Congrats to all CC's .

I am waiting for a case # so i am starting to gather my papers. ( I have printed Saylins WIKI and i read it every night before i sleep. My temporary bible :wow: )

I am going to do the 864 EZ . I have filed taxes for 2012 and 2013 (1040) I received the tax transcript for 2013 .

2011 unemployed therefore i will put 0 . correct ?

2012 & 2013 i will put whatever # is on line 22 on the 1040 correct ?

Last question .

Since i was unemployed 2011 and do not meet the poverty line (of 4 members) on 2012 but over exceed the poverty line on 2013 and my paystubs this year almost reached the amount required so far . Do i have to have a joint sponsor ?

Thank you

The poverty line for your household size is compared to your current income which is calculated by your actual pay checks over a one year period reflecting what you currently make. The numbers from your tax returns are not what they use to compare to the poverty line, so what you have on there from 2012 doesn’t matter as long as you report it exactly as it shows on the tax return.

Also, I have no experience with the EZ, but I have heard that the value is not line 22, but actually line 37. I will wait for someone to confirm or deny this though. Did you file in 2011 even though you didn’t work? I think in your case, only submitting the 2013 transcript return is best if you did not file in 2011 since then you will have to write a letter telling them why you didn’t file in 2011. If you didn’t file and just write “0” then I think you should be OK without submitting a transcript for 2012 and 2011.

I - 130 sent 2014-04-18

Got NOA1 2014-04-22

I-130 approved 2014-05-14

NVC received 2014-05-23

DS-261/AOS bill 2014-07-01

Submit DS-261 2014-07-01

Paid AOS 2014-07-01

Sent AOS pack 2014-07-04

IV fee invoice ???

Link to comment
Share on other sites

When filling out the I-864, if you have a joint sponsor, you can only report the beneficiary’s income and assets on either the main sponsor’s I-864 or the joint sponsor’s I-864, right? So, for the I-864 which we DO NOT include that money on, do we write “$0” for those values or “N/A” for those values?

For me, I just left the assets section blank because I did not use any assets as part of income, I did not have any problem for this section of the AOS.

 

 

 
 
 
July 28 2011- Married :dancing:
 
April 1 2013- Sent I-130
 
April 2 2013- NOA1
 
Nov 14 2013-Transferred to NSC
 
Nov 21- File touched
 
Jan 10, 2014- Approved! (NOA2)
 
Jan 13, 2014- Shipped out to NVC
 
Jan 27, 2014- Received by NVC
 
March 6,2014- Received Case Number and requested Case Number Change
 
March 9, 2014 -Sent in DS-261
 
March 10,2014 - Paid AOS Fee
 
March 22, 2014 - Sent in AOS Package
 
March 25,2014 - Paid IV Fee
 
March 26, 2014 - AOS Package picked up by a B.Standish
 
March 28, 2014 - IV fee shown as PAid
 
March 31, 2014 - Send corrections to AOS Package
 
April 1, 2014 - Corrected Aos Package received and signed by N Visa Center
 
April 5, 2014 - Case number changed finally
 
April 11, 2014- Got checklist for AOS
 
April 17, 2014- Submitted DS-260
 
April 18, 2014- Sent in IV package and AOS checklist
 
May 14, 2014- IV Checklist
 
May 16, 2014- Sent in IV Checklist
 
May 23, 2014- IV Checklist received
 
June 25, 2014- Case Complete
 
July 2, 2014- Receive CC email
 
July 11, 2014- Interview email received
 
July 21, 2014- Medical Done
 
Aug 26, 2014- Interview
 
Case in AP :ranting::ranting:
 
Oct 23, turned in needed documents
 
 
 
Case Updated- July 22, 30, Aug 5, Nov 2, Nov 4, Nov 8, Nov 15+16 (2015)
 
Nov 16-told to go to Embassy
 
 
 
Update Nov 29 + 30
 
Nov 29 - Gave Refusal Sheet :cry:
 
Informed that Case is being sent back to USCIS with intent to revoke :ranting::ranting::ranting:
 
 
 
Jan 12-13, 216 Case Date Update on CEAC
 
Feb 12,2016-Update on USCIS, case under review
 
Oct 14, 2016 NOIR sent out, received OCT 18, 2016
 
 
 
 

 

 Dream-dj.png

 

 

 

Link to comment
Share on other sites

Doesn't look like a checklist to me. It seems more like a case complete. Am not an expert here, please correct me if am wrong.

Looks like it correlates with that blip in your case, where it was CC, then not, now you're good to go! :D

Thank you both. I think (hope!) you're right! I am SOO ready to get back home with my hubby and baby!

USCIS

August 16, 2013: NOA 1, February 25, 2014: NOA 2

NVC

April 4, 2014: Case number, IIN and BIN assigned

April 9, 2014: AOS bill paid and DS-261 filled out online

April 11, 2014: AOS bill showing paid

April 17, 2014: AOS package sent

April 24, 2014: IV bill paid

April 25, 2014: AOS Received

April 28, 2014: AOS Package 2 Received (mistake caught after sending first package)

April 29, 2014: IV Bills showing paid and DS-260 Completed Online

April 29, 2014: IV Supporting Documents Sent

May 2, 2014: IV Supporting Documents Received

May 15, 2014: Checklist for I-864 and tax transcripts even though they already have them...

May 16, 2014: AOS Package Accepted

May 19, 2014: IV False Checklist

May 27, 2014: Case Complete! :) :)

June 2, 2014: Called to see if my interview had been scheduled and now they are saying my case is still under review?? #######.

June 2, 2014: Called again and my case complete date has changed to today for some reason.

June 11, 2014: Interview Date/Appointment Letter Received

Consulate

June 19?, 2014: Embassy Received

June 17, 2014: Medical

July 1, 2014: Interview! Woot!

July 4, 2014 (Australia time): Visa in Hand!!

July 16, 2014: POE

Citizenship

August 31, 2017: N-400 filed

September 15, 2017: NOA date

October 12, 2017: Biometric screening

November 26, 2018: Interview 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

I was told in another thread that you do need to get a current professional appraisal done. I was also told that they will not accept property that is currently being lived in by the sponsor as the primary residence. My joint sponsor does own an apartment building that is separate from his home. However, as it stands now, my joint sponsor combined with his household member have a current household income that exceeds the poverty line for their household size. In addition, they already have over $300,000 in liquid assets that they are reporting, so it seems to me that it is unnecessary to include the real-estate on the I-864. I worry that if we include it without the proper documents, we will get a checklist (for something we shouldn’t technically even need according to the criteria.) What do you think?

I heard the same thing you can't be living on the property you use as assets. I don't think you have anything to worry about. If they are at or above the poverty line for the total people under their roof including the sponsored persons then your fine but you can use bank accounts, CD's things like that I think all you need are bank statements. My parents get them from their bank every 3 months and that is what we were told to use.

But to answer you, your all good, but I would show bank statements to be extra sure they can't reject it.

(F) (L) (F)

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Congo DR
Timeline

so here I am in June. I've been waiting since may 8 for my DS-261 to be accepted and IV fee bill to be issued. it seems like the whole process just came to a screeching halt. the waiting is killing me. anyone had IV bills issued lately?

I-130 submitted :11/12/13

NOA-2: 3/18/14

NVC case number: 5/7/14

AOS fee bill: 5/8/14

AOS fee paid: 5/10/14

DS-261 submitted: 5/8/14

AOS received at NVC: 5/12/14

AOS scanned at NVC: 5/14/14

IV fee bill: 6/4/14

IV fee shows "paid": 6/6/14

DS-260 available 6/5/14 at 7pm

DS-260 submitted: 6/6/14, 1am

IV packet received at NVC: 6/6/14

IV packet scanned at NVC 6/9/14

Request for expedite 6/9/14

False checklist for IV packet = AOS complete 6/12/14

Expedite denied 6/23/14- no explanation given

Second expedite request sent: 7/11/14

Expedite request approved: 7/21/14

Interview date: August 11, 2014 - Moscow :dancing::dancing::dancing:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Greece
Timeline

Congrats to all CC's .

I am waiting for a case # so i am starting to gather my papers. ( I have printed Saylins WIKI and i read it every night before i sleep. My temporary bible :wow: )

I am going to do the 864 EZ . I have filed taxes for 2012 and 2013 (1040) I received the tax transcript for 2013 .

2011 unemployed therefore i will put 0 . correct ?

2012 & 2013 i will put whatever # is on line 22 on the 1040 correct ?

Last question .

Since i was unemployed 2011 and do not meet the poverty line (of 4 members) on 2012 but over exceed the poverty line on 2013 and my paystubs this year almost reached the amount required so far . Do i have to have a joint sponsor ?

Thank you

Hi Tino.. If I remember correctly, you mentioned in a previous post of yours that you are filing for your wife and child? If that is the case then unfortunately you cannot use the I-864EZ.

One of the conditions to be able to file the I-864EZ is that you are only sponsoring one person.

As for the 1040 line 22 is correct you need the Total Income figure.

Since in 2013 you are making more than the poverty line for 4 people and your 2013 IRS transcript reflects that then you don't need a sponsor. You also do not need to include transcripts for 2012 and 2011, it is your choice. So you either send just 2013 IRS transcript or 2013, 2012 and 2011. The choice is yours.

However on the I-864 form, Part 6, Section 13 it does ask you to confirm (by checking the box) that you have filed Federal tax returns for each of the three most recent years. (This is regardless if you will be sending the tax information for the 3 most recent years or not)

Since you hadn't filed in 2011, you will have include a letter of explanation as to why you were exempted from filing that year.

CR1 Visa

USCIS
08/13/2013 -- I130 Sent
08/14/2013 -- I130 NOA1 (email)

02/20/2014 -- I130 NOA2 (189 days - email)

NVC

02-28-2014 -- NVC received
04-03-2014 -- NVC case number assigned

05-22-2014 -- Case completed!!!!!!!
05-30-2014 -- Interview scheduled for July 16th 2014 08:30am

05-31-2014 -- Interview Letter received
Embassy
06-24-2014 -- Medical

07-16-2014 -- Interview Approved!!!!!
07-21-2014 -- Visa in hand
09-24-2014 -- POE

 

ROC
09-09-2016 -- I-751 sent
09-17-2016 -- NOA received

10-14-2016 -- Biometric appointment

08-07-2017 -- New card ordered
08-10-2017 -- New card mailed ( still no approval letter)

Link to comment
Share on other sites

Filed: EB-1 Visa Country: Kuwait
Timeline

My DS-261 page status changed yesterday and now is displaying the following:

"Please contact the National Visa Center , if you want to change the Agent/Attorney Name or Address Information on your case.

To process your case, you must first pay any required fees. Then, each applicant accompanying the principal applicant to the United States will need to complete the online IV Application (form DS-260). The IV Application may be partially completed and finished later, or may be completed at one time. However, once submitted, please contact the NVC if you need to update the form.

After submitting the DS-260, mail all supporting documentation (as listed on the Documents The Applicant Must Submit web page) for each applicant to the NVC.

Once received, it will take the NVC 2 to 4 weeks to review your case. If any additional information is required after the review, the NVC will notify the applicant (or the applicant’s agent)."

Is that normal or does it mean the DS-261 requirement was waved? For the record, I have an EB1 case where I'm the petitioner/principal applicant and no attorney is involved.

21-MAR-2014 I-140 + PP sent to USCIS

31-MAR-2014 Petition approved

16-APR-2014 Case shipped to NVC

29-APR-2014 Case received by NVC

23-MAY-2014 Case # assigned

4-JUN-2014 IV Bill invoiced and PAID (AOS Exempt, DS-261 Waived)

6-JUN-2014 DS-260 forms submitted

10-JUN-2014 IV Docs received by NVC

13-JUN-2014 IV Docs matched to case (scanned)

30-JUL-2014 Case Complete, CC email auto-sent one week later

20-AUG-2014 AOS fee changed to N/A (Final clearance for interview scheduling?)

29-AUG-2014 Consular Interview scheduled on Oct 1st. Later rescheduled to Sep 24th. P4 Letter received following business day

14-SEP-2014 CEAC status changed to Ready

15-SEP-2014 Medical results delivered to Embassy by Panel Physician

24-SEP-2014 Consular Interview, went into AP (3rd AP in as many consecutive visa applications)

14-OCT-2014 Visa issued

22-OCT-2014 POE at Dulles Airport, Washington, D.C.

Link to comment
Share on other sites

Filed: EB-1 Visa Country: Kuwait
Timeline

2) I have the long-form sheet (license on top and certificate on bottom) and the short-form (certificate only) issued from Colorado. Is either acceptable for NVC? I would hate to lose the long-form as I think it's irreplaceable.

Any feedback on this question regarding marriage certificates?

21-MAR-2014 I-140 + PP sent to USCIS

31-MAR-2014 Petition approved

16-APR-2014 Case shipped to NVC

29-APR-2014 Case received by NVC

23-MAY-2014 Case # assigned

4-JUN-2014 IV Bill invoiced and PAID (AOS Exempt, DS-261 Waived)

6-JUN-2014 DS-260 forms submitted

10-JUN-2014 IV Docs received by NVC

13-JUN-2014 IV Docs matched to case (scanned)

30-JUL-2014 Case Complete, CC email auto-sent one week later

20-AUG-2014 AOS fee changed to N/A (Final clearance for interview scheduling?)

29-AUG-2014 Consular Interview scheduled on Oct 1st. Later rescheduled to Sep 24th. P4 Letter received following business day

14-SEP-2014 CEAC status changed to Ready

15-SEP-2014 Medical results delivered to Embassy by Panel Physician

24-SEP-2014 Consular Interview, went into AP (3rd AP in as many consecutive visa applications)

14-OCT-2014 Visa issued

22-OCT-2014 POE at Dulles Airport, Washington, D.C.

Link to comment
Share on other sites

LoveMyTico and Jsumner86 called NVC and told them you went on vacation so they said they would make you wait as long as we had to. :D:secret: .............. :oops:

Very funny Soloenta. If that was the case, my case would be COMPLETE :P. But it's not.

They still haven't gotten to May 12th of mail... Ann told us last night they still haven't been reviewed... :cry:

Sukie, this week is your week! I know you will get CC!

Edited by jsumner86

I-130 STAGE
-------------------------------
16th May 2013- I-130 PD Date
30th Dec 2013- Transferred to TSC
13th Mar 2014- I-130 Approved
20th Mar 2014- Cased shipped to NVC.


NVC STAGE
--------------------------------
28th Mar 14 Case received at NVC
28th Apr 14 Case # & IIN assigned

13th May 14 AOS package scanned into the system
14th May 14 DS260 available/completed.
20th May 14 IV package scanned into the system

12th June 14 AOS checklist- NVC error-

13th June 14 Supervisor review, said she would remove it when spoke to her. (Up to 30 business days).

28th July 14 CASE COMPLETE!!!!

19th August 2014- Medical

5th September 2014- Interview @ London

05th Sep 2014-Interview

05th Sep 2014- APPROVED! Visa Status Issued same day!

10th Sep 2014- Visa in hand

18th September 2014- POE ORLANDO FL! DISNEY!! :dancing:

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Scotland
Timeline

Hi everyone. Allow me to introduce myself :goofy: I am a US citizen in Australia applying for my husband. I have been following this Forum religiously and my husband thinks I am crazy and should relax. It makes me feel better to know there are others like me though!

hi Amanda, welcome. My husband thinks I'm crazy for obsessing over the forums too lol. He doesn't mind it when I can tell him every step of the process and what dates are being filed at the moment though :jest:

I-130 Timeline

 

NOA1 July 3rd 2013

Transfer to CSC January 7th 2014
RFE (eNotification) February 20th 2014 - RFE (Hardcopy) arrives in mail March 7th 2014
RFE Evidence sent March 10th 2014 - RFE Received at CSC March 11th 2014
NOA2 April 9th 2014

NVC Timeline
Received at NVC - May 14th 2014
Assigned Case # / IIN / BIN - May 16th 2014
DS-261 Completed online - May 19th 2014
DS-261 & AOS Bill email received - May 20th 2014
AOS Bill paid - May 20th 2014 Show's as Paid on portal - May 21st 2014
AOS Package sent - May 21st 2014 AOS Package received/scanned - May 27th 2014
DS-261 Reviewed - June 9th 2014
IV Fee invoiced and paid - June 10th 2014 Shows a Paid on portal - June 16th 2014
IV Package sent - June 10th 2014 IV Docs received/scanned - June 17th 2014
DS-260 Available and completed - June 16th 2014
AOS Checklist generated - June 27th 2014 AOS Checklist email - June 30th 2014
AOS Checklist response sent - June 30th 2014 AOS Checklist response received/scanned - July 9th 2014
IV Package reviewed and accepted - August 1st 2014
AOS Checklist reviewed and accepted - August 22nd 2014 Case Complete - August 22nd 2014
Left NVC - September 10th 2014



Embassy Timeline

 

Medical - May 27th 2014
Interview scheduled - September 2nd 2014
Case arrived at Embassy - September 16th 2014
Interview Date - September 29th (Changed from October 31st 2014) - APPROVED!!!
Visa in hand - October 7th 2014 - Entry to USA - October 8th (LAX)

Removal of Conditions Timeline (I-751)

Packet mailed - September 6th 2016 - Signed for September 8th
NOA (receipt date) - September 8th 2016 - Physical letter received September 12th 2016

Called USCIS as no biometrics letter received - Service Request raised October 13th

Biometrics letter- Letter mailed October 14th - letter received October 17th 2015

Biometrics appointment - October 31st 2016

InfoPass stamp - October 25th 2017 (expires October 24th 2018)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

I totally understand how you feel! Sometimes I wonder how these people passed their bar exams when they cannot copy 5 numbers from one sheet of paper to another! Our paralegal screwed up by rounding up the total income instead of putting it exactly as it was. We got checklisted for that. So they redid it and when my husband went to check, she'd rounded it up again on the new forms!

Please don't tell me it was sent again this way! :bonk::bonk:

Dated my husband for 7 years

Married July 29,2013

USCIS

August 21st, 2013: NOA 1

February 21st, 2014: Transferred to California

March 4th, 2014: NOA 2

March 8th, 2014: NOA 2 Hard Copy

NVC

March 14, 2014 Case received by NVC

April 14, 2014: Case number, IIN and BIN assigned :dancing:

April 21, 2014: AOS & IV Bill Invoiced & Paid

April 21, 2014: EP enrollment sent

April 24, 2014 : AOS Bill showing paid

April 25, 2014 : IV Bill showing paid

April 29, 2014: AOS Packet sent (electronic)

May 22, 2014: EP enrollment confirmation received

May 27, 2014: Completed DS-260 & email IV package

June 2, 2014: AOS reviewed and approved

June 19, 2014: Sent missing document (mistake made by paralegal) :ranting:

July 1, 2014: Case Complete! :dance:

July 9, 2014: Received CC email

July 9, 2014-Interview August 18 received date by phone :dance:
July 10,2014-Consulate Received

July 16, 2014: Re-schedule interview for August 5th
July 16, 2014-Medical
August 5, 2014-Interview Visa approved :dancing::dancing:
August 8, 2014 -Visa in Hand :dance: :dance:

POE Montreal: August 11, 2014 :jest:

Link to comment
Share on other sites

My incompetent lawyer wrote the wrong zip code on the AOS. It was received on 5/22 so now I'm expecting a checklist over a f*#king zip code. I hate this woman with a burning passion.

My lawyer put the wrong income after I begged and pleaded with him not to use that number. He kept saying " Jen, they aren't going to question it since you are over the poverty guidelines" I had an argument with him over the phone... Then I get an email from him saying the office assistant forgot to get him to sign the AOS because I was pressuring them to rush...... OMG I was fuming !! As if 11 months wasn't long enough to gather my info..... I sent the correction 2 days after he sent the incorrect one. I didn't wait for the checklist... ( and I did get checklisted)

I honestly don't think they will checklist you for a zip code. Just my opinion but I think they are more worried about the income numbers. Maybe the zip code can be corrected at the interview.

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Shocker of the day !! I started dialing the NVC at 2 minutes til 7. OMG, when I dialed at exactly 7, the phone didn't even ring and Gina picked up the phone.. She was laughing when I said how surprised I was that it didn't ring. She said I was her first call. No interview scheduled BUT she said she would update my file removing the mail that was supposidly received on the 23rd. I explained it was BS...only an email that they sent with someone else's personal information.

She confirmed since our email addresses are on file, we all will get the CC notice and the Interview instructions. Good ol' Waldo told me I will NOT get the emails....

I hope everyone who calls today gets GINA...

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Very funny Soloenta. If that was the case, my case would be COMPLETE :P. But it's not.

They still haven't gotten to May 12th of mail... Ann told us last night they still haven't been reviewed... :cry:

Sukie, this week is your week! I know you will get CC!

I think maybe Monday or Tuesday for you !! If they were working on the 8th on Monday.... I think its totally possible !! Then you maybe a July interview too !! YAHOOOEY

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Very funny Soloenta. If that was the case, my case would be COMPLETE :P. But it's not.

They still haven't gotten to May 12th of mail... Ann told us last night they still haven't been reviewed... :cry:

Sukie, this week is your week! I know you will get CC!

I'm following your time line now! My IV was scanned in on May 16th. I let go of July interview :-( But I won't say no if we make it!!!!

5/21/2016: Mailed I-751 packet to CSC

5/23/2016: NOA1

7/29/2016: Biometrics Appointment

11/22/2016: I-751 Approved!

oprahbees.gif

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...