says.

NOA2: 4/13/2014

NVC Received Case: 4/28/2014

NVC Assigned Case no and IIN: 5/21/2014

DS261 available and submitted: 5/31/2014

AOS fees available and paid: 6/2/2014

AOS package sent out:6/3/2014

AOS fee shows paid: 6/4/2014

Resubmitted DS261 because it showed incomplete: 6/5/2014

AOS Package scanned at NVC: 6/9/2014 :protest:

IV fees paid: 7/10/14 :ranting:

DS260 Submitted: 7/12/14 :ranting:

IV Packaged Scanned by NVC: 7/15/2014 :ranting:

CC:9/7/2014 :dancing:

Interview:10/29/2014 :dancing: :dancing::dancing:

POE:11/09/2014 :dancing::dancing::dancing:

Link to comment
Share on other sites

Question, my husband sent me all the documents which are the following: Marriage certificate, birth certificate, police letter, a copy of the passport bio page and he sent me 8 pics 2x2 just in case. I am getting ready to send my IV packet sometime next week. The original documents are in Spanish, he got them translated and everything. So am I also supposed to send the SPANISH version with the English one attached, or just the English one? I am not sending my originals though, I am sending them copies.

USCIS

Priority

Date: Form I-130 Sept 27,2013

Approved: March 27, 2014

Sent over to NVC: April 2, 2014

NVC

Received approved petition on: April 14, 2014

Received NVC case number on: May 13, 2014

AOS Fee paid on: May 17, 2014

AOS FEE CLEARED and completed on: May 20, 2014

DS-261 completed and cleared on: May 21, 2014

AOS Packet sent on: June 4, 2014

AOS Packet delivered on: June 6, 2014

AOS Packet received by NVC: June 11, 2014

IV Fee visible on: June 25, 2014

IV Fee Paid by : June 25, 2014

DS-260 completed on: June 27, 2014

IV Packet sent on: June 27, 2014

IV Packet delivered on: June 30, 2014

IV Packet received by NVC on: July 7, 2014

Received AOS checklist: July 28, 2014

AOS resent again: 8/6/2014

Case Completed on: 10/6/2014

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

They probably had an attorney if both fees were available at the same time, and that is also why they did not need to submit the DS-261. Applicants without an attorney must submit the form.

Yes, that was the case. I was confused when they told me I didn't have to fill out DS 261. I had let go my lawyer go after he made mistakes in my i-130 but they still had him on record. They just removed him on phone on my request. I have tried to be very quick and I don't want to get checklist and I am still worried about checklist since I got it at I-130 due to lawyer mistake. I want my wife here soon!

Edited by baltoro
N400
----------------------------------------------------------
Feb 20 - USCIS update notification.
Feb 20 - biometrics done
Jan 31 - Applied N400 online 
 

NVC

----------------------------------------------------------

April 18, 2014 NVC received case

May 15, 2014 Case # and IIN assigned

DS-261 not required as I had lawyer on file

May 21, AOS and IV fee available and paid.

May 23, AOS and IV Packet sent.

May 23, DS 260 filled online.

May 29, AOS/IV scanned

Jun 3, Recieved email that AOS/IV fees are paid and I need to send the papers which I have already done.

July 3, Received postal mail from NVC that my visa preference has upgraded to CR1

July 8, Case Complete

 

I-130

--------------------------------------------------------

Feb 25, 2013 Priority date

April 01, 2014 I-130 approved

April 04, /2014 I-130 Send to NVC

 

If you have not filled you signature with timeline info yet, please do it now! Go to your profile, press 'Edit' and signature field becomes available.

 

Link to comment
Share on other sites

What did you ask about DS-261? It is not important form, I didn't even submit it. If they have your email on file which can give them over the phone, that is all for DS-261. Keeping checking for IV fee and than 260 will become available when you pay that.

I mean DS261 just set you up for email communications so its important but there is no processing for it. If they have your email on file, you are all set with it.

As another member asked, do you have an attorney/lawyer/legal representation attached to your case? The DS-261 is REQUIRED for everyone who does not have legal representation. The DS-261 is NOT for email set-up, it's to choose an agent. Those with an attorney/lawyer have that legal representative already automatically assigned as an agent, thus by-passing the DS-261.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Question, my husband sent me all the documents which are the following: Marriage certificate, birth certificate, police letter, a copy of the passport bio page and he sent me 8 pics 2x2 just in case. I am getting ready to send my IV packet sometime next week. The original documents are in Spanish, he got them translated and everything. So am I also supposed to send the SPANISH version with the English one attached, or just the English one? I am not sending my originals though, I am sending them copies.

'

Yes you need to send them Spanish ones as well and send them the ORIGINALS or you will get checklist.

N400
----------------------------------------------------------
Feb 20 - USCIS update notification.
Feb 20 - biometrics done
Jan 31 - Applied N400 online 
 

NVC

----------------------------------------------------------

April 18, 2014 NVC received case

May 15, 2014 Case # and IIN assigned

DS-261 not required as I had lawyer on file

May 21, AOS and IV fee available and paid.

May 23, AOS and IV Packet sent.

May 23, DS 260 filled online.

May 29, AOS/IV scanned

Jun 3, Recieved email that AOS/IV fees are paid and I need to send the papers which I have already done.

July 3, Received postal mail from NVC that my visa preference has upgraded to CR1

July 8, Case Complete

 

I-130

--------------------------------------------------------

Feb 25, 2013 Priority date

April 01, 2014 I-130 approved

April 04, /2014 I-130 Send to NVC

 

If you have not filled you signature with timeline info yet, please do it now! Go to your profile, press 'Edit' and signature field becomes available.

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: England
Timeline

'

Yes you need to send them Spanish ones as well and send them the ORIGINALS or you will get checklist.

:thumbs: They may also be certified copies, but I would send the originals. All original documentation will be returned back to the applicant in their packet after the interview.

Edited by k.dlg

Our Visa Journey(s)

K-1 Visa
01/15/2013 - Sent I-129F overnight via Fedex
07/17/2013 - Sent to London
*** Abandoned K1 Visa route due to wedding plans that could NOT be changed**

07/27/2013 - Married in TX!!

CR-1 Visa
09/12/2013 - Sent I-130 overnight via Fedex
09/18/2013 - NOA1 - E-mail and text - Sent to NBC Overland Park
03/03/2014 - Case Transferred to CSC
03/27/2014 - NOA2 - E-mail and text - APPROVED!!!
04/04/2014 - NVC Received

05/05/2014 - Case Number & IIN Assigned

05/08/2014 - Submitted DS-261

05/10/2014 - AOS Available/Paid/Sent Package

05/13/2014 - AOS Package Received/Fee withdrawn (Scanned on 5/15) - Happy bday to me! :)

05/14/2014 - AOS Shows as PAID

05/19/2014 - IV Available/Paid/Sent Package

05/20/2014 - IV Fee withdrawn/Shows as PAID/DS-260 Available & Submitted

05/21/2014 - IV Package Received (Scanned on 5/23)

06/13/2014 - AOS Approved

06/26/2014 - CASE COMPLETE!!! (Confirmed by call, AOS changed to N/A)

07/10/2014 - Interview date assigned!!!! (August 19th)

07/11/2014 - Received Interview letter via e-mail

07/21/2014 - Hubby's medical (Passed!)/E-mail sent to embassy requesting earlier date

07/23/2014 - Interview rescheduled!!

08/04/2014 - INTERVIEW IN LONDON!! - APPROVED!!!!! :luv:

08/12/2014 - VISA IN HAND!!

08/30/2014 - POE in Houston!!

352 days from filing to POE

*Full timeline in profile

Removal of Conditions (I-751)

07/07/2016 - Sent I-751 overnight via USPS

07/08/2016 - CSC received & NOA1

07/21/2016 - Biometrics letter received
07/25/2016 - Walk-in Biometrics Appt (Org. appt - 8/2)

"Love knows not distance; it hath no continent; its eyes are for the stars."

- Gilbert Parker

Link to comment
Share on other sites

Filed: Country: Dominican Republic
Timeline

I just received the call back from the supervisor confirming my case is complete and in line for an interview. I asked a ton of questions about how they assign interviews. She didn't know much but did say its all done electronically. The embassies provide time slots and the types of visas they will interview for . The queue takes them in order. I had a very long conversation about the nasty operators . She told me to send an email and report them because it should not be like that. So here is the email address. We should all report the nasty ones. LOOK OUT JOY and ARTHUR. I suppose we could also send emails of praise too !!

NVCINQUIRY@state.gov. Attn : P I Dept. ( in the subject line)

also, she told me again, they are finished with the first round of July interviews. She is not sure if there will be a second round. Sometimes there isn't. I told her that I have heard from others that they are still scheduling for July... her reply was that it is a brand new notification and they probably didn't get it yet. I asked about Costa Rica, she said I am one of very few for Costa Rica so I MIGHT get a July interview but it depends on what Costa Rica provided. She was very nice . She would not say yes or no whether I will be scheduled soon. She explained that they just don't have that information available.

So happy to know that your case is officially complete!!! FINALLY!!!

I'll definitely be writing to them, especially about how nice Gus has been.

My heart is broken to know that July interviews are done, I hope something changes. God is bigger than NVC and all the embassies.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

As another member asked, do you have an attorney/lawyer/legal representation attached to your case? The DS-261 is REQUIRED for everyone who does not have legal representation. The DS-261 is NOT for email set-up, it's to choose an agent. Those with an attorney/lawyer have that legal representative already automatically assigned as an agent, thus by-passing the DS-261.

Just posted the answer to this in my last post. I don't have attorney at NVC stage and they told me I still don't have to fill DS261. They said just nominate yourself by sending them email which I have done already and they also correct record over the phone. I should be fine right? Please let me know if I need to do something because I really really don't want to get checklist.

N400
----------------------------------------------------------
Feb 20 - USCIS update notification.
Feb 20 - biometrics done
Jan 31 - Applied N400 online 
 

NVC

----------------------------------------------------------

April 18, 2014 NVC received case

May 15, 2014 Case # and IIN assigned

DS-261 not required as I had lawyer on file

May 21, AOS and IV fee available and paid.

May 23, AOS and IV Packet sent.

May 23, DS 260 filled online.

May 29, AOS/IV scanned

Jun 3, Recieved email that AOS/IV fees are paid and I need to send the papers which I have already done.

July 3, Received postal mail from NVC that my visa preference has upgraded to CR1

July 8, Case Complete

 

I-130

--------------------------------------------------------

Feb 25, 2013 Priority date

April 01, 2014 I-130 approved

April 04, /2014 I-130 Send to NVC

 

If you have not filled you signature with timeline info yet, please do it now! Go to your profile, press 'Edit' and signature field becomes available.

 

Link to comment
Share on other sites

also, she told me again, they are finished with the first round of July interviews. She is not sure if there will be a second round. Sometimes there isn't. I told her that I have heard from others that they are still scheduling for July... her reply was that it is a brand new notification and they probably didn't get it yet. I asked about Costa Rica, she said I am one of very few for Costa Rica so I MIGHT get a July interview but it depends on what Costa Rica provided. She was very nice . She would not say yes or no whether I will be scheduled soon. She explained that they just don't have that information available.

C'mon July interview!!!!!

N-400 May 2017 Google Doc

Full timeline- 

 

Filed from abroad- Costa Rica

NOA1- NOA2: 316 days

Jan 12, 2013: Married!!
Mar 19, 2013: NOA1

Jan 28, 2014: I-130 approved

NVC- Green Card in Hand: 189 days

Feb 3, 2014: TSC sends case to NVC
April 14: Real checklist for AOS (saying tax number was incorrect when it wasn't)
April 30: Another AOS checklist, for proof of employment (which was already sent)
May 1: Checklist for IV- certified marriage certificate (even though I sent a certified one originally)
July 1: INTERVIEW!!! - APPROVED!
July 16: POE through Miami
July 22: SSN card in the mail
August 30, 2014: Green card arrives in the mail!!!
 
ROC: 366 days
April 27, 2016: Sent 300 page ROC packet to VSC via overnight mail
May 16: Check shown as charged online, received NOA 1 dated April 29
June 20, 2016- Biometrics
April 28, 2017: Approval
May 4, 2017: Approval letter arrived
May 15, 2017: GC arrives in mail
 
N-400: 190 days
May 8: Sent packet to Dallas Lockbox
May 12: NOA 1, Credit card charged
June 7: Biometrics
June 16: "In line"
Oct 2: Interview letter arrives (online status still says ''in line'')
Oct 31: Interview- Approved!
Nov 13: Oath ceremony!  Applied for passport & registered to vote on site.
Nov 22: Passport arrives (paid for expedited service and overnight delivery)
 
Journey complete! A total of 1701 days or 4 years, 7 months and 26 days.
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nigeria
Timeline

I just received the call back from the supervisor confirming my case is complete and in line for an interview. I asked a ton of questions about how they assign interviews. She didn't know much but did say its all done electronically. The embassies provide time slots and the types of visas they will interview for . The queue takes them in order. I had a very long conversation about the nasty operators . She told me to send an email and report them because it should not be like that. So here is the email address. We should all report the nasty ones. LOOK OUT JOY and ARTHUR. I suppose we could also send emails of praise too !!

NVCINQUIRY@state.gov. Attn : P I Dept. ( in the subject line)

also, she told me again, they are finished with the first round of July interviews. She is not sure if there will be a second round. Sometimes there isn't. I told her that I have heard from others that they are still scheduling for July... her reply was that it is a brand new notification and they probably didn't get it yet. I asked about Costa Rica, she said I am one of very few for Costa Rica so I MIGHT get a July interview but it depends on what Costa Rica provided. She was very nice . She would not say yes or no whether I will be scheduled soon. She explained that they just don't have that information available.

Congrats again. Its finally completed once and for all. Hope you can get schedule for July.

Link to comment
Share on other sites

@Baltoro and @K.dlg Ok thank you both, I hope they won't lose my papers or say that they didn't receive.

'

Yes you need to send them Spanish ones as well and send them the ORIGINALS or you will get checklist.

USCIS

Priority

Date: Form I-130 Sept 27,2013

Approved: March 27, 2014

Sent over to NVC: April 2, 2014

NVC

Received approved petition on: April 14, 2014

Received NVC case number on: May 13, 2014

AOS Fee paid on: May 17, 2014

AOS FEE CLEARED and completed on: May 20, 2014

DS-261 completed and cleared on: May 21, 2014

AOS Packet sent on: June 4, 2014

AOS Packet delivered on: June 6, 2014

AOS Packet received by NVC: June 11, 2014

IV Fee visible on: June 25, 2014

IV Fee Paid by : June 25, 2014

DS-260 completed on: June 27, 2014

IV Packet sent on: June 27, 2014

IV Packet delivered on: June 30, 2014

IV Packet received by NVC on: July 7, 2014

Received AOS checklist: July 28, 2014

AOS resent again: 8/6/2014

Case Completed on: 10/6/2014

Link to comment
Share on other sites

So what date are they on right now? Anyone know?

Married in Edinburgh, Scotland: 07-06-2013

I-130 Package Sent to Chicago Lockbox: 09-04-2013

NOA1 from the National Benefits Center: 09-05-2013

I-130 Package Transferred to California Service Center: 02-25-2014

NOA2: 03-05-2014

NVC Received: 03-17-2014

Case # and IIN Assigned: 04-18-2014

DS-261 Generated and Completed: 04-26-2014

AOS Fee Invoiced and Paid: 04-29-2014

IV Fee Invoiced and Paid: 05-01-2014

AOS Fee Shows as Paid: 05-01-2014

IV Fee Shows as Paid: 05-05-2014

AOS and IV Packages Sent via UPS: 05-08-2014

AOS and IV Packages Received: 05-12-2014

AOS and IV Packages Input Into System: 05-14-2014

DS-260 Completed: 05-16-2014

Case Complete: 06-11-2014

Medical Exam: 07-08-2014

Interview in Warsaw, Poland: 08-28-2014 @ 8:30AM - APPROVED!

Visa Package Received: 09-01-2014

POE at Chicago O'Hare International Airport: 09-23-2014

I-751 Package Received: 07-11-2016

NOA1: 07-16-2016

I-751 Biometrics Apointment: 08-01-2016

ROC Approval (during citizenship interview): 12-20-2017

10-Year Green Card Received: N/A due to approved N-400

N-400 Filed Online: 08-28-2017

N-400 NOA1 Date: 08-29-2017

N-400 Biometrics Appointment: 09-22-2017

Status Changed to Interview Scheduled: 09-22-2017

Status Change to Interview Scheduled, read the letter we mailed: 11-15-2017

N-400 Interview: 12-20-2017 - APPROVED!

Oath of Allegiance Scheduled: 12-29-2017

Oath of Allegiance: 01-18-2018 

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Scotland
Timeline

@Baltoro and @K.dlg Ok thank you both, I hope they won't lose my papers or say that they didn't receive.

MyMJLove14, apart from the date you sent the AOS, we have very similar timelines (according to your signature). Can you please add your VJ timeline so I can follow you? You can follow me too and get email notifications when I update mine.

I-130 Timeline

 

NOA1 July 3rd 2013

Transfer to CSC January 7th 2014
RFE (eNotification) February 20th 2014 - RFE (Hardcopy) arrives in mail March 7th 2014
RFE Evidence sent March 10th 2014 - RFE Received at CSC March 11th 2014
NOA2 April 9th 2014

NVC Timeline
Received at NVC - May 14th 2014
Assigned Case # / IIN / BIN - May 16th 2014
DS-261 Completed online - May 19th 2014
DS-261 & AOS Bill email received - May 20th 2014
AOS Bill paid - May 20th 2014 Show's as Paid on portal - May 21st 2014
AOS Package sent - May 21st 2014 AOS Package received/scanned - May 27th 2014
DS-261 Reviewed - June 9th 2014
IV Fee invoiced and paid - June 10th 2014 Shows a Paid on portal - June 16th 2014
IV Package sent - June 10th 2014 IV Docs received/scanned - June 17th 2014
DS-260 Available and completed - June 16th 2014
AOS Checklist generated - June 27th 2014 AOS Checklist email - June 30th 2014
AOS Checklist response sent - June 30th 2014 AOS Checklist response received/scanned - July 9th 2014
IV Package reviewed and accepted - August 1st 2014
AOS Checklist reviewed and accepted - August 22nd 2014 Case Complete - August 22nd 2014
Left NVC - September 10th 2014



Embassy Timeline

 

Medical - May 27th 2014
Interview scheduled - September 2nd 2014
Case arrived at Embassy - September 16th 2014
Interview Date - September 29th (Changed from October 31st 2014) - APPROVED!!!
Visa in hand - October 7th 2014 - Entry to USA - October 8th (LAX)

Removal of Conditions Timeline (I-751)

Packet mailed - September 6th 2016 - Signed for September 8th
NOA (receipt date) - September 8th 2016 - Physical letter received September 12th 2016

Called USCIS as no biometrics letter received - Service Request raised October 13th

Biometrics letter- Letter mailed October 14th - letter received October 17th 2015

Biometrics appointment - October 31st 2016

InfoPass stamp - October 25th 2017 (expires October 24th 2018)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Hi thanks for your response :-)

Re-establishing domicile list includes:

Maintained voter registration number (my husband "believed he sent in an absentee ballot, but apparently did it wrong so we couldn't use that as proof)

Newly renewed US drivers license

CRBA's for children

US passports for children

Letter from mother-in-law/joint sponsor stating we will be living with her until we get our own place

Correspondence from schools discussing enrollment of children

Moving quotes from Upack and another local moving company

Job letter from father-in-law stating my husband/USC will be working for him ( wondering if this will be a problem because my husbands current title and field is technical analyst, but his father is a who builds houses. The document states my husband will be an assistant carpenter. Will this be an issue because my husband does something totally different now? He will only be working with his father until he gets a job in his field in the US.)

Maintained social security number

Resignation letter from petitioners employer stating they are aware he will resign once visas are granted

Documents showing permanent US address

Bank statements from US bank account showing that it is still open and being used

This, i think, is all for now

Anyone have any thoughts??

USCIS 04-26-2014: Filed I-130

04-29-2014: NOA1 re-routed to CSC

05-14-2014: RFE

05-30 2014: RFE response sent

05-30-2014: RFE RESPONSE RECEIVED

06-04-2014: NOA2 I-130 Approved!

NVC

06-13-2014: Arrived at NVC

06-30-2014: Case # and IIN assigned

07-18-2014: D-261 sub mitted

07-18-2014: AOS fee invoiced

07-19-2014: AOS fee paid

07-25-2014: AOS package sent

07-28-2014 NVC received AOS

07-29-2014 NVC Scanned AOS

08-14-2014: resubmitted AOS

08-21-2014: NVC scanned AOS

09-02-2014: DS-261 reviewed and ACCEPTED! Woot!

10-03-2014: DS-260 completed

09-08-2014: IV fee invoiced

09-09-2014: IV fee paid

09-23-2014: AOS Checklist

10-08-2014: IV package scan date

10-10-2014: AOS Checklist scan date

10-23-1014: checklist scan date

12-05-2014: Case Complete

12-12-2014: Interview date scheduled

xx-xx-2014: Sent to embassy in Montreal

01-23-2015: Interview APPROVED!!

xx-xx-2014: Visa Received

xx-xx-2014: POE

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...