Actually you can. We ve asked. The answer was if you need to expedite your case, you can do it even with a USCIS receipt number.

Good to know!

Link to comment
Share on other sites

Folks, if you want to be added to the spreadsheet, it'd be great if you made things easier for me and just gave me the data I needed (especially when you don't have signatures). Actually look at the spreadsheet (seems like some of you even haven't done that...) and the different columns. Don't give me dates I don't need (for the spreadsheet, I could care less when your NOA1 was). All I need is the following:

Service Center (which your I-130 was approved from)

NOA2 date

Date NVC received your case

Date case number was assigned

Date AOS package was sent out

Date IV package was sent out

Date DS-260 was completed

And before you request, make sure your timeline is filled out. I am no longer adding anyone to the spreadsheet that doesn't have a timeline filled out. And please keep it up to date (and matching with dates you give/that are in your signature). I'm doing this now as the data from your timeline is used in some of the functions of this website. And although I'd love to require signatures as well (since they're so much better than timelines when looking at time ticks as timelines don't have everything), data isn't pulled from them by the website.

We could do like they did with the transfer spreadsheets, and make a form that collects that info for you, and it gets sent to your inbox. :)

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Vietnam
Timeline

AOS says "PAID" yay. planning on calling later today to find out if they have recieved my AOS package yet. hope everyone is having a wonderful morning, afternoon, or night.

IR-1/CR-1 Visa Event Date

USCIS:

Service Center : Texas Service Center

Consulate : Ho Chi Minh, Vietnam

02-09-2012: Marriage

15-03-2013: I-130 NOA1

06-11-2013: Transfer date to TSC

09-01-2014: NOA2 (I-130)

29-01-2014: Shipped to NVC (I-130)

NVC:

06-02-2014: NVC received case

13-03-2014: Case Number assigned

13-03-2014: IIN Number assigned. Email addresses given

17-03-2014: DS-261 Available and submitted to NVC

18-03-2014: AOS invoice available on portal; AOS paid. "IN PROCESS"

20-03-2014: AOS shows "PAID"

24-03-2014: AOS/I-864 packet express mailed to NVC

01-04-2014: AOS packet arrived at NVC

27-03-2014: IV invoice available on portal; IV invoice paid. "IN PROCESS"

31-03-2014: IV invoice shows "PAID"

01-04-2014: DS-260 submitted

26-04-2014: IV Packet express mailed to NVC

01-05-2014: IV Packet received by NVC

21-05-2014: Case Complete

07-08-2014: Interview Scheduled

02-07-2014: Medical Completed

Link to comment
Share on other sites

Filed: IR-5 Country: Nigeria
Timeline

1,Quick Question before i send the AOS documents. Do I have to send in the original pay stubs or is the copy ok, and is there anything that i have to send in the original.

2, Saylin please if you can add me , infos are on my timeline

Edited by allswell
Link to comment
Share on other sites

Lucybelle,

I brought our dog over from the Netherlands last December (1 yr old Jack Russell) and it went fine. When you board the plane just ask the crew if they can double check if your dog in on board. They happily do that. I didn't have a lay over but was told that if you have a lay over for more then 3 hours, most airlines will let you dog out to relieve itself. And the airline (Delta) would not allow our dog on board if it had taken any tranquilizer so check the airline.

My dog is fell just within the rules to be able to bring her in the cabin. We actually chose flying United because she could fly in the cabin with us. (She has severe anxiety issues, especially separation anxiety. We didn't want to spent 8 hours on a plane listening to her hysterical howls. And she would have. The entire time. :P

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

Filed: Country: India
Timeline

Hey, VJers oops8rh.gif

I am freaking out over DS 260. I think I switched month and year while filling out my moms passport info. How will this effect my case. OMG, its something new everyday :(

I 130 for parents March 18, 2013 NOA 1 November 1, 2013 Transfer to TSC December 10, 2013 NOA 2 December 31, 2013 shipped to NVC January 8, 2014 Case received by NVC February 10,2014 Case Number received

(Mother) February 13.2014 DS 261 submitted

February 14, 2014 paid AOS

February 19, 2014 AOS shows paid

March 5, 2014 mailed AOS

March 11 ,2014 AOS received by NVC

March 10, 2014 IV invoiced and paid

March 14, 2014 IV shows paid

March 15, 2014 Mailed IV packet

March 17,2014 DS-260 submitted

March 25.2014 AOS Check list (received by NVC on March 31st)

April 7, 2014 DS260 accepted & IV accepted AOS Checklist under review

April 10 2014: Case Complete

(Father) February 13.2014 DS 261 submitted

March 3,2014 Accidently resubmitted DS 261

February 14, 2014 paid AOS ( mother's payment covered both files)

February 19, 2014 AOS shows paid

March 5, 2014 mailed AOS (had to call NVC for father's cover sheet)

March 11 ,2014 AOS received by NVC

March 18, 2014 IV invoiced and paid

March 19, 2014 Mailed IV packet

March 21, 2014 IV shows paid

March 23,2014 DS-260 submitted

March 25.2014 AOS Check list (received by NVC on March 31st)

April 7, 2014 DS260 accepted & IV accepted AOS Checklist under review

April 10 2014: Case Complete

May 6. 2014 VAC

May 15.2014 Medical

June 2, 2014 Interview scheduled, Mumbai Embassy @ 7:30 (Excited & Nervous)

June 10, 2014 Visa Issued!!!! (was on hold for additional AOS)

June 25,2014 POE :rolleyes:

July 1, 2014 Pay fees for the Green Card

August 10, 2014 Green card arriver on August 10th

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

Good to know!

Hey, Saylin! Completely a different question:

I see a lot of people's signatures have "DS261 accepted", what does it mean? My original understanding was after the form being reviewed and approved (so to speak), but today we called NVC to ask for status on our DS261 and we were told it is in their system. This is not the same as acceptance right?

07/03/2009. Married in China
09/02/2012. Our daughter was born
01/04/2014. Expecting our 2nd child this September!!!


USCIS
06/21/2013 Sent i130
06/24/2013 NOA1 PD
01/21/2014. NOA2 via email (NSC)
01/22/2014. Shipped to Department of State for visa processing


NVC
02/03/2014. Case received at NVC!!!!!!
03/12/2014 Case #, IIN and BID assigned
03/14/2014 DS261 available and submitted
03/17/2014 AOS fee available, paid, and it shows "in process", ENROLL email for EP sent
03/18/2014. AOS bill shows "PAID"
03/19/2014. AOS package sent thru email
03/24/2014. IV bill invoiced and paid!
03/26/2014. IV bill shows PAID and DS 260 available, IV package sent via email
03/27/2014 DS 260 submitted!!!!!!!!!!!!!!!!!
04/05/2014. ENROLL acceptance email received and GZO number issued, another email stating they have received our AOS docs.

04/10/2014 AOS checklist and also said our DS 260 has been received; Expedite Request Sent

04/11/2014 Response to the checklist sent

04/18/2014 IV package under review (system didnt receive attachments from one of my emails, so I resent the IV package just to be sure)

05/02/2014 Expedite Request Approved, case is "in transit"

Consulate

05/05/2014 Consulate Rec. (CEAC says READY)

05/08/2014 AP for the first time

05/09/2014 Interview scheduled May 27, Medical May 13.

05/27/2014 Visa APPROVED!!!

05/28/2014 CEAC changed to "ISSUED"

Link to comment
Share on other sites

Actually you can. We ve asked. The answer was if you need to expedite your case, you can do it even with a USCIS receipt number.

My case was expedited at USCIS,when it arrived at NVC,we asked for another expedite but the agent told us that we need to wait for a case number to expedite and that's what we did.

Link to comment
Share on other sites

We could do like they did with the transfer spreadsheets, and make a form that collects that info for you, and it gets sent to your inbox. smile.png

Well, that sounds fancy blink.png

1,Quick Question before i send the AOS documents. Do I have to send in the original pay stubs or is the copy ok, and is there anything that i have to send in the original.

2, Saylin please if you can add me , infos are on my timeline

1. Copies are fine. For the AOS package, the only things that need to be original are the I-864 form and employment letter (and cover letter if you send one). Tax information and pay stubs can be copies.

2. Sadly, the timeline doesn't have everything (hence the reason for my post before). When was your case number assigned? Was your I-130 approved from NBC or was it transferred at some point and approved elsewhere? And your timeline says you're going through Armenia, which I'm thinking is not true, due to the country on your profile saying Nigeria.

Link to comment
Share on other sites

Hey, VJers oops8rh.gif

I am freaking out over DS 260. I think I switched month and year while filling out my moms passport info. How will this effect my case. OMG, its something new everyday sad.png

Well, first I'd suggest you figure out if you indeed switched them or not. Look at the printed review (which I'm hoping you did...). If you indeed made a mistake, call up NVC and see if they can do anything. If not, just mention it at the interview.

Hey, Saylin! Completely a different question:

I see a lot of people's signatures have "DS261 accepted", what does it mean? My original understanding was after the form being reviewed and approved (so to speak), but today we called NVC to ask for status on our DS261 and we were told it is in their system. This is not the same as acceptance right?

Well, I'd suggest calling back up and asking the operator specifically: "Is my DS-261 accepted?"

Link to comment
Share on other sites

We definitely don't care about the work permit.. and we don't care about the cost of adjusting. K3 is the same as a K1 except you are already married. It was designed to speed up the process ( even though the process has changed over the years) Why would they say NO for a K-3? and not for the I-130? We have a waiver to file so we would prefer to bypass this NVC BS. If we go for an interview for K-3 or I-130 we will get the same result , we still need to submit the waiver before he can come home. So for us, the K-3 makes sense. If we didn't need the waiver, I'd go for the I-130 because the interview is the end of the road.

Waiver?? What do you mean by that?

Our Journey:

USCIS:

07-24-2013: PD I-130

08-20-2013: PD I-129

01-03-2014 Transfer to TSC

02-01-2014 NOA2 both petitions

02-05-2014 I-129 sent to NVC

02-14-2014 I-130 sent to NVC


NVC:

02-18-2014 I-129 received, Case number & IIN available

02-20-2014 I-129 sent to consulate

02-25-2014 I-130 received by NVC

02-26-2014 Received letter with instructions from US consulate to follow up with for the K3 visa

03-28-2014 Case number and INN received

03-31-2014 Received email that invoices are ready to be paid

03-31-2014 Invoices paid by bank

04-02-2014 Invoices show PAID

04-03-2014 DS-260 filed by Lawyer

04-04-2014 AOS and IV package sent by Lawyer to NVC

04-25-2014 Checklist AOS and Birth Certificate - Lawyer clueless - sigh

04-30-2014 New birth certificates with apostilles

05-01-2014 Sent package to Lawyer with updated docs

05-05-2014 Lawyer sent out new package to NVC

05-06-2014 NVC received updated package

05-07-2014 NVC logged package in their system

06-02-2014 Case Complete - Waiting for email and interview date :clock: :clock: :clock:


Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Hey, Saylin! Completely a different question:

I see a lot of people's signatures have "DS261 accepted", what does it mean? My original understanding was after the form being reviewed and approved (so to speak), but today we called NVC to ask for status on our DS261 and we were told it is in their system. This is not the same as acceptance right?

It's not the same. It's simply in their system now waiting review and acceptance. When it gets accepted or it's above to be accepted you'll see the yellow triangle on CEAC. After that you'll get a confirmation email for selection of agent and IV bill. Few hours after that the invoice will actually become payable.

Chceck out my signature, I have described all of the steps that were seen. It's consistent with what others have seen as well.

USCIS



08-09-2013: Sent I-130 packet


08-13-2013: I-130 NOA1


08-26-2013: Sent I-129F packet


08-28-2013: I-129F NOA1


09-10-2013: I-129F Alien registration number changed


02-03-2014: I-130 and I-129F Transfer to California Service Center


02-13-2014 (AM): I-130 Alien registration number changed


02-13-2014(PM): I-130 and I-129F Approved



NVC


02-27-2014(?): NVC Case Received


03-03-2014: Case Number and IIN assigned; Provided my wife's email address (they had mine on file already)


03-03-2014: DS-261 Available and submitted to NVC


03-04-2014: AOS payment email from NVC


03-05-2014: AOS invoice available on portal; AOS paid


03-06-2014: DS-261 in NVC system awaiting review


03-07-2014: AOS/I-864EZ packet express mailed to NVC


03-08-2014: Received hardcopy in the mail from NVC stating that my K3 Visa application was closed due to the I-130 approval


03-10-2014: AOS shows "PAID"


03-10-2014: AOS packet arrived at NVC


03-12-2014: AOS packet in the system


03-18-2014: IV invoice icon changed from locked folder to yellow exclamation indicating payment to be available soon


03-19-2014: IV invoice/agent email received; IV invoice available on CEAC few hours later; IV invoice paid


03-20-2014: IV Packet express mailed to NVC


03-21-2014: IV invoice shows "PAID"


03-21-2014: IV Packet arrived at NVC


03-21-2014: DS-260 Complete


03-25-2014: IV Packet in the system

03-27-2014: False checklist for IV civil documents. AOS Accepted

04-04-2014: Case Complete


04-11-2014: Case Complete Email


04-11-2014: Interview date assigned for May 22nd


05-22-2014: Visa Approved

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

My case was expedited at USCIS,when it arrived at NVC,we asked for another expedite but the agent told us that we need to wait for a case number to expedite and that's what we did.

Wow...our case was expedited thru USCIS too. And before we got our case numbers, we were really worried cause we are on a tight time frame so we asked and explained our need to expedite our case, and we were told we could do it now, without case number and any of that stuff. But because of China's "special" customs rules, we decided to go thru EP cause the consulate will decide if they want me to file with paper or electronically, and we can't take that chance, so we decided (also on Darnell's advise) to wait for EP, so we didn't expedite it thru NVC.

07/03/2009. Married in China
09/02/2012. Our daughter was born
01/04/2014. Expecting our 2nd child this September!!!


USCIS
06/21/2013 Sent i130
06/24/2013 NOA1 PD
01/21/2014. NOA2 via email (NSC)
01/22/2014. Shipped to Department of State for visa processing


NVC
02/03/2014. Case received at NVC!!!!!!
03/12/2014 Case #, IIN and BID assigned
03/14/2014 DS261 available and submitted
03/17/2014 AOS fee available, paid, and it shows "in process", ENROLL email for EP sent
03/18/2014. AOS bill shows "PAID"
03/19/2014. AOS package sent thru email
03/24/2014. IV bill invoiced and paid!
03/26/2014. IV bill shows PAID and DS 260 available, IV package sent via email
03/27/2014 DS 260 submitted!!!!!!!!!!!!!!!!!
04/05/2014. ENROLL acceptance email received and GZO number issued, another email stating they have received our AOS docs.

04/10/2014 AOS checklist and also said our DS 260 has been received; Expedite Request Sent

04/11/2014 Response to the checklist sent

04/18/2014 IV package under review (system didnt receive attachments from one of my emails, so I resent the IV package just to be sure)

05/02/2014 Expedite Request Approved, case is "in transit"

Consulate

05/05/2014 Consulate Rec. (CEAC says READY)

05/08/2014 AP for the first time

05/09/2014 Interview scheduled May 27, Medical May 13.

05/27/2014 Visa APPROVED!!!

05/28/2014 CEAC changed to "ISSUED"

Link to comment
Share on other sites

Filed: Country: India
Timeline

Well, first I'd suggest you figure out if you indeed switched them or not. Look at the printed review (which I'm hoping you did...). If you indeed made a mistake, call up NVC and see if they can do anything. If not, just mention it at the interview.

YOU....are a saint, Saylin heart.gif

I will call NVC as soon as I get off work. If they say they cannot do anything, I will tell my mom to mention it at the interview. It wont have any impact on the processing, right ? cray5ol.gif I feel so dumb rightnow.

Edited by Peace500

I 130 for parents March 18, 2013 NOA 1 November 1, 2013 Transfer to TSC December 10, 2013 NOA 2 December 31, 2013 shipped to NVC January 8, 2014 Case received by NVC February 10,2014 Case Number received

(Mother) February 13.2014 DS 261 submitted

February 14, 2014 paid AOS

February 19, 2014 AOS shows paid

March 5, 2014 mailed AOS

March 11 ,2014 AOS received by NVC

March 10, 2014 IV invoiced and paid

March 14, 2014 IV shows paid

March 15, 2014 Mailed IV packet

March 17,2014 DS-260 submitted

March 25.2014 AOS Check list (received by NVC on March 31st)

April 7, 2014 DS260 accepted & IV accepted AOS Checklist under review

April 10 2014: Case Complete

(Father) February 13.2014 DS 261 submitted

March 3,2014 Accidently resubmitted DS 261

February 14, 2014 paid AOS ( mother's payment covered both files)

February 19, 2014 AOS shows paid

March 5, 2014 mailed AOS (had to call NVC for father's cover sheet)

March 11 ,2014 AOS received by NVC

March 18, 2014 IV invoiced and paid

March 19, 2014 Mailed IV packet

March 21, 2014 IV shows paid

March 23,2014 DS-260 submitted

March 25.2014 AOS Check list (received by NVC on March 31st)

April 7, 2014 DS260 accepted & IV accepted AOS Checklist under review

April 10 2014: Case Complete

May 6. 2014 VAC

May 15.2014 Medical

June 2, 2014 Interview scheduled, Mumbai Embassy @ 7:30 (Excited & Nervous)

June 10, 2014 Visa Issued!!!! (was on hold for additional AOS)

June 25,2014 POE :rolleyes:

July 1, 2014 Pay fees for the Green Card

August 10, 2014 Green card arriver on August 10th

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...