Ok, so, as we all know (especially those of us filing for IR-1/CR-1, who seem to be most affected by it right now:

Somewhere around the 20th of the month, USCIS "updates" the processing times data on their website. We get to know those dates pretty well, because those are the dates that Tier 2s will be quoting to us for the next month.

Of course, we know that the data is out of date from the moment it's posted. It says so, right on the website. The current batch of data (that was posted about January 22, 2014) was current as of November 30th, 2013.

We also often wonder if the data was ever right, or if it's been manipulated to minimize the number of people who have the right to call and complain. Unfortunately, we seem to find it difficult to remember what was (by our observation) going on almost 2 months ago.

SO...

Today is January 30th. Tomorrow, we post as much information as we can about what is going on in our corner of VJ. Then, in March, when the USCIS posts the data that they allegedly have for January 31, 2014, we will be able to see how the two sets of data line up.

For example,on the VJ Estimated Processing dates chart that was posted today, I-130s were being processed as follows:

CSC: June 14th

VSC: April 21st

TSC: May 15th
NBC: May 13th

We don't have information about NSC posted on this list, but I think their numbers would be pretty much in line with the numbers posted for VSC. (In fact, since no recent transfers went to VSC, it seems possible that those dates are actually meant to apply to Nebraska.

The vast majority of July has been transferred to other centres, chiefly CSC, and anecdotally they are already receiving approvals. Meanwhile, NSC is starting to get caught up, approving petitions from (mostly) April.

Let's get together and make a time capsule that we can refer to when the January data comes from USCIS in March!

 

Is your timeline updated?


Oath Ceremony Dec 14th, 2018 I am finally a citizen and done with USCIS for good!

 

 

IR-1/CR-1 Visa:                            

Marriage: 2013-08-05                                   I-130 Sent: 2013-10-07                                                 I-130 NOA1: 2013-10-09                               

I-130 transferred to VSC: 2014-03-12        I-130 NOA2: 2014-03-24                                              NVC Received: 2014-04-07 

Case Number and IIN: 2014-05-05             Sent ENROLL email for EP: 2014-05-06                    Gave email addresses to NVC: 2014-05-08             

DS261 submitted: 2014-05-09                    AOS invoiced and paid: 2014-05-12                           DS261 re-submitted - GRRRR! 2014-05-21               

ENROLL conf. email: 2014-06-05               Submitted AOS documents:2014-06-08                    IV fee email received: 2014-06-23 

IV fee available and paid: 2014-06-24       DS260  submitted: 2014-06-26                                   Case Complete: 2014-07-31                                       

Interview: 2014-09-19 APPROVED!!!          Visa in Hand: 2014-09-24 (Loomis depot)                POE (Pac Hwy Crossing, BC) 2014-11-08 

SSN Card arrived (approx) 2014-11-26     Green Card arrived (approx) 2014-12-17 

Removal of Conditions - I-751:

I-751 Mailed (USPS) Aug 10, 2016             NOA: August 17, 2016 (received Aug 23)                  Biometrics Letter Sent: Sept 23, 2016

Biometrics Letter Rec'd: Sept 30, 2016     Walk-In Biometrics Oct 6, 2016                                    Infopass for I-551 stamp Aug 17, 2017   

Service Request: Dec 27, 2017                   SR Response: Jan 10, 2018 (no prediction)              Senator Inquiry: Jan 5, 2018

Senator Resp: Jan 8, 2018 (60 days)         Service Request 2: Mar 8 2018                                   Senator Inquiry 2: Mar 9 2018

SR 2 Response: Mar 12 (security checks) Senator Response 2: Mar 13, 2018                            Approval (via phone!): Mar 14, 2018

New Green Card Arrived: Mar 22, 2018

Naturalization - N-400: 

Submitted N-400 Online: Feb 4, 2018       Denied for Payment Failure: Feb 8, 2018                     Resubmitted N-400 Online Feb 8, 2018

NOA: Feb 8, 2018                                          Biometrics: Feb 26, 2018                                                Interview: Nov 2,2018 (approved)

Oath: Dec 14, 2018

 

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Posted

Thats a good idea !

15th Feb 2013 (Married)

03rd-Jun-13 NOA1 (Priority Date)

12th-Jun-13 NOA1 Hard Copy

17th-Dec-13 USCIS Transfer Email 1

18th-Dec-13 USCIS Transfer Email 2

23rd-Dec-13 USCIS Transfer Email 3

26th-Dec-13 Hard Copy Transferred to Nebraska (NSC)

21st-Feb-14 NOA2 Approved Email 1

25th-Feb-14 NOA2 Approved Email 2

27th-Feb-14 NOA2 Hard Copy

10th-Mar-14 NVC received approved documents

10th-April-14 NVC assigned case number

12th April-14 AOS Fees

14th April-14 AOS Package sent

16th April-14 Submit DS261

23rd April-14 Recieve IV Bill

24th April-14 IV Fees

16th May-14 Sent IV Package

6th June-14 package received by NVC

10th July 2014 Case completed

10th July 2014 Interview letter

Interview 19 Aug 2014 "Thank God" *Approved* :yes:

25th August 2014 *Passport Received*

Posted

On January 31, 2014, VJ data was as follows:

In the Immigration Timelines section, it said

Petitions with NOA1 dates as follows are currently being processed:

I-130s for IR1/CR1 and K3 Visas:

CSC: May 17, 2013

VSC: April 23, 2013

TSC: June 15, 2013 (!)

NBC: May 13, 2013

Igor's list (showing the last 15 approvals)

From NBC: 7 from April, 1 from May, 6 from the second half of July, and 1 from the beginning of August (these are actually from several offices, since Igor's list doesn't always recognise transfers.

From CSC: (only shows 2 from January (see? doesn't show transfers)), 1 from Sept 2012, and 1 from April

From TSC: (2 from January), 1 from March and 1 from July

From VSC: (6 from January), 2 from March, 1 from May, 1 from June, 2 from July

July Transfers seem to be virtually finished. August transfers have begun, albeit sporadically. A lot of these transfers seem to be going to CSC, which is processing them very quickly, while the other offices seem to be slowly catching up with older cases.

Looking at the transfer spreadsheets (this data is even less representative, since it requires 2 levels of compliance (it doesn't automatically update based on timeline updates, and people have to sign up for it and update it themselves)

Of March's reported transfers, 71% have gotten their NOA2 - those who have not are overwhelmingly from NSC

Of April's reported transfers, 78% have gotten their NOA2 - those who have not are from TSC and NSC (slightly more from TSC)

Of May's reported transfers, only 26% have gotten their NOA2 - basically only those who were transferred to CSC and a few from TSC.

Of June's reported transfers, 68% have gotten their NOA2 - again, NSC seems to be lagging (although both May and June sent a disproportionate number of petitions to NSC in the first place - more than half of May and slightly less than half of June transfers went there.

Of July's reported transfers, 46% have gotten their NOA2 - CSC is processing quite a lot of them, but they got the disproportionate number for July. TSC's approval percentages aren't too shabby either.

So it looks as though USCIS is looking to get the numbers down to a 6-7 month average by Feb or March. They're doing this by working both "ends" (in this case, the older cases in the backlog and the July (6month wait) towards the middle, which, while immensely frustrating for the people in the "middle", is actually fairly effective as a methodology.

My guess is that this process will continue, with one office (maybe CSC) continuing to mostly work ahead at chipping away at "new" cases - about 6 months out - and the other offices continuing to try to get rid of the backlog.

Overall, if VJ's data is a representative enough sample, (and USCIS is honest) the processing date that will be posted around March 20 should be somewhere in mid May.

Does anyone have anything else that should go in the Time Capsule?

 

Is your timeline updated?


Oath Ceremony Dec 14th, 2018 I am finally a citizen and done with USCIS for good!

 

 

IR-1/CR-1 Visa:                            

Marriage: 2013-08-05                                   I-130 Sent: 2013-10-07                                                 I-130 NOA1: 2013-10-09                               

I-130 transferred to VSC: 2014-03-12        I-130 NOA2: 2014-03-24                                              NVC Received: 2014-04-07 

Case Number and IIN: 2014-05-05             Sent ENROLL email for EP: 2014-05-06                    Gave email addresses to NVC: 2014-05-08             

DS261 submitted: 2014-05-09                    AOS invoiced and paid: 2014-05-12                           DS261 re-submitted - GRRRR! 2014-05-21               

ENROLL conf. email: 2014-06-05               Submitted AOS documents:2014-06-08                    IV fee email received: 2014-06-23 

IV fee available and paid: 2014-06-24       DS260  submitted: 2014-06-26                                   Case Complete: 2014-07-31                                       

Interview: 2014-09-19 APPROVED!!!          Visa in Hand: 2014-09-24 (Loomis depot)                POE (Pac Hwy Crossing, BC) 2014-11-08 

SSN Card arrived (approx) 2014-11-26     Green Card arrived (approx) 2014-12-17 

Removal of Conditions - I-751:

I-751 Mailed (USPS) Aug 10, 2016             NOA: August 17, 2016 (received Aug 23)                  Biometrics Letter Sent: Sept 23, 2016

Biometrics Letter Rec'd: Sept 30, 2016     Walk-In Biometrics Oct 6, 2016                                    Infopass for I-551 stamp Aug 17, 2017   

Service Request: Dec 27, 2017                   SR Response: Jan 10, 2018 (no prediction)              Senator Inquiry: Jan 5, 2018

Senator Resp: Jan 8, 2018 (60 days)         Service Request 2: Mar 8 2018                                   Senator Inquiry 2: Mar 9 2018

SR 2 Response: Mar 12 (security checks) Senator Response 2: Mar 13, 2018                            Approval (via phone!): Mar 14, 2018

New Green Card Arrived: Mar 22, 2018

Naturalization - N-400: 

Submitted N-400 Online: Feb 4, 2018       Denied for Payment Failure: Feb 8, 2018                     Resubmitted N-400 Online Feb 8, 2018

NOA: Feb 8, 2018                                          Biometrics: Feb 26, 2018                                                Interview: Nov 2,2018 (approved)

Oath: Dec 14, 2018

 

Posted

On January 31, 2014, VJ data was as follows:

In the Immigration Timelines section, it said

Petitions with NOA1 dates as follows are currently being processed:

I-130s for IR1/CR1 and K3 Visas:

CSC: May 17, 2013

VSC: April 23, 2013

TSC: June 15, 2013 (!)

NBC: May 13, 2013

Igor's list (showing the last 15 approvals)

From NBC: 7 from April, 1 from May, 6 from the second half of July, and 1 from the beginning of August (these are actually from several offices, since Igor's list doesn't always recognise transfers.

From CSC: (only shows 2 from January (see? doesn't show transfers)), 1 from Sept 2012, and 1 from April

From TSC: (2 from January), 1 from March and 1 from July

From VSC: (6 from January), 2 from March, 1 from May, 1 from June, 2 from July

July Transfers seem to be virtually finished. August transfers have begun, albeit sporadically. A lot of these transfers seem to be going to CSC, which is processing them very quickly, while the other offices seem to be slowly catching up with older cases.

Looking at the transfer spreadsheets (this data is even less representative, since it requires 2 levels of compliance (it doesn't automatically update based on timeline updates, and people have to sign up for it and update it themselves)

Of March's reported transfers, 71% have gotten their NOA2 - those who have not are overwhelmingly from NSC

Of April's reported transfers, 78% have gotten their NOA2 - those who have not are from TSC and NSC (slightly more from TSC)

Of May's reported transfers, only 26% have gotten their NOA2 - basically only those who were transferred to CSC and a few from TSC.

Of June's reported transfers, 68% have gotten their NOA2 - again, NSC seems to be lagging (although both May and June sent a disproportionate number of petitions to NSC in the first place - more than half of May and slightly less than half of June transfers went there.

Of July's reported transfers, 46% have gotten their NOA2 - CSC is processing quite a lot of them, but they got the disproportionate number for July. TSC's approval percentages aren't too shabby either.

So it looks as though USCIS is looking to get the numbers down to a 6-7 month average by Feb or March. They're doing this by working both "ends" (in this case, the older cases in the backlog and the July (6month wait) towards the middle, which, while immensely frustrating for the people in the "middle", is actually fairly effective as a methodology.

My guess is that this process will continue, with one office (maybe CSC) continuing to mostly work ahead at chipping away at "new" cases - about 6 months out - and the other offices continuing to try to get rid of the backlog.

Overall, if VJ's data is a representative enough sample, (and USCIS is honest) the processing date that will be posted around March 20 should be somewhere in mid May.

Does anyone have anything else that should go in the Time Capsule?

I actually think you are bang on here, I think those "in the middle" are being screwed while the July - September (Pre-direct to the service centres) are going to be done quickly, allowing TSC and VSC to "catch up".

Therefore July - September should see a 6-7 month time to NOA2....

Im happy to "map this" with you

USCIS


August 22nd 2013: NOA 1


February 18th : Transferred to California


February 26th : NOA 2


March 3rd : NOA 2 Hard Copy



NVC


March 7th 2014: Case received by NVC


April 4th 2014: NVC Case# and IN #Received


xxxx: AOS Bill Invoiced & Paid


xxxx: AOS Bill showing paid


xxxx: AOS Packet sent (electronic)


Posted

On January 31, 2014, VJ data was as follows:

In the Immigration Timelines section, it said

Petitions with NOA1 dates as follows are currently being processed:

I-130s for IR1/CR1 and K3 Visas:

CSC: May 17, 2013

VSC: April 23, 2013

TSC: June 15, 2013 (!)

NBC: May 13, 2013

Igor's list (showing the last 15 approvals)

From NBC: 7 from April, 1 from May, 6 from the second half of July, and 1 from the beginning of August (these are actually from several offices, since Igor's list doesn't always recognise transfers.

From CSC: (only shows 2 from January (see? doesn't show transfers)), 1 from Sept 2012, and 1 from April

From TSC: (2 from January), 1 from March and 1 from July

From VSC: (6 from January), 2 from March, 1 from May, 1 from June, 2 from July

July Transfers seem to be virtually finished. August transfers have begun, albeit sporadically. A lot of these transfers seem to be going to CSC, which is processing them very quickly, while the other offices seem to be slowly catching up with older cases.

Looking at the transfer spreadsheets (this data is even less representative, since it requires 2 levels of compliance (it doesn't automatically update based on timeline updates, and people have to sign up for it and update it themselves)

Of March's reported transfers, 71% have gotten their NOA2 - those who have not are overwhelmingly from NSC

Of April's reported transfers, 78% have gotten their NOA2 - those who have not are from TSC and NSC (slightly more from TSC)

Of May's reported transfers, only 26% have gotten their NOA2 - basically only those who were transferred to CSC and a few from TSC.

Of June's reported transfers, 68% have gotten their NOA2 - again, NSC seems to be lagging (although both May and June sent a disproportionate number of petitions to NSC in the first place - more than half of May and slightly less than half of June transfers went there.

Of July's reported transfers, 46% have gotten their NOA2 - CSC is processing quite a lot of them, but they got the disproportionate number for July. TSC's approval percentages aren't too shabby either.

So it looks as though USCIS is looking to get the numbers down to a 6-7 month average by Feb or March. They're doing this by working both "ends" (in this case, the older cases in the backlog and the July (6month wait) towards the middle, which, while immensely frustrating for the people in the "middle", is actually fairly effective as a methodology.

My guess is that this process will continue, with one office (maybe CSC) continuing to mostly work ahead at chipping away at "new" cases - about 6 months out - and the other offices continuing to try to get rid of the backlog.

Overall, if VJ's data is a representative enough sample, (and USCIS is honest) the processing date that will be posted around March 20 should be somewhere in mid May.

Does anyone have anything else that should go in the Time Capsule?

This is great, although you think that TSC is processing ahead of CSC?

USCIS


August 22nd 2013: NOA 1


February 18th : Transferred to California


February 26th : NOA 2


March 3rd : NOA 2 Hard Copy



NVC


March 7th 2014: Case received by NVC


April 4th 2014: NVC Case# and IN #Received


xxxx: AOS Bill Invoiced & Paid


xxxx: AOS Bill showing paid


xxxx: AOS Packet sent (electronic)


Posted

This is great, although you think that TSC is processing ahead of CSC?

No, I didn't say that. Quite the opposite. I think CSC is processing the most petitions across the board right now, although it looks like their focus is on newer files now. They seem to be processing a lot of July filers, while the other offices are working from the other end.

 

Is your timeline updated?


Oath Ceremony Dec 14th, 2018 I am finally a citizen and done with USCIS for good!

 

 

IR-1/CR-1 Visa:                            

Marriage: 2013-08-05                                   I-130 Sent: 2013-10-07                                                 I-130 NOA1: 2013-10-09                               

I-130 transferred to VSC: 2014-03-12        I-130 NOA2: 2014-03-24                                              NVC Received: 2014-04-07 

Case Number and IIN: 2014-05-05             Sent ENROLL email for EP: 2014-05-06                    Gave email addresses to NVC: 2014-05-08             

DS261 submitted: 2014-05-09                    AOS invoiced and paid: 2014-05-12                           DS261 re-submitted - GRRRR! 2014-05-21               

ENROLL conf. email: 2014-06-05               Submitted AOS documents:2014-06-08                    IV fee email received: 2014-06-23 

IV fee available and paid: 2014-06-24       DS260  submitted: 2014-06-26                                   Case Complete: 2014-07-31                                       

Interview: 2014-09-19 APPROVED!!!          Visa in Hand: 2014-09-24 (Loomis depot)                POE (Pac Hwy Crossing, BC) 2014-11-08 

SSN Card arrived (approx) 2014-11-26     Green Card arrived (approx) 2014-12-17 

Removal of Conditions - I-751:

I-751 Mailed (USPS) Aug 10, 2016             NOA: August 17, 2016 (received Aug 23)                  Biometrics Letter Sent: Sept 23, 2016

Biometrics Letter Rec'd: Sept 30, 2016     Walk-In Biometrics Oct 6, 2016                                    Infopass for I-551 stamp Aug 17, 2017   

Service Request: Dec 27, 2017                   SR Response: Jan 10, 2018 (no prediction)              Senator Inquiry: Jan 5, 2018

Senator Resp: Jan 8, 2018 (60 days)         Service Request 2: Mar 8 2018                                   Senator Inquiry 2: Mar 9 2018

SR 2 Response: Mar 12 (security checks) Senator Response 2: Mar 13, 2018                            Approval (via phone!): Mar 14, 2018

New Green Card Arrived: Mar 22, 2018

Naturalization - N-400: 

Submitted N-400 Online: Feb 4, 2018       Denied for Payment Failure: Feb 8, 2018                     Resubmitted N-400 Online Feb 8, 2018

NOA: Feb 8, 2018                                          Biometrics: Feb 26, 2018                                                Interview: Nov 2,2018 (approved)

Oath: Dec 14, 2018

 

Posted

I've been taking screen shots of the relevant info for two months, and I know in the monthly threads there are others from the previous months.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Filed: Lift. Cond. (apr) Country: China
Timeline
Posted

Moved from Process & Procedures to Progress Reports.

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Posted

Kaylara-

That's awesome- I haven't seen any of that info... I was sure I wasn't the first person to think of it - I just thought it would be good to have it all in one thread. Can you post some of your screenshots or links to other info on this thread?

It always seemed to me that when the info got posted by uscis, we'd all be trying to remember what was actually happening back when that data was current, which is why I posted this.

Partly, I'm interested in finding out (inasmuch as possible) whether VJ's members make up a statistically relevant sample: does the data we collect accurately reflect the average.

 

Is your timeline updated?


Oath Ceremony Dec 14th, 2018 I am finally a citizen and done with USCIS for good!

 

 

IR-1/CR-1 Visa:                            

Marriage: 2013-08-05                                   I-130 Sent: 2013-10-07                                                 I-130 NOA1: 2013-10-09                               

I-130 transferred to VSC: 2014-03-12        I-130 NOA2: 2014-03-24                                              NVC Received: 2014-04-07 

Case Number and IIN: 2014-05-05             Sent ENROLL email for EP: 2014-05-06                    Gave email addresses to NVC: 2014-05-08             

DS261 submitted: 2014-05-09                    AOS invoiced and paid: 2014-05-12                           DS261 re-submitted - GRRRR! 2014-05-21               

ENROLL conf. email: 2014-06-05               Submitted AOS documents:2014-06-08                    IV fee email received: 2014-06-23 

IV fee available and paid: 2014-06-24       DS260  submitted: 2014-06-26                                   Case Complete: 2014-07-31                                       

Interview: 2014-09-19 APPROVED!!!          Visa in Hand: 2014-09-24 (Loomis depot)                POE (Pac Hwy Crossing, BC) 2014-11-08 

SSN Card arrived (approx) 2014-11-26     Green Card arrived (approx) 2014-12-17 

Removal of Conditions - I-751:

I-751 Mailed (USPS) Aug 10, 2016             NOA: August 17, 2016 (received Aug 23)                  Biometrics Letter Sent: Sept 23, 2016

Biometrics Letter Rec'd: Sept 30, 2016     Walk-In Biometrics Oct 6, 2016                                    Infopass for I-551 stamp Aug 17, 2017   

Service Request: Dec 27, 2017                   SR Response: Jan 10, 2018 (no prediction)              Senator Inquiry: Jan 5, 2018

Senator Resp: Jan 8, 2018 (60 days)         Service Request 2: Mar 8 2018                                   Senator Inquiry 2: Mar 9 2018

SR 2 Response: Mar 12 (security checks) Senator Response 2: Mar 13, 2018                            Approval (via phone!): Mar 14, 2018

New Green Card Arrived: Mar 22, 2018

Naturalization - N-400: 

Submitted N-400 Online: Feb 4, 2018       Denied for Payment Failure: Feb 8, 2018                     Resubmitted N-400 Online Feb 8, 2018

NOA: Feb 8, 2018                                          Biometrics: Feb 26, 2018                                                Interview: Nov 2,2018 (approved)

Oath: Dec 14, 2018

 

Posted (edited)

Ok most recent screen shots:


And the charts

Info posted in Jan. processing times as of Nov. 31, 2013

post-169816-0-35785600-1391401847_thumb.png

post-169816-0-94579900-1391401847_thumb.png

post-169816-0-46333400-1391401848_thumb.png

post-169816-0-88182300-1391401848_thumb.png

post-169816-0-27074900-1391401849_thumb.png

post-169816-0-95569200-1391401914_thumb.png

post-169816-0-62314400-1391401915_thumb.png

post-169816-0-17083900-1391401916_thumb.png

post-169816-0-69128800-1391401916_thumb.png

post-169816-0-35528900-1391401917_thumb.png

post-169816-0-27134000-1391401918_thumb.png

post-169816-0-90029400-1391401918_thumb.png

post-169816-0-91753800-1391401919_thumb.png

post-169816-0-81704000-1391401920_thumb.png

post-169816-0-42401100-1391401921_thumb.png

Edited by Kaylara

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Posted

Here are Dec. charts, info current as of Oct. 31, 2013


Hmmm... Seems like the files are too big to upload together. Let me tweak them.

post-169816-0-49578700-1391402201_thumb.png

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Posted

Trying again... Nope, not working

https://www.facebook.com/groups/USGreencardpetitionerscommittee/ I have the screenshots all uploaded there.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Posted

On January 31, 2014, VJ data was as follows:

In the Immigration Timelines section, it said

Petitions with NOA1 dates as follows are currently being processed:

I-130s for IR1/CR1 and K3 Visas:

CSC: May 17, 2013

VSC: April 23, 2013

TSC: June 15, 2013 (!)

NBC: May 13, 2013

Igor's list (showing the last 15 approvals)

From NBC: 7 from April, 1 from May, 6 from the second half of July, and 1 from the beginning of August (these are actually from several offices, since Igor's list doesn't always recognise transfers.

From CSC: (only shows 2 from January (see? doesn't show transfers)), 1 from Sept 2012, and 1 from April

From TSC: (2 from January), 1 from March and 1 from July

From VSC: (6 from January), 2 from March, 1 from May, 1 from June, 2 from July

July Transfers seem to be virtually finished. August transfers have begun, albeit sporadically. A lot of these transfers seem to be going to CSC, which is processing them very quickly, while the other offices seem to be slowly catching up with older cases.

Looking at the transfer spreadsheets (this data is even less representative, since it requires 2 levels of compliance (it doesn't automatically update based on timeline updates, and people have to sign up for it and update it themselves)

Of March's reported transfers, 71% have gotten their NOA2 - those who have not are overwhelmingly from NSC

Of April's reported transfers, 78% have gotten their NOA2 - those who have not are from TSC and NSC (slightly more from TSC)

Of May's reported transfers, only 26% have gotten their NOA2 - basically only those who were transferred to CSC and a few from TSC.

Of June's reported transfers, 68% have gotten their NOA2 - again, NSC seems to be lagging (although both May and June sent a disproportionate number of petitions to NSC in the first place - more than half of May and slightly less than half of June transfers went there.

Of July's reported transfers, 46% have gotten their NOA2 - CSC is processing quite a lot of them, but they got the disproportionate number for July. TSC's approval percentages aren't too shabby either.

So it looks as though USCIS is looking to get the numbers down to a 6-7 month average by Feb or March. They're doing this by working both "ends" (in this case, the older cases in the backlog and the July (6month wait) towards the middle, which, while immensely frustrating for the people in the "middle", is actually fairly effective as a methodology.

My guess is that this process will continue, with one office (maybe CSC) continuing to mostly work ahead at chipping away at "new" cases - about 6 months out - and the other offices continuing to try to get rid of the backlog.

Overall, if VJ's data is a representative enough sample, (and USCIS is honest) the processing date that will be posted around March 20 should be somewhere in mid May.

Does anyone have anything else that should go in the Time Capsule?

I think u did a pretty good calculation which can give us an idea what will be the next processing times but I m sorry u got the June info wrong. 68% have not gotten their NOA2 only 32% have gotten it uptil now according to the transfer sheet.

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Posted

I think u did a pretty good calculation which can give us an idea what will be the next processing times but I m sorry u got the June info wrong. 68% have not gotten their NOA2 only 32% have gotten it uptil now according to the transfer sheet.

Sorry! The day I looked at the transfer sheets the June sheet had a glitch of some kind. AND I probably read it wrong. Sorry if I gave false hope to all the June filers!

 

Is your timeline updated?


Oath Ceremony Dec 14th, 2018 I am finally a citizen and done with USCIS for good!

 

 

IR-1/CR-1 Visa:                            

Marriage: 2013-08-05                                   I-130 Sent: 2013-10-07                                                 I-130 NOA1: 2013-10-09                               

I-130 transferred to VSC: 2014-03-12        I-130 NOA2: 2014-03-24                                              NVC Received: 2014-04-07 

Case Number and IIN: 2014-05-05             Sent ENROLL email for EP: 2014-05-06                    Gave email addresses to NVC: 2014-05-08             

DS261 submitted: 2014-05-09                    AOS invoiced and paid: 2014-05-12                           DS261 re-submitted - GRRRR! 2014-05-21               

ENROLL conf. email: 2014-06-05               Submitted AOS documents:2014-06-08                    IV fee email received: 2014-06-23 

IV fee available and paid: 2014-06-24       DS260  submitted: 2014-06-26                                   Case Complete: 2014-07-31                                       

Interview: 2014-09-19 APPROVED!!!          Visa in Hand: 2014-09-24 (Loomis depot)                POE (Pac Hwy Crossing, BC) 2014-11-08 

SSN Card arrived (approx) 2014-11-26     Green Card arrived (approx) 2014-12-17 

Removal of Conditions - I-751:

I-751 Mailed (USPS) Aug 10, 2016             NOA: August 17, 2016 (received Aug 23)                  Biometrics Letter Sent: Sept 23, 2016

Biometrics Letter Rec'd: Sept 30, 2016     Walk-In Biometrics Oct 6, 2016                                    Infopass for I-551 stamp Aug 17, 2017   

Service Request: Dec 27, 2017                   SR Response: Jan 10, 2018 (no prediction)              Senator Inquiry: Jan 5, 2018

Senator Resp: Jan 8, 2018 (60 days)         Service Request 2: Mar 8 2018                                   Senator Inquiry 2: Mar 9 2018

SR 2 Response: Mar 12 (security checks) Senator Response 2: Mar 13, 2018                            Approval (via phone!): Mar 14, 2018

New Green Card Arrived: Mar 22, 2018

Naturalization - N-400: 

Submitted N-400 Online: Feb 4, 2018       Denied for Payment Failure: Feb 8, 2018                     Resubmitted N-400 Online Feb 8, 2018

NOA: Feb 8, 2018                                          Biometrics: Feb 26, 2018                                                Interview: Nov 2,2018 (approved)

Oath: Dec 14, 2018

 

  • 4 weeks later...
Posted

Ok, ready to do another time capsule on Friday - I can't believe it's already another month end!

We'll be able to check our data against the next USCIS update in just a few weeks!

 

Is your timeline updated?


Oath Ceremony Dec 14th, 2018 I am finally a citizen and done with USCIS for good!

 

 

IR-1/CR-1 Visa:                            

Marriage: 2013-08-05                                   I-130 Sent: 2013-10-07                                                 I-130 NOA1: 2013-10-09                               

I-130 transferred to VSC: 2014-03-12        I-130 NOA2: 2014-03-24                                              NVC Received: 2014-04-07 

Case Number and IIN: 2014-05-05             Sent ENROLL email for EP: 2014-05-06                    Gave email addresses to NVC: 2014-05-08             

DS261 submitted: 2014-05-09                    AOS invoiced and paid: 2014-05-12                           DS261 re-submitted - GRRRR! 2014-05-21               

ENROLL conf. email: 2014-06-05               Submitted AOS documents:2014-06-08                    IV fee email received: 2014-06-23 

IV fee available and paid: 2014-06-24       DS260  submitted: 2014-06-26                                   Case Complete: 2014-07-31                                       

Interview: 2014-09-19 APPROVED!!!          Visa in Hand: 2014-09-24 (Loomis depot)                POE (Pac Hwy Crossing, BC) 2014-11-08 

SSN Card arrived (approx) 2014-11-26     Green Card arrived (approx) 2014-12-17 

Removal of Conditions - I-751:

I-751 Mailed (USPS) Aug 10, 2016             NOA: August 17, 2016 (received Aug 23)                  Biometrics Letter Sent: Sept 23, 2016

Biometrics Letter Rec'd: Sept 30, 2016     Walk-In Biometrics Oct 6, 2016                                    Infopass for I-551 stamp Aug 17, 2017   

Service Request: Dec 27, 2017                   SR Response: Jan 10, 2018 (no prediction)              Senator Inquiry: Jan 5, 2018

Senator Resp: Jan 8, 2018 (60 days)         Service Request 2: Mar 8 2018                                   Senator Inquiry 2: Mar 9 2018

SR 2 Response: Mar 12 (security checks) Senator Response 2: Mar 13, 2018                            Approval (via phone!): Mar 14, 2018

New Green Card Arrived: Mar 22, 2018

Naturalization - N-400: 

Submitted N-400 Online: Feb 4, 2018       Denied for Payment Failure: Feb 8, 2018                     Resubmitted N-400 Online Feb 8, 2018

NOA: Feb 8, 2018                                          Biometrics: Feb 26, 2018                                                Interview: Nov 2,2018 (approved)

Oath: Dec 14, 2018

 

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×