Jump to content
dwheels76

March 2014 Interviews

 Share

469 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: India
Timeline

Case complete for me today!!!

Congratulations on case Complete. Welcome.

Goodness alot of folks from India now.

Mar 07, 2013 : NOA 1

Nov 19, 2013 : Request for Evidence mail received

Nov 25, 2013 : Documents send in response to RFE

Dec 03, 2013 : NOA 2 ( I 130 approved)

Dec 09, 2013 : Case reached NVC

Jan 08, 2014 : NVC assigned Case Number

Jan 15, 2014 : Paid I 864 (AOS) bill online

Jan 16, 2014 : Completed DS 261 (choice of agent) online

Jan 21, 2014 : Express mailed AOS package

Jan 27, 2014 : Paid DS 260 bill online

Jan 29, 2014 : Express mailed DS 260 civil docs

Jan 29, 2014 : Submitted DS 260 online

Feb 13, 2014 : Received False checklist for civil docs by email

Feb 24, 2014 : Case Complete

April 14, 2014 : Interview. YAY!!!

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Nigeria
Timeline

DO NOT DELETE: ***USE MOST RECENT LIST AT THE BOTTOM***



Instructions:
If you want to share your case complete and interview dates:
1. Go to LAST PAGE or before and click "Quote/Reply" on the MOST RECENT LIST.
2. Ask for help only if you will mess up the list
3. Please make sure you are using Rich Text Editor as your message setting(Settings>Posting Settings->Enable visual (RTE))
4. Remove

around the list by clicking back space just before "do not delete"
5. Always use [Courier New] Font.(It will stay lined up correctly if you use the correct font.)
6. Add in order by NVC case complete date.
7. Add the date you received your interview date so others can see from case complete to assignment time-frame.
8. Please use your VJ member name not the Petitioner/Beneficiary name on your timeline.
9. Please update your timeline so VJ members can have accurate timelines to monitor their own case.



August cases waiting on interview:
NAME ...............COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

Ahmed Mossa.........08/19/13....01/01/14....02/11/14....IR-1/CR-1....Egypt

September cases waiting on interview:
NAME ...............COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

Marslove............09/30/13....xx/xx/13....xx/xx/14....IR-1/CR-1....Egypt

November cases waiting on interview:
NAME ...............COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

Ezenca21............11/05/13....12/27/13....02/24/14....IR-1/CR-1....Albania

bertha&j............11/13/13....12/26/13....02/11/14....IR-1/CR-1....Nigeria
EAA.................11/27/13....xx/xx/13....xx/xx/14....IR-1/CR-1....Egypt
Sleepless_36........11/29/13....xx/xx/13....xx/xx/14....IR-1/CR-1....Yemen

kaevom..............11/29/13....12/27/13....02/03/14....F2A..........Philippines


December cases waiting on interview:
NAME ...............COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

salboreni...........12/05/13....01/21/13....02/03/14....IR-1/CR-1....Israel

vkrishn.............12/05/13....12/27/13....02/03/14....F2A..........India

ehab 1994...........12/06/13....12/31/13....02/02/14....IR-2.........Jordan
deltagal............12/09/13....01/30/13....03/14/14....IR-1/CR-1....Nigeria

segs................12/13/13....12/26/13....02/03/14....F2A..........Nigeria

cesarjr.............12/13/13....12/27/13....02/07/14....IR-1/CR-1....Brazil
lailamine...........12/16/13....12/27/13....02/20/14....IR-1.........Morocco
Azah................12/16/13....01/30/13....03/25/14....IR-1/CR-1....Nigeria
Kaale and Dalli.....12/18/13....12/26/13....02/25/14....IR-1/CR-1....Nepal
Kmg617..............12/19/13....12/27/13....02/13/14....IR-1/CR-1....Israel

omar&jessica........12/19/13....12/28/13....02/11/14....IR-1/CR-1....Morocco

wel_mie.............12/20/13....12/27/13....02/11/14....IR-1/CR-1....Philippines

dwml................12/19/13....12/27/13....02/03/14....IR-1/CR-1....Jamaica
MO-MO1974...........12/23/13....01/30/13....03/25/14....IR-1/CR-1....Nigeria
bertha&j............12/23/13....01/06/14....02/11/14....IR-1/CR-1....Nigeria
successfulG.........12/23/13....01/30/14....03/22/14....IR-1/CR-1....Nigeria
Raven Lotus.........12/27/13....12/27/13....02/04/14....IR-1/CR-1....Philippines
Sirius..............12/30/13....12/30/13....02/13/14....IR-1/CR-1....Canada

Lovemiloads.........12/30/13....01/30/13....03/19/14....F2A..........Nigeria

matt & dhaz.........12/30/13....01/13/14....02/11/14....IR-1/CR-1....Philippines

jay hiswife newby...12/30/13....01/14/14....02/20/14....IR-1/CR-1....Jamaica
jematt..............12/31/13....01/09/14....02/06/14....IR-1/CR-1....Netherlands

January cases waiting on interview:
NAME ...............COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

bebobyby............01/03/14....xx/xx/14....xx/xx/14....IR-1/CR-1....Egypt

Pob260..............01/06/14....01/29/14....03/04/14....F2A..........Nepal

Faraz.azeem.........01/06/14....01/30/14....03/07/14....IR-1/CR-1....Pakistan
Kiky................01/08/14....01/30/14....03/24/14....IR-1/CR-1....Congo DR
mrsparker...........01/08/14....01/15/14....02/07/14....IR-1/CR-1....Jamaica (expedite)
Nipp................01/09/14....01/31/14....03/25/14....F2A..........Warsaw

NYC person..........01/10/14....01/10/14....02/11/14....IR-1/CR-1....Thailand

xeon................01/14/14....01/31/14....03/05/14....F2A..........France
*Milly*.............01/15/14....01/31/14....03/04/14....IR-1/CR-1....Uzbekistan
ag8102..............01/15/14....01/29/14....03/28/14....IR-1/CR-1....Mexico
AKSinghSingh79......01/16/14....01/31/14....03/06/14....IR-1/CR-1....India
TimandAna...........01/21/14....01/30/14....03/03/14....IR-1/CR-1....El Salvador
Mina09..............01/22/14....01/30/14....03/05/14....IR-1/CR-1....Bosnia
jeremias115.........01/23/14....01/29/14....03/10/14....IR-1/CR-1....Jamaica
Blackfield..........01/23/14....01/29/14....03/26/14....IR-1/CR-1....Indonesia
amkam83.............01/24/14....01/31/14....03/12/14....IR-1/CR-1....India

Soulfulsplash.......01/24/14....01/30/14....03/19/14....IR-1/CR-1....Canada
JWD531..............01/27/14....01/29/14....02/25/14....IR-1/CR-1....Philippines

poa.................01/27/14....01/29/14....02/20/14....IR-1/CR-1....Philippines
muzk2014............01/28/14....01/31/14....03/06/14....IR-1/CR-1....Bahrain

Hbamboutcha.........01/29/14....xx/xx/14....xx/xx/14....IR-1/CR-1....Tunisia

krispykreme.........01/29/14....02/10/14....02/24/14....IR-1/CR-1....Philippines

dens................01/30/14....02/10/14....03/03/14....IR-1/CR-1....Philippines

RLOVESA.............01/31/14....02/12/14....03/18/14....IR-1/CR-1....Pakistan

February cases waiting on interview:
NAME ...............COMPLETE....RECEIVED....INTERVIEW...VISA TYPE....EMBASSY

Shamroz Kadiwal.....02/10/14....02/12/14....03/21/14....IR-1/CR-1....Pakistan

Nz2ny...............02/10/14....02/12/14....03/03/14....IR-1/CR-1....New Zealand

Intocable...........02/10/14....xx/xx/14....xx/xx/14....IR-1/CR-1....DR

NYC.RSA.............02/11/14....xx/xx/14....xx/xx/14....IR-1/CR-1....South Africa

Onlinegamer.........02/12/14....xx/xx/14....xx/xx/14....IR-1/CR-1....India

Sam400..............02/13/14....02/24/14....03/03/14....IR-1/CR-1....Nepal

La Isla Bonita......02/20/14....xx/xx/14....xx/xx/14....IR-1/CR-1....Bahamas

MY HOPE.............02/20/14....xx/xx/14....xx/xx/14....IR-1/CR-1....Morocco

Chella17............02/21/14....xx/xx/14....xx/xx/14....IR-1/CR-1....Canada

sunn................02/21/14....xx/xx/14....xx/xx/14....IR-1/CR-1....India

aptiger.............02/24/14....xx/xx/14....xx/xx/14....IR-1/CR-1....India

satbir7.............02/24/14....xx/xx/14....xx/xx/14....IR-1/CR-1....India

mygrade100..........02/24/14....xx/xx/14....xx/xx/14....IR-1/CR-1....India

Edited by dwheels76

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Link to comment
Share on other sites

Hard to say until you speak to your wife. All cases go into AP after an interview. report back after you talk to them. Would hate to speculate.

Whew, I sure hope so. We've double, triple, and quadruple checked everything so many times, it'd break my heart if we have to do ANYTHING else again. It's been 5.5 hours since her appointment started. Hopefully she's done soon and I can find out.

Personal
July 3, 2011 - Met
July, 2012 - Proposed (Skype - Texas/Cavite, Philippines)
Nov, 2012 - Formal Proposal in Tagaytay, Philippines
Feb 3, 2013 - Married in Batangas, Philippines
Dec 22, 2013 thru Jan 4, 2014 - Spent Christmas and New Years holiday in Philippines (Cavite, Tagaytay, Marinduque, Rizal)
USCIS - Serviced by National Benefits Center / California Service Center
- called USCIS one to two times a week asking about status update, after about the third month
Mar 15, 2013 - I-130 Sent
Mar 18, 2013 - I-130 NOA1
Nov 5, 2013 - Transfer to local office according to USCIS web site, but customer service couldn't verify location (I'm assuming Houston)
Nov 5, 2013 - Set up infopass appointment for 11/13/13
Nov 8, 2013 - Received transfer letter, case at CSC
Nov 18, 2013 - Received initial approval by email/text
Nov 21, 2013 - Received hard copy approval (797C) in the mail
NVC
- called NVC every single day from November 18th to January 30th asking about status update
Dec 4, 2013 - Case received at NVC
Dec 19, 2013 - Received case number by calling NVC
Dec 21, 2013 - Submitted DS-261 online
Dec 25, 2013 - Paid AOS fee online (Merry Christmas!!!)
Dec 27, 2013 - AOS fee payment cleared bank, so mailed AOS package to NVC. Paid IV package fee online
Dec 30, 2013 - IV fee payment cleared bank, so mailed IV package to NVC
Dec 31, 2013 - AOS package arrived at NVC
Jan 6, 2014 - IV package arrived at NVC
Jan 7, 2014 - Submitted DS-260 online
Jan 24, 2014 - Received checklist via email (said reviewed DS-260 and instructed me to send in civil documents). I called NVC to verify I can ignore checklist and they said yes, to ignore it.
Jan 27, 2014 - Called NVC and was told that our case is complete and that we're just waiting for an interview appointment date.
Jan 29, 2014- Called NVC and was told that our interview was scheduled for March 10, 2014. Also registered for St Luke medical exam online.
Jan 30, 2014 - Received P4 letter in email.
US Embassy (Manila) / Medical (St. Luke's)
- called embassy every day after the interview, during AP status and after visa status changed to "Issued," asking about status update and visa delivery timeframe
Feb 4-5, 2014 - Wife went to medical exam (took two days), results mailed to US Embassy in Manila.
Feb 7, 2014, Package sent from NVC to US Embassy in Manila (according to NVC phone operator).
Feb 10, 2014 - CEAC website updated case as "In Transit."
Feb 11, 2014 - DHL website shows case as delivered to US Embassy in Manila.
Feb 12, 2014 - Called US Embassy in Manila and interview rescheduled for Feb 25th.
Feb 25, 2014 - "Approved," but we have to submit CENOMAR then wait for visa after it's processed, so I guess technically it's in Administrative Processing (AP).
Mar 17, 2014 - CEAC website, visa status changed to "Issued." Now we wait for pickup/delivery.
Mar 21, 2014 - Juvy picked up visa from 2GO location, got CFO stamp, and I booked her ticket.
Mar 22, 2014 - Juvy left Manila, through Japan and Detroit, and finally onto Houston!! :-)
THE REST OF MY LIFE CAN NOW OFFICIALLY BEGIN!!!
event.png
event.png

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Nigeria
Timeline

Okay people what is happening in India. Goodness Interview scheduling will be something else for ya'll. Congrats on all the case complete glad to see NVC finally working.

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Link to comment
Share on other sites

Whew, I sure hope so. We've double, triple, and quadruple checked everything so many times, it'd break my heart if we have to do ANYTHING else again. It's been 5.5 hours since her appointment started. Hopefully she's done soon and I can find out.

Well, she didn't have her CENOMAR. (certificate of no previous marriage). No where did it say that on my P4 letter, any other documents, nor did anyone at the embassy mention that as a requirement for the interview. My wife got that before we got married, and it wasn't mentioned in any documents that I saw. I guess I must have let it slip through the cracks, but I don't remember seeing it brought up in any of these forums either. I read every post of every interview thread since November, every NVC thread since October, and both Feb and Mar 130 threads.

I still don't understand how a CENOMAR is required for CR-1 visa in the first place. I'm pretty pissed off right now.

Personal
July 3, 2011 - Met
July, 2012 - Proposed (Skype - Texas/Cavite, Philippines)
Nov, 2012 - Formal Proposal in Tagaytay, Philippines
Feb 3, 2013 - Married in Batangas, Philippines
Dec 22, 2013 thru Jan 4, 2014 - Spent Christmas and New Years holiday in Philippines (Cavite, Tagaytay, Marinduque, Rizal)
USCIS - Serviced by National Benefits Center / California Service Center
- called USCIS one to two times a week asking about status update, after about the third month
Mar 15, 2013 - I-130 Sent
Mar 18, 2013 - I-130 NOA1
Nov 5, 2013 - Transfer to local office according to USCIS web site, but customer service couldn't verify location (I'm assuming Houston)
Nov 5, 2013 - Set up infopass appointment for 11/13/13
Nov 8, 2013 - Received transfer letter, case at CSC
Nov 18, 2013 - Received initial approval by email/text
Nov 21, 2013 - Received hard copy approval (797C) in the mail
NVC
- called NVC every single day from November 18th to January 30th asking about status update
Dec 4, 2013 - Case received at NVC
Dec 19, 2013 - Received case number by calling NVC
Dec 21, 2013 - Submitted DS-261 online
Dec 25, 2013 - Paid AOS fee online (Merry Christmas!!!)
Dec 27, 2013 - AOS fee payment cleared bank, so mailed AOS package to NVC. Paid IV package fee online
Dec 30, 2013 - IV fee payment cleared bank, so mailed IV package to NVC
Dec 31, 2013 - AOS package arrived at NVC
Jan 6, 2014 - IV package arrived at NVC
Jan 7, 2014 - Submitted DS-260 online
Jan 24, 2014 - Received checklist via email (said reviewed DS-260 and instructed me to send in civil documents). I called NVC to verify I can ignore checklist and they said yes, to ignore it.
Jan 27, 2014 - Called NVC and was told that our case is complete and that we're just waiting for an interview appointment date.
Jan 29, 2014- Called NVC and was told that our interview was scheduled for March 10, 2014. Also registered for St Luke medical exam online.
Jan 30, 2014 - Received P4 letter in email.
US Embassy (Manila) / Medical (St. Luke's)
- called embassy every day after the interview, during AP status and after visa status changed to "Issued," asking about status update and visa delivery timeframe
Feb 4-5, 2014 - Wife went to medical exam (took two days), results mailed to US Embassy in Manila.
Feb 7, 2014, Package sent from NVC to US Embassy in Manila (according to NVC phone operator).
Feb 10, 2014 - CEAC website updated case as "In Transit."
Feb 11, 2014 - DHL website shows case as delivered to US Embassy in Manila.
Feb 12, 2014 - Called US Embassy in Manila and interview rescheduled for Feb 25th.
Feb 25, 2014 - "Approved," but we have to submit CENOMAR then wait for visa after it's processed, so I guess technically it's in Administrative Processing (AP).
Mar 17, 2014 - CEAC website, visa status changed to "Issued." Now we wait for pickup/delivery.
Mar 21, 2014 - Juvy picked up visa from 2GO location, got CFO stamp, and I booked her ticket.
Mar 22, 2014 - Juvy left Manila, through Japan and Detroit, and finally onto Houston!! :-)
THE REST OF MY LIFE CAN NOW OFFICIALLY BEGIN!!!
event.png
event.png

Link to comment
Share on other sites

Well, she didn't have her CENOMAR. (certificate of no previous marriage). No where did it say that on my P4 letter, any other documents, nor did anyone at the embassy mention that as a requirement for the interview. My wife got that before we got married, and it wasn't mentioned in any documents that I saw. I guess I must have let it slip through the cracks, but I don't remember seeing it brought up in any of these forums either. I read every post of every interview thread since November, every NVC thread since October, and both Feb and Mar 130 threads.

I still don't understand how a CENOMAR is required for CR-1 visa in the first place. I'm pretty pissed off right now.

It's a country specific required document, can be found in nvc's website if you search for philippines under the country reciprocity schedule for required documents. For fiance visa, they need the cenomar, for spouse it's the cemar (certificate of marriage)..but usually they just call it cenomar. I hope her visa will be issued soon after she submits the document.

08.24.2013 - got married in the Philippines!

09.25.2013 - NOA1 via email

11.18.2013 - requested expedite due to typhoon

12.02.2013 - CFO seminar

12.12.2013 - I-130 approved, NOA2 via email (never transferred); shipped to NVC

12.30.2013 - NVC received the case

01.06.2014 - requested expedite due to typhoon and PCS

01.08.2014 - Case # and IIN; submitted DS-261; NVC asked for 2 contact #s of beneficiary

01.09.2014 - AOS fee billed

01.14.2014 - AOS fee showed paid

01.15.2014 - IV fee billed; expedite approved

01.18.2014 - sent AOS package

01.22.2014 - IV fee showed paid; AOS arrived at NVC as per UPS (10:18am by FNU)

01.24.2014 - sent IV package

01.27.2014 - submitted DS-260; IV docs delivered to NVC as per DHL (10:52am by PETERS G)

01.29.2014 - CASE COMPLETE (via phonecall)

01.30.2014 - received checklist for Dutch Police Record (VOG) via email

01.31.2014 - left NVC, sent to embassy

02.04.2014 - received at embassy, READY as per CEAC

02.10-11.2014 - medical done, passed!

02.24.2014 - interview: APPROVED!!

02.27.2014 - Received SMS from 2Go, ready for pick up

02.28.2014 - visa on hand; CFO sticker

03.01.2014 - paid ELIS

03.06.2014 - POE Hawaii...Aloooohaaa! :)

04.10.2014 - 2yr green card received

Link to comment
Share on other sites

It's a country specific required document, can be found in nvc's website if you search for philippines under the country reciprocity schedule for required documents. For fiance visa, they need the cenomar, for spouse it's the cemar (certificate of marriage)..but usually they just call it cenomar. I hope her visa will be issued soon after she submits the document.

That's the thing, she had the marriage certificate. The original. She had the yellow colored copy, plus she even had the original black and white form with the purple stamp along with it, just in case.

Personal
July 3, 2011 - Met
July, 2012 - Proposed (Skype - Texas/Cavite, Philippines)
Nov, 2012 - Formal Proposal in Tagaytay, Philippines
Feb 3, 2013 - Married in Batangas, Philippines
Dec 22, 2013 thru Jan 4, 2014 - Spent Christmas and New Years holiday in Philippines (Cavite, Tagaytay, Marinduque, Rizal)
USCIS - Serviced by National Benefits Center / California Service Center
- called USCIS one to two times a week asking about status update, after about the third month
Mar 15, 2013 - I-130 Sent
Mar 18, 2013 - I-130 NOA1
Nov 5, 2013 - Transfer to local office according to USCIS web site, but customer service couldn't verify location (I'm assuming Houston)
Nov 5, 2013 - Set up infopass appointment for 11/13/13
Nov 8, 2013 - Received transfer letter, case at CSC
Nov 18, 2013 - Received initial approval by email/text
Nov 21, 2013 - Received hard copy approval (797C) in the mail
NVC
- called NVC every single day from November 18th to January 30th asking about status update
Dec 4, 2013 - Case received at NVC
Dec 19, 2013 - Received case number by calling NVC
Dec 21, 2013 - Submitted DS-261 online
Dec 25, 2013 - Paid AOS fee online (Merry Christmas!!!)
Dec 27, 2013 - AOS fee payment cleared bank, so mailed AOS package to NVC. Paid IV package fee online
Dec 30, 2013 - IV fee payment cleared bank, so mailed IV package to NVC
Dec 31, 2013 - AOS package arrived at NVC
Jan 6, 2014 - IV package arrived at NVC
Jan 7, 2014 - Submitted DS-260 online
Jan 24, 2014 - Received checklist via email (said reviewed DS-260 and instructed me to send in civil documents). I called NVC to verify I can ignore checklist and they said yes, to ignore it.
Jan 27, 2014 - Called NVC and was told that our case is complete and that we're just waiting for an interview appointment date.
Jan 29, 2014- Called NVC and was told that our interview was scheduled for March 10, 2014. Also registered for St Luke medical exam online.
Jan 30, 2014 - Received P4 letter in email.
US Embassy (Manila) / Medical (St. Luke's)
- called embassy every day after the interview, during AP status and after visa status changed to "Issued," asking about status update and visa delivery timeframe
Feb 4-5, 2014 - Wife went to medical exam (took two days), results mailed to US Embassy in Manila.
Feb 7, 2014, Package sent from NVC to US Embassy in Manila (according to NVC phone operator).
Feb 10, 2014 - CEAC website updated case as "In Transit."
Feb 11, 2014 - DHL website shows case as delivered to US Embassy in Manila.
Feb 12, 2014 - Called US Embassy in Manila and interview rescheduled for Feb 25th.
Feb 25, 2014 - "Approved," but we have to submit CENOMAR then wait for visa after it's processed, so I guess technically it's in Administrative Processing (AP).
Mar 17, 2014 - CEAC website, visa status changed to "Issued." Now we wait for pickup/delivery.
Mar 21, 2014 - Juvy picked up visa from 2GO location, got CFO stamp, and I booked her ticket.
Mar 22, 2014 - Juvy left Manila, through Japan and Detroit, and finally onto Houston!! :-)
THE REST OF MY LIFE CAN NOW OFFICIALLY BEGIN!!!
event.png
event.png

Link to comment
Share on other sites

That's the thing, she had the marriage certificate. The original. She had the yellow colored copy, plus she even had the original black and white form with the purple stamp along with it, just in case.

Uhm, thats different from the one being asked from her. Aside from the marriage certificate, theres another nso document called CEMAR.

"Marriage Index Documents

Available. The NSO issues Certificates of No Marriage (CENOMAR) certifying that an applicant was never married. Certificates of Marriage (CEMAR) provide a chronological listing of all applicant's marriages. A CDLI endorsement should be requested.

Marriage index documents can also be ordered on the website www.ecensus.com.ph. The site accepts credit cards issued in the U.S., Japan, Europe, Australia, and Hong Kong. There is a flat fee for each document of $25. The fee includes shipping by courier to the delivery address abroad."

08.24.2013 - got married in the Philippines!

09.25.2013 - NOA1 via email

11.18.2013 - requested expedite due to typhoon

12.02.2013 - CFO seminar

12.12.2013 - I-130 approved, NOA2 via email (never transferred); shipped to NVC

12.30.2013 - NVC received the case

01.06.2014 - requested expedite due to typhoon and PCS

01.08.2014 - Case # and IIN; submitted DS-261; NVC asked for 2 contact #s of beneficiary

01.09.2014 - AOS fee billed

01.14.2014 - AOS fee showed paid

01.15.2014 - IV fee billed; expedite approved

01.18.2014 - sent AOS package

01.22.2014 - IV fee showed paid; AOS arrived at NVC as per UPS (10:18am by FNU)

01.24.2014 - sent IV package

01.27.2014 - submitted DS-260; IV docs delivered to NVC as per DHL (10:52am by PETERS G)

01.29.2014 - CASE COMPLETE (via phonecall)

01.30.2014 - received checklist for Dutch Police Record (VOG) via email

01.31.2014 - left NVC, sent to embassy

02.04.2014 - received at embassy, READY as per CEAC

02.10-11.2014 - medical done, passed!

02.24.2014 - interview: APPROVED!!

02.27.2014 - Received SMS from 2Go, ready for pick up

02.28.2014 - visa on hand; CFO sticker

03.01.2014 - paid ELIS

03.06.2014 - POE Hawaii...Aloooohaaa! :)

04.10.2014 - 2yr green card received

Link to comment
Share on other sites

Uhm, thats different from the one being asked from her. Aside from the marriage certificate, theres another nso document called CEMAR.

"Marriage Index Documents

Available. The NSO issues Certificates of No Marriage (CENOMAR) certifying that an applicant was never married. Certificates of Marriage (CEMAR) provide a chronological listing of all applicant's marriages. A CDLI endorsement should be requested.

Marriage index documents can also be ordered on the website www.ecensus.com.ph. The site accepts credit cards issued in the U.S., Japan, Europe, Australia, and Hong Kong. There is a flat fee for each document of $25. The fee includes shipping by courier to the delivery address abroad."

Well, the link at the beginning of this thread states to select three letter identifier, and follow the instructions, which say the following:

3. MARRIAGE CERTIFICATE (if applicable). For Philippine marriages, copies must be issued by the National Statistics Office (NSO) on security paper (

. You may call the NSO Information Center at (632) 737-1111 to inquire about securing a marriage certificate or visit their web site at http://www.census.gov.ph.

That doesn't say CEMAR nor does it say marriage index, so if I just stopped there, then how would I have known about the CEMAR. It just said cert of mar, not cert of no mar. guess it was only confusing to me.

Personal
July 3, 2011 - Met
July, 2012 - Proposed (Skype - Texas/Cavite, Philippines)
Nov, 2012 - Formal Proposal in Tagaytay, Philippines
Feb 3, 2013 - Married in Batangas, Philippines
Dec 22, 2013 thru Jan 4, 2014 - Spent Christmas and New Years holiday in Philippines (Cavite, Tagaytay, Marinduque, Rizal)
USCIS - Serviced by National Benefits Center / California Service Center
- called USCIS one to two times a week asking about status update, after about the third month
Mar 15, 2013 - I-130 Sent
Mar 18, 2013 - I-130 NOA1
Nov 5, 2013 - Transfer to local office according to USCIS web site, but customer service couldn't verify location (I'm assuming Houston)
Nov 5, 2013 - Set up infopass appointment for 11/13/13
Nov 8, 2013 - Received transfer letter, case at CSC
Nov 18, 2013 - Received initial approval by email/text
Nov 21, 2013 - Received hard copy approval (797C) in the mail
NVC
- called NVC every single day from November 18th to January 30th asking about status update
Dec 4, 2013 - Case received at NVC
Dec 19, 2013 - Received case number by calling NVC
Dec 21, 2013 - Submitted DS-261 online
Dec 25, 2013 - Paid AOS fee online (Merry Christmas!!!)
Dec 27, 2013 - AOS fee payment cleared bank, so mailed AOS package to NVC. Paid IV package fee online
Dec 30, 2013 - IV fee payment cleared bank, so mailed IV package to NVC
Dec 31, 2013 - AOS package arrived at NVC
Jan 6, 2014 - IV package arrived at NVC
Jan 7, 2014 - Submitted DS-260 online
Jan 24, 2014 - Received checklist via email (said reviewed DS-260 and instructed me to send in civil documents). I called NVC to verify I can ignore checklist and they said yes, to ignore it.
Jan 27, 2014 - Called NVC and was told that our case is complete and that we're just waiting for an interview appointment date.
Jan 29, 2014- Called NVC and was told that our interview was scheduled for March 10, 2014. Also registered for St Luke medical exam online.
Jan 30, 2014 - Received P4 letter in email.
US Embassy (Manila) / Medical (St. Luke's)
- called embassy every day after the interview, during AP status and after visa status changed to "Issued," asking about status update and visa delivery timeframe
Feb 4-5, 2014 - Wife went to medical exam (took two days), results mailed to US Embassy in Manila.
Feb 7, 2014, Package sent from NVC to US Embassy in Manila (according to NVC phone operator).
Feb 10, 2014 - CEAC website updated case as "In Transit."
Feb 11, 2014 - DHL website shows case as delivered to US Embassy in Manila.
Feb 12, 2014 - Called US Embassy in Manila and interview rescheduled for Feb 25th.
Feb 25, 2014 - "Approved," but we have to submit CENOMAR then wait for visa after it's processed, so I guess technically it's in Administrative Processing (AP).
Mar 17, 2014 - CEAC website, visa status changed to "Issued." Now we wait for pickup/delivery.
Mar 21, 2014 - Juvy picked up visa from 2GO location, got CFO stamp, and I booked her ticket.
Mar 22, 2014 - Juvy left Manila, through Japan and Detroit, and finally onto Houston!! :-)
THE REST OF MY LIFE CAN NOW OFFICIALLY BEGIN!!!
event.png
event.png

Link to comment
Share on other sites

Uhm, thats different from the one being asked from her. Aside from the marriage certificate, theres another nso document called CEMAR.

"Marriage Index Documents

Available. The NSO issues Certificates of No Marriage (CENOMAR) certifying that an applicant was never married. Certificates of Marriage (CEMAR) provide a chronological listing of all applicant's marriages. A CDLI endorsement should be requested.

Marriage index documents can also be ordered on the website www.ecensus.com.ph. The site accepts credit cards issued in the U.S., Japan, Europe, Australia, and Hong Kong. There is a flat fee for each document of $25. The fee includes shipping by courier to the delivery address abroad."

Oh, and even the 221g email she got says CENOMAR not CEMAR. So I just told her to get both... LOL. HAY NAKU!

Personal
July 3, 2011 - Met
July, 2012 - Proposed (Skype - Texas/Cavite, Philippines)
Nov, 2012 - Formal Proposal in Tagaytay, Philippines
Feb 3, 2013 - Married in Batangas, Philippines
Dec 22, 2013 thru Jan 4, 2014 - Spent Christmas and New Years holiday in Philippines (Cavite, Tagaytay, Marinduque, Rizal)
USCIS - Serviced by National Benefits Center / California Service Center
- called USCIS one to two times a week asking about status update, after about the third month
Mar 15, 2013 - I-130 Sent
Mar 18, 2013 - I-130 NOA1
Nov 5, 2013 - Transfer to local office according to USCIS web site, but customer service couldn't verify location (I'm assuming Houston)
Nov 5, 2013 - Set up infopass appointment for 11/13/13
Nov 8, 2013 - Received transfer letter, case at CSC
Nov 18, 2013 - Received initial approval by email/text
Nov 21, 2013 - Received hard copy approval (797C) in the mail
NVC
- called NVC every single day from November 18th to January 30th asking about status update
Dec 4, 2013 - Case received at NVC
Dec 19, 2013 - Received case number by calling NVC
Dec 21, 2013 - Submitted DS-261 online
Dec 25, 2013 - Paid AOS fee online (Merry Christmas!!!)
Dec 27, 2013 - AOS fee payment cleared bank, so mailed AOS package to NVC. Paid IV package fee online
Dec 30, 2013 - IV fee payment cleared bank, so mailed IV package to NVC
Dec 31, 2013 - AOS package arrived at NVC
Jan 6, 2014 - IV package arrived at NVC
Jan 7, 2014 - Submitted DS-260 online
Jan 24, 2014 - Received checklist via email (said reviewed DS-260 and instructed me to send in civil documents). I called NVC to verify I can ignore checklist and they said yes, to ignore it.
Jan 27, 2014 - Called NVC and was told that our case is complete and that we're just waiting for an interview appointment date.
Jan 29, 2014- Called NVC and was told that our interview was scheduled for March 10, 2014. Also registered for St Luke medical exam online.
Jan 30, 2014 - Received P4 letter in email.
US Embassy (Manila) / Medical (St. Luke's)
- called embassy every day after the interview, during AP status and after visa status changed to "Issued," asking about status update and visa delivery timeframe
Feb 4-5, 2014 - Wife went to medical exam (took two days), results mailed to US Embassy in Manila.
Feb 7, 2014, Package sent from NVC to US Embassy in Manila (according to NVC phone operator).
Feb 10, 2014 - CEAC website updated case as "In Transit."
Feb 11, 2014 - DHL website shows case as delivered to US Embassy in Manila.
Feb 12, 2014 - Called US Embassy in Manila and interview rescheduled for Feb 25th.
Feb 25, 2014 - "Approved," but we have to submit CENOMAR then wait for visa after it's processed, so I guess technically it's in Administrative Processing (AP).
Mar 17, 2014 - CEAC website, visa status changed to "Issued." Now we wait for pickup/delivery.
Mar 21, 2014 - Juvy picked up visa from 2GO location, got CFO stamp, and I booked her ticket.
Mar 22, 2014 - Juvy left Manila, through Japan and Detroit, and finally onto Houston!! :-)
THE REST OF MY LIFE CAN NOW OFFICIALLY BEGIN!!!
event.png
event.png

Link to comment
Share on other sites

Oh, and even the 221g email she got says CENOMAR not CEMAR. So I just told her to get both... LOL. HAY NAKU!

Lol @ "hay naku".. Actually if youre married and you request for cenomar, they will automatically give you the cemar. Its just a certificate showing how many marriages youve had. But if youve never been married, they will give you the cenomar instead. The officer asked for my cenomar yesterday and i handed her my cemar, and she accepted it.

08.24.2013 - got married in the Philippines!

09.25.2013 - NOA1 via email

11.18.2013 - requested expedite due to typhoon

12.02.2013 - CFO seminar

12.12.2013 - I-130 approved, NOA2 via email (never transferred); shipped to NVC

12.30.2013 - NVC received the case

01.06.2014 - requested expedite due to typhoon and PCS

01.08.2014 - Case # and IIN; submitted DS-261; NVC asked for 2 contact #s of beneficiary

01.09.2014 - AOS fee billed

01.14.2014 - AOS fee showed paid

01.15.2014 - IV fee billed; expedite approved

01.18.2014 - sent AOS package

01.22.2014 - IV fee showed paid; AOS arrived at NVC as per UPS (10:18am by FNU)

01.24.2014 - sent IV package

01.27.2014 - submitted DS-260; IV docs delivered to NVC as per DHL (10:52am by PETERS G)

01.29.2014 - CASE COMPLETE (via phonecall)

01.30.2014 - received checklist for Dutch Police Record (VOG) via email

01.31.2014 - left NVC, sent to embassy

02.04.2014 - received at embassy, READY as per CEAC

02.10-11.2014 - medical done, passed!

02.24.2014 - interview: APPROVED!!

02.27.2014 - Received SMS from 2Go, ready for pick up

02.28.2014 - visa on hand; CFO sticker

03.01.2014 - paid ELIS

03.06.2014 - POE Hawaii...Aloooohaaa! :)

04.10.2014 - 2yr green card received

Link to comment
Share on other sites

anyone got an interview date yet ??? idea9dv.gif

Edited by MY HOPE

Marriage (if applicable): 2012-02-04

I-130 Sent : 2013-02-28

I-130 NOA1 : 2013-03-04

I-130 RFE :

I-130 RFE Sent :

I-130 Approved : 2013-10-15

NVC Received : 2013-10-31

Received DS-3032 / I-864 Bill : 2013-11-23

Pay I-864 Bill 2013-11-29

Receive I-864 Package : 2013-12-03

Return Completed I-864 : 2013-12-06

Return Completed DS-3032 : 2013-12-19

Receive IV Bill : 2013-12-25

Pay IV Bill : 2013-12-25

Receive Instruction Package : 2013-12-27

Case Completed at NVC : 2014-02-20

Link to comment
Share on other sites

Oh, and besides the CENOMAR incident, the interview was fine.

My wife was asked "what is your husband's full name" by first the Filipino consulate officer, and then again by the American. That was her only question. She showed them a few photos and that was it.

They never looked at nor asked about the other documents we had (1 original and 2 copies of ALL docs we submitted to USCIS and NVC, western union receipts, pay stubs from last 8 months, tax transcrips, returns and W2s and 1098s from 2010-2012, plus 2013 W2s, employment letter, all our Skype conversations since September 2013 (that was as far back as it went), FB conversations, all FB posts on each others walls since we met in July of 2011, all documents NVC say we need for interview, etc.

Oh well, hopefully they don't take the full 30 days they told us to wait...

Personal
July 3, 2011 - Met
July, 2012 - Proposed (Skype - Texas/Cavite, Philippines)
Nov, 2012 - Formal Proposal in Tagaytay, Philippines
Feb 3, 2013 - Married in Batangas, Philippines
Dec 22, 2013 thru Jan 4, 2014 - Spent Christmas and New Years holiday in Philippines (Cavite, Tagaytay, Marinduque, Rizal)
USCIS - Serviced by National Benefits Center / California Service Center
- called USCIS one to two times a week asking about status update, after about the third month
Mar 15, 2013 - I-130 Sent
Mar 18, 2013 - I-130 NOA1
Nov 5, 2013 - Transfer to local office according to USCIS web site, but customer service couldn't verify location (I'm assuming Houston)
Nov 5, 2013 - Set up infopass appointment for 11/13/13
Nov 8, 2013 - Received transfer letter, case at CSC
Nov 18, 2013 - Received initial approval by email/text
Nov 21, 2013 - Received hard copy approval (797C) in the mail
NVC
- called NVC every single day from November 18th to January 30th asking about status update
Dec 4, 2013 - Case received at NVC
Dec 19, 2013 - Received case number by calling NVC
Dec 21, 2013 - Submitted DS-261 online
Dec 25, 2013 - Paid AOS fee online (Merry Christmas!!!)
Dec 27, 2013 - AOS fee payment cleared bank, so mailed AOS package to NVC. Paid IV package fee online
Dec 30, 2013 - IV fee payment cleared bank, so mailed IV package to NVC
Dec 31, 2013 - AOS package arrived at NVC
Jan 6, 2014 - IV package arrived at NVC
Jan 7, 2014 - Submitted DS-260 online
Jan 24, 2014 - Received checklist via email (said reviewed DS-260 and instructed me to send in civil documents). I called NVC to verify I can ignore checklist and they said yes, to ignore it.
Jan 27, 2014 - Called NVC and was told that our case is complete and that we're just waiting for an interview appointment date.
Jan 29, 2014- Called NVC and was told that our interview was scheduled for March 10, 2014. Also registered for St Luke medical exam online.
Jan 30, 2014 - Received P4 letter in email.
US Embassy (Manila) / Medical (St. Luke's)
- called embassy every day after the interview, during AP status and after visa status changed to "Issued," asking about status update and visa delivery timeframe
Feb 4-5, 2014 - Wife went to medical exam (took two days), results mailed to US Embassy in Manila.
Feb 7, 2014, Package sent from NVC to US Embassy in Manila (according to NVC phone operator).
Feb 10, 2014 - CEAC website updated case as "In Transit."
Feb 11, 2014 - DHL website shows case as delivered to US Embassy in Manila.
Feb 12, 2014 - Called US Embassy in Manila and interview rescheduled for Feb 25th.
Feb 25, 2014 - "Approved," but we have to submit CENOMAR then wait for visa after it's processed, so I guess technically it's in Administrative Processing (AP).
Mar 17, 2014 - CEAC website, visa status changed to "Issued." Now we wait for pickup/delivery.
Mar 21, 2014 - Juvy picked up visa from 2GO location, got CFO stamp, and I booked her ticket.
Mar 22, 2014 - Juvy left Manila, through Japan and Detroit, and finally onto Houston!! :-)
THE REST OF MY LIFE CAN NOW OFFICIALLY BEGIN!!!
event.png
event.png

Link to comment
Share on other sites

Was abt to post same question? Did you call nvc? I asked my husband to call... I can't wait anymore!!!:/

i will try to call today and see about this

Marriage (if applicable): 2012-02-04

I-130 Sent : 2013-02-28

I-130 NOA1 : 2013-03-04

I-130 RFE :

I-130 RFE Sent :

I-130 Approved : 2013-10-15

NVC Received : 2013-10-31

Received DS-3032 / I-864 Bill : 2013-11-23

Pay I-864 Bill 2013-11-29

Receive I-864 Package : 2013-12-03

Return Completed I-864 : 2013-12-06

Return Completed DS-3032 : 2013-12-19

Receive IV Bill : 2013-12-25

Pay IV Bill : 2013-12-25

Receive Instruction Package : 2013-12-27

Case Completed at NVC : 2014-02-20

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...