Filed: IR-1/CR-1 Visa Country: Thailand
Timeline

Just printed out my Tax Transcripts for last 3 years.

They are available immediately online at no cost.

You just have to create account with email verification.

To save each year I clicked print and then save as PDF

http://www.irs.gov/Individuals/Get-Transcript

USCIS
2013-07-25 - Sent i-130 Before Posting Please Read Saylin's NVC Guide
2013-07-29 - NOA1
2014-01-13 - Transferred to CSC http://www.visajourney.com/wiki/index.php/NVC_Process
2014-01-21 - NOA2
NVC
2014-02-06 - NVC received
2014-03-13 - NVC case number assigned
2014-03-17 - DS-261 Online Completed

2014-03-18 - I-864 (AOS) Bill Generated and Paid
2014-03-20 - I-864 (AOS) Bill Shows Paid
2014-03-21 - DS-261 Accepted
2014-03-25 - I-864 (AOS) Package Sent

2014-03-26 - I-864 (AOS) Package Recieved (signed: B. Standish)
2014-03-27 - IV Bill invoiced and Paid
2014-03-27 - IV Packet Sent

2014-03-28 - IV Packet Received (signed: G. Peters)
2014-03-31 - DS-260 Available and Completed online
2014-04-10 - I-864 (AOS) Accepted
2014-04-11 - Received False Checklist
2014-04-14 - Case Complete
2014-04-21 - Received Email Confirmation Case Complete
2014-04-30 - Interview Scheduled for June 3
2014-05-02 - Interview Confirmation Email ( P4) Received
Consulate
2014-05-05 - Case " In Transit " to Embassy

2014-05-08 - Case Arrived U.S.Embassy Bangkok (signed: Nawaphas R)

2014-05-19 - Medical Complete

2014-06-03 - Interview - VISA APPROVED !!!

USA

2014-06-17 - POE - LAX AIRPORT - VISA JOURNEY COMPLETE !!!

2014-06-30 - Social Security Card Received

2014-07-24 - Green Card Received (Valid until 6-17-2024)

new.jpg

My Family

ddf.jpg

katt_Trip.jpgmdpool.jpgdrewmom.jpgkatt2.jpg

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Hi Saylin

I am waiting for case completion..

12/20/2013- IV Paid

12/20/2013- Checklist for AOS

12/20/2013- Responed to checklist

12/23/2013- NVC received packet

Holidays...

We called NVC they said we started reviewing process

1/6/2014

They said its still under reviewing process....

How long it ll take to complete the case?????????

I am very worried...

Link to comment
Share on other sites

Filed: Timeline

Called NVC this morning. Case recieved 1/7 and STILL no case#. Ugh!!!!!!!!! This is almost as bad as USCIS. sad.png

tried my luck with only 3mins remaining on my callcard, was able to speak with an operator and STILL NO CASE NUMBER.....huh.png

maybe not as bad as USCIS that made me wait 9mos to get apporved. *positive thinking mayberolleyes.gif

2013-02-28 i-130 filed @ phoenix lockbox 2013-11-06 transferred to "ANOTHER ofc 2013-12-09 to "alien number changed"
2013-03-05 check cashed 2013-11-07 transferred to "NEBRASKA ofc 2013-12-10 APPROVED
2013-03-09 NOA hardcopy rcvd w/ msc# PD march 4 2013-11-08 at USCIS ofc 2013-12-11 Shipped to DOS
2013-03-10 checked USCIS site - initial review 2013-12-17 NOA2 hardcopy rcvd


NVC STAGE
2014-01-09 NVC rcvd case (all 3)
2014-02-03 CASE number assigned (all 3)
2014-02-11 DS261 available filled out
2014-02-15 AOS fee paid
2014-02-21 AOS shows paid
2014-02-27 IV fee invoiced / paid (all 3)
2014-03-04 IV documents sent (UPS tracking 03-07)
2014-03-05 IV shows PAID / DS260 filled out (SPOUSE)
2014-03-06 IV fee for 1minor not accepted ERROR
2014-03-07 IV shows PAID / DS260 filled out (1 minor)
2014-03-07 IV fee invoiced again
2014-03-11 error IV rejected was able to pay again
2014-03-15 IV shows PAID / DS260 filled out (all 3 cases done)
2014-03-26 IV documents approved / false checklist for AOS
2014-04-01 AOS sent via certified mail (USPS tracking 04-07)
2014-04-09 AOS logged into the system
2014-04-23 CASE COMPLETE for 2 minor
2014-04-23 AOS checklist ( petitioner line13.a & joint sponsor tax extension)
2014-05-20 Checklist response mailed (FEDEX tracking 05-23)
2014-05-28 Checklist response scanned into system
2014-06-30 CASE COMPLETE

2014-07-01 CC EMAIL RCVD
2014-07-10 INTERVIEW SCHED GIVEN (by calling) (07/09 US date)
2014-07-11 INTERVIEW LETTER RCVD (07/10 US date)
2014-07-11 MEDICAL (07/09 - 07/11 PPD reading for minor)

2014-08-05 INTERVIEW @ USEM (221g NSO reverification)

2014-08-14 attached & send to CO for review

2014-08-19 VISA ISSUED

2014-08-20 visa printed

2014-08-26 VISA ON HAND!!!

Link to comment
Share on other sites

Question about the DS260 guys, please help..

Example, lets say my name is:

surname/married - SMITH

Middle/maiden - CRUZ

given name - APRIL MAY

When i started ds260, the surname and given name fields were already automatically filled out.

Surnames SMITH

Given names APRIL MAY

then under that there's "Full name in native alphabet"

What should i use? APRIL MAY SMITH or APRIL MAY CRUZ SMITH ??

Im just confused..hope u can help me, thanks! :)

Edited by krispykreme

08.24.2013 - got married in the Philippines!

09.25.2013 - NOA1 via email

11.18.2013 - requested expedite due to typhoon

12.02.2013 - CFO seminar

12.12.2013 - I-130 approved, NOA2 via email (never transferred); shipped to NVC

12.30.2013 - NVC received the case

01.06.2014 - requested expedite due to typhoon and PCS

01.08.2014 - Case # and IIN; submitted DS-261; NVC asked for 2 contact #s of beneficiary

01.09.2014 - AOS fee billed

01.14.2014 - AOS fee showed paid

01.15.2014 - IV fee billed; expedite approved

01.18.2014 - sent AOS package

01.22.2014 - IV fee showed paid; AOS arrived at NVC as per UPS (10:18am by FNU)

01.24.2014 - sent IV package

01.27.2014 - submitted DS-260; IV docs delivered to NVC as per DHL (10:52am by PETERS G)

01.29.2014 - CASE COMPLETE (via phonecall)

01.30.2014 - received checklist for Dutch Police Record (VOG) via email

01.31.2014 - left NVC, sent to embassy

02.04.2014 - received at embassy, READY as per CEAC

02.10-11.2014 - medical done, passed!

02.24.2014 - interview: APPROVED!!

02.27.2014 - Received SMS from 2Go, ready for pick up

02.28.2014 - visa on hand; CFO sticker

03.01.2014 - paid ELIS

03.06.2014 - POE Hawaii...Aloooohaaa! :)

04.10.2014 - 2yr green card received

Link to comment
Share on other sites

Filed: F-2A Visa Country: India
Timeline

tried my luck with only 3mins remaining on my callcard, was able to speak with an operator and STILL NO CASE NUMBER.....huh.png

maybe not as bad as USCIS that made me wait 9mos to get apporved. *positive thinking mayberolleyes.gif

just called no case number yet. they used to say wait til 20 day after we receive the case. today she said wait 4 to 6 weeks before calling.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

This is awesome!!!!!!!!!

hi, all! We just got approved with our i130 this morning! Fresh newbies about NVC stage! But thank you Saylin for this post!!!!!!!!!!!! I am sooooo blessed to have all my questions answered just by reading post 1 and 2!!!!!

Bless you for your work, Saylin!!!

Will try to call after a week!

07/03/2009. Married in China
09/02/2012. Our daughter was born
01/04/2014. Expecting our 2nd child this September!!!


USCIS
06/21/2013 Sent i130
06/24/2013 NOA1 PD
01/21/2014. NOA2 via email (NSC)
01/22/2014. Shipped to Department of State for visa processing


NVC
02/03/2014. Case received at NVC!!!!!!
03/12/2014 Case #, IIN and BID assigned
03/14/2014 DS261 available and submitted
03/17/2014 AOS fee available, paid, and it shows "in process", ENROLL email for EP sent
03/18/2014. AOS bill shows "PAID"
03/19/2014. AOS package sent thru email
03/24/2014. IV bill invoiced and paid!
03/26/2014. IV bill shows PAID and DS 260 available, IV package sent via email
03/27/2014 DS 260 submitted!!!!!!!!!!!!!!!!!
04/05/2014. ENROLL acceptance email received and GZO number issued, another email stating they have received our AOS docs.

04/10/2014 AOS checklist and also said our DS 260 has been received; Expedite Request Sent

04/11/2014 Response to the checklist sent

04/18/2014 IV package under review (system didnt receive attachments from one of my emails, so I resent the IV package just to be sure)

05/02/2014 Expedite Request Approved, case is "in transit"

Consulate

05/05/2014 Consulate Rec. (CEAC says READY)

05/08/2014 AP for the first time

05/09/2014 Interview scheduled May 27, Medical May 13.

05/27/2014 Visa APPROVED!!!

05/28/2014 CEAC changed to "ISSUED"

Link to comment
Share on other sites

Filed: Timeline

Hi Saylin

I am waiting for case completion..

12/20/2013- IV Paid

12/20/2013- Checklist for AOS

12/20/2013- Responed to checklist

12/23/2013- NVC received packet

Holidays...

We called NVC they said we started reviewing process

1/6/2014

They said its still under reviewing process....

How long it ll take to complete the case?????????

I am very worried...

did you call the NVC and told you they started reviewing on 1/6/2014 ??????

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Just got off the phone with NVC. I completed DS 261 on Jan 16. They are saying it takes 8-12 business days to review it :(

Mar 07, 2013 : NOA 1

Nov 19, 2013 : Request for Evidence mail received

Nov 25, 2013 : Documents send in response to RFE

Dec 03, 2013 : NOA 2 ( I 130 approved)

Dec 09, 2013 : Case reached NVC

Jan 08, 2014 : NVC assigned Case Number

Jan 15, 2014 : Paid I 864 (AOS) bill online

Jan 16, 2014 : Completed DS 261 (choice of agent) online

Jan 21, 2014 : Express mailed AOS package

Jan 27, 2014 : Paid DS 260 bill online

Jan 29, 2014 : Express mailed DS 260 civil docs

Jan 29, 2014 : Submitted DS 260 online

Feb 13, 2014 : Received False checklist for civil docs by email

Feb 24, 2014 : Case Complete

April 14, 2014 : Interview. YAY!!!

Link to comment
Share on other sites

Filed: Country: India
Timeline

Hi Saylin

I am waiting for case completion..

12/20/2013- IV Paid

12/20/2013- Checklist for AOS

12/20/2013- Responed to checklist

12/23/2013- NVC received packet

Holidays...

We called NVC they said we started reviewing process

1/6/2014

They said its still under reviewing process....

How long it ll take to complete the case?????????

I am very worried...

Hey, you are almost there :) just a bit more wait and it will soon be over :) do you mind sharing what did you receive checklist for?

I 130 for parents March 18, 2013 NOA 1 November 1, 2013 Transfer to TSC December 10, 2013 NOA 2 December 31, 2013 shipped to NVC January 8, 2014 Case received by NVC February 10,2014 Case Number received

(Mother) February 13.2014 DS 261 submitted

February 14, 2014 paid AOS

February 19, 2014 AOS shows paid

March 5, 2014 mailed AOS

March 11 ,2014 AOS received by NVC

March 10, 2014 IV invoiced and paid

March 14, 2014 IV shows paid

March 15, 2014 Mailed IV packet

March 17,2014 DS-260 submitted

March 25.2014 AOS Check list (received by NVC on March 31st)

April 7, 2014 DS260 accepted & IV accepted AOS Checklist under review

April 10 2014: Case Complete

(Father) February 13.2014 DS 261 submitted

March 3,2014 Accidently resubmitted DS 261

February 14, 2014 paid AOS ( mother's payment covered both files)

February 19, 2014 AOS shows paid

March 5, 2014 mailed AOS (had to call NVC for father's cover sheet)

March 11 ,2014 AOS received by NVC

March 18, 2014 IV invoiced and paid

March 19, 2014 Mailed IV packet

March 21, 2014 IV shows paid

March 23,2014 DS-260 submitted

March 25.2014 AOS Check list (received by NVC on March 31st)

April 7, 2014 DS260 accepted & IV accepted AOS Checklist under review

April 10 2014: Case Complete

May 6. 2014 VAC

May 15.2014 Medical

June 2, 2014 Interview scheduled, Mumbai Embassy @ 7:30 (Excited & Nervous)

June 10, 2014 Visa Issued!!!! (was on hold for additional AOS)

June 25,2014 POE :rolleyes:

July 1, 2014 Pay fees for the Green Card

August 10, 2014 Green card arriver on August 10th

Link to comment
Share on other sites

Filed: Timeline

Hi Infoneeded

Case number will be given to you very soon.

May be till Friday this week or Next week..

Don't worry..

thankssmile.png maybe ill try next week ...reading.gif

2013-02-28 i-130 filed @ phoenix lockbox 2013-11-06 transferred to "ANOTHER ofc 2013-12-09 to "alien number changed"
2013-03-05 check cashed 2013-11-07 transferred to "NEBRASKA ofc 2013-12-10 APPROVED
2013-03-09 NOA hardcopy rcvd w/ msc# PD march 4 2013-11-08 at USCIS ofc 2013-12-11 Shipped to DOS
2013-03-10 checked USCIS site - initial review 2013-12-17 NOA2 hardcopy rcvd


NVC STAGE
2014-01-09 NVC rcvd case (all 3)
2014-02-03 CASE number assigned (all 3)
2014-02-11 DS261 available filled out
2014-02-15 AOS fee paid
2014-02-21 AOS shows paid
2014-02-27 IV fee invoiced / paid (all 3)
2014-03-04 IV documents sent (UPS tracking 03-07)
2014-03-05 IV shows PAID / DS260 filled out (SPOUSE)
2014-03-06 IV fee for 1minor not accepted ERROR
2014-03-07 IV shows PAID / DS260 filled out (1 minor)
2014-03-07 IV fee invoiced again
2014-03-11 error IV rejected was able to pay again
2014-03-15 IV shows PAID / DS260 filled out (all 3 cases done)
2014-03-26 IV documents approved / false checklist for AOS
2014-04-01 AOS sent via certified mail (USPS tracking 04-07)
2014-04-09 AOS logged into the system
2014-04-23 CASE COMPLETE for 2 minor
2014-04-23 AOS checklist ( petitioner line13.a & joint sponsor tax extension)
2014-05-20 Checklist response mailed (FEDEX tracking 05-23)
2014-05-28 Checklist response scanned into system
2014-06-30 CASE COMPLETE

2014-07-01 CC EMAIL RCVD
2014-07-10 INTERVIEW SCHED GIVEN (by calling) (07/09 US date)
2014-07-11 INTERVIEW LETTER RCVD (07/10 US date)
2014-07-11 MEDICAL (07/09 - 07/11 PPD reading for minor)

2014-08-05 INTERVIEW @ USEM (221g NSO reverification)

2014-08-14 attached & send to CO for review

2014-08-19 VISA ISSUED

2014-08-20 visa printed

2014-08-26 VISA ON HAND!!!

Link to comment
Share on other sites

​Thanks for the reply.

​Are you suggesting then that I fill out the DS-260 as:

Given names: <first name>

​Surname: <maiden name> <married surname>

​?

Yes

You have brains in your head. You have feet in your shoes. You can steer yourself any direction you choose.  - Dr. Seuss

 

Link to comment
Share on other sites

Filed: Timeline

just called no case number yet. they used to say wait til 20 day after we receive the case. today she said wait 4 to 6 weeks before calling.

we have the same timeline as stacey&mischo

2013-02-28 i-130 filed @ phoenix lockbox 2013-11-06 transferred to "ANOTHER ofc 2013-12-09 to "alien number changed"
2013-03-05 check cashed 2013-11-07 transferred to "NEBRASKA ofc 2013-12-10 APPROVED
2013-03-09 NOA hardcopy rcvd w/ msc# PD march 4 2013-11-08 at USCIS ofc 2013-12-11 Shipped to DOS
2013-03-10 checked USCIS site - initial review 2013-12-17 NOA2 hardcopy rcvd


NVC STAGE
2014-01-09 NVC rcvd case (all 3)
2014-02-03 CASE number assigned (all 3)
2014-02-11 DS261 available filled out
2014-02-15 AOS fee paid
2014-02-21 AOS shows paid
2014-02-27 IV fee invoiced / paid (all 3)
2014-03-04 IV documents sent (UPS tracking 03-07)
2014-03-05 IV shows PAID / DS260 filled out (SPOUSE)
2014-03-06 IV fee for 1minor not accepted ERROR
2014-03-07 IV shows PAID / DS260 filled out (1 minor)
2014-03-07 IV fee invoiced again
2014-03-11 error IV rejected was able to pay again
2014-03-15 IV shows PAID / DS260 filled out (all 3 cases done)
2014-03-26 IV documents approved / false checklist for AOS
2014-04-01 AOS sent via certified mail (USPS tracking 04-07)
2014-04-09 AOS logged into the system
2014-04-23 CASE COMPLETE for 2 minor
2014-04-23 AOS checklist ( petitioner line13.a & joint sponsor tax extension)
2014-05-20 Checklist response mailed (FEDEX tracking 05-23)
2014-05-28 Checklist response scanned into system
2014-06-30 CASE COMPLETE

2014-07-01 CC EMAIL RCVD
2014-07-10 INTERVIEW SCHED GIVEN (by calling) (07/09 US date)
2014-07-11 INTERVIEW LETTER RCVD (07/10 US date)
2014-07-11 MEDICAL (07/09 - 07/11 PPD reading for minor)

2014-08-05 INTERVIEW @ USEM (221g NSO reverification)

2014-08-14 attached & send to CO for review

2014-08-19 VISA ISSUED

2014-08-20 visa printed

2014-08-26 VISA ON HAND!!!

Link to comment
Share on other sites

If your approval came from TSC it will take longer than other service centers. They have historically just taken longer to send it. Look in the NVC forum for evidence of this.

You have brains in your head. You have feet in your shoes. You can steer yourself any direction you choose.  - Dr. Seuss

 

Link to comment
Share on other sites

we have the same timeline as stacey&mischo

Hi Infoneeded, My case was sent on 1/6 we r so close, I will krep you posted when I get a case # ?

Marriage: 2013-01-16

I-130 NOA1 : 2013-03-19

I-130 Approved : 2013-12-31

NVC Received : 2014-01-21

Case & IIN number Received: 2014-25-02

I864 bill: 2014-03-05

IV bill: 2014-03-05

I864 & IV packet sent: 2014-03-06

DS260: 2014-03-11

Case Complete: 2014-03-28

Interview date: 2014-05-13

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...