If you can get back into the DS-261 and re-submit it, go for it. But that makes no sense to me if they already have it.

thanks a lot Ms. Saylin :) I just did the DS-261 again, I hope we can be done with this NVC process thing so soon like others here are wanting. by the way Ms. saylin is it just parts with "x" mark that is needing to correct? so if its like " I " mark it means its not included with the checklist. just really wanted to make sure since we cant afford another delay again :( you're a lot of help Ms. Saylin, Bless you always

Nov 5 2013: NOA 1Priority date

Dec 11 2013: NOA2

Feb 4: DS-261 available (choice of agent) mistakes done

Feb 6:AOS fee generated

Feb 7:AOS payment

Feb 10: AOS Paid

Feb 18: DS-261 submitted (2nd time)

March 11: CR2 IV invoiced

March 20: AOS checklist mailed off

March 21: CR1 IV invoiced

March 22: CR2 and CR1 IV payment made

March 25: IV paid & DS-260 done

March 28: IV packets sent

April 11: CASE COMPLETE (called NVC)

May 14: Interview Schedule

Link to comment
Share on other sites

Finally my IV bill got invoiced and did the payment.. smile.png

Saylin, please add me to the spreadsheet!!

Added!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

First & foremost, I would like to thank you Saylin for your endless support, encouragements beyond immigration. It means so much to me and my family.

Happy to be back on track.luv.gif

My Journey:

March 29, 2013 :PD Dec-20, 2013 USCIS approval date July 28. 2015 (F) (F) (F)Interview Date APPROVED.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Finally my IV bill got invoiced and did the payment.. smile.png

Saylin, please add me to the spreadsheet!!

Hi there,

I submitted my 261 on Feb 28th as well and have not yet been invoiced for IV. I see on your timeline it says 3/4/14 261 accepted. Did you get an email or something from NVC? I have received nothing from them regarding the 261 except the receipt that you get immediately after filling out the form. Thank you.

Edited by Christopher1384

USCIS

April 9, 2013: NOA 1

Nov. 18: Transferred to Texas

Dec 9: NOA 2

Dec 17: NOA 2 Hard Copy

NVC

Jan 17, 2014: Case received by NVC

Feb. 25: NVC Case# Received

Feb 28: DS-261 Submitted

March 3: AOS Bill Invoiced & Paid

March 6: AOS Bill showing paid

March 6: AOS Packet sent EP (I did not know at the time but 3 attachments were JPEG's, only PDF's are accepted)

March 12: EP enrollment confirmation received

March 13: Resent AOS packet email as I am confused if they received original since EP enrollment confirmation was received by me after AOS was sent.

March 14: Resent AOS packet as I realized previous two packets had JPEG's in them. This is my first correct packet with all PDF's.

March 17: Resent AOS packet for the 4th time with all PDF's and finally got a confirmation of receipt. This one was the only one sent during "business hours"

March 20: IV Bill Invoiced & Paid

March 24: IV Bill Shows Paid and DS260 Available online

March 25: Supervisor states AOS packet approved

March 27: DS260 & Supporting Documents submitted

April 18: False checklist for IV Packet

May 4: Checklist requesting proof of eligibility (passport or BC). Wrote a nasty note back with a passport attached since they already had both as its part of the IV Packet duh

May 13: NVC Approval Email

Embassy

May 16: Interview Scheduled June 25th

May 28: Medical Exam Completed

June 25: Interview Montreal

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Sri Lanka
Timeline

Anyone here waiting for Case to be Completed at NVC?

I'm here.... reading.gif

I-130 Track:

Feb 19, 2013: I-130 Sent

Feb 19, 2013: Priority Date

Feb 22, 2013: NOA1 Received

Sep 04, 2013: RFE received

Oct 04, 2013: RFE response

Dec 05, 2013: NOA2 Approved

Dec 12, 2013: NOA2 Hard copy received

NVC Track:

Dec 17, 2013: NVC received file

Jan 10, 2014: NVC Case # and IIN assigned

Jan 17, 2014: Email to pay AOS & IV fee

Jan 17, 2014: AOS & IV invoice available

Jan 21, 2014: AOS & IV fees paid

Jan 23, 2014: AOS & IV show as "PAID"

Jan 23, 2014: DS260 available & completed

Jan 30, 2014: AOS & IV packet sent (my paralegal delayed this)

Feb 04, 2014: AOS & IV entered in to the system

Feb 19, 2014: Second IV packet delivered to NVC (Entered to the system on 20th)

Feb 26, 2014: Check list for AOS

Feb 27, 2014: Response to AOS checklist sent - New AOS

Mar 04, 2014: AOS checklist response entered to the system

Mar 13, 2014: False checklist for AOS checklist response (IV pkts were reviewed/Approved)

Mar 18, 2014: Case Completed (As per call to NVC on March 19th)

Apr 02, 2014: Interview scheduled for May 22nd

May 22, 2014: Interview............ Visa Approved!!!

Jun 05, 2014: PP & docs collected from embassy

Jun 22, 2014: POE

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Anyone here waiting for Case to be Completed at NVC?

Here o/

1/15/2013 - Married

USCIS:
4/11: Mailed out IR-30 via FedEx Ground
4/15: Forms received by USCIS Chicago (Signed)

12/2: Case Transferred to CSC

12/17/2013: NOA-2!!!! (8 Months, 2 days)

NVC:

12/27/2013: Case received by NVC

1/23/2014: NVC Case #, BIN, & IIN received.

1/31/2014: DS-261 Available & filled out.

2/4/2014: AOS Invoice available & paid

2/7/2014: I-864(AOS) completed & sent

2/11/2014: IV Bill availiable and paid.

2/14/2014: DS-260 completed (IV)

2/14/2014: DS-260 support documents sent

2/26/2014: I-864 (AOS) documents received and logged by NVC.

3/4/2014: Checklist for AOS ( I knew it :|a)

3/5/2014: Checklist for AOS submitted

3/7/2014: DS-260 documents received & logged by NVC

3/13/2014: IV packet + documents approved and logged

4/14:2014: Case Complete!!! (3 months 2 weeks 4 days @NVC)

Consulate:

Medical: 05/28/2014

Interview: 06/03/2014 (?)

Consulate didn't like our police records, have to resend--> AP

APPROVED: 07/02/2014

visa in hand: 07/11/2014

PoE: Halifax Stanfield International (07/25/2014)

REMOVING CONDITIONS:

06/10/2016: Packet Mailed

06/16/2016: Check Cashed

7/11/2016: Biometrics Appointment

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I filled out my DS260 about a month ago.

You will need to put that address because the online form does not allow you to have time gaps.

And remember, when you click add more address button, it only adds at the last. You cannot add in between addresses nor switch around addresses you already typed.

Also, it does not save until the page is filled completely.

I wanted to save in middle of fryping 15 addresses, but it didn't let me do it...

thanks for the info

USCIS



08-09-2013: Sent I-130 packet


08-13-2013: I-130 NOA1


08-26-2013: Sent I-129F packet


08-28-2013: I-129F NOA1


09-10-2013: I-129F Alien registration number changed


02-03-2014: I-130 and I-129F Transfer to California Service Center


02-13-2014 (AM): I-130 Alien registration number changed


02-13-2014(PM): I-130 and I-129F Approved



NVC


02-27-2014(?): NVC Case Received


03-03-2014: Case Number and IIN assigned; Provided my wife's email address (they had mine on file already)


03-03-2014: DS-261 Available and submitted to NVC


03-04-2014: AOS payment email from NVC


03-05-2014: AOS invoice available on portal; AOS paid


03-06-2014: DS-261 in NVC system awaiting review


03-07-2014: AOS/I-864EZ packet express mailed to NVC


03-08-2014: Received hardcopy in the mail from NVC stating that my K3 Visa application was closed due to the I-130 approval


03-10-2014: AOS shows "PAID"


03-10-2014: AOS packet arrived at NVC


03-12-2014: AOS packet in the system


03-18-2014: IV invoice icon changed from locked folder to yellow exclamation indicating payment to be available soon


03-19-2014: IV invoice/agent email received; IV invoice available on CEAC few hours later; IV invoice paid


03-20-2014: IV Packet express mailed to NVC


03-21-2014: IV invoice shows "PAID"


03-21-2014: IV Packet arrived at NVC


03-21-2014: DS-260 Complete


03-25-2014: IV Packet in the system

03-27-2014: False checklist for IV civil documents. AOS Accepted

04-04-2014: Case Complete


04-11-2014: Case Complete Email


04-11-2014: Interview date assigned for May 22nd


05-22-2014: Visa Approved

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Sri Lanka
Timeline

CASE COMPLETE! For both wife and stepson biggrin.png

Just got off the phone with the NVC, both cases were completed on 3/14!

dancin5hr.gif

Congrat Nobby7 !!! kicking.gifkicking.gifkicking.gif

I-130 Track:

Feb 19, 2013: I-130 Sent

Feb 19, 2013: Priority Date

Feb 22, 2013: NOA1 Received

Sep 04, 2013: RFE received

Oct 04, 2013: RFE response

Dec 05, 2013: NOA2 Approved

Dec 12, 2013: NOA2 Hard copy received

NVC Track:

Dec 17, 2013: NVC received file

Jan 10, 2014: NVC Case # and IIN assigned

Jan 17, 2014: Email to pay AOS & IV fee

Jan 17, 2014: AOS & IV invoice available

Jan 21, 2014: AOS & IV fees paid

Jan 23, 2014: AOS & IV show as "PAID"

Jan 23, 2014: DS260 available & completed

Jan 30, 2014: AOS & IV packet sent (my paralegal delayed this)

Feb 04, 2014: AOS & IV entered in to the system

Feb 19, 2014: Second IV packet delivered to NVC (Entered to the system on 20th)

Feb 26, 2014: Check list for AOS

Feb 27, 2014: Response to AOS checklist sent - New AOS

Mar 04, 2014: AOS checklist response entered to the system

Mar 13, 2014: False checklist for AOS checklist response (IV pkts were reviewed/Approved)

Mar 18, 2014: Case Completed (As per call to NVC on March 19th)

Apr 02, 2014: Interview scheduled for May 22nd

May 22, 2014: Interview............ Visa Approved!!!

Jun 05, 2014: PP & docs collected from embassy

Jun 22, 2014: POE

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Hi there,

I submitted my 261 on Feb 28th as well and have not yet been invoiced for IV. I see on your timeline it says 3/4/14 261 accepted. Did you get an email or something from NVC? I have received nothing from them regarding the 261 except the receipt that you get immediately after filling out the form. Thank you.

Hello Christopher1384,

I didn't get any mail/e-mail regarding my DS-261 approval. By DS-261 acceptance i meant, that is the day NVC accepted my DS-261 on to their file and started reviewing. After they start reviewing DS-261, it will take 5-10 business days(NVC operator told me this info) to get the IV invoice. But it seemed correct for my case. It took exactly 10 business days to get my IV invoice after they start reviewing.. I suggest you call NVC and ask when did they start reviewing your DS-261..

Did you get an yellow exclamation mark on your payment portal?

USCIS:

  • 02/25/13 : I-130 Filed NBC
  • 02/28/13 : NOA1
  • 10/23/13 : Case transferred to Nebraska Service center
  • 12/06/13 : NOA2

NVC:

  • 01/03/14 : Shipped to NVC.
  • 01/17/14 : NVC recieved the case.
  • 02/24/14 : Case number assigned and IIN/BIN.
  • 02/28/14 : DS-261 Available and completed.
  • 03/03/14 : Received e-mail to pay AOS Fee.
  • 03/04/14 : AOS invoice available and paid(In Process).
  • 03/04/14 : DS-261 Accepted.
  • 03/05/14 : AOS package sent to NVC.
  • 03/06/14 : AOS bill shows PAID.
  • 03/10/14 : AOS package received at NVC (Dock).
  • 03/12/14 : AOS entered into the System.
  • 03/18/14 : IV invoice available and paid(In Process).
  • 03/20/14 : IV package sent to NVC.
  • 03/21/14 : IV bill shows PAID || DS-260 Available || IV package received at NVC (Dock).
  • 03/22/14 : DS-260 Completed.
  • 03/25/14 : IV packet entered into the System.
  • 03/28/14 : Checklist for leaving a space blank on the I-864A form, Part-1, Item-3 :(
  • 03/29/14 : Checklist response express mailed.
  • 03/31/14 : Checklist response received at NVC (Dock).
  • 04/02/14 : Checklist response entered into the System.
  • 04/04/14 : IV packet and DS-260 Accepted.
  • 04/14/14 : Case Complete :dancing:
  • 04/21/14 : Case Complete e-mail.
  • 04/30/14 : Interview scheduled for JUNE 3rd :dancing: :dancing: :dancing:
  • 05/01/14 : Received Interview Letter (P4)
  • 05/08/14 : Medical Done
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Hello Christopher1384,

I didn't get any mail/e-mail regarding my DS-261 approval. By DS-261 acceptance i meant, that is the day NVC accepted my DS-261 on to their file and started reviewing. After they start reviewing DS-261, it will take 5-10 business days(NVC operator told me this info) to get the IV invoice. But it seemed correct for my case. It took exactly 10 business days to get my IV invoice after they start reviewing.. I suggest you call NVC and ask when did they start reviewing your DS-261..

Did you get an yellow exclamation mark on your payment portal?

No yellow for me, I will call in the morning and ask about the reviewing. Thank you.

USCIS

April 9, 2013: NOA 1

Nov. 18: Transferred to Texas

Dec 9: NOA 2

Dec 17: NOA 2 Hard Copy

NVC

Jan 17, 2014: Case received by NVC

Feb. 25: NVC Case# Received

Feb 28: DS-261 Submitted

March 3: AOS Bill Invoiced & Paid

March 6: AOS Bill showing paid

March 6: AOS Packet sent EP (I did not know at the time but 3 attachments were JPEG's, only PDF's are accepted)

March 12: EP enrollment confirmation received

March 13: Resent AOS packet email as I am confused if they received original since EP enrollment confirmation was received by me after AOS was sent.

March 14: Resent AOS packet as I realized previous two packets had JPEG's in them. This is my first correct packet with all PDF's.

March 17: Resent AOS packet for the 4th time with all PDF's and finally got a confirmation of receipt. This one was the only one sent during "business hours"

March 20: IV Bill Invoiced & Paid

March 24: IV Bill Shows Paid and DS260 Available online

March 25: Supervisor states AOS packet approved

March 27: DS260 & Supporting Documents submitted

April 18: False checklist for IV Packet

May 4: Checklist requesting proof of eligibility (passport or BC). Wrote a nasty note back with a passport attached since they already had both as its part of the IV Packet duh

May 13: NVC Approval Email

Embassy

May 16: Interview Scheduled June 25th

May 28: Medical Exam Completed

June 25: Interview Montreal

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Unless they've changed things, the DS-260 asks for ALL addresses, no matter the length.

Thanks

USCIS



08-09-2013: Sent I-130 packet


08-13-2013: I-130 NOA1


08-26-2013: Sent I-129F packet


08-28-2013: I-129F NOA1


09-10-2013: I-129F Alien registration number changed


02-03-2014: I-130 and I-129F Transfer to California Service Center


02-13-2014 (AM): I-130 Alien registration number changed


02-13-2014(PM): I-130 and I-129F Approved



NVC


02-27-2014(?): NVC Case Received


03-03-2014: Case Number and IIN assigned; Provided my wife's email address (they had mine on file already)


03-03-2014: DS-261 Available and submitted to NVC


03-04-2014: AOS payment email from NVC


03-05-2014: AOS invoice available on portal; AOS paid


03-06-2014: DS-261 in NVC system awaiting review


03-07-2014: AOS/I-864EZ packet express mailed to NVC


03-08-2014: Received hardcopy in the mail from NVC stating that my K3 Visa application was closed due to the I-130 approval


03-10-2014: AOS shows "PAID"


03-10-2014: AOS packet arrived at NVC


03-12-2014: AOS packet in the system


03-18-2014: IV invoice icon changed from locked folder to yellow exclamation indicating payment to be available soon


03-19-2014: IV invoice/agent email received; IV invoice available on CEAC few hours later; IV invoice paid


03-20-2014: IV Packet express mailed to NVC


03-21-2014: IV invoice shows "PAID"


03-21-2014: IV Packet arrived at NVC


03-21-2014: DS-260 Complete


03-25-2014: IV Packet in the system

03-27-2014: False checklist for IV civil documents. AOS Accepted

04-04-2014: Case Complete


04-11-2014: Case Complete Email


04-11-2014: Interview date assigned for May 22nd


05-22-2014: Visa Approved

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Who's Saylara? tongue.png

And added links to my sample cover letters in the wiki. But I'm not sure why you would use them as a checklist since the list of items needed is listed in the wiki

Sorry about that. But it is a nice hybrid of Saylin + Kaylara :) The two persons I have learnt the most from. Thank you both.

IR-1/CR-1 Visa
Service Center : National Benefits Center; Consulate : Mumbai, India; Marriage (if applicable): 2013-07-05
USCIS
I-130 Sent : 2013-07-20; I-130 NOA1 : 2013-07-26; I-130 Transferred to CSC: 2014-01-13; I-130 Approved: 2014-01-22
NVC
NVC Received: 2014-02-03; AOS Bill Shows PAID: 2014-03-19
NVC Case # and IIN Assigned: 2014-03-11; AOS Package Delivered: 2014-03-21;
Submitted/Completed DS-261 online: 2014-03-12; AOS Package Touched: 2014-03-25;
Receive & Pay AOS Bill : 2014-03-13; AOS Package Approved: 2014-04-08
AOS Package Mailed (USPS Priority): 2014-03-18;
IV Bill:
Receive & Pay IV Bill: 2014-03-24; False Checklist for Civil Documents: 2014-04-07
IV Bill Shows PAID: 2014-03-26; Case Completed at NVC: 2014-04-16;
IV Package Mailed (USPS Priority): 2014-03-26; Case Complete Email Received: 2014-04-23
IV Package Received by NVC: 2014-03-31; Interview scheduled: 2014-05-01;
IV Package Touched: 2014-04-03 (still in review); IL Email Received: 2014-05-01
DS-260 Available/Completed/Submitted: 2014-03-27
Consulate: Mumbai
Fingerprinting & Photo: 2014-05-09 Medicals: 2014-05-19
Interview: 2014-06-04 Visa Approved CEAC Website Status "Issued": 2014-06-05
USCIS ELIS Fee Paid: 2014-06-08 Passport w/Visa Received: 2014-06-09
POE (LAX): 2014-07-20 SS# Received: 2014-07-28
Actual GC received 2014-08-30
CA ID Received: 2014-09-02.
First job in USA (yeeeh!!!) starting: 2014-09-22
Taking driving lessons....!!!!

ROC
Application Sent: 2016-04-26
NOA1:2016-04-28
Biometrics: 2016-06-02 (early walk-in on May 31st)

ROC Approval Email and Online Status Change - 2016-11-07
Google Doc for April 2016 filers: https://docs.google.com/spreadsheets/d/12Mb-ALcbwQbYafLj4vFaEMjSGD-wfjtrycs3ul8QlUo/edit?pref=2&pli=1#gid=0

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

For some reason I have not received any emails from NVC. Should I worry about that? Although I am able to log into the NVC site and see the status of my AOS feed payment - In Process.

IR-1/CR-1 Visa
Service Center : National Benefits Center; Consulate : Mumbai, India; Marriage (if applicable): 2013-07-05
USCIS
I-130 Sent : 2013-07-20; I-130 NOA1 : 2013-07-26; I-130 Transferred to CSC: 2014-01-13; I-130 Approved: 2014-01-22
NVC
NVC Received: 2014-02-03; AOS Bill Shows PAID: 2014-03-19
NVC Case # and IIN Assigned: 2014-03-11; AOS Package Delivered: 2014-03-21;
Submitted/Completed DS-261 online: 2014-03-12; AOS Package Touched: 2014-03-25;
Receive & Pay AOS Bill : 2014-03-13; AOS Package Approved: 2014-04-08
AOS Package Mailed (USPS Priority): 2014-03-18;
IV Bill:
Receive & Pay IV Bill: 2014-03-24; False Checklist for Civil Documents: 2014-04-07
IV Bill Shows PAID: 2014-03-26; Case Completed at NVC: 2014-04-16;
IV Package Mailed (USPS Priority): 2014-03-26; Case Complete Email Received: 2014-04-23
IV Package Received by NVC: 2014-03-31; Interview scheduled: 2014-05-01;
IV Package Touched: 2014-04-03 (still in review); IL Email Received: 2014-05-01
DS-260 Available/Completed/Submitted: 2014-03-27
Consulate: Mumbai
Fingerprinting & Photo: 2014-05-09 Medicals: 2014-05-19
Interview: 2014-06-04 Visa Approved CEAC Website Status "Issued": 2014-06-05
USCIS ELIS Fee Paid: 2014-06-08 Passport w/Visa Received: 2014-06-09
POE (LAX): 2014-07-20 SS# Received: 2014-07-28
Actual GC received 2014-08-30
CA ID Received: 2014-09-02.
First job in USA (yeeeh!!!) starting: 2014-09-22
Taking driving lessons....!!!!

ROC
Application Sent: 2016-04-26
NOA1:2016-04-28
Biometrics: 2016-06-02 (early walk-in on May 31st)

ROC Approval Email and Online Status Change - 2016-11-07
Google Doc for April 2016 filers: https://docs.google.com/spreadsheets/d/12Mb-ALcbwQbYafLj4vFaEMjSGD-wfjtrycs3ul8QlUo/edit?pref=2&pli=1#gid=0

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

No yellow for me, I will call in the morning and ask about the reviewing. Thank you.

I hope you didn't edit and make any changes to your DS-261 after you submit. Because it will only count from the last submitted date. Since you can see that "Green tick mark" next to your DS-261, you are fine. Anyways call NVC and ask about your DS-261 received date. Don't worry, you will definitely get your IV invoice within this week..

USCIS:

  • 02/25/13 : I-130 Filed NBC
  • 02/28/13 : NOA1
  • 10/23/13 : Case transferred to Nebraska Service center
  • 12/06/13 : NOA2

NVC:

  • 01/03/14 : Shipped to NVC.
  • 01/17/14 : NVC recieved the case.
  • 02/24/14 : Case number assigned and IIN/BIN.
  • 02/28/14 : DS-261 Available and completed.
  • 03/03/14 : Received e-mail to pay AOS Fee.
  • 03/04/14 : AOS invoice available and paid(In Process).
  • 03/04/14 : DS-261 Accepted.
  • 03/05/14 : AOS package sent to NVC.
  • 03/06/14 : AOS bill shows PAID.
  • 03/10/14 : AOS package received at NVC (Dock).
  • 03/12/14 : AOS entered into the System.
  • 03/18/14 : IV invoice available and paid(In Process).
  • 03/20/14 : IV package sent to NVC.
  • 03/21/14 : IV bill shows PAID || DS-260 Available || IV package received at NVC (Dock).
  • 03/22/14 : DS-260 Completed.
  • 03/25/14 : IV packet entered into the System.
  • 03/28/14 : Checklist for leaving a space blank on the I-864A form, Part-1, Item-3 :(
  • 03/29/14 : Checklist response express mailed.
  • 03/31/14 : Checklist response received at NVC (Dock).
  • 04/02/14 : Checklist response entered into the System.
  • 04/04/14 : IV packet and DS-260 Accepted.
  • 04/14/14 : Case Complete :dancing:
  • 04/21/14 : Case Complete e-mail.
  • 04/30/14 : Interview scheduled for JUNE 3rd :dancing: :dancing: :dancing:
  • 05/01/14 : Received Interview Letter (P4)
  • 05/08/14 : Medical Done
Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Sri Lanka
Timeline

Waiting for my case to be completed,hopefully by the end of this month.We called them yesterday but still the rep. said,the IV and DS-260 is still under review.

Hi Irra,

You should here something this Friday or next Monday..... This is my prediction !!! cool.png

Then myn should follow you.... next Monday or Tuesday (24th-25th) idea9dv.gif

Edited by casper212

I-130 Track:

Feb 19, 2013: I-130 Sent

Feb 19, 2013: Priority Date

Feb 22, 2013: NOA1 Received

Sep 04, 2013: RFE received

Oct 04, 2013: RFE response

Dec 05, 2013: NOA2 Approved

Dec 12, 2013: NOA2 Hard copy received

NVC Track:

Dec 17, 2013: NVC received file

Jan 10, 2014: NVC Case # and IIN assigned

Jan 17, 2014: Email to pay AOS & IV fee

Jan 17, 2014: AOS & IV invoice available

Jan 21, 2014: AOS & IV fees paid

Jan 23, 2014: AOS & IV show as "PAID"

Jan 23, 2014: DS260 available & completed

Jan 30, 2014: AOS & IV packet sent (my paralegal delayed this)

Feb 04, 2014: AOS & IV entered in to the system

Feb 19, 2014: Second IV packet delivered to NVC (Entered to the system on 20th)

Feb 26, 2014: Check list for AOS

Feb 27, 2014: Response to AOS checklist sent - New AOS

Mar 04, 2014: AOS checklist response entered to the system

Mar 13, 2014: False checklist for AOS checklist response (IV pkts were reviewed/Approved)

Mar 18, 2014: Case Completed (As per call to NVC on March 19th)

Apr 02, 2014: Interview scheduled for May 22nd

May 22, 2014: Interview............ Visa Approved!!!

Jun 05, 2014: PP & docs collected from embassy

Jun 22, 2014: POE

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...