Jump to content
Saylin

NVC Filers - April 2014

 Share

5,795 posts in this topic

Recommended Posts

Welcome to another monthly thread for those going through NVC! :)
Before posting questions, please read the wiki I wrote on the NVC process here. Once you're done, read it one or two more times to really understand it ;)
For up to date time frames, you can view my spreadsheet here. If you would like to be added (or have your entry updated), then please fill out the form here (please read the instructions at the top carefully, especially the update part as people aren't filling the form out correctly [they're filling out information not needed]).
P.S. I will be much less active in reading (and thus answering) posts in these monthly threads, so don't bother asking me questions directly. Just post them here for everyone to see and someone will come along to answer. Remember to be patient ;)
Good luck to all! (And congratulations now on all the progress that will be made this month!)

Saylin my info is not on your spreadsheet. I filled out the form, but I still don't see my name. I know your busy too .... thank you for all the information, time and energy you put into the site.

NOA 1- March 25, 2013

NOA 2- Dec 23, 2013

Dec 27, 2013 Case shipped from NSC to NVC

Case in NVC building-Jan 13,2013

National Visa Center Processing

Case # and IIN- 02/14/2014

DS-261 completed: 2/19/2014

AOS Invoiced and shows IN PROGRESS: 2/20/2014

AOS shows PAID: 2/24/2014 AOS- packet added to the case: 3/17/2014

DS 261 Accepted: 03/20/2014IV fee yellow triangle with exclamation mark seen on CEAC- 03/18/2014

IV fee available to pay and shows IN PROGRESS: 3/20/2014

IV packet received by NVC 03/7/2014

IV packet FALSE checklist-(Checklist shows: I need to complete the DS 261 form): 03/17/2014

IV Packet FALSE checklist (Checklist shows: pay IV fee): 3/20/2014

IV fee shows PAID 3/24/2014IV packet accepted 3/24/2014 (all civil documents reviewed per NVC rep 4/1, currently waiting on DS 260 to be reviewed)

DS-260 - SUBMITTED 3/25/2014

Checklist for Court record and Indian PCC- April

Submitted Court Record document and NVC scanned into system- 4/23
NVC received Indian PCC at their door on 5/9/2014
PCC scanned into system- 5/12/2014
Mysterious Second Package scanned into system- 5/16/2014
Case complete- 06/11/2014
interview Date: 07/08/2014 changed from 7/15/14
delivery of Child #1- 6/11/2014
Medical Completed 4/4/2014 at knightsbridge doctors

Link to comment
Share on other sites

Saylin my info is not on your spreadsheet. I filled out the form, but I still don't see my name. I know your busy too .... thank you for all the information, time and energy you put into the site.

I'm not sure what you're talking about as you ARE on the spreadsheet. I added you right away once I saw the form request...

Link to comment
Share on other sites

Filed: F-2A Visa Country: India
Timeline

Hi Saylin,

Does it mean my case is completed at NVC?

received following email,

We have finished reviewing your case. We will tell you when we set an interview
date for your case. Please do not contact the U.S. Embassy or Consulate in NEW
DELHI, INDIA about your interview until we give you the date.
We saw that either your Affidavit of Support was incomplete, some of your
supporting documents were missing, or both. We have marked the missing items
on the checklist below.
You should send any of the missing items to XXXXX so he or
she can take them to the visa interview. The Consular Officer will review the
missing items at the time of the interview.
Please pay special attention to any items related to the Affidavit of Support form.
If the checklist shows any problems with the form, you should complete a new
form and send it to XXXXX.
If you do not send the missing information to XXXXX, his or
her visa application could be delayed or denied.
Link to comment
Share on other sites

I'm not sure what you're talking about as you ARE on the spreadsheet. I added you right away once I saw the form request...

Saylin,

I found myself, thank you for adding me. :dancing:

NOA 1- March 25, 2013

NOA 2- Dec 23, 2013

Dec 27, 2013 Case shipped from NSC to NVC

Case in NVC building-Jan 13,2013

National Visa Center Processing

Case # and IIN- 02/14/2014

DS-261 completed: 2/19/2014

AOS Invoiced and shows IN PROGRESS: 2/20/2014

AOS shows PAID: 2/24/2014 AOS- packet added to the case: 3/17/2014

DS 261 Accepted: 03/20/2014IV fee yellow triangle with exclamation mark seen on CEAC- 03/18/2014

IV fee available to pay and shows IN PROGRESS: 3/20/2014

IV packet received by NVC 03/7/2014

IV packet FALSE checklist-(Checklist shows: I need to complete the DS 261 form): 03/17/2014

IV Packet FALSE checklist (Checklist shows: pay IV fee): 3/20/2014

IV fee shows PAID 3/24/2014IV packet accepted 3/24/2014 (all civil documents reviewed per NVC rep 4/1, currently waiting on DS 260 to be reviewed)

DS-260 - SUBMITTED 3/25/2014

Checklist for Court record and Indian PCC- April

Submitted Court Record document and NVC scanned into system- 4/23
NVC received Indian PCC at their door on 5/9/2014
PCC scanned into system- 5/12/2014
Mysterious Second Package scanned into system- 5/16/2014
Case complete- 06/11/2014
interview Date: 07/08/2014 changed from 7/15/14
delivery of Child #1- 6/11/2014
Medical Completed 4/4/2014 at knightsbridge doctors

Link to comment
Share on other sites

This was discussed somewhere in the I-130 March 2013 filers' thread and I was told I could not call the USCIS. I just now saw Saylin's spreadsheet and those people whose cases were approved from Nebraska as late as 10th March have added an NVC received date. I and Leury (NOA2 date 3/10) seem to be the only ones from Nebraska whose cases have not been received by NVC yet.

Why were you told you can't call? Once NVC has your case there's no point calling USCIS anymore, but until NVC acknowledges it has arrived USCIS is still the only place that can give you information.

ROC Timeline

04/06/2016 - Mailed I-751

04/07/2016 - NOA1

04/13/2016 - Check cashed

04/14/2016 - NOA1 hardcopy

05/04/2016 - Received biometric notice

05/16/2016 - Biometrics appointment

05/17/2017 - Approved

05/22/2017 - Card in Production

05/25/2017 - Card Mailed

05/30/2017 - Card Received

Link to comment
Share on other sites

Congratulations kalloo,

your case is complete.. just bring the missing documents to the interview date once you recieve a date.... Since you got your email today, your case was completed a few days ago. :dancing:

Hi Saylin,

Does it mean my case is completed at NVC?

received following email,

We have finished reviewing your case. We will tell you when we set an interview
date for your case. Please do not contact the U.S. Embassy or Consulate in NEW
DELHI, INDIA about your interview until we give you the date.
We saw that either your Affidavit of Support was incomplete, some of your
supporting documents were missing, or both. We have marked the missing items
on the checklist below.
You should send any of the missing items to XXXXX so he or
she can take them to the visa interview. The Consular Officer will review the
missing items at the time of the interview.
Please pay special attention to any items related to the Affidavit of Support form.
If the checklist shows any problems with the form, you should complete a new
form and send it to XXXXX.
If you do not send the missing information to XXXXX, his or
her visa application could be delayed or denied.

NOA 1- March 25, 2013

NOA 2- Dec 23, 2013

Dec 27, 2013 Case shipped from NSC to NVC

Case in NVC building-Jan 13,2013

National Visa Center Processing

Case # and IIN- 02/14/2014

DS-261 completed: 2/19/2014

AOS Invoiced and shows IN PROGRESS: 2/20/2014

AOS shows PAID: 2/24/2014 AOS- packet added to the case: 3/17/2014

DS 261 Accepted: 03/20/2014IV fee yellow triangle with exclamation mark seen on CEAC- 03/18/2014

IV fee available to pay and shows IN PROGRESS: 3/20/2014

IV packet received by NVC 03/7/2014

IV packet FALSE checklist-(Checklist shows: I need to complete the DS 261 form): 03/17/2014

IV Packet FALSE checklist (Checklist shows: pay IV fee): 3/20/2014

IV fee shows PAID 3/24/2014IV packet accepted 3/24/2014 (all civil documents reviewed per NVC rep 4/1, currently waiting on DS 260 to be reviewed)

DS-260 - SUBMITTED 3/25/2014

Checklist for Court record and Indian PCC- April

Submitted Court Record document and NVC scanned into system- 4/23
NVC received Indian PCC at their door on 5/9/2014
PCC scanned into system- 5/12/2014
Mysterious Second Package scanned into system- 5/16/2014
Case complete- 06/11/2014
interview Date: 07/08/2014 changed from 7/15/14
delivery of Child #1- 6/11/2014
Medical Completed 4/4/2014 at knightsbridge doctors

Link to comment
Share on other sites

This was discussed somewhere in the I-130 March 2013 filers' thread and I was told I could not call the USCIS. I just now saw Saylin's spreadsheet and those people whose cases were approved from Nebraska as late as 10th March have added an NVC received date. I and Leury (NOA2 date 3/10) seem to be the only ones from Nebraska whose cases have not been received by NVC yet.

Incorrect. You have all the right to call the NVC and ask them as well as the USCIS and ask whether your case has even been shipped to the NVC...

NOA 1- March 25, 2013

NOA 2- Dec 23, 2013

Dec 27, 2013 Case shipped from NSC to NVC

Case in NVC building-Jan 13,2013

National Visa Center Processing

Case # and IIN- 02/14/2014

DS-261 completed: 2/19/2014

AOS Invoiced and shows IN PROGRESS: 2/20/2014

AOS shows PAID: 2/24/2014 AOS- packet added to the case: 3/17/2014

DS 261 Accepted: 03/20/2014IV fee yellow triangle with exclamation mark seen on CEAC- 03/18/2014

IV fee available to pay and shows IN PROGRESS: 3/20/2014

IV packet received by NVC 03/7/2014

IV packet FALSE checklist-(Checklist shows: I need to complete the DS 261 form): 03/17/2014

IV Packet FALSE checklist (Checklist shows: pay IV fee): 3/20/2014

IV fee shows PAID 3/24/2014IV packet accepted 3/24/2014 (all civil documents reviewed per NVC rep 4/1, currently waiting on DS 260 to be reviewed)

DS-260 - SUBMITTED 3/25/2014

Checklist for Court record and Indian PCC- April

Submitted Court Record document and NVC scanned into system- 4/23
NVC received Indian PCC at their door on 5/9/2014
PCC scanned into system- 5/12/2014
Mysterious Second Package scanned into system- 5/16/2014
Case complete- 06/11/2014
interview Date: 07/08/2014 changed from 7/15/14
delivery of Child #1- 6/11/2014
Medical Completed 4/4/2014 at knightsbridge doctors

Link to comment
Share on other sites

I'm not sure what you're talking about as you ARE on the spreadsheet. I added you right away once I saw the form request...Saylin

Saylin,

I just noticed that on the spreadsheet under the AOS packet, it says 3/17 ( this is the date it was accepted...) the date it was actually received by the NVC was on 2/25... I don't recall if that's the date you wanted on your form.. sorry..

NOA 1- March 25, 2013

NOA 2- Dec 23, 2013

Dec 27, 2013 Case shipped from NSC to NVC

Case in NVC building-Jan 13,2013

National Visa Center Processing

Case # and IIN- 02/14/2014

DS-261 completed: 2/19/2014

AOS Invoiced and shows IN PROGRESS: 2/20/2014

AOS shows PAID: 2/24/2014 AOS- packet added to the case: 3/17/2014

DS 261 Accepted: 03/20/2014IV fee yellow triangle with exclamation mark seen on CEAC- 03/18/2014

IV fee available to pay and shows IN PROGRESS: 3/20/2014

IV packet received by NVC 03/7/2014

IV packet FALSE checklist-(Checklist shows: I need to complete the DS 261 form): 03/17/2014

IV Packet FALSE checklist (Checklist shows: pay IV fee): 3/20/2014

IV fee shows PAID 3/24/2014IV packet accepted 3/24/2014 (all civil documents reviewed per NVC rep 4/1, currently waiting on DS 260 to be reviewed)

DS-260 - SUBMITTED 3/25/2014

Checklist for Court record and Indian PCC- April

Submitted Court Record document and NVC scanned into system- 4/23
NVC received Indian PCC at their door on 5/9/2014
PCC scanned into system- 5/12/2014
Mysterious Second Package scanned into system- 5/16/2014
Case complete- 06/11/2014
interview Date: 07/08/2014 changed from 7/15/14
delivery of Child #1- 6/11/2014
Medical Completed 4/4/2014 at knightsbridge doctors

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Thailand
Timeline

______F - FINANCIAL EVIDENCE:______________________________________

A review of the I-864, I-864EZ, I-864W or I-864A (if applicable) Affidavit of Support form and supporting documents that you submitted has revealed that you have provided incomplete information in your response or you have not responded to some questions.

Please pay specific attention to the questions marked in the attached I-864/A checklist. You will need to complete and submit a new form with the changes noted on the attached checklist.

You will need to follow the instructions for the Affidavit of Support (I-864) that are posted on the Department of State website at the following address:

www.ImmigrantVisas.state.gov. From there, you can fill out a new form online, print the new completed form and mail it to NVC. If you are the Petitioner, please read all instructions and complete the correct form to submit to NVC. An Affidavit of Support form is required to be submitted from the Petitioner on each case regardless of his/her income level.

NVC will hold this case until you send us these needed items. When you return the documents to NVC, please make sure that the documents submitted are in the correct order and stapled together, as stated in the I-864 Important Notice instructions.

When responding to the National Visa Center, please include the bar code sheet that came with this letter. Failure to include the bar code sheet may cause a delay in the processing of your case. The bar code sheet should be placed on top of all documents being submitted for this case and mailed to the address provided.

Form I-864, Affidavit of Support, & Financial Evidence Checklist)

Please review the instructions below then refer to the final page of this checklist for mailing instructions.

I-864, Affidavit of Support Checklist

[x] The Affidavit of Support is an important legal contract between you and the U.S. government. During our review, we identified one or more sections that were either incomplete or contained incorrect information. Please review the additional instructions below then complete and submit a new Affidavit of Support. You can download the I-864 form and instructions at http://www.uscis.gov/i-864.

[x]

In Part 1. Basis for Filing Affidavit of Support, please correct the following... [x]

In Part 2. Information on the Principal Immigrant, please correct the following... [x]

In Part 3, Information on the Immigrant(s) You are sponsoring, please correct the following... [x]

In Part 4. Information on the Sponsor, please correct the following... [x]

In Part 5. Sponsor's Household Size, please correct the following... [x]

In Part 6. Sponsor's Income and Employment, please correct the following...

[x] Items 13.a.1. The income you enter must match the total (gross) income reported on your most recent Federal

income tax return. If you filed Form 1040EZ, use the adjusted gross income instead.

[x]

In Part 8, Sponsor's Contract, please correct the following... [x]

The Form I-864 we received was missing the following page(s). Please ensure you include all nine pages when you resubmit the form.

[x]

You must submit the following financial evidence: [x]

is it false or real checklist i think its real but how come my lawyer did that lot of mistake what should I do know do i have to resend all

We have the same checklist. The reason why is because the attny left some boxes blank, should put N/A. And also part 2 it's confusing should put the immigrant's mailing address. Not the address in the US.

exactly the same as ours.

(F) 2013-01-03 - Got married (F) (L) (L) (L)

USCIS

NVC

2013-01-21 - Sent i-130 2014-01-17 - NVC received 2014-04-30 - email for case complete received (got early in the morning)

2013-02-22 - NOA1 2014-02-28 - NVC case number assigned 2014-04-30 - Interview scheduled (by phone in the afternoon)

2013-12-10 got RFE 2014-03-03 - AOS (I-864) and IV bill paid 2014-05-02 - IL received by email

2013-12-23 RFE sent 2014-03-06 - Sent I-864(AOS) Package 2014-05-03 - Case in Transit (checked from ceac tracking)

2014-01-03 Approved 2014-03-07 - DS-260 completed online 2014-05-09 - Case Ready (Ceac tracking)

2014-01-21 - NOA2 2014-03-24 - Received checklist for IV (civil docs)

2014-03-27 - Received checklist for AOS

2014-04-01 - Sent AOS package and original civil docs by our attorney via regular mail (respond to checklist)

2014-04-07 - Received AOS and civil docs package by NVC

2014-04-09 - AOS and civil docs package (checklist) by NVC logged in the system

2014-04-23 - Case completed Consulate

2014-05-05 - Medical done

2014-06-06 - Interview (AP received 221g white form for additional documents, letter from my husband answering the CO's questions in the form ) and proofs (e.g. emails, pictures, call logs, etc which we already submitted during the interview but still I added more evidence such as our FB Private Messages, money transfer receipts and a letter from my husband's bishop to prove that our marriage is real)

2014-06-17 - Status updated still AP

2014-06-18 - Status updated still AP - (the US Emb. received the doc.) 2014-06-19 - Status updated still AP

2014-06-26 - Status updated still AP 2014-07-01 - Status updated still AP - (my husband wrote an email to the CO and he got a reply. - said under consideration)

2014-07-16 - Status updated still AP - (the house of rep. sent them an email and the US Embassy replied to him/her)

2014-07- 18 - USEM received more evidence we sent (Western Union - money transfer receipt).

2014-07- 20 - Status updated still AP (confused bec it is Sunday on the 20th July, maybe scanned the additional docs sent to them)

2014-07- 21 - Status updated still AP 2014-07- 23 - My husband went to the house of Senate and they attended to him right away.

2014-07- 24 - The asst. at the senate responded immediately and contacted the USEM.

2014-07- 28 - Status updated still AP (received an email from the USEM, 1. Applicant, your case is ready to be issued, but your passport #********** needs to be cancelled first & returned to our office at your earliest convenience. Please contact visasbkki@state.gov to pick up your old passport to complete this step.)

2014-07- 28 - Cancelled my old passport and sent them to the USEM.

2014-07- 30 - The embassy received my 2 passports (old and new) 2014-07- 31 - Status updated still AP (Maybe scanned my mail)

2014-08- 08 - Status updated "READY"

2014-08- 13 - Status updated still "READY" I sent them an email re the ready status. Aug. 11 & 12 National holiday USEM closed.

2014-08- 14 - Status updated still "READY" I received an email from the USEM,We have received your said documents. Please be informed that your visa has now been approved. We are working with the preparation of your visa package and will mail it to the applicant address on GSS profile which takes approximately 7-10 days. Applicant should refrain from making any irrevocable travel arrangements until he/she receives.<p>

2014-08- 18 - Visa in-hand

2014-09-07 arrived Atlanta airport

Link to comment
Share on other sites

Filed: F-2A Visa Country: India
Timeline

Congratulations kalloo,

your case is complete.. just bring the missing documents to the interview date once you recieve a date.... Since you got your email today, your case was completed a few days ago. :dancing:

Thanks Luckygirl, i was very worried with is email in check list they want updated 864 with recent total income. i can take that to the interview? no need to mail here at NVC? right? .

one more question, how much time it take to get the interview schedule letter.

Praying for your case completion soon.

Kalloo

Link to comment
Share on other sites

Saylin,

I just noticed that on the spreadsheet under the AOS packet, it says 3/17 ( this is the date it was accepted...) the date it was actually received by the NVC was on 2/25... I don't recall if that's the date you wanted on your form.. sorry..

Well, I had to pull from your signature. And I actually want the dates the packages were SENT, not received or accepted.

Link to comment
Share on other sites

Five days of processing pending for us since 28th, so maybe a shot... I plan to cross all my fingers and call on Thursday and until then :whistle:

I'll be eagerly watching for your update on Thursday, and you can keep an eye out for mine on Friday if you don't get any news before then. We'll just tag team NVC until case complete! :lol:

ROC Timeline

04/06/2016 - Mailed I-751

04/07/2016 - NOA1

04/13/2016 - Check cashed

04/14/2016 - NOA1 hardcopy

05/04/2016 - Received biometric notice

05/16/2016 - Biometrics appointment

05/17/2017 - Approved

05/22/2017 - Card in Production

05/25/2017 - Card Mailed

05/30/2017 - Card Received

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I echo Bos_Lhr. You should definitely call USCIS and ask if it has physically left the building then track that sucker until you know it has arrived at the NVC just to make sure it doesn't get shipped to the national records center by mistake. I have seen that happen on here.

Now I am scared. I don't want to be going to the national records center, already more than one year was taken up for the approval. I have never called USCIS before but I called just now. However, I was unable to get to a live person. Someone with an accurate link on how to get to a live person at USCIS. I searched other threads and they gave many options on how to do that, one was to not enter anything, not even choose the language. They will think you are using a rotary phone and transfer you to a live person. I did that and the recorded voice said to call Mon through Fri between 8 a.m. to 6 p.m. and disconnected the call. On the USCIS website the time is past 8:00 a.m.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Panama
Timeline

BOOMERRR I SENT MY ORIGINAL DOCUMENTS FOR THE I 130 :( WAAA NOW IM GONNA HAVE TO GET NEW ORIGINAL DOCS FOR THE EMBASSY INTERVIEW, GET THEM TRANSLATED AND ALL THAT STUFF -_- I WAS PLANNING ON SENDING A COPY OF THE MARRIAGE CERTIFICATE I SENT FOR I-130 BUT GUESS WHAT MY SUPER SMART COUNTRY PUTS AND EXPIRE DATE ON MARRIAGE CERTIFICATES LIKE WHAT THE HECKKKKK :ranting::ranting: SO HERE I GO AGAIN GONNA HAVE TO WAIT SO BY THE TIME I GET AN INTERVIEW IT DOESNT EXPIRE! WHY WOULD SOMEONE PUT AN EXPIRE DATE ON A MARRIAGE CERTIFICATE IT MAKES NO SENSE AGRRR

"I Wish You Were Here"

Journey :clock:

Met on 2011

travel together back to my country on sept 2012

got married October 12th, 2012

hubby tried living in Panama but it was hard to get use to

he left on Nov 2012

Apply on March 2013

PD March 19th, 2013

Transferred to Nebraska SC Nov 08 2013

Contacted congressman on Jan 2014

Sent an email to NSC on Jan 8th 2014

Last update on our case was on Jan 31st 2014 :(

Place 2 e-request on March 2014 :ranting:

Contacted another congressman March 28TH 2014

NOA2 28th March 2014 yeahhhh babyyyyy :dancing:

Your I-130 was approved in 374 days from your NOA1 date.

Got NOA2 Hard Copy March 31st 2014 :thumbs:

File got to NVC on April 14th .. waiting for a case number still

MAY 19 got case number

Paid AOS fee May 21st

Filed DS 260 July 6th, now is on us to get all the documents :)

Sent AOS package and IV on June

NVC RECEIVES PACKAGE ON JULY 22

We got a check list saying my IV package is not there :/??? SEPT 15TH 2014

MEDICAL EXAM OCTOBER 13TH

INTERVIEW SCHEDULED NOVEMBER 6TH 2014.

POE DEC 1ST 2014

NO GREEN CARD YET

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...