Jump to content
Saylin

NVC Filers - January 2014

 Share

1,993 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: Tunisia
Timeline

Am I the only one still waiting for case complete on this thread? :/ it seems like everybody moved on to case complete thread... While others just starting the process... Well good luck for everybody!

Link to comment
Share on other sites

Filed: Country: India
Timeline

Hello peepz.. NVC receive my file on January the 6th, I called last night and they dont have a case number for me. Any body got a case number with this date aleady I just wanna compare.

Hey, I haven't heard anything either sad.png

I 130 for parents March 18, 2013 NOA 1 November 1, 2013 Transfer to TSC December 10, 2013 NOA 2 December 31, 2013 shipped to NVC January 8, 2014 Case received by NVC February 10,2014 Case Number received

(Mother) February 13.2014 DS 261 submitted

February 14, 2014 paid AOS

February 19, 2014 AOS shows paid

March 5, 2014 mailed AOS

March 11 ,2014 AOS received by NVC

March 10, 2014 IV invoiced and paid

March 14, 2014 IV shows paid

March 15, 2014 Mailed IV packet

March 17,2014 DS-260 submitted

March 25.2014 AOS Check list (received by NVC on March 31st)

April 7, 2014 DS260 accepted & IV accepted AOS Checklist under review

April 10 2014: Case Complete

(Father) February 13.2014 DS 261 submitted

March 3,2014 Accidently resubmitted DS 261

February 14, 2014 paid AOS ( mother's payment covered both files)

February 19, 2014 AOS shows paid

March 5, 2014 mailed AOS (had to call NVC for father's cover sheet)

March 11 ,2014 AOS received by NVC

March 18, 2014 IV invoiced and paid

March 19, 2014 Mailed IV packet

March 21, 2014 IV shows paid

March 23,2014 DS-260 submitted

March 25.2014 AOS Check list (received by NVC on March 31st)

April 7, 2014 DS260 accepted & IV accepted AOS Checklist under review

April 10 2014: Case Complete

May 6. 2014 VAC

May 15.2014 Medical

June 2, 2014 Interview scheduled, Mumbai Embassy @ 7:30 (Excited & Nervous)

June 10, 2014 Visa Issued!!!! (was on hold for additional AOS)

June 25,2014 POE :rolleyes:

July 1, 2014 Pay fees for the Green Card

August 10, 2014 Green card arriver on August 10th

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ireland
Timeline

Great! Congrats on your NOA2 approval!

Hi Suzy, great to see you here, you're flying through NVC! Hopefully we will too. X

Edited by NoelAnne

Married 2013/05/24

.i130 sent. 2013/05/25.

NOAI rec'd. 2013/06/12.

Transferred to TSC. 2013/12/27.

NOA2 rec'd. 2014/01/27

NVC Rec'd 2014/02/11

IIN &case no. rec'd 2014/03/19

DS261submitted 2014/03/21

AOS invoice ready 2014/03/24

Ds260submitted. 2014/04/09

I130 in transit to embassy as per CEAC 2014/04/09

I130 rec'd in embassy 2014/04/11

Email with interview date 2014/04/11

letter with interview date and instructions 2014/04/15

Interview scheduled for 2014/04/29

VISA APPROVED!!! 2014/04/29.

Visa issued. 2014/05/02

Flight to Seattle. 2014/05/14!!!!

I129 sent. 2013/06/17NOA 1 rec'd. 2013/06/29NOA 2 rec'd. 2014/02/10NVC rec'd. 2014/02/11Rec'd by embassy. 2014/02/27Email from embassy with case no. and telling me how to proceed 2014/03/01Ds160 submitted online 2014/03/01medical scheduled for 2014/03/28Medical report received by embassy 2014/04/02Ceac status updated to ' READY' 2014/04/03 ( waiting for interview to be scheduled)Ceac status updated again!! 2014/04/08I129 will be closed and i130 being processed, 2014/04/09

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

NVC received my cases (stepson and wife) on January 6th as well, just got off the phone with them a moment ago and I have both my case numbers! I was told to wait about a week and a half to get information on the next step, they took my email and updated my phone number dancin5hr.gif

Hopefully we'll get ours tomorrow.

5c5769bc18.png

s-event.png

06/02/2013- Got Married

USCIS: CR-1

07/05/2013- I130 sent

07/07/2013- NOA1

12/17/2013- NOA2 (APPROVED from California Service Centre)

NVC:

01/06/2014- Received at NVC

01/31/2014- Received case no, Invoice Identification no & provided our email addresses.

02/06/2014-DS-261- Available

02/07/2014-Completed DS-261

02/07/2014-AOS fee invoiced.

02/21/2014-IV fee invoiced.

03/13/2014-Paid both AOS & IV fees.

03/17/2014-Both payments reflecting as PAID

03/24/2014-AOS packet mailed to NVC

03/26/2014-IV packet mailed to NVC

04/02/2014-DS- 260 Completed

04/11/2014- False checklist

04/14/2014- CASE COMPLETE confirmed over the phone.

04/21/2014- Case complete confirmation email received.

CONSULATE: Mumbai

05/01/2014- IL received via email.

05/15/2014- Medical (Chennai)

05/16/2014- Biometrics/OFC (Chennai)

06/03/2014- INTERVIEW scheduled. (((((((((((( A.P.P.R.O.V.E.D.)))))))))))))) :dancing:

06/04/2014 -Ceac site: Administrative processing

06/05/2014- Ceac site: ISSUED. Visa printed.

06/07/2014- Us travel doc site: Passport has been received from the consular section, and is currently being processed for delivery.

06/09/2014- Us travel doc site: Passport ready for pick up.

06/09/2014- Us travel doc site: Passport has been picked up. (collected from VFS office Prestige Atrium)/Visa in HAND.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Hey, I haven't heard anything either sad.png

I called earlier today but no case # still. sad.png

5c5769bc18.png

s-event.png

06/02/2013- Got Married

USCIS: CR-1

07/05/2013- I130 sent

07/07/2013- NOA1

12/17/2013- NOA2 (APPROVED from California Service Centre)

NVC:

01/06/2014- Received at NVC

01/31/2014- Received case no, Invoice Identification no & provided our email addresses.

02/06/2014-DS-261- Available

02/07/2014-Completed DS-261

02/07/2014-AOS fee invoiced.

02/21/2014-IV fee invoiced.

03/13/2014-Paid both AOS & IV fees.

03/17/2014-Both payments reflecting as PAID

03/24/2014-AOS packet mailed to NVC

03/26/2014-IV packet mailed to NVC

04/02/2014-DS- 260 Completed

04/11/2014- False checklist

04/14/2014- CASE COMPLETE confirmed over the phone.

04/21/2014- Case complete confirmation email received.

CONSULATE: Mumbai

05/01/2014- IL received via email.

05/15/2014- Medical (Chennai)

05/16/2014- Biometrics/OFC (Chennai)

06/03/2014- INTERVIEW scheduled. (((((((((((( A.P.P.R.O.V.E.D.)))))))))))))) :dancing:

06/04/2014 -Ceac site: Administrative processing

06/05/2014- Ceac site: ISSUED. Visa printed.

06/07/2014- Us travel doc site: Passport has been received from the consular section, and is currently being processed for delivery.

06/09/2014- Us travel doc site: Passport ready for pick up.

06/09/2014- Us travel doc site: Passport has been picked up. (collected from VFS office Prestige Atrium)/Visa in HAND.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

AOS fees 88$ paid,IV fees PAID, now there is link display to fill DS-260 form but did't send AOS and IV package still. can we send AOS and IV packager after filling DS-260 form ?

Link to comment
Share on other sites

AOS fees 88$ paid,IV fees PAID, now there is link display to fill DS-260 form but did't send AOS and IV package still. can we send AOS and IV packager after filling DS-260 form ?

It doesn't matter what you do first, second, or third. As long as NVC gets both packages and receives a DS-260, that's all that matters; the order doesn't.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

had some free time moments ago, called up and got a human at DoS. Whilst waiting firstly, listened to the voice announcement that as of 27th DoS no longer handle inquires for immigrant visa cases.

Got a human on the phone, and gave her a Darnell interrogatory.

She was defensively clueless, stating that this function was switched over to NVC. Will call NVC tonight and give em the Darnell Interrogatory and see what's up. I'm betting NO SERCO CONTRACTORS have access to the Consular Casefile Processing System.

smatterings from Saylin...

Well then headbonk.gif Wonder why DOS decided to do this...

Edited by Darnell

Sometimes my language usage seems confusing - please feel free to 'read it twice', just in case !
Ya know, you can find the answer to your question with the advanced search tool, when using a PC? Ditch the handphone, come back later on a PC, and try again.

-=-=-=-=-=R E A D ! ! !=-=-=-=-=-

Whoa Nelly ! Want NVC Info? see http://www.visajourney.com/wiki/index.php/NVC_Process

Congratulations on your approval ! We All Applaud your accomplishment with Most Wonderful Kissies !

 

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Nepal
Timeline

All waiting for Interview dates.

They are out. I got mine for MAR04

Good Luck to all

I-130 (California Service Center) / Category: F2A / Priority Date: Sep 6rd, 2013

I-130
2013-09-01 : I-130 Sent

  • 2013-09-03: I-130 Received
  • 2013-09-06: NOA-1
  • 2013-10-01: NOA2 approved (SMS and email from USCIS

2013-10-06: NOA2 (Hardcopy)

NVC

2013-10-15: NVC received the case

2013-10-21: Case Number , Invoice Number and BIN received

  • 2013-10-24: Choice of Agent (DS 261) filled. (AOS, IV fee not available yet)
  • 2013-10-25: Email to pay AOS fee
  • 2013-10-28: AOS payment available and paid
  • 2013-10-30: AOS Shows as "Paid"
  • 2013-11-01: Mailed i864 docs
  • 2013-11-01: IV fee available and paid
  • 2013-11-01: AOS Docs received at NVC ( Based on USPS tracking )
  • 2013-11-04 IV Supporting Docs mailed ( IV payment still shows as IN PROCESS...but moneys already withdrawn from account)
  • 2013-11-06 IV Supporting Docs received ( Based on USPS tracking )
  • 2013-11-07: IV Shows as "PAID"

2013-11-07: Received/Entered both AOS and IV in the system for review.

  • 2013-11-08: DS 260 completes and submitted.

2013-12-05: Received checklist for AOS

In Part 4. Information on the Sponsor, please correct the following...

[x] Item 12. As the petitioner sponsoring your spouse or child, you must indicate whether or not you are currently on active duty in the U.S. armed services.

In Part 6. Sponsor's Income and Employment, please correct the following...

[x] Item 10. The current annual household income must equal the sum of items 5, 6.c., 7.c., 8.c., and 9.c.

  • 2013-12-05: Sent checklist response for AOS
  • 2013-12-07: Received "false checklist": IV Docs reviewed and accepted

2013-12-11: Entered checklist for AOS into system

2014-01-06: Case Complete per call to NVC.

2014-01-29: Interview Date assigned

2014-02-03: CEAC site updated to "In Transit"

2014-03-04: Interview Date

2014-03-04: VISA APPROVED. pickup on 2013-03-06

Thanks to all
GLTA

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

Hi! Is this the spreadsheet for this discussion group? How could I be added to it? Thanks a lot

https://spreadsheets.google.com/spreadsheet/lv?hl=en&key=t8c3yWLIuqmRn4puoXDiHjw&hl=en

NOA1 7/24/2013

Transfer to CSC 1/14/2014

NOA2 1/24/2014

Saylin's wiki: http://www.visajourney.com/wiki/index.php/NVC_Process

DS260 Word format (I created based on screenshots Jan/Mar 2014): http://www.mediafire.com/view/?a5xs2cvq92ev9qp

USCIS

NOA1 - 7/24/2013

Transfer to CSC - 1/14/2014

NOA2 - 1/24/2014

NVC

Case Received at NVC - 2/4/2014

Case/ Invoice Numbers Received - 3/12//2014

AOS and IV fees invoiced and paid - 3/14/2014

AOS mailed - 3/20

AOS received at NVC - 3/25

IV docs mailed - 4/1 (meeting with lawyer 4/7)

DS260 submitted - 5/1 (Husband called NVC 5/7 and was told docs/AOS were received and would take 30 days from DS260 submission to complete review)d

Case Complete!!!! - 5/22

Interview scheduled for July 18 - 5/29 APPROVED!!!!!

Review of interview: http://www.visajourney.com/reviews/view-dos-cis-reviews.php?entry=14872

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

Saylin - this has changed up - have a read?

http://travel.state.gov/content/visas/english/contact.html

then read it twice, noticing the buckets.

Sometimes my language usage seems confusing - please feel free to 'read it twice', just in case !
Ya know, you can find the answer to your question with the advanced search tool, when using a PC? Ditch the handphone, come back later on a PC, and try again.

-=-=-=-=-=R E A D ! ! !=-=-=-=-=-

Whoa Nelly ! Want NVC Info? see http://www.visajourney.com/wiki/index.php/NVC_Process

Congratulations on your approval ! We All Applaud your accomplishment with Most Wonderful Kissies !

 

Link to comment
Share on other sites

had some free time moments ago, called up and got a human at DoS. Whilst waiting firstly, listened to the voice announcement that as of 27th DoS no longer handle inquires for immigrant visa cases.

Got a human on the phone, and gave her a Darnell interrogatory.

She was defensively clueless, stating that this function was switched over to NVC. Will call NVC tonight and give em the Darnell Interrogatory and see what's up. I'm betting NO SERCO CONTRACTORS have access to the Consular Casefile Processing System.

smatterings from Saylin...

Well then headbonk.gif Wonder why DOS decided to do this...

Hmm. It just doesn't make sense to me for folks to call up NVC, instead of DOS, if they're done with the NVC process and their case has moved onto the embassy/consulate, since NVC would theoretically not have access to their case anymore. Hence DOS's [former] position. For folks with embassies/consulates with no available phone number to ask questions, DOS was available (instead of having to wait for a reply by email, as many embassies/consulates are notoriously slow to respond).

Hi! Is this the spreadsheet for this discussion group? How could I be added to it? Thanks a lot

https://spreadsheets.google.com/spreadsheet/lv?hl=en&key=t8c3yWLIuqmRn4puoXDiHjw&hl=en

NOA1 7/24/2013

Transfer to CSC 1/14/2014

NOA2 1/24/2014

Yup, that's my spreadsheet. You've been added :)

Link to comment
Share on other sites

Can I be added to the spreadsheet too

NOA2-Jan 10, 2014

NVC Received- Jan 27, 2014

 

 

 
 
 
July 28 2011- Married :dancing:
 
April 1 2013- Sent I-130
 
April 2 2013- NOA1
 
Nov 14 2013-Transferred to NSC
 
Nov 21- File touched
 
Jan 10, 2014- Approved! (NOA2)
 
Jan 13, 2014- Shipped out to NVC
 
Jan 27, 2014- Received by NVC
 
March 6,2014- Received Case Number and requested Case Number Change
 
March 9, 2014 -Sent in DS-261
 
March 10,2014 - Paid AOS Fee
 
March 22, 2014 - Sent in AOS Package
 
March 25,2014 - Paid IV Fee
 
March 26, 2014 - AOS Package picked up by a B.Standish
 
March 28, 2014 - IV fee shown as PAid
 
March 31, 2014 - Send corrections to AOS Package
 
April 1, 2014 - Corrected Aos Package received and signed by N Visa Center
 
April 5, 2014 - Case number changed finally
 
April 11, 2014- Got checklist for AOS
 
April 17, 2014- Submitted DS-260
 
April 18, 2014- Sent in IV package and AOS checklist
 
May 14, 2014- IV Checklist
 
May 16, 2014- Sent in IV Checklist
 
May 23, 2014- IV Checklist received
 
June 25, 2014- Case Complete
 
July 2, 2014- Receive CC email
 
July 11, 2014- Interview email received
 
July 21, 2014- Medical Done
 
Aug 26, 2014- Interview
 
Case in AP :ranting::ranting:
 
Oct 23, turned in needed documents
 
 
 
Case Updated- July 22, 30, Aug 5, Nov 2, Nov 4, Nov 8, Nov 15+16 (2015)
 
Nov 16-told to go to Embassy
 
 
 
Update Nov 29 + 30
 
Nov 29 - Gave Refusal Sheet :cry:
 
Informed that Case is being sent back to USCIS with intent to revoke :ranting::ranting::ranting:
 
 
 
Jan 12-13, 216 Case Date Update on CEAC
 
Feb 12,2016-Update on USCIS, case under review
 
Oct 14, 2016 NOIR sent out, received OCT 18, 2016
 
 
 
 

 

 Dream-dj.png

 

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Peru
Timeline

Hmm. It just doesn't make sense to me for folks to call up NVC, instead of DOS, if they're done with the NVC process and their case has moved onto the embassy/consulate, since NVC would theoretically not have access to their case anymore. Hence DOS's [former] position. For folks with embassies/consulates with no available phone number to ask questions, DOS was available (instead of having to wait for a reply by email, as many embassies/consulates are notoriously slow to respond).

Yup, that's my spreadsheet. You've been added smile.png

Can you add me too please? Info is in my sig

06-09-2012 - Met in Lima, Peru
06-27-2012 - Officially a couple
02-14-2013 - Engaged!

05-02-2013 - Married in Callao, Peru!

07-03-2013 - I-130 petitions sent for wife and stepson

07-10-2013 - NOA1 (both petitions)

12-10-2013 - Notice of transfer to California Service Center from NBC (both petitions)

12-23-2013 - NOA2 (both petitions)

01-06-2014 - NVC Received

01-29-2014 - NVC case numbers assigned

02-06-2014 - DS-261 available and submitted (both petitions)

02-07-2014 - AOS bill invoiced and paid

02-08-2014 - AOS packages mailed (received on 02-18-14 per NVC)

02-11-2014 - AOS shows PAID

02-12-2014 - Resubmitted I-864 (noticed own error after sending AOS package) (received on 03-05-14 per NVC)

02-18-2014 - Stepson IV bill invoiced and paid

02-20-2014 - Stepson IV bill shows PAID, DS-260 available and submitted

02-21-2014 - Wife IV bill invoiced and paid

02-21-2014 - IV packages mailed (received on 02-26-14 per NVC)

02-25-2014 - Wife IV bill shows PAID, DS-260 available

02-26-2014 - Wife DS-260 submitted

03-06-2014 - AOS checklist requesting correct income information (sent on 02-12-14, waiting for review)
03-10-2014 - IV "false" checklist

03-14-2014 - CASE COMPLETE (Wife and stepson)

04-02-2014 - Email with Interview Letters. May 12th for both wife and stepson

04-21-2014 - Medical Examinations

05-12-2014 - Interview Result: BOTH VISAS APPROVED!

05-17-2014 - Visas in hand

09-07-2014 - Dallas POE (wife)

10-15-2014 - Miami POE (step-son)

Link to comment
Share on other sites

Can I be added to the spreadsheet too

NOA2-Jan 10, 2014

NVC Received- Jan 27, 2014

Can you add me too please? Info is in my sig

Both of you added!

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×