Jump to content

6,035 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

is there a point calling when you're waiting for an interview date? do you get the interview email a day after it's scheduled?

from what i've seen in the interview thread, you get the case complete email about 10-12 days after your CC. Then after 2-3 days you'll get the interview date. (I'm guesstimating.. i'd be curious to know when you get your interview date)

07-09-13 - Application received at Chicago Lockbox NOA1

01-03-14 - Transfer notice to Nebraska

01-06-14 - Application received at Nebraska

03-13-14 - NOA2 notification

03-25-14 - NVC received case

04-24-14 - Case number and IIN received over the phone

05-02-14 - Paid AOS Fees

05-06-14 - Sent AOS package

05-07-14 - AOS Fees showed up as paid

05-08-14 - AOS package received at NVC (Scanned on may 8th)

05-08-14 - IV Bill showed up and paid

05-12-14 - Sent IV package overnight

05-13-14 - IV package received at NVC (Scanned on may 15th)

06-05-14 - AOS Checklist for not having N/A written for "Place of Residence" (checklist info received over the phone).

06-09-14 - AOS Checklist - I864EZ delivered today.

06-11-14 - I864EZ got scanned today.

06-13-14 - Sent original marriage and birth certificate out to NVC. (Received at NVC 06-16-14)

06-16-14 - received fake checklist asking for 864ez and marriage certificate

06-20-14 - Marriage and Birth certificate scanned

07-23-14 - Case complete (Talked to Don at NVC on 7/24) -- Received CC email 7/30

08-01-14 - Interview date assigned (Sept 9th)

08-05-14 - Received Interview Letter via email

09-10-14 - Visa Approved

09-11-14 - Paid the extortion fees

Posted

is there a point calling when you're waiting for an interview date? do you get the interview email a day after it's scheduled?

I got my Case Complete e-mail exactly one week after CC. As dar as interview dates go, they're currently scheduling for August, but there seems to be a long queue. I got my interview date 8 days after CC. I got the e-mail about that the following day.

Hop on over to dwheels interview thread and add yourself to the spreadsheet (if you haven't already) :-)

5/21/2016: Mailed I-751 packet to CSC

5/23/2016: NOA1

7/29/2016: Biometrics Appointment

11/22/2016: I-751 Approved!

oprahbees.gif

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Posted

Congrats on all the case completes!!!

Does anyone know where I can download the DS-260? I tried USCIS and checked Saylin's Wiki, I need to be able to download it so my husband can pre -fill it out. Don't know where else to look. :D Thank you. (F) (L) (F)

Use this :luv:

Hey, I looked in the NVC Wiki and did not see a link to print out the old DS-230 to practice for the DS-260. Do you have a link for that? :)

as above :)

Why use the DS 230 when you can use the DS 260?

Hmm, thought I had the link in there, but guess not! It's in my NVC EP wiki though :lol: I'll update the wiki to include the link. Thanks for noticing that :)

For now though, you can find it here: http://www.state.gov/documents/organization/81807.pdf

Saylin, why not link the DS260 exemplar rather than the old DS230?

Hey Saylin

I tried looking in the NVC Wiki and did not see a link to print out the I864 form to practice Do you have a link for that? :)

Just go to the website for the form and instructions, print it out and practice on that :idea::luv:

http://www.uscis.gov/i-864


Hi, I got a checklist for incompetence of..

I-864

In Part 6. Sponsor's Income and Employment, please correct the following...

[x] Item 13.a. You must include your ___2013________________________________ tax and income information.

[x] Items 13.a.1. The income you enter must match the total (gross) income reported on your most recent Federal

income tax return. If you filed Form 1040EZ, use the adjusted gross income instead.

The question 13.a. and 13.a.1. on the I-864 asks for most recent Tax Year and Total Income

My question is that I don't have a job so I left that blank and put "*claimed as a dependent on parents tax return." under the question. So what do I write? N/A?

I-864A

Part 1 Information on the Household Member

[x] This section is incomplete. Please answer all questions completely. (If N/A, please indicated in the

appropriate space).

What I left blank for Part 1 was #3. Place of Residence and #12 My Assets...do I put the same address for #3 and N/A's all over #12?

Please help me I want to be done with this case already.

You must put a '0' in there and include a written statement about why you didn't file taxes.

For the next question, there is no number 3 in Part 1. Part 1 is 1, 1.a. -> 1.f.

The Part 2 section on the immigrant is what carries over to the right side of the page, as per the I-864 instructions (linked in the response to the last quote).

ahh.. so you're now talking about someone's 864a - put 'see above' or rewrite the address in Part 1 #3.

And in our case, the person filing the 864a left number 12 blank completely without any issue.

"If you are not willing to learn, no one can help you. If you are determined to learn, no one can stop you."

"Life is not what it's supposed to be. It's what it is. The way you cope with it is what makes the difference."

Beneficiary - Applying for CR1/IR1 (but also played the K3 card prior to understanding it may be phased out.)

2013: July 20: I-130 sent (Chicago lockbox)

July 24: I-130 NOA1

July 24: I-129F sent (Dallas Lockbox)

Aug 2: I-129F NOA1

Aug 12: Alien Registration Number was changed, I-129F.

2014: Jan 28/29/30: - 3 transfer notices for I-130 and I-129F.

Feb 3 - Hard copy arrived -Notice of transfer to Texas stating Jan 29th.

Feb 10 - NOA2

Feb 27 - email stating I-130 being sent to NVC from TSC.

March 6 -NVC received our case.

April 7 - CASE NUMBER yay! IIN and BIN obtained and email given.

April 9 - DS261 available and filled in online.

April 9 - AOS not yet payable but visible.

April 10 - email regarding NVC case number and access to DS261 received/ email regarding AOS received and paid.

April 11 - AOS sent by snail mail.

April 14 - AOS arrived per mail tracking.

April 15 - IV bill received via email, IV bill paid/ in process, IV package sent.

April 18 - IV bill showing paid/ DS-260 available and done!

- AOS scanned into their system.

April 21 - IV package arrived per mail tracking.

April 24 - IV scanned into their system.

May 2 - False checklist for IV documents= AOS approval.

May 13 - NVC rep reported ? missing Police certificate via my phone call.

- Supervisor review initiated.

May 14 - Checklist for Police certificate came via email.

- Sent checklisted documentation priority post!

May 15 - Package delivered per mail tracking.

May 19 - Case COMPLETE!! Police certificate found by NVC:)

May 28 - Case complete email arrived.

May 30 - Assigned Interview date!

June 2 - Interview letter arrived via email.

June 11- Medical appointment Surrey, BC

July 8 - Interview in Montreal!! APPROVED!!!!!!!! July 10 - Visa package and passport in hand!! July 23 - POE!!

Filed: Country: Senegal
Timeline
Posted

I submitted mine May 28 Th and nothing yet. :(

Just spoke to Jeff, nice guy said my AOS has been scanned, my tracking says they received it on the 12Th of June they say the 25 Th and scanned

in on the 30 of Fing June. Also that my IV fees should be ready in a Fing week or two. DS-261 was sent on the 28Th of May. :ranting: :ranting: :ranting: :ranting: :ranting: :ranting: :ranting: :ranting: :ranting: :ranting: :ranting: :ranting: :ranting: :ranting: :ranting: :ranting: :ranting: :ranting:

Ok, I've been lurking here for a while now and I've never posted anything... but I just have to on this one because it boggles my mind.

Did he really tell you that the scan date is June 30th? Because that's next Monday.... how can that be possible... :huh:

Click Here For The Business Days Calculator




03/22/2013: Married :wub:


09/16/2013: I-130 Sent


09/26/2013: Email NOA1 received, never received a hard copy


03/05/2014: Transferred to NSC


04/02/2014: NOA2 email :dance:


04/21/2014: NVC Received


05/16/2014: Case Number, IIN, and BIN given


05/20/2014: AOS Invoiced/DS-261 Form Available


05/20/2014: Submit DS-261


05/21/2014: AOS Fee Paid


05/28/2014: AOS Package Sent


05/29/2014: Accidentally re-submit DS-261


06/03/2014: AOS Package Scanned


07/09/2014: Received checklist for DS-261.


07/10/2014: Called NVC, DS-261 checklist is false, no status update. Rep Olivia states she will request a review of my DS-261 since it has been 30 biz days.


07/11/2014: AOS package reviewed and accepted. No checklist!!! Rep Mel states DS-261 was pushed through today, should receive IV invoice next week......


07/14/2014: IV fee invoice received and paid!!! FINALLY!


07/15/2014: IV Package Sent


07/16/2014: IV Package delivered to NVC, IV Fee shows "Paid", and DS-260 available


07/18/2014: IV Package Scanned


07/19/2014: DS-260 Submitted


07/20/2014: Sent Expedite Request, received no response.


07/29/2014: Sent Second Expedite Request, received email asking for contact numbers, replied, and email sent from NVC to embassy with expedite request.


08/05/2014: Received email: Expedite Request Denied.



09/09/2014: CASE COMPLETE :dancing:


09/10/2014: Interview scheduled


09/11/2014: Received interview letter (no joke, the very next day)



10/10/2014: Medical


10/25/2014: Flying to Dakar to attend interview with my husband (L)


10/30/2014: Interview!!!

Posted

IV fee status changed to paid, the DS-260 is now visible. I am going to fill it out right now. Will be sending IV documents tomorrow asap in the AM. :dancing: :dancing: :dancing: :dancing: :dancing: :dancing:

USCIS

Priority

Date: Form I-130 Sept 27,2013

Approved: March 27, 2014

Sent over to NVC: April 2, 2014

NVC

Received approved petition on: April 14, 2014

Received NVC case number on: May 13, 2014

AOS Fee paid on: May 17, 2014

AOS FEE CLEARED and completed on: May 20, 2014

DS-261 completed and cleared on: May 21, 2014

AOS Packet sent on: June 4, 2014

AOS Packet delivered on: June 6, 2014

AOS Packet received by NVC: June 11, 2014

IV Fee visible on: June 25, 2014

IV Fee Paid by : June 25, 2014

DS-260 completed on: June 27, 2014

IV Packet sent on: June 27, 2014

IV Packet delivered on: June 30, 2014

IV Packet received by NVC on: July 7, 2014

Received AOS checklist: July 28, 2014

AOS resent again: 8/6/2014

Case Completed on: 10/6/2014

Filed: Citizen (pnd) Country: Scotland
Timeline
Posted

IV fee status changed to paid, the DS-260 is now visible. I am going to fill it out right now. Will be sending IV documents tomorrow asap in the AM. :dancing: :dancing: :dancing: :dancing: :dancing: :dancing:

Best of luck!!!

I-130 Timeline

 

NOA1 July 3rd 2013

Transfer to CSC January 7th 2014
RFE (eNotification) February 20th 2014 - RFE (Hardcopy) arrives in mail March 7th 2014
RFE Evidence sent March 10th 2014 - RFE Received at CSC March 11th 2014
NOA2 April 9th 2014

NVC Timeline
Received at NVC - May 14th 2014
Assigned Case # / IIN / BIN - May 16th 2014
DS-261 Completed online - May 19th 2014
DS-261 & AOS Bill email received - May 20th 2014
AOS Bill paid - May 20th 2014 Show's as Paid on portal - May 21st 2014
AOS Package sent - May 21st 2014 AOS Package received/scanned - May 27th 2014
DS-261 Reviewed - June 9th 2014
IV Fee invoiced and paid - June 10th 2014 Shows a Paid on portal - June 16th 2014
IV Package sent - June 10th 2014 IV Docs received/scanned - June 17th 2014
DS-260 Available and completed - June 16th 2014
AOS Checklist generated - June 27th 2014 AOS Checklist email - June 30th 2014
AOS Checklist response sent - June 30th 2014 AOS Checklist response received/scanned - July 9th 2014
IV Package reviewed and accepted - August 1st 2014
AOS Checklist reviewed and accepted - August 22nd 2014 Case Complete - August 22nd 2014
Left NVC - September 10th 2014



Embassy Timeline

 

Medical - May 27th 2014
Interview scheduled - September 2nd 2014
Case arrived at Embassy - September 16th 2014
Interview Date - September 29th (Changed from October 31st 2014) - APPROVED!!!
Visa in hand - October 7th 2014 - Entry to USA - October 8th (LAX)

Removal of Conditions Timeline (I-751)

Packet mailed - September 6th 2016 - Signed for September 8th
NOA (receipt date) - September 8th 2016 - Physical letter received September 12th 2016

Called USCIS as no biometrics letter received - Service Request raised October 13th

Biometrics letter- Letter mailed October 14th - letter received October 17th 2015

Biometrics appointment - October 31st 2016

InfoPass stamp - October 25th 2017 (expires October 24th 2018)

Filed: IR-5 Country: India
Timeline
Posted

I left VJ after I got the damn checklist because I couldn't handle it, but I've come back because I can relax (a little) and say that today we got case complete. Waiting on the interview date now.

congrats!!! I hope tomorrow is our day!!

Told you. Tomorrow is our day :yes:

YES!!! you were right!! tomorrow is our day and I can't wait!!

Husband called this morning and our case completed !! Finally. She said we need to wait for the interview schedule now

congrats!!

CASE COMPLETE TODAY....I'm sooooo happy....it's been a long journey

Now I'm waiting for the email with the interview date :thumbs:

Wish you all good luck and thank you all

congrats!

08-29-2014 POE

USCIS

06-18-2013 I-130 filed-Phoenix Lockbox (Mother & Father-in-law)

06-20-2013 NOA1

12-30-2013 Transferred to NSC0

3-04-2014 I-130 Approved!

03-08-2014 NOA2 Hard Copy Received

NVC

03-05-2014 File Shipped to NVC

03-18-2014 NVC received both files

04-17-2014 NVC case numbers/IIN/BIN assigned

04-24-2014 Completed DS-261 Online

04-25-2014 I-864 (AOS) Bill Generated and Paid/AOS Package Sent/Received E-mail from NVC to fill out DS-261/Pay AOS Fee

04-26-2014 AOS Fee deducted from bank account0

4-28-2014 DS-261 Accepted/IV Fee Invoiced but can't pay

04-29-2014 I-864 (AOS) Bill Shows PAID/I-864 (AOS) Packet Delivered (Signed by FNU)

04-29-2014 Received E-mail from NVC-DS-261 has been accepted

04-30-2014 IV Bill Paid0

5-01-2014 IV Bill deducted from Bank Account

05-01-2014 AOS Package entered into the system

05-02-2014 IV Bill shows PAID/DS-260 Available and Completed online (Waiting for PCC)

05-19-2014 IV Packet Sent overnight0

5-20-2014 IV Packet Delivered (Signed by DRAFAN)

05-21-2014 Checklist via phone for AOS

05-22-2014 Checklist E-mail received for AOS line# 13A for I-864/line# 11 for I-864A/sent checklist response overnight

05-23-2014 Checklist response delivered (Signed by FNU)

05-23-2014 IV Package entered into the system

05-27-2014 False checklist for IV Package

05-28-2014 Checklist response entered into the system

06-26-2014 IV Package accepted!!

06-30-2014 Case Complete!!!

07-08-2014 Case complete E-mail received!

07-09-2014 Interview Scheduled for August 11 @ 12:45PM0

7-18-2014 Medical

07-21-2014 Biometrics appointment

08-11-2014 Interview-APPROVED!!

08-13-2014 Picked up the Passport/Paid ELIS Fee

Posted

Hey Everyone!

I am one of the quiet lurkers here on visa journey! Got my case complete yesterday finally!! Thank you guys for giving me advice and helping me out with any questions I have had. It was a very long journey. Wishing everyone else all the best and case completes soon.

:dance::dance::dance::lol::dance::dance::dance:

Congratulations!!! :dancing:

USCIS
18 June 2013 - Sent I-130
21 June 2013 - NOA1

18 Dec 2013 - Transferred to Nebraska

6 March 2014 - I-130 Approval/NOA2

NVC
18 March 2014 - Case received

28 April 2014 - DS -261 Available and complete

28 April 2014 - AOS Bill invoiced and paid

1 May 2014 - IV Bill invoiced and paid

2 May 2014 - AOS Package sent

6 May 2014 - DS-260 Completed online

9 May 2014 - AOS Package scanned at NVC

15 May 2014 - IV Package sent

22 May 2014 - IV Package scanned at NVC

6 June 2014 - Received AOS checklist

10 June 2014 - Posted AOS checklist response

20 June 2014 - AOS checklist scanned at NVC

24 June 2014 - False checklist for AOS checklist received (IV package approved)

26 August 2014 - Case complete via supervisor review over the phone, AOS fee changed to "N/A" on CEAC website

10 September 2014 - Interview scheduled

12 September 2014 - Paperwork "In Transit" on CEAC website

Embassy
15 September 2014 - Medical

15 September 2014 - Paperwork arrived at embassy (according to DHL tracking)

19 September 2014 - Paperwork "Ready" on CEAC website
7 October 2014 - Interview - VISA APPROVED!!!

9 October 2014 - Visa in hand
22 January 2015 - POE LAX

Filed: Citizen (pnd) Country: Scotland
Timeline
Posted (edited)

Hey Everyone!

I am one of the quiet lurkers here on visa journey! Got my case complete yesterday finally!! Thank you guys for giving me advice and helping me out with any questions I have had. It was a very long journey. Wishing everyone else all the best and case completes soon.

:dance::dance::dance::lol::dance::dance::dance:

Lurker or not, you got your case complete YAAAAAY!!!! Congratulations.

smiley_tag.0157886001403842722.gif

EDIT: Sorry, my Grafitti smiley doesn't recognize the "<" symbol.

Edited by ColGil

I-130 Timeline

 

NOA1 July 3rd 2013

Transfer to CSC January 7th 2014
RFE (eNotification) February 20th 2014 - RFE (Hardcopy) arrives in mail March 7th 2014
RFE Evidence sent March 10th 2014 - RFE Received at CSC March 11th 2014
NOA2 April 9th 2014

NVC Timeline
Received at NVC - May 14th 2014
Assigned Case # / IIN / BIN - May 16th 2014
DS-261 Completed online - May 19th 2014
DS-261 & AOS Bill email received - May 20th 2014
AOS Bill paid - May 20th 2014 Show's as Paid on portal - May 21st 2014
AOS Package sent - May 21st 2014 AOS Package received/scanned - May 27th 2014
DS-261 Reviewed - June 9th 2014
IV Fee invoiced and paid - June 10th 2014 Shows a Paid on portal - June 16th 2014
IV Package sent - June 10th 2014 IV Docs received/scanned - June 17th 2014
DS-260 Available and completed - June 16th 2014
AOS Checklist generated - June 27th 2014 AOS Checklist email - June 30th 2014
AOS Checklist response sent - June 30th 2014 AOS Checklist response received/scanned - July 9th 2014
IV Package reviewed and accepted - August 1st 2014
AOS Checklist reviewed and accepted - August 22nd 2014 Case Complete - August 22nd 2014
Left NVC - September 10th 2014



Embassy Timeline

 

Medical - May 27th 2014
Interview scheduled - September 2nd 2014
Case arrived at Embassy - September 16th 2014
Interview Date - September 29th (Changed from October 31st 2014) - APPROVED!!!
Visa in hand - October 7th 2014 - Entry to USA - October 8th (LAX)

Removal of Conditions Timeline (I-751)

Packet mailed - September 6th 2016 - Signed for September 8th
NOA (receipt date) - September 8th 2016 - Physical letter received September 12th 2016

Called USCIS as no biometrics letter received - Service Request raised October 13th

Biometrics letter- Letter mailed October 14th - letter received October 17th 2015

Biometrics appointment - October 31st 2016

InfoPass stamp - October 25th 2017 (expires October 24th 2018)

Posted

WOW everyone! So much great new happening in here. I hope NVC keep churning out the case completes at a rapid pace so we can all get through this process as quickly as possible.

Sending positive vibes out to all of my VJ family!!!! :goofy:

USCIS
18 June 2013 - Sent I-130
21 June 2013 - NOA1

18 Dec 2013 - Transferred to Nebraska

6 March 2014 - I-130 Approval/NOA2

NVC
18 March 2014 - Case received

28 April 2014 - DS -261 Available and complete

28 April 2014 - AOS Bill invoiced and paid

1 May 2014 - IV Bill invoiced and paid

2 May 2014 - AOS Package sent

6 May 2014 - DS-260 Completed online

9 May 2014 - AOS Package scanned at NVC

15 May 2014 - IV Package sent

22 May 2014 - IV Package scanned at NVC

6 June 2014 - Received AOS checklist

10 June 2014 - Posted AOS checklist response

20 June 2014 - AOS checklist scanned at NVC

24 June 2014 - False checklist for AOS checklist received (IV package approved)

26 August 2014 - Case complete via supervisor review over the phone, AOS fee changed to "N/A" on CEAC website

10 September 2014 - Interview scheduled

12 September 2014 - Paperwork "In Transit" on CEAC website

Embassy
15 September 2014 - Medical

15 September 2014 - Paperwork arrived at embassy (according to DHL tracking)

19 September 2014 - Paperwork "Ready" on CEAC website
7 October 2014 - Interview - VISA APPROVED!!!

9 October 2014 - Visa in hand
22 January 2015 - POE LAX

Posted

:ot: Since NVC is now closed for the day and nobody will be calling for several hours, I was thinking of a way to pass time. There are some amazingly witty writers here on VJ and I love stumbling across anyone with a blog. My favourite so far is the one by bdrew612. It has kept me laughing througout this ridiculous gauntlet. If you have time, give it a read!!! http://thelonelynewl....wordpress.com/ I hope this link works and bdrew612 won't mind me sharing!

If anyone else has a blog to share about NVC or immigration please share! It makes me feel better to read other people's stories to know I am not alone :ot2:

USCIS
18 June 2013 - Sent I-130
21 June 2013 - NOA1

18 Dec 2013 - Transferred to Nebraska

6 March 2014 - I-130 Approval/NOA2

NVC
18 March 2014 - Case received

28 April 2014 - DS -261 Available and complete

28 April 2014 - AOS Bill invoiced and paid

1 May 2014 - IV Bill invoiced and paid

2 May 2014 - AOS Package sent

6 May 2014 - DS-260 Completed online

9 May 2014 - AOS Package scanned at NVC

15 May 2014 - IV Package sent

22 May 2014 - IV Package scanned at NVC

6 June 2014 - Received AOS checklist

10 June 2014 - Posted AOS checklist response

20 June 2014 - AOS checklist scanned at NVC

24 June 2014 - False checklist for AOS checklist received (IV package approved)

26 August 2014 - Case complete via supervisor review over the phone, AOS fee changed to "N/A" on CEAC website

10 September 2014 - Interview scheduled

12 September 2014 - Paperwork "In Transit" on CEAC website

Embassy
15 September 2014 - Medical

15 September 2014 - Paperwork arrived at embassy (according to DHL tracking)

19 September 2014 - Paperwork "Ready" on CEAC website
7 October 2014 - Interview - VISA APPROVED!!!

9 October 2014 - Visa in hand
22 January 2015 - POE LAX

Filed: Citizen (pnd) Country: Scotland
Timeline
Posted (edited)

:ot: Since NVC is now closed for the day and nobody will be calling for several hours, I was thinking of a way to pass time. There are some amazingly witty writers here on VJ and I love stumbling across anyone with a blog. My favourite so far is the one by bdrew612. It has kept me laughing througout this ridiculous gauntlet. If you have time, give it a read!!! http://thelonelynewl....wordpress.com/ I hope this link works and bdrew612 won't mind me sharing!

If anyone else has a blog to share about NVC or immigration please share! It makes me feel better to read other people's stories to know I am not alone :ot2:

I'm a newcomer to bdrew's blog but I find it so inspirational. There is a lot of truth in there. I wish I'd been focussed enough to write a blog, but I didn't expect this process to last this long, so I didn't start one, and fear it's too late to start one now.

On the subject of wit, I'll say goodnight on a phrase my late grandmother used to say whenever I cracked a joke:

"If you are as $#itty as you are witty, you'll be in a heck of a mess!" Good night, God bless, Good luck to all.

Edited by ColGil

I-130 Timeline

 

NOA1 July 3rd 2013

Transfer to CSC January 7th 2014
RFE (eNotification) February 20th 2014 - RFE (Hardcopy) arrives in mail March 7th 2014
RFE Evidence sent March 10th 2014 - RFE Received at CSC March 11th 2014
NOA2 April 9th 2014

NVC Timeline
Received at NVC - May 14th 2014
Assigned Case # / IIN / BIN - May 16th 2014
DS-261 Completed online - May 19th 2014
DS-261 & AOS Bill email received - May 20th 2014
AOS Bill paid - May 20th 2014 Show's as Paid on portal - May 21st 2014
AOS Package sent - May 21st 2014 AOS Package received/scanned - May 27th 2014
DS-261 Reviewed - June 9th 2014
IV Fee invoiced and paid - June 10th 2014 Shows a Paid on portal - June 16th 2014
IV Package sent - June 10th 2014 IV Docs received/scanned - June 17th 2014
DS-260 Available and completed - June 16th 2014
AOS Checklist generated - June 27th 2014 AOS Checklist email - June 30th 2014
AOS Checklist response sent - June 30th 2014 AOS Checklist response received/scanned - July 9th 2014
IV Package reviewed and accepted - August 1st 2014
AOS Checklist reviewed and accepted - August 22nd 2014 Case Complete - August 22nd 2014
Left NVC - September 10th 2014



Embassy Timeline

 

Medical - May 27th 2014
Interview scheduled - September 2nd 2014
Case arrived at Embassy - September 16th 2014
Interview Date - September 29th (Changed from October 31st 2014) - APPROVED!!!
Visa in hand - October 7th 2014 - Entry to USA - October 8th (LAX)

Removal of Conditions Timeline (I-751)

Packet mailed - September 6th 2016 - Signed for September 8th
NOA (receipt date) - September 8th 2016 - Physical letter received September 12th 2016

Called USCIS as no biometrics letter received - Service Request raised October 13th

Biometrics letter- Letter mailed October 14th - letter received October 17th 2015

Biometrics appointment - October 31st 2016

InfoPass stamp - October 25th 2017 (expires October 24th 2018)

Posted

I'm a newcomer to bdrew's blog but I find it so inspirational. There is a lot of truth in there. I wish I'd been focussed enough to write a blog, but I didn't expect this process to last this long, so I didn't start one, and fear it's too late to start one now.

On the subject of wit, I'll say goodnight on a phrase my late grandmother used to say whenever I cracked a joke:

"If you are as $#itty as you are witty, you'll be in a heck of a mess!" Good night, God bless, Good luck to all.

I agree, if I had the foresight to know how long this process would take, I would have definitely kept a blog or at least a journal. When I started this process 12 months ago, I didn't have my head around the whole process and thought it would be about 6 months, boy was I wrong! I also thought getting our I-130 approved would get us the green card. Jokes on me! After 10 months of waiting, there is a whole other step called the NVC! Wish I had stumbled upon VJ long before I did, I would have been prepared.

I love your grandmother's quote, so cute.

USCIS
18 June 2013 - Sent I-130
21 June 2013 - NOA1

18 Dec 2013 - Transferred to Nebraska

6 March 2014 - I-130 Approval/NOA2

NVC
18 March 2014 - Case received

28 April 2014 - DS -261 Available and complete

28 April 2014 - AOS Bill invoiced and paid

1 May 2014 - IV Bill invoiced and paid

2 May 2014 - AOS Package sent

6 May 2014 - DS-260 Completed online

9 May 2014 - AOS Package scanned at NVC

15 May 2014 - IV Package sent

22 May 2014 - IV Package scanned at NVC

6 June 2014 - Received AOS checklist

10 June 2014 - Posted AOS checklist response

20 June 2014 - AOS checklist scanned at NVC

24 June 2014 - False checklist for AOS checklist received (IV package approved)

26 August 2014 - Case complete via supervisor review over the phone, AOS fee changed to "N/A" on CEAC website

10 September 2014 - Interview scheduled

12 September 2014 - Paperwork "In Transit" on CEAC website

Embassy
15 September 2014 - Medical

15 September 2014 - Paperwork arrived at embassy (according to DHL tracking)

19 September 2014 - Paperwork "Ready" on CEAC website
7 October 2014 - Interview - VISA APPROVED!!!

9 October 2014 - Visa in hand
22 January 2015 - POE LAX

Posted

Best of luck!!!

Thanks it was a breeze, I am at the last part. Am I supposed to put yes for both questions?

I am stuck at the social security part

Do you want the Social Security Administration to issue a Social Security number and a card?

Do you authorize disclosure of information from this form to the Department of Homeland Security, the Social Security Administration, and such other U.S. Government agencies as may be required for the purposes of assigning you a social security number (SSN) and issuing you a Social Security card and do you authorize the Social Security Administration to share your S?

USCIS

Priority

Date: Form I-130 Sept 27,2013

Approved: March 27, 2014

Sent over to NVC: April 2, 2014

NVC

Received approved petition on: April 14, 2014

Received NVC case number on: May 13, 2014

AOS Fee paid on: May 17, 2014

AOS FEE CLEARED and completed on: May 20, 2014

DS-261 completed and cleared on: May 21, 2014

AOS Packet sent on: June 4, 2014

AOS Packet delivered on: June 6, 2014

AOS Packet received by NVC: June 11, 2014

IV Fee visible on: June 25, 2014

IV Fee Paid by : June 25, 2014

DS-260 completed on: June 27, 2014

IV Packet sent on: June 27, 2014

IV Packet delivered on: June 30, 2014

IV Packet received by NVC on: July 7, 2014

Received AOS checklist: July 28, 2014

AOS resent again: 8/6/2014

Case Completed on: 10/6/2014

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...