Can anyone help, our Priority date is 15 April 2014 - Cali Service Center, so likely to be approved fast, when our case is sent to NVC, do we send off AOS and IV packages, or wait until we become current?

Thanks

You have to send AoS and IV packages in order to complete your case and get the interview when your PD become current :)

Best of luck

USCIS
June 01, 2013 I-130 Started

June 10, 2013 Priority Date
June 14, 2013 NOA 1
September 10, 2013 NOA 2


NVC
October 21, 2013 AoS Fee Paid
December 22, 2013 DS261 Submitted
December 27, 2013 DS261 Accepted ( via email )
December 28, 2013 IV Fee Bill Invoiced
December 29, 2013 AoS Package Sent
December 30, 2013 IV Fee Paid & DS260 Submitted
January 11, 2014 IV Package Sent
January 07, 2014 AoS Package Received ( call NVC )
January 15, 2014 IV Package Received ( call NVC )
January 27,2014 Received AoS Checklists ( email )
January 27,2014 Received IV Checklists ( email )
February 25,2014 Sent IV Checklists back
February 28,2014 IV Checklists Package Delivered
March 5,2014 Sent AOS Checklists back
March 10,2014 AOS Checklists Package Delivered
March 19,2014 Case Completed ( call NVC )
March 22,2014 Case Completed ( CC email )


Consulate
February 05,2015 Interview Letter
March 12,2015 Interview

Link to comment
Share on other sites

Filed: IR-5 Country: Colombia
Timeline

Case completed. We received an email saying to wait for interview letter. :)

MY JOURNEY!!
4/2005 - Sent I130
12/1/05 - I130 Approved
5/31/10 - Sent I360-VAWA (self-petition)
12/1/10 - VAWA APPROVED!!!
12/15/10 - Sent I485 y I765
2/1/11 - Fingerprints done
3/15/11 - Card/Document Production for I765
3/21/11 - Received EAD, intereview letter and I also applied for Social Security
3/27/11 - Received Social Security Card
4/19/11 - Interview for AOS. IO said I had to apply for a waiver
6/17/11 - Sent waiver package
8/1/11 - Received welcome letter dated 7/27/11
8/1/11 - Card/Production ordered for I485
8/4/11 - Received Green Card. Thank you Lord!!!!!
N-400 JOURNEY (Apply while stationed in Germany - military husband)
12/28/11 - Applied for naturalization based on 319(b)
1/11/12 - Check Cashed
1/21/12 - Received NOA dated January 11, 2012
2/15/12 - Place in line for interview scheduling
3/8/12 - Scheduled for Interview
3/21/12 - Interview/Oath. I'M A UNITED STATES CITIZEN!!!
MY MOM'S JOURNEY
6/11/12 - Submitted I-130 package to US Embassy in Germany.
8/31/12 - I-130 Approved.
10/10/12 - I called NVC and received via email DS-3032 and AOS bill.
10/11/12 - AOS PAID.
10/15/12 - My mom sent via email the executed DS-3032.
11/2/12 - IV PAID.
01/29/13 - Sent IV package and it was delivered 2/6/13.
2/6/13 - Sent AOS package and it was delivered 2/13/13.
2/16/13 - Received email from NVC with checklist.
2/20/13 - CASE COMPLETED
2/22/13 - Sent photos as per checklist and they were delivered 2/26/13.
2/27/13 - Received email saying that they had all necessary documentation.
3/6/13 - Received email scheduling interview for 4/12/13.

4/12/13 - Passed Interview. 5/20/13 - Entered USA.

MY BROTHER'S JOURNEY

7/4/13 - Submitted I-130 package.

12/6/13 - I-130 Approved. 12/9/13 - I-130 shipped to NVC.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Hi Guys,

I am waiting to get NVC case number, our I-130 was approved 1st April. I called them last Friday and it was not yet available. I am also trying to figure out what is the next step. Can I pay AOS and IV right away when case number is available or I will have to wait for that to become available? Do they send me email when its available assuming I have singed for email communication. We have waited over a year for I-130 approval so would really appreciate to cut the time. Do you also know any common mistakes to avoid checklist or RFE so I can watch for? I would really appreciate. Thanks!

N400
----------------------------------------------------------
Feb 20 - USCIS update notification.
Feb 20 - biometrics done
Jan 31 - Applied N400 online 
 

NVC

----------------------------------------------------------

April 18, 2014 NVC received case

May 15, 2014 Case # and IIN assigned

DS-261 not required as I had lawyer on file

May 21, AOS and IV fee available and paid.

May 23, AOS and IV Packet sent.

May 23, DS 260 filled online.

May 29, AOS/IV scanned

Jun 3, Recieved email that AOS/IV fees are paid and I need to send the papers which I have already done.

July 3, Received postal mail from NVC that my visa preference has upgraded to CR1

July 8, Case Complete

 

I-130

--------------------------------------------------------

Feb 25, 2013 Priority date

April 01, 2014 I-130 approved

April 04, /2014 I-130 Send to NVC

 

If you have not filled you signature with timeline info yet, please do it now! Go to your profile, press 'Edit' and signature field becomes available.

 

Link to comment
Share on other sites

Filed: F-2A Visa Country: Italy
Timeline

Case completed. We received an email saying to wait for interview letter. :)

Congrats!!

Hi Guys,

I am waiting to get NVC case number, our I-130 was approved 1st April. I called them last Friday and it was not yet available. I am also trying to figure out what is the next step. Can I pay AOS and IV right away when case number is available or I will have to wait for that to become available? Do they send me email when its available assuming I have singed for email communication. We have waited over a year for I-130 approval so would really appreciate to cut the time. Do you also know any common mistakes to avoid checklist or RFE so I can watch for? I would really appreciate. Thanks!

Hi Okemo! When you get Case Number you need to wait to be available to sign in.

After you need to complete DS-261 Choice of Address and Agent, pay AOS and IV fees and finally complete form DS-260.

They don't send none email to let you know if you will be available to sign in, you will receive emails to know next steps you will need to do (like complete DS-261, pay the fees and for collect documents about AOS & IV Packages)

Before I get my approval I waited 21months..so long!!!

Just read carefully corrispondence they send to you and check every day the available to CEAC site, don't wait for NVC email, earn a lot of time!

Good Luck!!


2FMbp1.png

I-130 / F-2A ( Spouse of LPR ) varie_amore_10.gif

To see every step go to my Immigration Story..

02.13.2012 NOA 1 - PRIORITY DATE

11.20.2013 NOA 2 - APPROVAL DATE

03.07.2014 CASE COMPLETE

04.04.2014 INTERVIEW LETTER

05.20.2014 MEDICAL EXAMINATION

05.21.2014 INTERVIEW DATE

06.03.2014 AP...THE WAIT CAN BE FROM 1 TO 4 MONTHS...

08.08.2014 YET IN AP, STATUS UPDATE DATE CHANGE AT TODAY!! AUGUST 8 !! YUPPY!

08.11.2014 YET IN AP...AT TODAY HAVE PASSED 7 WEEKS (counting business days)

08.12.2014 OMG!! TODAY VISA STATUS SAY READY!!! I can't believe!!!

08.13.2014 VISA STATUS ISSUED!!!!!

08.24.25014 POE

lineacuori.gif

N-400 My hubby's Naturalization varie_amore_10.gif

PHOENIX LOCKBOX

07.14.2014 N-400 MAILED

07.17.2014 N-400 DELIVERED

07.24.2014 N-400 ACCEPTANCE CONFIRMATION LETTER

08.08.2014 FINGERPRINT LETTER

08.18.2014 FINGERPRINT APPOINTMENT DATE

28.09.2014 INTERVIEW LETTER

22.10.2014 INTERVIEW DATE

30.10.2014 OATH CERIMONY FINALLY US CITIZEN!!!!

11.07.2014 US Passport Received!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

I am waiting to get Case number. NVC received my file on April 18th but they tell me it takes a month from it to get assigned case number. I really hope it is not that long. I see from people signatures it has been taking about 2 weeks after case was received but I am wondering if these has stretched over since and I have see few people waiting a month!

N400
----------------------------------------------------------
Feb 20 - USCIS update notification.
Feb 20 - biometrics done
Jan 31 - Applied N400 online 
 

NVC

----------------------------------------------------------

April 18, 2014 NVC received case

May 15, 2014 Case # and IIN assigned

DS-261 not required as I had lawyer on file

May 21, AOS and IV fee available and paid.

May 23, AOS and IV Packet sent.

May 23, DS 260 filled online.

May 29, AOS/IV scanned

Jun 3, Recieved email that AOS/IV fees are paid and I need to send the papers which I have already done.

July 3, Received postal mail from NVC that my visa preference has upgraded to CR1

July 8, Case Complete

 

I-130

--------------------------------------------------------

Feb 25, 2013 Priority date

April 01, 2014 I-130 approved

April 04, /2014 I-130 Send to NVC

 

If you have not filled you signature with timeline info yet, please do it now! Go to your profile, press 'Edit' and signature field becomes available.

 

Link to comment
Share on other sites

Filed: F-2A Visa Country: Italy
Timeline

I am waiting to get Case number. NVC received my file on April 18th but they tell me it takes a month from it to get assigned case number. I really hope it is not that long. I see from people signatures it has been taking about 2 weeks after case was received but I am wondering if these has stretched over since and I have see few people waiting a month!

Yeah, they told ever 30 business day.

In my case they took 11 business days, so don't worry, just call every 3/4 days to know for Case Number ;)


2FMbp1.png

I-130 / F-2A ( Spouse of LPR ) varie_amore_10.gif

To see every step go to my Immigration Story..

02.13.2012 NOA 1 - PRIORITY DATE

11.20.2013 NOA 2 - APPROVAL DATE

03.07.2014 CASE COMPLETE

04.04.2014 INTERVIEW LETTER

05.20.2014 MEDICAL EXAMINATION

05.21.2014 INTERVIEW DATE

06.03.2014 AP...THE WAIT CAN BE FROM 1 TO 4 MONTHS...

08.08.2014 YET IN AP, STATUS UPDATE DATE CHANGE AT TODAY!! AUGUST 8 !! YUPPY!

08.11.2014 YET IN AP...AT TODAY HAVE PASSED 7 WEEKS (counting business days)

08.12.2014 OMG!! TODAY VISA STATUS SAY READY!!! I can't believe!!!

08.13.2014 VISA STATUS ISSUED!!!!!

08.24.25014 POE

lineacuori.gif

N-400 My hubby's Naturalization varie_amore_10.gif

PHOENIX LOCKBOX

07.14.2014 N-400 MAILED

07.17.2014 N-400 DELIVERED

07.24.2014 N-400 ACCEPTANCE CONFIRMATION LETTER

08.08.2014 FINGERPRINT LETTER

08.18.2014 FINGERPRINT APPOINTMENT DATE

28.09.2014 INTERVIEW LETTER

22.10.2014 INTERVIEW DATE

30.10.2014 OATH CERIMONY FINALLY US CITIZEN!!!!

11.07.2014 US Passport Received!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Yeah, they told ever 30 business day.

In my case they took 11 business days, so don't worry, just call every 3/4 days to know for Case Number ;)

Thanks that sounds good, I called yesterday but will call in again at end of week when two weeks will be complete. Btw does NVC schedule the interview at embassy or the concerned embassy will do that? I think I read somewhere about someone who got NVC schedule the interview. I think this might be better to cut down some time and have timetable if possible.

N400
----------------------------------------------------------
Feb 20 - USCIS update notification.
Feb 20 - biometrics done
Jan 31 - Applied N400 online 
 

NVC

----------------------------------------------------------

April 18, 2014 NVC received case

May 15, 2014 Case # and IIN assigned

DS-261 not required as I had lawyer on file

May 21, AOS and IV fee available and paid.

May 23, AOS and IV Packet sent.

May 23, DS 260 filled online.

May 29, AOS/IV scanned

Jun 3, Recieved email that AOS/IV fees are paid and I need to send the papers which I have already done.

July 3, Received postal mail from NVC that my visa preference has upgraded to CR1

July 8, Case Complete

 

I-130

--------------------------------------------------------

Feb 25, 2013 Priority date

April 01, 2014 I-130 approved

April 04, /2014 I-130 Send to NVC

 

If you have not filled you signature with timeline info yet, please do it now! Go to your profile, press 'Edit' and signature field becomes available.

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Chantal&Marjo

Oh you got the interview data from NVC, I just noticed your timeline :)

Edited by okemo
N400
----------------------------------------------------------
Feb 20 - USCIS update notification.
Feb 20 - biometrics done
Jan 31 - Applied N400 online 
 

NVC

----------------------------------------------------------

April 18, 2014 NVC received case

May 15, 2014 Case # and IIN assigned

DS-261 not required as I had lawyer on file

May 21, AOS and IV fee available and paid.

May 23, AOS and IV Packet sent.

May 23, DS 260 filled online.

May 29, AOS/IV scanned

Jun 3, Recieved email that AOS/IV fees are paid and I need to send the papers which I have already done.

July 3, Received postal mail from NVC that my visa preference has upgraded to CR1

July 8, Case Complete

 

I-130

--------------------------------------------------------

Feb 25, 2013 Priority date

April 01, 2014 I-130 approved

April 04, /2014 I-130 Send to NVC

 

If you have not filled you signature with timeline info yet, please do it now! Go to your profile, press 'Edit' and signature field becomes available.

 

Link to comment
Share on other sites

Filed: F-2A Visa Country: Italy
Timeline

Every Embassy need to open month's slot interview to NVC. When this happen, NVC schedule interview. Wait time depend how busy is the Embassy.

Yes!!! 20 days yet this journey wil be at the end :)


2FMbp1.png

I-130 / F-2A ( Spouse of LPR ) varie_amore_10.gif

To see every step go to my Immigration Story..

02.13.2012 NOA 1 - PRIORITY DATE

11.20.2013 NOA 2 - APPROVAL DATE

03.07.2014 CASE COMPLETE

04.04.2014 INTERVIEW LETTER

05.20.2014 MEDICAL EXAMINATION

05.21.2014 INTERVIEW DATE

06.03.2014 AP...THE WAIT CAN BE FROM 1 TO 4 MONTHS...

08.08.2014 YET IN AP, STATUS UPDATE DATE CHANGE AT TODAY!! AUGUST 8 !! YUPPY!

08.11.2014 YET IN AP...AT TODAY HAVE PASSED 7 WEEKS (counting business days)

08.12.2014 OMG!! TODAY VISA STATUS SAY READY!!! I can't believe!!!

08.13.2014 VISA STATUS ISSUED!!!!!

08.24.25014 POE

lineacuori.gif

N-400 My hubby's Naturalization varie_amore_10.gif

PHOENIX LOCKBOX

07.14.2014 N-400 MAILED

07.17.2014 N-400 DELIVERED

07.24.2014 N-400 ACCEPTANCE CONFIRMATION LETTER

08.08.2014 FINGERPRINT LETTER

08.18.2014 FINGERPRINT APPOINTMENT DATE

28.09.2014 INTERVIEW LETTER

22.10.2014 INTERVIEW DATE

30.10.2014 OATH CERIMONY FINALLY US CITIZEN!!!!

11.07.2014 US Passport Received!

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Ireland
Timeline

Got my NOA2 yesterday, 30 April; good news, and very fast approval, 15 days, just hope the NVC process is fast - want to get case number so that we can pay the fees.

In the process of getting police certificate and tax returns, w2s etc - but still unclear whether or not we will be sending them now, or waiting until PD is current.

Link to comment
Share on other sites

Filed: F-2A Visa Country: Colombia
Timeline

Hey guys i got a check list and im trying to fill out the I 864 but the stupid thing doesnt let me put the number symbol or dashes.. It says letters, numbers, spaces only.

I need that symbol for my wife's address

Any one knows how to get it tonwork?

Link to comment
Share on other sites

Filed: F-2A Visa Country: Italy
Timeline

Hey guys i got a check list and im trying to fill out the I 864 but the stupid thing doesnt let me put the number symbol or dashes.. It says letters, numbers, spaces only.

I need that symbol for my wife's address

Any one knows how to get it tonwork?

What symbol you need to put in the address? write just number and street


2FMbp1.png

I-130 / F-2A ( Spouse of LPR ) varie_amore_10.gif

To see every step go to my Immigration Story..

02.13.2012 NOA 1 - PRIORITY DATE

11.20.2013 NOA 2 - APPROVAL DATE

03.07.2014 CASE COMPLETE

04.04.2014 INTERVIEW LETTER

05.20.2014 MEDICAL EXAMINATION

05.21.2014 INTERVIEW DATE

06.03.2014 AP...THE WAIT CAN BE FROM 1 TO 4 MONTHS...

08.08.2014 YET IN AP, STATUS UPDATE DATE CHANGE AT TODAY!! AUGUST 8 !! YUPPY!

08.11.2014 YET IN AP...AT TODAY HAVE PASSED 7 WEEKS (counting business days)

08.12.2014 OMG!! TODAY VISA STATUS SAY READY!!! I can't believe!!!

08.13.2014 VISA STATUS ISSUED!!!!!

08.24.25014 POE

lineacuori.gif

N-400 My hubby's Naturalization varie_amore_10.gif

PHOENIX LOCKBOX

07.14.2014 N-400 MAILED

07.17.2014 N-400 DELIVERED

07.24.2014 N-400 ACCEPTANCE CONFIRMATION LETTER

08.08.2014 FINGERPRINT LETTER

08.18.2014 FINGERPRINT APPOINTMENT DATE

28.09.2014 INTERVIEW LETTER

22.10.2014 INTERVIEW DATE

30.10.2014 OATH CERIMONY FINALLY US CITIZEN!!!!

11.07.2014 US Passport Received!

Link to comment
Share on other sites

  • 4 months later...
Filed: IR-1/CR-1 Visa Country: India
Timeline

I got my case number and IIN on sep 23rd. But when I am trying to log into the CEAC website it is showing the following:
Please be advised that the case that you have attempted to access is not eligible for further processing by the National Visa Center at this time. Please contact the National Visa Center if you believe that you have received this message in error.
So my husband called yesterday and an NVC agent said that our case cannot be processed further till my husband gets citizenship. Is this true? I am so sad.

I thought NVC completes the case under F2A category and puts it on waiting if priority date is not current before sending the completed case to the local consulate.

Can anyone clarify please?

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...