Per wiki:

Step 8 - Review: Checklists and Case Complete

NVC operators are stating 30 business days now to review packages. In most cases though, it's a little faster than that.

Question: how fast is fast? what is the typical turn around on cases that have less to no RFEs?

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I suggest you should FAX NSC, since they would not take beneficiaries call.

Send the fax with both of your names and email addresses. I know the fax to TSC but sorry don't know NSC. My petition was stick Ayr TSC for 30 days and when i sent a FAX i got transferred to NVC and also received email directly from TSC.

I was told the beneficiary can't call USCIS. Anyway, I will try calling USCIS. Can someone tell me how to get to a tier 2?

Thanks for that information. I e-mailed NSC after a few days of the approval not to delay shipping of my case. I did not get the answer to my e-mail. I will try to fax NSC.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Per wiki:

Step 8 - Review: Checklists and Case Complete

NVC operators are stating 30 business days now to review packages. In most cases though, it's a little faster than that.

Question: how fast is fast? what is the typical turn around on cases that have less to no RFEs?

Lately it has been taking around 2-2.5 weeks to review packets. Bookmark Saylin's spreadsheet and take a look at the cases around yours for an idea of what to expect: https://docs.google.com/spreadsheet/ccc?key=0AtbvTEwLyHz1dDhjM3lXTEl1cW1SbjRwdW9YRGlIanc&hl=en#gid=0

ROC Timeline

04/06/2016 - Mailed I-751

04/07/2016 - NOA1

04/13/2016 - Check cashed

04/14/2016 - NOA1 hardcopy

05/04/2016 - Received biometric notice

05/16/2016 - Biometrics appointment

05/17/2017 - Approved

05/22/2017 - Card in Production

05/25/2017 - Card Mailed

05/30/2017 - Card Received

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country:
Timeline

Saylin, i forgot about that... we submit DS261 on March 18, but I was correcting something on March 24, and submitted again. Is that ok? I forgot to mention that yesterday when i spoke with NVC, maybe is that delay for IV fee? or it doesn't meter?

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

We got the IV yellow triangle last Wednesday 26th, and just yesterday in the afternoon we got an email from NVC and were able to pay. This morning at 8 am my husband express mailed the IV packet to NVC :luv:

I updated the form Saylin, did it work?

Thank you!

USCIS



04-29-2013: Sent I-130 packet


05-06-2013: I-130 NOA1


05-16-2013: Sent I-129F packet


05-20-2013: I-129F NOA1


06-06-2013: I-129F Alien registration number changed


11-20-2013: Submitted I-129F e-Request


12-11-2013: I-130 and I-129F Transfer to Nebraska Service Center


01-03-2014 Submitted second I-129F e-Request


01-14-2014: I-130 Alien registration number changed


01-14-2014: I-130 and I-129F Approved


01-16-2014: I-130 shipped to DoS email


01-17-2014: I-129F shipped to DoS email



NVC



01-29-2014: NVC received case


03-07-2014: Case Number and Invoice ID Number assigned


03-08-2014: DS-261 Available and submitted to NVC


03-10-2014: AOS invoice available and paid


03-13-2014: AOS packet express mailed to NVC


03-14-2014: AOS packet delivered to NVC


03-14-2014: AOS shows "PAID"


03-18-2014: AOS Packet entered to the system


03-19-2014 DS-261 Accepted


03-31-2014: IV invoice available and paid


04-01-2014: IV packet express mailed to NVC


04-01-2014: AOS Accepted


04-02-2014: IV packet delivered to NVC


04-04-2014: IV shows "PAID"


04-04-2014: DS-260 submitted


04-04-2014: IV packet entered to the system


23-04-2014: Case Complete - No Checklists!!


30-04-2014: Interview scheduled



CONSULATE



10-06-2014: Interview :dancing:

Link to comment
Share on other sites

:thumbs::thumbs::thumbs:

Ok then, I will start panicking after my 8 weeks are up :thumbs: .

Did you get an text message saying your case was shipped to the NVC? My case hasn't been received yet either. I received the text on March 21st. I heard TSC takes forever to send the cases out. GRRRRRRRRRRR :ranting:

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Kaylara how many days did you have yellow triangle? I'm waiting 8 days, call yesterday, it's normal... But i want to know how many days you were stuck?

I called on 3/20/14 because we still hadn't gotten our Triangle of Doom, and the wonderful Agent Todd contacted a supervisor because I had been told it should be 10 business days from filling out the DS261 before I got the IV bill. (And it was past that.) On 3/20/14 we got the Triangle of Doom, and it was available on 3/24/14 to be paid. But Agent Todd did tell me there had been having problems with the payment portal. Maybe call again and see what's up?

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: England
Timeline

I called on 3/20/14 because we still hadn't gotten our Triangle of Doom, and the wonderful Agent Todd contacted a supervisor because I had been told it should be 10 business days from filling out the DS261 before I got the IV bill. (And it was past that.) On 3/20/14 we got the Triangle of Doom, and it was available on 3/24/14 to be paid. But Agent Todd did tell me there had been having problems with the payment portal. Maybe call again and see what's up?

:rofl: Love it that you call it the Triangle of Doom now :)

My blog about my visa journey and adjusting to my new life in the US http://albiontoamerica.wordpress.com/

Link to comment
Share on other sites

:D It's a great name for it! I can't claim to have come up with it, but I'll happily appropriate it!

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country:
Timeline

I called on 3/20/14 because we still hadn't gotten our Triangle of Doom, and the wonderful Agent Todd contacted a supervisor because I had been told it should be 10 business days from filling out the DS261 before I got the IV bill. (And it was past that.) On 3/20/14 we got the Triangle of Doom, and it was available on 3/24/14 to be paid. But Agent Todd did tell me there had been having problems with the payment portal. Maybe call again and see what's up?

I mailed them on March 28, I got the same answer yesterday when i called about 10 business day, i forgot that on march 24 i resubmitted DS261, by mistake... maybe that's why is this...

Edited by B&T_P
Link to comment
Share on other sites

I think you're probably right about that.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Morocco
Timeline

Hi Everyone,

Glad to join the thread.

Timeline to Immigrate to the United States of America -

Travel back to our Moroccan Home from Casa: 10/17/2014

Husband submits for vacation from Protection Civile: 10/28/2015

Husband submits for demission from Protection Civile :11/10/2014

I travel personally to the Main Office of the Protection Civile in Rabat and submit a Dolence: 12/09/2014

I travel back to the USA in preparation of the birth of our baby - 12/18/2014

Husband travels back to Rabat to the main office of the Protection Civile and meets with "Head of Human resources" and told to resubmit his vacation request - told his request will be approved by 1/15/ 2015: 1/07/2015

Husband asks commander to call main office of Protection Civile to check the status of the new vacation request and is told no one but the general can approve his request and he is on vacation: 1/28/2015

Husband stops going to work for the Protection Civile in protest: 1/29/2015

We hire a lawyer in Casablanca to help my husbands case with regards to the Protection Civile : 02/2015

Lawyer sends letter to the Main office of the Protection Civile - 02/04/2015

Our daughter is born with my husband still stuck in Morocco - 2/09/2015

Direction (Main Office) of the Protection Civile Sends out Alert Letter to my husband and my husband picks it up on- 02/13/2015

Husband goes to US Consulate to request an extension of his visa - US Consulate says they won't extend his visa however they can issue him a new one at the cost of 3000DH/ $311 -/+ and to come back the last week of the month to get his second visa- 3/08/2015

Husband returns to the US Consulate and picks up *NEW VISA* with expiration date of 09/22/2015 on: 03/26/2015

Husband's first visa expires: 04/08/2015

Protection Civile continues to pay my husband - 04/2015

The lawyer sends letters to the Ministry of the Interior - 04//2015

My husband seeks help from the Prime Minister of Morocco's political party and called the lawyer to set an appointment to check on his case: 05/6/2015

My husband seeks help from a second lawyer when the first one proves unhelpful: 05/07/2015

My husband goes to Parliment to follow up with the Prime Minister's party - set a follow up appointment at a cafe the next day: 05/08/2015

I send a letter to the Moroccan Ambassador to the United States asking for help with my husband's case (registered mail): 05/26/2015

I go to Sen. Diane Feinstein's office seeking help with my husband's demission from the Protection Civile: 05/27/2015

I go to Sen. Barbara Boxer's office seeking help with my husband's demission from the Protection Civile: 05/28/2015

My husband returns to hometown in Morocco and returned his materials, the message awaiting him says "Demission Favorable.": 06/11/2015

Lots of running around to meetings and trying to get the authorization to leave Morocco by my husband: 07/2015

Husband goes to CMN airport trying to get paperwork authorizing him to leave Morocco and with the help of some powerful people GETS THE AUTHORIZATION: 07/23/2015 :dancing:

My husband leaves Morocco and arrives in the U.S.A. and meets his daughter for the first time at SFO airport: 07/27/2015

event.png

bzBsm8.png

Link to comment
Share on other sites

My case was just received today !! I had to ask her if it was a joke ( because its April Fool's day ) she laughed ! No case number yet and she gave me the 20 day #######. I asked about the K3 and she said they get processed faster.... so I told her I'll call back tomorrow. She laughed again.

OH HAPPY DAY !!! I was starting to doubt whether TSC really sent it....

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

I was playing around with the "received by NVC" data on the spreadsheet out of curiosity since I know a lot of you are waiting. Looking at 2014 cases that do not have case completes, the following are average wait times between NOA2 and NVC receiving case:

Texas

22.5 days

Nebraska

17.5 days

California

11 days

Whatever CSC is doing, can the other service centers please do the same? Worth noting the more recent case entries for NSC and TSC are more like ~2 weeks to being received... just trying to soothe the fears out there that cases are being lost ;)

Edited by BOS_LHR

ROC Timeline

04/06/2016 - Mailed I-751

04/07/2016 - NOA1

04/13/2016 - Check cashed

04/14/2016 - NOA1 hardcopy

05/04/2016 - Received biometric notice

05/16/2016 - Biometrics appointment

05/17/2017 - Approved

05/22/2017 - Card in Production

05/25/2017 - Card Mailed

05/30/2017 - Card Received

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...