thank you saylin

saylin how do i know wen my case has arrived to the nvc and whats the difrence between the nvc and the DOS

For the third time, please read posts 1 and 2!!

Do I really to send in page 9 even if I am filling everything out on my I864?

If you don't want a checklist, send in all 9 pages ;)

Saylin.....Question?

I just received another checklist saying that my AOS is incomplete or missing, and I have sent everything is requested and matched my last year income with the recent one on the line. But, the checklist also is telling me they will schedule an appointment at the embassy in the near future.

My doubt is, are they doing this to see my 2013 Income at the embassy? I have no other explanation.

Can you post the important bit about the checklist? Hard to tell what it's asking/saying otherwise.

(Taken from Saylin's posts 1 and 2 of this forum)

[...]

Hey look, someone who reads! star_smile.gifgood.gif

How long does it take for NVC to invoice the IV fee??? They received my AOS fee and it stated paid on 2/24, they received the the AOS packet on 2/25/2014... its been 7 business days... my husband and I are getting really hopeless... utterly hopeless. we are depressed, we are expecting in june. do ya'll think he'll be here before then???? I have no hope in the NVC.

The IV bill doesn't have anything to do with the AOS track. It's based on the DS-261 being accepted and added to the case file. Time to read posts 1 and 2 again.

@Saylin or anyone

When I started my part time job I was single, but I've since married and for 2014 I filled as married. However I just noticed that on my paystub that it says single. Is this gonan be a problem?

It should be fine (Canada isn't a high-fraud country), but I'd suggest getting it changed pronto.

Hi everyone.

I just received an email from NVC which says checklist cover letter and at the bottom it says that they have reviewed ds 260 and waiting for us to send civil docs. IV package was received on Feb 18. Is this what is called a false checklist. AOS has been reviewed and entered in their system.

Yup, sounds like a false checklist to me based on them reviewing (and likely accepting) your DS-260. Call up to confirm!

Saylin please add us to the spreadsheet...thnx

NOA2 approved and shipped from Nebraska on Feb 21. Not yet received by NVC.

Added!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

I just called NVC, not happy, still waiting to get my case number. The rep. said I should call back in about two weeks... Huh really? mad.gif

Edited by DearJohn

USCIS



04-29-2013: Sent I-130 packet


05-06-2013: I-130 NOA1


05-16-2013: Sent I-129F packet


05-20-2013: I-129F NOA1


06-06-2013: I-129F Alien registration number changed


11-20-2013: Submitted I-129F e-Request


12-11-2013: I-130 and I-129F Transfer to Nebraska Service Center


01-03-2014 Submitted second I-129F e-Request


01-14-2014: I-130 Alien registration number changed


01-14-2014: I-130 and I-129F Approved


01-16-2014: I-130 shipped to DoS email


01-17-2014: I-129F shipped to DoS email



NVC



01-29-2014: NVC received case


03-07-2014: Case Number and Invoice ID Number assigned


03-08-2014: DS-261 Available and submitted to NVC


03-10-2014: AOS invoice available and paid


03-13-2014: AOS packet express mailed to NVC


03-14-2014: AOS packet delivered to NVC


03-14-2014: AOS shows "PAID"


03-18-2014: AOS Packet entered to the system


03-19-2014 DS-261 Accepted


03-31-2014: IV invoice available and paid


04-01-2014: IV packet express mailed to NVC


04-01-2014: AOS Accepted


04-02-2014: IV packet delivered to NVC


04-04-2014: IV shows "PAID"


04-04-2014: DS-260 submitted


04-04-2014: IV packet entered to the system


23-04-2014: Case Complete - No Checklists!!


30-04-2014: Interview scheduled



CONSULATE



10-06-2014: Interview :dancing:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nepal
Timeline

Case completed 02/28 /2014

USCIS
2013-03-01 - Sent i-130
2013-03-04 - NOA1

2013-10-28 - Transferred to NSC
2013-11-26 - NOA2

2013-11-29 - NOA2 Shipped to NVC

NVC
2013-12-16 - NVC received at the dock

2013-12-20 - NVC received in the building

2014-01-15 - NVC case number assigned

2014-01-23 - Completed DS-261 online
2014-01-24 - AOS Bill Generated and paid
2014-01-28 - Shows paid. Sent AOS Package

2014-01-29 - USPS tracking says delivered

2014-01-31 - IV bill invoiced and paid

2014-02-03 - IV shows paid. DS-260 completed online. IV package sent

2014-02-06 - USPS tracking says delivered
2014-02-28 - Case completed
2014-04-01 - Interview scheduled

Consulate
2014-03-25 - Medical
2014-04-01 - Interview
2014-XX-XX - Visa in hand
2014-XX-XX - POE

Link to comment
Share on other sites

thanks sandraprry i will cantact the irs tomorrow to see how can i get this fixed since i filed my tax return all ready as single this guy that did my taxes is no good i explain to him everything :(

We're on the same boat :( and my husband already filed ITR2013 which he filed single . But he already amend his status from single to MFJ.. The preparer was the one who put MFJ . My husband insist that we need ITIN but the preparer told him that he just only need my signature .. Better to call IRS then :(

Our 1-130, CR-1 Visa Journey

USCIS STAGE

04/16/2013: Got Married
05/19/2013: Sent I-130 to the Phoenix Lockbox
05/29/2013: Notice of Action 1
12/03/2013: Notice of Action 2
12/09/2013: Shipped to NVC

NVC STAGE

01/06/2014: NVC received the case

01/21/2014: NVC Assigned Case Number and IIN

01/21/2014: DS-261 available and completed

01/22/2014: AOS bill invoice available and paid

01/28/2014: AOS Mailed

01/29/2014: IV bill invoice available and paid

01/31/2014: DS-260 Available and completed

02/07/2014: AOS and IV package received

02/27/2014: Checklist Received for AOS

02/28/2014: Respond to checklist

03/10/2014: IV package has been reviewed and completed

03/24/2014: Case Complete

CONSULATE

02/11/2014:Advance Medical

05/15/2014:Interview

05/05/2014:Early interview (APPROVED)

05/08/2014:VISA ON HAND

05/19/2014:POE (SEATTLE)




i3gEbcS.jpgi3gEp8.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I am filing out my I-864.. Which line from my W2 should be taken as to calculate my current individual annual income in Part-8 Item-5..?? Please Help!!

USCIS:

  • 02/25/13 : I-130 Filed NBC
  • 02/28/13 : NOA1
  • 10/23/13 : Case transferred to Nebraska Service center
  • 12/06/13 : NOA2

NVC:

  • 01/03/14 : Shipped to NVC.
  • 01/17/14 : NVC recieved the case.
  • 02/24/14 : Case number assigned and IIN/BIN.
  • 02/28/14 : DS-261 Available and completed.
  • 03/03/14 : Received e-mail to pay AOS Fee.
  • 03/04/14 : AOS invoice available and paid(In Process).
  • 03/04/14 : DS-261 Accepted.
  • 03/05/14 : AOS package sent to NVC.
  • 03/06/14 : AOS bill shows PAID.
  • 03/10/14 : AOS package received at NVC (Dock).
  • 03/12/14 : AOS entered into the System.
  • 03/18/14 : IV invoice available and paid(In Process).
  • 03/20/14 : IV package sent to NVC.
  • 03/21/14 : IV bill shows PAID || DS-260 Available || IV package received at NVC (Dock).
  • 03/22/14 : DS-260 Completed.
  • 03/25/14 : IV packet entered into the System.
  • 03/28/14 : Checklist for leaving a space blank on the I-864A form, Part-1, Item-3 :(
  • 03/29/14 : Checklist response express mailed.
  • 03/31/14 : Checklist response received at NVC (Dock).
  • 04/02/14 : Checklist response entered into the System.
  • 04/04/14 : IV packet and DS-260 Accepted.
  • 04/14/14 : Case Complete :dancing:
  • 04/21/14 : Case Complete e-mail.
  • 04/30/14 : Interview scheduled for JUNE 3rd :dancing: :dancing: :dancing:
  • 05/01/14 : Received Interview Letter (P4)
  • 05/08/14 : Medical Done
Link to comment
Share on other sites

Ya, seems like you can just bring the corrected I-864EZ to the interview. Consider yourself lucky and not have to wait another 20ish business days for a checklist to be reviewed.

Awesome, I get to see my wife I believe. I'm heading to the interview with her.

Thanks again....

Link to comment
Share on other sites

how do you get notified that your case is at the nvc calling every day after the 2 weeks or you get an email from uscis

Call NVC after 2 weeks.

Case completed 02/28 /2014

Congratulations!

http://www.smashwords.com/books/download/221102/1/latest/0/0/mabuhay-love.pdf (book written by my husband after seeing each other the very first time). 

Jan 10, 2013 - wedding day

USCIS Process

Feb 25, 2013 - sent out I130 Package to USCIS

Mar 07 - priority date (NBC/MSC)

Mar 11 - NOA1 hardcopy

Oct 25 - transferred case from NBC/MSC to CSC

Nov 05 - being processed at a local USCIS office (CSC)

NVC Process

Nov 20 - finally! NOA 2

Dec 21 - Case number and IIN generated

Dec 23 - Submitted/Completed DS-261 online

Dec 23 - AOS fee bill invoiced

Dec 28 - AOS shows PAID

Dec 28 - IV fee bill invoiced

Jan 12, 2014 - sent out AOS Package

Jan 18 - IV fee shows PAID

Jan 18 - DS-260 available

Jan 19 - Completed/Submitted DS-260 online

Jan 26 - IV Package sent to NVC

Feb 03 - IV package under review (wait for 30 days to complete)

Feb 06 - advance medical done (results & cd on-hand)

Feb 10 - AOS package has been reviewed and completed (by email) (25 days)

Feb 24 - IV package has been reviewed & completed  (by phone call) (22 days)  

Feb 24 - Case Completed (phone call & email)

Feb 28 - received an email about my interview appointment (P4 letter)

April 04, 2014 - Interview Schedule (by email)
April 04 - Administrative processing ( due to missing AOS documents, sent out right away)
April 07/08 - still AP
April 11 - AP changed to Ready (for interview)
April 11 - Ready changed to ISSUED (Thanks God!)

April 22 - Visa received

May 10 - My most awaited date! My flight to San Diego CA.

 

May 23 - applied for SSN. June 2 - received my SSN Jun 9 - got a job. July 21 - received my green card (wrong expiration date and combined first and middle name, filed for I-90-correction) Aug 08 - applied for a state ID Sep 05 - biometrics appointment  Oct 09 - received my state ID Nov 03 - post decision activity (I-90 application) Nov 07 - card/document production (need to wait for 30 days for my new green card) Nov 10 - received the new green card (2 months & 5 days)

 

Thank you so much to this awesome group! for all the help. God bless us all!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Honduras
Timeline

I got the hard copies in the mail today. please update 4 me.

thanks

MY JOURNEY

2009-03-03 - Married in San Pedro Sula, Cortez, Honduras

2011-07-11 - Our second Daughter is Born in La Ceiba, Atlántida, Honduras

2013-04-15 Consular Report of Birth Abroad Completed- she is USA Citizen

We are a family of four-

TWO I130 CASES - running concurrently One for my wife and Second for my stepdaughter

USCIS
2013-08-20 - NOA1 - Priority Date established
2014-02-27 - NOA2 - after transfer to California Service Center in January

7 MONTHS and 23 DAYS at USCIS

NVC

2014-04-11 - NVC case Number & IIN Assigned

2014-04-15 - DS-261 online done and accepted

2014-04-29 - DS-260 completed online and approved on 5/14/2014

AOS

2014-04-16 - I-864 INVOICE Generated and paid

2014-04-21 - I-864 Package sent via FedEx

2014-04-22 - I-864 Package at NVC Signed for by B Standish 9:21 am FedEx

2014-05-14- I-864 package on case approved

IV

2014-04-24 - IV INVOICE Generated and paid

2014-05-02 - IV packets sent via FedEx scanned on 05/05/2014 approved on 5/29/2014 - 24 days

2014-05-29 - Case ONE OF TWO completed, 48 days

2014-06-20- CASES(s) complete Case TWO took 71 days (checklist)

Consulate

2014-08-13- POE --FT Lauderdale, FLA for my wife

221(g) additional follow up required with Consulate

2015-06-19- POE FT Lauderdale, FLA fro my Stepdaughter

Link to comment
Share on other sites

I am filing out my I-864.. Which line from my W2 should be taken as to calculate my current individual annual income in Part-8 Item-5..?? Please Help!!

Current income isn't taken from previous year's tax information. It's based on what you're CURRENTLY making, as of right NOW.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Current income isn't taken from previous year's tax information. It's based on what you're CURRENTLY making, as of right NOW.

Thank you so much Saylin. I really appreciate your help!!

USCIS:

  • 02/25/13 : I-130 Filed NBC
  • 02/28/13 : NOA1
  • 10/23/13 : Case transferred to Nebraska Service center
  • 12/06/13 : NOA2

NVC:

  • 01/03/14 : Shipped to NVC.
  • 01/17/14 : NVC recieved the case.
  • 02/24/14 : Case number assigned and IIN/BIN.
  • 02/28/14 : DS-261 Available and completed.
  • 03/03/14 : Received e-mail to pay AOS Fee.
  • 03/04/14 : AOS invoice available and paid(In Process).
  • 03/04/14 : DS-261 Accepted.
  • 03/05/14 : AOS package sent to NVC.
  • 03/06/14 : AOS bill shows PAID.
  • 03/10/14 : AOS package received at NVC (Dock).
  • 03/12/14 : AOS entered into the System.
  • 03/18/14 : IV invoice available and paid(In Process).
  • 03/20/14 : IV package sent to NVC.
  • 03/21/14 : IV bill shows PAID || DS-260 Available || IV package received at NVC (Dock).
  • 03/22/14 : DS-260 Completed.
  • 03/25/14 : IV packet entered into the System.
  • 03/28/14 : Checklist for leaving a space blank on the I-864A form, Part-1, Item-3 :(
  • 03/29/14 : Checklist response express mailed.
  • 03/31/14 : Checklist response received at NVC (Dock).
  • 04/02/14 : Checklist response entered into the System.
  • 04/04/14 : IV packet and DS-260 Accepted.
  • 04/14/14 : Case Complete :dancing:
  • 04/21/14 : Case Complete e-mail.
  • 04/30/14 : Interview scheduled for JUNE 3rd :dancing: :dancing: :dancing:
  • 05/01/14 : Received Interview Letter (P4)
  • 05/08/14 : Medical Done
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

How long does it take for NVC to invoice the IV fee??? They received my AOS fee and it stated paid on 2/24, they received the the AOS packet on 2/25/2014... its been 7 business days... my husband and I are getting really hopeless... utterly hopeless. we are depressed, we are expecting in june. do ya'll think he'll be here before then???? I have no hope in the NVC.

reallly,

me and few others have been waiting for 1 month for IV fees to be invoiced. just have patience.

USCIS
04/19/13 NOA1 Priority Date
12/12/13 info pass at local office told me file was transferred on 5th DEC
12/12/13 File at NSC
12/19/13 NOA2 (244days)
NVC
01/03/14 NVC Received Case
01/28/14 NVC Assigned Case Number and IIN
02/05/14 DS-261 Available and completed
02/06/14 Received e-mail to pay AOS Fee
02/06/14 AOS bill invoice available and paid
02/08/14 AOS Mailed
03/12/14 IV bill invoice available and paid
03/12/14 Pacakge IV mailed
03/15/14 DS-260 Available and completed
03/28/14 Case Complete
Consulate
04/07/14 Medicals
05/05/14 Fingerprinting & Photo
05/06/14 Interview

Link to comment
Share on other sites

I completed the DS261 on 2/19, how long should I wait till IV fee and DS 260 become available. For crying out loud the DS 261 is electronic. It has been 9 business says. Anyone with the same timeline?

reallly,

me and few others have been waiting for 1 month for IV fees to be invoiced. just have patience.

I don't have much more patience. This process is not supposed to take this long. This has become ridiculous

NOA 1- March 25, 2013

NOA 2- Dec 23, 2013

Dec 27, 2013 Case shipped from NSC to NVC

Case in NVC building-Jan 13,2013

National Visa Center Processing

Case # and IIN- 02/14/2014

DS-261 completed: 2/19/2014

AOS Invoiced and shows IN PROGRESS: 2/20/2014

AOS shows PAID: 2/24/2014 AOS- packet added to the case: 3/17/2014

DS 261 Accepted: 03/20/2014IV fee yellow triangle with exclamation mark seen on CEAC- 03/18/2014

IV fee available to pay and shows IN PROGRESS: 3/20/2014

IV packet received by NVC 03/7/2014

IV packet FALSE checklist-(Checklist shows: I need to complete the DS 261 form): 03/17/2014

IV Packet FALSE checklist (Checklist shows: pay IV fee): 3/20/2014

IV fee shows PAID 3/24/2014IV packet accepted 3/24/2014 (all civil documents reviewed per NVC rep 4/1, currently waiting on DS 260 to be reviewed)

DS-260 - SUBMITTED 3/25/2014

Checklist for Court record and Indian PCC- April

Submitted Court Record document and NVC scanned into system- 4/23
NVC received Indian PCC at their door on 5/9/2014
PCC scanned into system- 5/12/2014
Mysterious Second Package scanned into system- 5/16/2014
Case complete- 06/11/2014
interview Date: 07/08/2014 changed from 7/15/14
delivery of Child #1- 6/11/2014
Medical Completed 4/4/2014 at knightsbridge doctors

Link to comment
Share on other sites

My priority date is March 25,2013 does this make a difference at the NVC??

NOA 1- March 25, 2013

NOA 2- Dec 23, 2013

Dec 27, 2013 Case shipped from NSC to NVC

Case in NVC building-Jan 13,2013

National Visa Center Processing

Case # and IIN- 02/14/2014

DS-261 completed: 2/19/2014

AOS Invoiced and shows IN PROGRESS: 2/20/2014

AOS shows PAID: 2/24/2014 AOS- packet added to the case: 3/17/2014

DS 261 Accepted: 03/20/2014IV fee yellow triangle with exclamation mark seen on CEAC- 03/18/2014

IV fee available to pay and shows IN PROGRESS: 3/20/2014

IV packet received by NVC 03/7/2014

IV packet FALSE checklist-(Checklist shows: I need to complete the DS 261 form): 03/17/2014

IV Packet FALSE checklist (Checklist shows: pay IV fee): 3/20/2014

IV fee shows PAID 3/24/2014IV packet accepted 3/24/2014 (all civil documents reviewed per NVC rep 4/1, currently waiting on DS 260 to be reviewed)

DS-260 - SUBMITTED 3/25/2014

Checklist for Court record and Indian PCC- April

Submitted Court Record document and NVC scanned into system- 4/23
NVC received Indian PCC at their door on 5/9/2014
PCC scanned into system- 5/12/2014
Mysterious Second Package scanned into system- 5/16/2014
Case complete- 06/11/2014
interview Date: 07/08/2014 changed from 7/15/14
delivery of Child #1- 6/11/2014
Medical Completed 4/4/2014 at knightsbridge doctors

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

saylin need help,

In few hrs its going to be a month since i filled my agent form and still i have not been invoiced for IV fees.

I tried to get supervisor review but they say its not applicable

anything else i can try??

Thanks

USCIS
04/19/13 NOA1 Priority Date
12/12/13 info pass at local office told me file was transferred on 5th DEC
12/12/13 File at NSC
12/19/13 NOA2 (244days)
NVC
01/03/14 NVC Received Case
01/28/14 NVC Assigned Case Number and IIN
02/05/14 DS-261 Available and completed
02/06/14 Received e-mail to pay AOS Fee
02/06/14 AOS bill invoice available and paid
02/08/14 AOS Mailed
03/12/14 IV bill invoice available and paid
03/12/14 Pacakge IV mailed
03/15/14 DS-260 Available and completed
03/28/14 Case Complete
Consulate
04/07/14 Medicals
05/05/14 Fingerprinting & Photo
05/06/14 Interview

Link to comment
Share on other sites

Filed: Country: Canada
Timeline

Thanks Saylin,

I understand the total income from the 2013,12 and 11 tax returns are Ok and W2 is not applicable to I-864EZ.

I will sleep better!

Thank you!

Lukiduki

IR5 - Parents of US Citizen

USCIS

30 July 2013 : I-130 IR5 Sent

03 Aug 2013 : NOA1 Date

22 Jan 2014 : Transfer to CSC

30 Jan 2014 : I-130 Approved ?

NVC

12 Feb 2014 : NVC Received the Case

20 Mar 2014 : Case IIN BIN Numbers Assigned ?

21 Mar 2014 : ENROLL email sent to NVC - First Time (Did not Receive AutoReply)

22 Mar 2014 : DS-261 Available

23 Mar 2014 : DS-261 Submitted

24 Mar 2014 : AOS Invoice Available and Paid

26 Mar 2014 : AOS Invoice shows Paid

26 Mar 2014 : ENROLL email sent to NVC - Second Time (AutoReply Received from NVC)

27 Mar 2014 : IV Invoice Triangle Shown, but Not Payable Online

28 Mar 2014 : IV Invoice became Available for Payment Online

01 Apr 2014 : IV Invoice Paid

03 Apr 2014 : IV Invoice shows Paid

03 Apr 2014 : DS-260 Available

21 Apr 2014: EROLL Confirmation Received ?

21 Apr 2014: DS-260 Completed and Sent

21 Apr 2014 : AOS Package Email sent to NVC (auto reply received)

21 Apr 2014 : IV Package Email sent to NVC

14 May 2014 : Checklist emails received for all the IV and AOS documents (False Checklist?)

27 May 2014 : Received Checklist: asking 2013 Transcript (one checklist for each parent)

30 May 2014: Called NVC spoke with supervisor. The supervisor could not open the 2013 Transcripts we've sent in our AOS package on April21, because it was downloaded from IRS site. He said it was password protected.

We scanned the transcript and sent it to the supervisor at nvcinquiry@state.gov.

The supervisor was kind enough to wait on the phone and confirm that he has received our email with scanned transcripts attachments.

Supervisor asked another 3 weeks to review our cases.

01 Jun 2014: We sent 2 separate emails (one case # for each parent ) "Response to Checklist" to nvcelectronic@state.gov complete with all the attachments scanned into pdf.

04 Jun 2014 : Case Complete for both parents! ?

Thanks to all VJs members and special thanks to Saylin, Jag and Ripu, Canadianplum and Xprecious32 for your help, support and encouragement. Kind Regards and best wishes for all of you!

25 Jun 2014 : Medical done

22 Jul 2014 : Montreal interview. Approved! ?

09Sep2014 : Entry at Niagara-Buffalo Peace Bridge Officer also requested Green Card and SSN. We have received the Green Cards but we never received SIN. We requested the SIN cards again in November at Local Office and receiver the cards in one week.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...