Melibelle, don't be sad ! You and I we have the same local office.. and I've been on testing and interview since June 30th ... similar to you.

That doesn't mean anything bad :) just our local office is crowded

Which is even scarier in a way, because no one has been reporting getting interviews in NYC. The last person who posted getting an interview date was over a month ago. I am sure NYC is a busy office, but if no one is getting interviews, imagine how backed up they must be with people ahead of us...

I'm not really worried about getting approved; I think we're pretty well-prepared, but I just want it to happen already!!!!! I was so optimistic we'd be done in 3 months like the folks who applied in February and March. Not even having an interview date at this point is discouraging.

Anyway. Whining over. Thanks for the encouragement. I will hopefully be more positive (or at least less negative) tomorrow.

 

AOS from TN (I'm the petitioner)

05-14-14: Married!

05-22-14: (Day 00) - AOS package (I-130/I-485/I-131/I-765) overnighted to Chicago

05-23-14: (Day 01) - Package delivered and signed for by J.C.

05-30-14: (Day 08) - Email/text notifications received at 12:24am

06-05-14: (Day 14) - NOAs received in the mail

06-07-14: (Day 16) - Biometrics appointment received in the mail

06-20-14: (Day 29) - Biometrics complete as scheduled

06-26-14: (Day 35) - Received text that I-485 was moved to "Testing and Interview" stage

08-12-14: (Day 82) - EAD/AP card in production

08-20-14: (Day 90) - EAD/AP card arrived

08-27-14: (Day 97) - Received email for interview October 3rd

08-29-14: (Day 99) - NOA2 for interview received in the mail

10-03-14: (Day 134) - Interview at Federal Plaza - APPROVED! Card in Production email 20 minutes later!

10-09-14: (Day 140) - Received email that card was mailed

10-10-14: (Day 141) - Green card, Welcome to the US notice, and approval of I-130 received in the mail

ROC

08-02-16: Mailed ROC package to VSC

08-09-16: Check cashed

08-12-16: Received NOA dated 8-5

08-26-16: Received biometrics appointment for 9/8/16

07-13-17: New card is being produced!

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Canada
Timeline

Ah, thanks. My laptop is ancient and clunky so I rarely use it in favor of my iPad. I was completely confused.

I've been in testing and interview since June 26th too. I'd hoped with that, that I would have had my interview in August. :( I'm trying to be patient, but having my interview later in the fall means my husband will need to take the day off work - an annoyance for a teacher.

I suppose it was my fault. My plan was to submit my application in March, but my baby came 4 weeks early (100% healthy), so it derailed my plans for several weeks, to say the least.

Once my EAD comes, I am trying to decide if it is 'safe' to send off my passport to be renewed. It would be horrible for it to be gone for the interview. Though, I suppose I'd have my AP so I could cross and go to a Canadian passport office to speed up the process (and keep my passport in hand). But AP still makes me cautious, I don't want to cross unless it's a true emergency.

First Entered US with TN Status: 04/13/2012
Engaged: 08/24/2012
Married: 08/10/2013

Adjustment of Status from TN Status to Permanent Resident:
Day 00: AOS mailed by USPS priority Post: 05/19/2014
Day 02: AOS package arrived: 05/21/2014
Day 08: Text/email notice of acceptance: 05/27/2014
Day 11: NOAs for I-130, I-485, I-765, I-131 received, 05/30/2014
Day 14: Biometrics notice received with an appointment of June 17, 2914 at 3pm. 06/02/2014
Day 15: attempted walk-in successful after a very long wait 06/03/2014
Day 38: email notice that I-485 has moved to testing & interview! 06/26/2014
Day 77: EAD/AP - card production 08/06/2014
Day 84: EAD/AP card received 08/13/2014
Day 129: Infopass appointment for an update (very helpful!) 09/24/2014
Day 136: Email received with interview date 10/01/2014
Day 138: Interview notice received! 10/03/2014
Day 170: Green Card Approved on the Spot! 11/04/2014
Day 178: Green Card Received 11/12/2014

REMOVAL OF CONDITIONS:

Day 00: ROC Package (Weighing 1.7kg -- 3lbs 13oz) mailed by USPS Priority Post: 09/13/2016

Day 03: ROC Package Received: 09/16/2016

Day 07: Check Cashed: 09/20/2016

Day Too many to count: Received Approval 02/05/2018

NATURALIZATION

Day 00: Submitted file online for N400 -- 07/31/2020

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Canada
Timeline

Which is even scarier in a way, because no one has been reporting getting interviews in NYC. The last person who posted getting an interview date was over a month ago. I am sure NYC is a busy office, but if no one is getting interviews, imagine how backed up they must be with people ahead of us...

I'm not really worried about getting approved; I think we're pretty well-prepared, but I just want it to happen already!!!!! I was so optimistic we'd be done in 3 months like the folks who applied in February and March. Not even having an interview date at this point is discouraging.

Anyway. Whining over. Thanks for the encouragement. I will hopefully be more positive (or at least less negative) tomorrow.

Yeah, and looking at USCIS' processing times is more annoying. For my office it says they are working on January's. Fortunately timelines here say that people in April have had interviews. I'd just like to have it done. Summer slowdown? I imagine like many offices they have more folks on holidays. Arg.

I'd love it if they would just grant our GC. We have a mortgage and a baby together. How much more bona fide can you get. Plus I'm an RN that had to go through a much more stringent clearance to get my license and TN visa to work down here than the GC paperwork. Don't even get me started on how to do that paperwork. Ugh.

First Entered US with TN Status: 04/13/2012
Engaged: 08/24/2012
Married: 08/10/2013

Adjustment of Status from TN Status to Permanent Resident:
Day 00: AOS mailed by USPS priority Post: 05/19/2014
Day 02: AOS package arrived: 05/21/2014
Day 08: Text/email notice of acceptance: 05/27/2014
Day 11: NOAs for I-130, I-485, I-765, I-131 received, 05/30/2014
Day 14: Biometrics notice received with an appointment of June 17, 2914 at 3pm. 06/02/2014
Day 15: attempted walk-in successful after a very long wait 06/03/2014
Day 38: email notice that I-485 has moved to testing & interview! 06/26/2014
Day 77: EAD/AP - card production 08/06/2014
Day 84: EAD/AP card received 08/13/2014
Day 129: Infopass appointment for an update (very helpful!) 09/24/2014
Day 136: Email received with interview date 10/01/2014
Day 138: Interview notice received! 10/03/2014
Day 170: Green Card Approved on the Spot! 11/04/2014
Day 178: Green Card Received 11/12/2014

REMOVAL OF CONDITIONS:

Day 00: ROC Package (Weighing 1.7kg -- 3lbs 13oz) mailed by USPS Priority Post: 09/13/2016

Day 03: ROC Package Received: 09/16/2016

Day 07: Check Cashed: 09/20/2016

Day Too many to count: Received Approval 02/05/2018

NATURALIZATION

Day 00: Submitted file online for N400 -- 07/31/2020

Link to comment
Share on other sites

Filed: Citizen (apr) Country: France
Timeline

Which is even scarier in a way, because no one has been reporting getting interviews in NYC. The last person who posted getting an interview date was over a month ago. I am sure NYC is a busy office, but if no one is getting interviews, imagine how backed up they must be with people ahead of us...

I'm not really worried about getting approved; I think we're pretty well-prepared, but I just want it to happen already!!!!! I was so optimistic we'd be done in 3 months like the folks who applied in February and March. Not even having an interview date at this point is discouraging.

Anyway. Whining over. Thanks for the encouragement. I will hopefully be more positive (or at least less negative) tomorrow.

I understand. But also it is summer and between the crowded office and the employee's holiday... one thing and another... I was thinking it would be faster also, but hey, we got to testing and interview pretty fast too!! :)

Let's just wait, that's the only way

03/28/2014 - Married in New York Clerks Office

Adjusting from H1B

5/28/2014 - Sent AOS package
5/30/2014 - AOS Package Delivered
6/06/2014 - Text and email notification received
6/10/2014 - 4 Hard copies of NOA1 received
6/13/2014 - Biometrics appointment letter in the mail

6/17/2014 - Walk-in biometrics at Varick Street
6/27/2014 - Scheduled appointment for biometrics

6/30/2014 - Notification from USCIS, Testing & Interview

8/13/2014 - EAD and AP approved

8/18/2014 - EAD received

10/15/2014 - Interview at New York Federal Plaza and APPROVED email and text at the end of day

10/21/2014 - Green card in the mail

ROC

07/16/2016 - Sent I-751 to VSC

07/18/2016 - Package delivered

07/21/2016 - Check cashed

07/29/2016 - Received NOA1 dated 07/19/2016

08/08/2016 - Biometrics walk-in successful

08/17/2016 - Scheduled appointment for biometrics

07/10/2017 - Approval Letter received dated 07/06/2017

07/20/2017 - Green card in the mail

03/28/2018 - Divorce granted
CITIZENSHIP

07/17/2019 - Sent N400 Online -  5 years residency rule

07/23/2019 - Received NOA for biometrics

08/05/2019 - Biometrics appointment 

09/30/2020 - Interview - Approved

01/13/2021 - Oath Ceremony

01/13/2021 - Applied for passport at USPS

02/02/2021 - Status "In Process" 

02/18/2021 - Passport Received

 

 
Link to comment
Share on other sites

Filed: AOS (apr) Country: Mexico
Timeline

EAD is on its way! :dancing::dance::yes:

"Application Type: I765 , APPLICATION FOR EMPLOYMENT AUTHORIZATION


Your Case Status: Card/ Document Production


On August 8, 2014, we mailed the new card directly to the address we have on file. You should receive your new card within 30 days. If you do not, or if you move before you get it, call customer service at
1-800-375-5283
."

dAdjusting from F1

05/21/14 Package sent via FedEX

05/23/14 (day 1) Package delivered Chicago Lockbox 10:29am signed by J.Chyba

05/29/14 (day 6) emal/txt message NOA1

06/03/14 (day 11) paper NOA1 arrived in the mail

06/07/14 (day 15) Biometrics notice in the mail/ appointment June 19, 2:00pm

06/19/14 (day 27) Biometrics done

06/26/14 (day 34) email notification I-485 case status "Testing and Interview"

07/18/14 (day 56) email/txt notification Interview letter was sent on the mail. Interview date 08/20/14

07/21/14 (day 59) hard copy in the mail for AOS interview date

08/05/14 (day 74) email/txt notification EAD card is in production (59 days after Biometrics)

08/08/14 (day 77) email/txt notification EAD card has been mailed

08/09/14 (day 78) EAD in hand (4 days after "card production" notification)

08/20/14 (day 89) AOS Interview -APPROVED!!! 2 hrs after interview received text/email notification "card in production". 5 hrs after interview received text/email notification I-130 has been approved/notice of permanent resident status has been registered

08/28/14 (day 97) NOA2/Welcome to USA notice arrived in the mail

08/28/14 (day 97) email/txt notification Green Card has been mailed with tracking # -sent priority mail 2-Day

08/29/14 (day 98) GREEN CARD in hand delivered at 1:17pm . Yes it is green! :dance::D:dance::D:dance::D:dance:

RoC

08/01/16 I-751 sent via USPS Express Mail

08/02/16 (Day 1) Package delivery confirmation USPS 10:17am PDT

08/04/16 (Day 3) Check cashed

08/06/16 (Day 5) NOA I-797 Received on the mail dated 08/02/2016

09/20/16 (Day 50) 45 days after receiving NOA -1yr permit extension- I filed service request to inquire about Biometrics appointment letter

09/29/16 (Day 59) Biometrics appointment letter received dated 9/24/16

10/11/16 (Day 71) Biometrics completed. *Also, received on the mail response letter from previous service request filed with copy of Biometrics appointment letter.

11/11/17 (Day 466) Case Status changed to New Card Production

11/16/17 (Day 471) Case Status indicate  New Card being sent on the mail .:dance::dance::D:dance::dance::dance:

11/17/17 (Day 472) I-797  Notice of Removal of Condition being approved received in the mail.

11/20/17 (Day 475/15 months 18 days) New Lawful Permanent Resident arrived in the mail; card in hand at last! :dancing:

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Lithuania
Timeline

EAD is on its way! :dancing::dance::yes:

"Application Type: I765 , APPLICATION FOR EMPLOYMENT AUTHORIZATION

Your Case Status: Card/ Document Production

On August 8, 2014, we mailed the new card directly to the address we have on file. You should receive your new card within 30 days. If you do not, or if you move before you get it, call customer service at 1-800-375-5283."

awesome! congrats!!!

AOS

May 14, 2014 (day 00) - sent I-130/ I-485/ I-758
May 16, 2014 (day 02) - Package delivered to Chicago lockbox
May 21, 2014 (day 05) - text/emails received
May 25, 2014 (day 09) - NOA1
May 29, 2014 (day 13) - Biometrics letter received (app scheduled for 06/12/2014)
June 12, 2014 (day 27) - Biometrics done
June 26, 2014 (day 41) - I-485 Testing and Interview
July 7, 2014 (day 52) - email Interview scheduled for AUGUST 6, 2014!
July 9, 2014 (day 54) - hard copy with interview date
July 9, 2014 (day 54) - requested to expedite EAD
July 18, 2014 (day 63) - EAD card production
July 25, 2014 (day 70) - EAD received
August 6, 2014 (day 82) - Interview approved!

August 14, 2014 (day 90) - Conditional Green Card received!!!!!!!!!!!!!!!!!!!

AOS APPROVED IN 82 days!!!!! :dancing: :dancing: :dancing:

:goofy:

Link to comment
Share on other sites

Filed: AOS (apr) Country: Mexico
Timeline

awesome! congrats!!!

Morgan Spice congrats to you on your approval! I just read your interview experience and I am so happy for you! I wish for all of us here to give such a great update like yours when our time comes

dAdjusting from F1

05/21/14 Package sent via FedEX

05/23/14 (day 1) Package delivered Chicago Lockbox 10:29am signed by J.Chyba

05/29/14 (day 6) emal/txt message NOA1

06/03/14 (day 11) paper NOA1 arrived in the mail

06/07/14 (day 15) Biometrics notice in the mail/ appointment June 19, 2:00pm

06/19/14 (day 27) Biometrics done

06/26/14 (day 34) email notification I-485 case status "Testing and Interview"

07/18/14 (day 56) email/txt notification Interview letter was sent on the mail. Interview date 08/20/14

07/21/14 (day 59) hard copy in the mail for AOS interview date

08/05/14 (day 74) email/txt notification EAD card is in production (59 days after Biometrics)

08/08/14 (day 77) email/txt notification EAD card has been mailed

08/09/14 (day 78) EAD in hand (4 days after "card production" notification)

08/20/14 (day 89) AOS Interview -APPROVED!!! 2 hrs after interview received text/email notification "card in production". 5 hrs after interview received text/email notification I-130 has been approved/notice of permanent resident status has been registered

08/28/14 (day 97) NOA2/Welcome to USA notice arrived in the mail

08/28/14 (day 97) email/txt notification Green Card has been mailed with tracking # -sent priority mail 2-Day

08/29/14 (day 98) GREEN CARD in hand delivered at 1:17pm . Yes it is green! :dance::D:dance::D:dance::D:dance:

RoC

08/01/16 I-751 sent via USPS Express Mail

08/02/16 (Day 1) Package delivery confirmation USPS 10:17am PDT

08/04/16 (Day 3) Check cashed

08/06/16 (Day 5) NOA I-797 Received on the mail dated 08/02/2016

09/20/16 (Day 50) 45 days after receiving NOA -1yr permit extension- I filed service request to inquire about Biometrics appointment letter

09/29/16 (Day 59) Biometrics appointment letter received dated 9/24/16

10/11/16 (Day 71) Biometrics completed. *Also, received on the mail response letter from previous service request filed with copy of Biometrics appointment letter.

11/11/17 (Day 466) Case Status changed to New Card Production

11/16/17 (Day 471) Case Status indicate  New Card being sent on the mail .:dance::dance::D:dance::dance::dance:

11/17/17 (Day 472) I-797  Notice of Removal of Condition being approved received in the mail.

11/20/17 (Day 475/15 months 18 days) New Lawful Permanent Resident arrived in the mail; card in hand at last! :dancing:

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Lithuania
Timeline

Morgan Spice congrats to you on your approval! I just read your interview experience and I am so happy for you! I wish for all of us here to give such a great update like yours when our time comes

thanks!! I am waiting for that thingy in the mail, so excited :dancing: Going to update my SSN and I guess I will be done for 2 years! I know you guys will do great with your interviews, we all deserve a good end right? I will be checking this forum every day, so please don't forget to update! ;)

AOS

May 14, 2014 (day 00) - sent I-130/ I-485/ I-758
May 16, 2014 (day 02) - Package delivered to Chicago lockbox
May 21, 2014 (day 05) - text/emails received
May 25, 2014 (day 09) - NOA1
May 29, 2014 (day 13) - Biometrics letter received (app scheduled for 06/12/2014)
June 12, 2014 (day 27) - Biometrics done
June 26, 2014 (day 41) - I-485 Testing and Interview
July 7, 2014 (day 52) - email Interview scheduled for AUGUST 6, 2014!
July 9, 2014 (day 54) - hard copy with interview date
July 9, 2014 (day 54) - requested to expedite EAD
July 18, 2014 (day 63) - EAD card production
July 25, 2014 (day 70) - EAD received
August 6, 2014 (day 82) - Interview approved!

August 14, 2014 (day 90) - Conditional Green Card received!!!!!!!!!!!!!!!!!!!

AOS APPROVED IN 82 days!!!!! :dancing: :dancing: :dancing:

:goofy:

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Lithuania
Timeline

just checked the price for ROC and it is $590 again haha I guess they make a bank from us


oh sorry for flooding, but just out of curiosity, how many of you are planning on going through naturalization process?

AOS

May 14, 2014 (day 00) - sent I-130/ I-485/ I-758
May 16, 2014 (day 02) - Package delivered to Chicago lockbox
May 21, 2014 (day 05) - text/emails received
May 25, 2014 (day 09) - NOA1
May 29, 2014 (day 13) - Biometrics letter received (app scheduled for 06/12/2014)
June 12, 2014 (day 27) - Biometrics done
June 26, 2014 (day 41) - I-485 Testing and Interview
July 7, 2014 (day 52) - email Interview scheduled for AUGUST 6, 2014!
July 9, 2014 (day 54) - hard copy with interview date
July 9, 2014 (day 54) - requested to expedite EAD
July 18, 2014 (day 63) - EAD card production
July 25, 2014 (day 70) - EAD received
August 6, 2014 (day 82) - Interview approved!

August 14, 2014 (day 90) - Conditional Green Card received!!!!!!!!!!!!!!!!!!!

AOS APPROVED IN 82 days!!!!! :dancing: :dancing: :dancing:

:goofy:

Link to comment
Share on other sites

Filed: AOS (apr) Country: Mexico
Timeline

just checked the price for ROC and it is $590 again haha I guess they make a bank from us

oh sorry for flooding, but just out of curiosity, how many of you are planning on going through naturalization process?

I will go all the way of course

dAdjusting from F1

05/21/14 Package sent via FedEX

05/23/14 (day 1) Package delivered Chicago Lockbox 10:29am signed by J.Chyba

05/29/14 (day 6) emal/txt message NOA1

06/03/14 (day 11) paper NOA1 arrived in the mail

06/07/14 (day 15) Biometrics notice in the mail/ appointment June 19, 2:00pm

06/19/14 (day 27) Biometrics done

06/26/14 (day 34) email notification I-485 case status "Testing and Interview"

07/18/14 (day 56) email/txt notification Interview letter was sent on the mail. Interview date 08/20/14

07/21/14 (day 59) hard copy in the mail for AOS interview date

08/05/14 (day 74) email/txt notification EAD card is in production (59 days after Biometrics)

08/08/14 (day 77) email/txt notification EAD card has been mailed

08/09/14 (day 78) EAD in hand (4 days after "card production" notification)

08/20/14 (day 89) AOS Interview -APPROVED!!! 2 hrs after interview received text/email notification "card in production". 5 hrs after interview received text/email notification I-130 has been approved/notice of permanent resident status has been registered

08/28/14 (day 97) NOA2/Welcome to USA notice arrived in the mail

08/28/14 (day 97) email/txt notification Green Card has been mailed with tracking # -sent priority mail 2-Day

08/29/14 (day 98) GREEN CARD in hand delivered at 1:17pm . Yes it is green! :dance::D:dance::D:dance::D:dance:

RoC

08/01/16 I-751 sent via USPS Express Mail

08/02/16 (Day 1) Package delivery confirmation USPS 10:17am PDT

08/04/16 (Day 3) Check cashed

08/06/16 (Day 5) NOA I-797 Received on the mail dated 08/02/2016

09/20/16 (Day 50) 45 days after receiving NOA -1yr permit extension- I filed service request to inquire about Biometrics appointment letter

09/29/16 (Day 59) Biometrics appointment letter received dated 9/24/16

10/11/16 (Day 71) Biometrics completed. *Also, received on the mail response letter from previous service request filed with copy of Biometrics appointment letter.

11/11/17 (Day 466) Case Status changed to New Card Production

11/16/17 (Day 471) Case Status indicate  New Card being sent on the mail .:dance::dance::D:dance::dance::dance:

11/17/17 (Day 472) I-797  Notice of Removal of Condition being approved received in the mail.

11/20/17 (Day 475/15 months 18 days) New Lawful Permanent Resident arrived in the mail; card in hand at last! :dancing:

Link to comment
Share on other sites

Filed: AOS (apr) Country: Romania
Timeline

I will for sure post after my interview. I hope it goes well, but for now :unsure:

I don't know if I will go through with naturalization. That is too far in the future to think about right now. We'll see where life takes us...

My EAD is here, time to schedule an appointment with the DMV ^^

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Uganda
Timeline

EAD is on its way! :dancing::dance::yes:

"Application Type: I765 , APPLICATION FOR EMPLOYMENT AUTHORIZATION

Your Case Status: Card/ Document Production

On August 8, 2014, we mailed the new card directly to the address we have on file. You should receive your new card within 30 days. If you do not, or if you move before you get it, call customer service at 1-800-375-5283."

Congrats!

Link to comment
Share on other sites

Filed: AOS (apr) Country: Mexico
Timeline

Congrats!

Thank you! counting down the days to interview

dAdjusting from F1

05/21/14 Package sent via FedEX

05/23/14 (day 1) Package delivered Chicago Lockbox 10:29am signed by J.Chyba

05/29/14 (day 6) emal/txt message NOA1

06/03/14 (day 11) paper NOA1 arrived in the mail

06/07/14 (day 15) Biometrics notice in the mail/ appointment June 19, 2:00pm

06/19/14 (day 27) Biometrics done

06/26/14 (day 34) email notification I-485 case status "Testing and Interview"

07/18/14 (day 56) email/txt notification Interview letter was sent on the mail. Interview date 08/20/14

07/21/14 (day 59) hard copy in the mail for AOS interview date

08/05/14 (day 74) email/txt notification EAD card is in production (59 days after Biometrics)

08/08/14 (day 77) email/txt notification EAD card has been mailed

08/09/14 (day 78) EAD in hand (4 days after "card production" notification)

08/20/14 (day 89) AOS Interview -APPROVED!!! 2 hrs after interview received text/email notification "card in production". 5 hrs after interview received text/email notification I-130 has been approved/notice of permanent resident status has been registered

08/28/14 (day 97) NOA2/Welcome to USA notice arrived in the mail

08/28/14 (day 97) email/txt notification Green Card has been mailed with tracking # -sent priority mail 2-Day

08/29/14 (day 98) GREEN CARD in hand delivered at 1:17pm . Yes it is green! :dance::D:dance::D:dance::D:dance:

RoC

08/01/16 I-751 sent via USPS Express Mail

08/02/16 (Day 1) Package delivery confirmation USPS 10:17am PDT

08/04/16 (Day 3) Check cashed

08/06/16 (Day 5) NOA I-797 Received on the mail dated 08/02/2016

09/20/16 (Day 50) 45 days after receiving NOA -1yr permit extension- I filed service request to inquire about Biometrics appointment letter

09/29/16 (Day 59) Biometrics appointment letter received dated 9/24/16

10/11/16 (Day 71) Biometrics completed. *Also, received on the mail response letter from previous service request filed with copy of Biometrics appointment letter.

11/11/17 (Day 466) Case Status changed to New Card Production

11/16/17 (Day 471) Case Status indicate  New Card being sent on the mail .:dance::dance::D:dance::dance::dance:

11/17/17 (Day 472) I-797  Notice of Removal of Condition being approved received in the mail.

11/20/17 (Day 475/15 months 18 days) New Lawful Permanent Resident arrived in the mail; card in hand at last! :dancing:

Link to comment
Share on other sites

Filed: AOS (apr) Country: Mexico
Timeline

:dancing: Yet another notification with tracking #, according to USPS my EAD is expected to be delivered on Monday 8/11 :dancing:

We are leaving town this weekend and won't be back until Tuesday midnite, I already talked to our neighbor to take care of our mail as usual when we are gone, and she will send me a text message when this particular letter arrives.

Interesting the destination that shows "shipment accepted" is in Corbin, KY. It was sent priority 2 days and includes $100.00 insurance.

dAdjusting from F1

05/21/14 Package sent via FedEX

05/23/14 (day 1) Package delivered Chicago Lockbox 10:29am signed by J.Chyba

05/29/14 (day 6) emal/txt message NOA1

06/03/14 (day 11) paper NOA1 arrived in the mail

06/07/14 (day 15) Biometrics notice in the mail/ appointment June 19, 2:00pm

06/19/14 (day 27) Biometrics done

06/26/14 (day 34) email notification I-485 case status "Testing and Interview"

07/18/14 (day 56) email/txt notification Interview letter was sent on the mail. Interview date 08/20/14

07/21/14 (day 59) hard copy in the mail for AOS interview date

08/05/14 (day 74) email/txt notification EAD card is in production (59 days after Biometrics)

08/08/14 (day 77) email/txt notification EAD card has been mailed

08/09/14 (day 78) EAD in hand (4 days after "card production" notification)

08/20/14 (day 89) AOS Interview -APPROVED!!! 2 hrs after interview received text/email notification "card in production". 5 hrs after interview received text/email notification I-130 has been approved/notice of permanent resident status has been registered

08/28/14 (day 97) NOA2/Welcome to USA notice arrived in the mail

08/28/14 (day 97) email/txt notification Green Card has been mailed with tracking # -sent priority mail 2-Day

08/29/14 (day 98) GREEN CARD in hand delivered at 1:17pm . Yes it is green! :dance::D:dance::D:dance::D:dance:

RoC

08/01/16 I-751 sent via USPS Express Mail

08/02/16 (Day 1) Package delivery confirmation USPS 10:17am PDT

08/04/16 (Day 3) Check cashed

08/06/16 (Day 5) NOA I-797 Received on the mail dated 08/02/2016

09/20/16 (Day 50) 45 days after receiving NOA -1yr permit extension- I filed service request to inquire about Biometrics appointment letter

09/29/16 (Day 59) Biometrics appointment letter received dated 9/24/16

10/11/16 (Day 71) Biometrics completed. *Also, received on the mail response letter from previous service request filed with copy of Biometrics appointment letter.

11/11/17 (Day 466) Case Status changed to New Card Production

11/16/17 (Day 471) Case Status indicate  New Card being sent on the mail .:dance::dance::D:dance::dance::dance:

11/17/17 (Day 472) I-797  Notice of Removal of Condition being approved received in the mail.

11/20/17 (Day 475/15 months 18 days) New Lawful Permanent Resident arrived in the mail; card in hand at last! :dancing:

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
“;}
×
×
  • Create New...