When you get that yellow exclamation point triangle thing next to IV bill how long does it take before it is available to pay?

Based on my experience, 1-2 days. Daughter's case - 1 day. Son's case - 2 day.

Approved 6 Months and 4 Days after NOA1. 1 Month and 3 weeks and 4 days since case was transferred to NSC.

July 12, 2013 - NOA1

November 21, 2013 - case transferred to NSC

January 16, 2014 - NOA2

January 16, 2014 - Shipped to NVC

January 28, 2014 - NVC Received

March 10, 2014 - Case Number and IIN assigned; Provided beneficiary's email address.

March 11, 2014 - DS-261 Available and submitted to NVC

March 11, 2014 - AOS Fee invoice available & paid

March 13, 2014 - AOS package sent to NVC

March 14, 2014 - AOS Bill Payment "PAID"

March 17, 2014 - AOS package Delivered to NVC

March 20, 2014 - IV invoice icon changed from locked folder to yellow exclamation. Only for my daughters' case, my son's case icon still locked folder.

March 21, 2014 - Daughters' IV invoiced and Paid

March 25, 2014 - Son's IV invoice icon changed from locked folder to yellow exclamation.

March 27, 2014 - Son's IV invoiced and Paid

March 27, 2014 - IV package sent to NVC

March 28, 2014 - IV package Delivered to NVC

March 31, 2014 - Completed DS-260

April 3, 2014 - Received AOS Checklist (Daughter's Name)

April 4, 2014 - Sent response to AOS checklist

April 7, 2014 - NVC recieved AOS checklist

April 14, 2014 - Son's Case Completed (now waiting for Daughter's case)

April 23, 2014 - Daughter's Case Completed

April 29, 2014 - Interview Date Scheduled

June 09 2014 - Interview Date

Filed: IR-1/CR-1 Visa Country: Thailand
Timeline
Posted

When you get that yellow exclamation point triangle thing next to IV bill how long does it take before it is available to pay?

Mine took 2 business days....use IE to pay bill....

have your packet ready to ship...you can print out the bar coded sheet

to put on top of your documents as soon as you pay.

You can wait for it to show paid but I did not.

You have shipping time and 4 days average until it is entered in the system

so plenty of time for it to show paid.

Mine showed pending in my Bank account the next day.

USCIS
2013-07-25 - Sent i-130 Before Posting Please Read Saylin's NVC Guide
2013-07-29 - NOA1
2014-01-13 - Transferred to CSC http://www.visajourney.com/wiki/index.php/NVC_Process
2014-01-21 - NOA2
NVC
2014-02-06 - NVC received
2014-03-13 - NVC case number assigned
2014-03-17 - DS-261 Online Completed

2014-03-18 - I-864 (AOS) Bill Generated and Paid
2014-03-20 - I-864 (AOS) Bill Shows Paid
2014-03-21 - DS-261 Accepted
2014-03-25 - I-864 (AOS) Package Sent

2014-03-26 - I-864 (AOS) Package Recieved (signed: B. Standish)
2014-03-27 - IV Bill invoiced and Paid
2014-03-27 - IV Packet Sent

2014-03-28 - IV Packet Received (signed: G. Peters)
2014-03-31 - DS-260 Available and Completed online
2014-04-10 - I-864 (AOS) Accepted
2014-04-11 - Received False Checklist
2014-04-14 - Case Complete
2014-04-21 - Received Email Confirmation Case Complete
2014-04-30 - Interview Scheduled for June 3
2014-05-02 - Interview Confirmation Email ( P4) Received
Consulate
2014-05-05 - Case " In Transit " to Embassy

2014-05-08 - Case Arrived U.S.Embassy Bangkok (signed: Nawaphas R)

2014-05-19 - Medical Complete

2014-06-03 - Interview - VISA APPROVED !!!

USA

2014-06-17 - POE - LAX AIRPORT - VISA JOURNEY COMPLETE !!!

2014-06-30 - Social Security Card Received

2014-07-24 - Green Card Received (Valid until 6-17-2024)

new.jpg

My Family

ddf.jpg

katt_Trip.jpgmdpool.jpgdrewmom.jpgkatt2.jpg

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted (edited)

The bad thing is that i'm in a group C and i have to submit all the papers through post.

Why?????????? :crying:

I think you misunderstood what I am trying to say. You need to fill the form which is linked in Saylin's signature to be ADDED to the NVC filers spreadsheet which Saylin is maintaining. And it is a good thing to be submitting all papers through post the way I see it. I've seen posts on this thread wishing they could post papers but it is not an option for them. So cheer up, everything is going just great. Edited by dilmera

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Filed: IR-1/CR-1 Visa Country: France
Timeline
Posted

Hi!

We received our case number (form to update the spreadsheet submitted - btw Saylin: nice background!!!).

However we were supposed to change my husband's address over the phone once the case number is assigned, but the NVC lady told us to send a request by email... which I find kinda weird (she had to ask a supervisor). Has anyone changed their address over the phone??

Thanks

He is a US citizen, lived in the UK, now moved back to the US. I am French, we met in 2010 in the UK and got married in March 2013 in France.

-2013-04-22: NOA1 (Case transferred on 12/04) -2014-02-07: NOA2 -2014-02-24: Case received at NVC (Case # received on 03/27) -2014-03-29: DS-261 completed -2014-03-31: AOS fee paid (shown as PAID on 04/02, package sent on 04/03) -2014-04-04: IV fee paid (shown as PAID on 04/08, package sent on 04/05) -2014-04-08: DS-260 completed online -2014-04-14: AOS & IV packages received at NVC (entered in the system on 04/17 and 04/18) -2014-05-05: AOS checklist (phone), joint-sponsor's proof of citizenship lost (other copy arrived at NVC on 05/08, NVC "received" the checklist response on 05/09)
-2014-05-09: IV package accepted
-2014-06-04: Case complete
-2014-06-11: Interview scheduled (July 23rd - APPROVED)
-2014-08-01: Visa in hand
-2014-08-04: POE

- 2016-05-05: CRI-89 - Petition to remove conditions sent

- 2016-05-10: NOA received

- 2016-06-13: Biometrics

Waiting....

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Posted

Uh-oh! I wish you send them the checklist highlighting where it mentions only needs to be filled if different.

They sent me checklist for the exact same thing. When I called they said you must fill it in leave no blanks. Can't believe they cost me another 30 days for something so stupid.

Filed: Country: India
Timeline
Posted

Another question regarding the institutions, I graduated from a college which is affiliated to a university. All my graduation certificates are from the university, so for the graduation institution, it has to be the college where I studied or the university?

As far a I know, you have to put college. I don't think they are so picky about small stuff. They don't ask for certification etc.

I 130 for parents March 18, 2013 NOA 1 November 1, 2013 Transfer to TSC December 10, 2013 NOA 2 December 31, 2013 shipped to NVC January 8, 2014 Case received by NVC February 10,2014 Case Number received

(Mother) February 13.2014 DS 261 submitted

February 14, 2014 paid AOS

February 19, 2014 AOS shows paid

March 5, 2014 mailed AOS

March 11 ,2014 AOS received by NVC

March 10, 2014 IV invoiced and paid

March 14, 2014 IV shows paid

March 15, 2014 Mailed IV packet

March 17,2014 DS-260 submitted

March 25.2014 AOS Check list (received by NVC on March 31st)

April 7, 2014 DS260 accepted & IV accepted AOS Checklist under review

April 10 2014: Case Complete

(Father) February 13.2014 DS 261 submitted

March 3,2014 Accidently resubmitted DS 261

February 14, 2014 paid AOS ( mother's payment covered both files)

February 19, 2014 AOS shows paid

March 5, 2014 mailed AOS (had to call NVC for father's cover sheet)

March 11 ,2014 AOS received by NVC

March 18, 2014 IV invoiced and paid

March 19, 2014 Mailed IV packet

March 21, 2014 IV shows paid

March 23,2014 DS-260 submitted

March 25.2014 AOS Check list (received by NVC on March 31st)

April 7, 2014 DS260 accepted & IV accepted AOS Checklist under review

April 10 2014: Case Complete

May 6. 2014 VAC

May 15.2014 Medical

June 2, 2014 Interview scheduled, Mumbai Embassy @ 7:30 (Excited & Nervous)

June 10, 2014 Visa Issued!!!! (was on hold for additional AOS)

June 25,2014 POE :rolleyes:

July 1, 2014 Pay fees for the Green Card

August 10, 2014 Green card arriver on August 10th

Posted

Hi saylin i am trying to write case number on passport pics with pencil but it wont work. can i use a pen instead. ThanK

write the number on a piece of scotch tape and put it on the back of the pic.

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted (edited)

They sent me checklist for the exact same thing. When I called they said you must fill it in leave no blanks. Can't believe they cost me another 30 days for something so stupid.

30 days for such a trivial thing! They ought to rephrase their instructions to fill in if different otherwise write what's appropriate, but don't leave blanks. Edited by dilmera

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Filed: Country: India
Timeline
Posted

30 days for such a trivial thing! They ought to rephrase their instructions to fill in if different otherwise write what's appropriate, but don't leave blanks.

I was very patient with the whole process, however now I am SO SO ready to get done. I am so over it now :blink::mellow:

I 130 for parents March 18, 2013 NOA 1 November 1, 2013 Transfer to TSC December 10, 2013 NOA 2 December 31, 2013 shipped to NVC January 8, 2014 Case received by NVC February 10,2014 Case Number received

(Mother) February 13.2014 DS 261 submitted

February 14, 2014 paid AOS

February 19, 2014 AOS shows paid

March 5, 2014 mailed AOS

March 11 ,2014 AOS received by NVC

March 10, 2014 IV invoiced and paid

March 14, 2014 IV shows paid

March 15, 2014 Mailed IV packet

March 17,2014 DS-260 submitted

March 25.2014 AOS Check list (received by NVC on March 31st)

April 7, 2014 DS260 accepted & IV accepted AOS Checklist under review

April 10 2014: Case Complete

(Father) February 13.2014 DS 261 submitted

March 3,2014 Accidently resubmitted DS 261

February 14, 2014 paid AOS ( mother's payment covered both files)

February 19, 2014 AOS shows paid

March 5, 2014 mailed AOS (had to call NVC for father's cover sheet)

March 11 ,2014 AOS received by NVC

March 18, 2014 IV invoiced and paid

March 19, 2014 Mailed IV packet

March 21, 2014 IV shows paid

March 23,2014 DS-260 submitted

March 25.2014 AOS Check list (received by NVC on March 31st)

April 7, 2014 DS260 accepted & IV accepted AOS Checklist under review

April 10 2014: Case Complete

May 6. 2014 VAC

May 15.2014 Medical

June 2, 2014 Interview scheduled, Mumbai Embassy @ 7:30 (Excited & Nervous)

June 10, 2014 Visa Issued!!!! (was on hold for additional AOS)

June 25,2014 POE :rolleyes:

July 1, 2014 Pay fees for the Green Card

August 10, 2014 Green card arriver on August 10th

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted (edited)

Uh-oh! I wish you send them the checklist highlighting where it mentions only needs to be filled if different.

Yesterday i called NVC and made them read those instructions. But there was no use. Still they have the same answer :ranting:

Edited by jem13

USCIS:

  • 02/25/13 : I-130 Filed NBC
  • 02/28/13 : NOA1
  • 10/23/13 : Case transferred to Nebraska Service center
  • 12/06/13 : NOA2

NVC:

  • 01/03/14 : Shipped to NVC.
  • 01/17/14 : NVC recieved the case.
  • 02/24/14 : Case number assigned and IIN/BIN.
  • 02/28/14 : DS-261 Available and completed.
  • 03/03/14 : Received e-mail to pay AOS Fee.
  • 03/04/14 : AOS invoice available and paid(In Process).
  • 03/04/14 : DS-261 Accepted.
  • 03/05/14 : AOS package sent to NVC.
  • 03/06/14 : AOS bill shows PAID.
  • 03/10/14 : AOS package received at NVC (Dock).
  • 03/12/14 : AOS entered into the System.
  • 03/18/14 : IV invoice available and paid(In Process).
  • 03/20/14 : IV package sent to NVC.
  • 03/21/14 : IV bill shows PAID || DS-260 Available || IV package received at NVC (Dock).
  • 03/22/14 : DS-260 Completed.
  • 03/25/14 : IV packet entered into the System.
  • 03/28/14 : Checklist for leaving a space blank on the I-864A form, Part-1, Item-3 :(
  • 03/29/14 : Checklist response express mailed.
  • 03/31/14 : Checklist response received at NVC (Dock).
  • 04/02/14 : Checklist response entered into the System.
  • 04/04/14 : IV packet and DS-260 Accepted.
  • 04/14/14 : Case Complete :dancing:
  • 04/21/14 : Case Complete e-mail.
  • 04/30/14 : Interview scheduled for JUNE 3rd :dancing: :dancing: :dancing:
  • 05/01/14 : Received Interview Letter (P4)
  • 05/08/14 : Medical Done
Filed: Citizen (apr) Country: Nigeria
Timeline
Posted (edited)

PLEASE HELP: my case was completed yesterday according to CSR however I receive a checklist today and it was the same checklist I have before number 19 on I-864EZ I have copied exactly whats on my W2 now I dont have idea on what Im doing wrong. They want the beneficiary to bring the corrected one during interview but I dont know how to correct it. Please help...

Well good news is you still have case complete and the NVC is having you fix for interview. Without knowing the issue I or others can't help.

I mean what is the issue? Have you called NVC. Is it the amount? On the 864EZ its very specific and its your adjusted gross not whats on your W2.

Edited by dwheels76

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Filed: Other Country: Germany
Timeline
Posted

Well good news is you still have case complete and the NVC is having you fix for interview. Without knowing the issue I or others can't help.

I mean what is the issue? Have you called NVC. Is it the amount? On the 864EZ its very specific and its your adjusted gross not whats on your W2.

Hi dwheels do I qualify to be on your case complete sheet? My visa category IB1. Thank you

Filed: Citizen (apr) Country: Nigeria
Timeline
Posted

Hi dwheels do I qualify to be on your case complete sheet? My visa category IB1. Thank you

You know what you are the first IB-1 and well you are going through the NVC nightmare why not. Come on over when you get case complete.

http://www.visajourney.com/forums/topic/483203-april-2014-interviews/page-38#entry6911029

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Filed: IR-1/CR-1 Visa Country: Spain
Timeline
Posted

Just got done talking to NVC and I have a CASE COMPLETE :dancing::dancing:

Thank you very much Saylin, NLR, Dwheels and everyone who helped me with this journey.

I bust into tears when he said congratulations you have a case complete

I had to wait close to 6 weeks for iv bill to come and it was painful

once again thanks to god and everyone who has helped me out

cheers

Wow! Congrats! :)

01/03/2014 - 1-130 Approved

01/14/2014 - NVC received

02/24/2014 - NVC case number assigned

02/25/2014 - Invoice Identification no. assigned

02/26/2014 - AOS Payment

02/27/2014 - DS 261 submitted

02/28/2014 - AOS showed paid

03/05/2014 - Got an email that DS 261 received by NVC

03/06/2014 - Sent AOS (I-864EZ) package to NVC

03/07/2014 - AOS (I-864EZ) package received by NVC (per USPS tracking)

03/11/2014 - AOS package was logged in the system

03/13/2014 - IV Billed

03/17/2014 - IV Payment

03/19/2014 - IV showed paid and DS 260 - available

03/19/2014 - DS 260 submitted

03/19/2014 - IV package sent to NVC

03/21/2014 - IV package received by NVC (per USPS tracking)

03/24/2014 - AOS reviewed

03/25/2014 - AOS checklist was received via email

03/25/2014 - Got an email that DS 260 received by NVC

03/26/2014 - IV package was logged in the system

03/26/2014 - Sent AOS package (respond to checklist)

03/28/2014 - Received AOS package by NVC (per USPS tracking)

04/01/2014 - AOS package (checklist) was logged in the system

04/07/2014 - Police Clearance - False Checklist

04/14/2014 - AOS finally accepted!

04/15/2014 - Case Complete

04/22/2014 - Got CC email

05/01/2014 - Interview scheduled

05/02/2014 - Got P-4, IL email

05/06/2014 - Medical Examination

06/04/2014 - Interview at Madrid, Spain - APPROVED!!!

Posted

Hi guys so I left some blanks... I guess I'm going to send another i864 just in case before I get a check list.... Also I checked this morning I have the infamous yellow triangle next to my IV bill hooray!!! This process is so much better than USCIS except for the tedious things like leaving blanks or not

USCIS*

07/17/13: NOA 1

01/03/14: Transferred to Texas

01/24/14: NOA 2

02/10/14: shipped to NVC

NVC*

02/18/14: Case received by NVC

03/21/14: NVC Case# Received

03/27/14: AOS shows paid

03/27/14: dropped off AOS package at post office

03/31/14: AOS received at NVC

04/02/14: IV shows paid

04/02/14: DS-260 Completed

04/02/14: dropped off IV package and resent I-864

04/04/14: Received at NVC (IV package and I-864)

04/16/14: received a real checklist for I-864

04/20/14: AOS accepted

04/22/14: received a real checklist for IV package (birth certificate :cry:)

04/23/14: NVC received checklist item (IV package)

05/14/14: Case complete at NVC

05/21/14: email about case complete

06/12/14: Received email for interview (P4)

06/23/14: Medical done

07/02/14: Pick up medical results

07/07/14: Interview Date----Approved :dancing:

07/14/14: Received Visa in hands

07/23/14:POE JFK

08/2?/14:Had to apply for SSN-- received in mail--- applied three weeks later and received less than a week after

09/02/14:Conditional Green CARD received in mail

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...