Interesting information regarding huge delays in I-130 processing

 Share

61 posts in this topic

Recommended Posts

Filed: Country: Australia
Timeline

Hi guys,

I don't usually post much on forums but last month I submitted my I-130 application and I have been reading in horror about the 12 month wait times that we have been told to expect. So I did some research and came up with some articles regarding the new processing facilities in Overland Park, MO. It looks like most of our I-130 applications have been going straight to the NBC (either Overland Park or Lee's Summit). It also looks like basically none of the applications that have gone to the NBC in the past months have been approved. The only ones being approved are the ones that are going to the service centres (particularly Texas).

Here is a link to a couple of articles that will likely be of interest to you if your application seems to have been sitting in a corner for several months:

http://www.alipac.us/f12/federal-agency-charge-immigration-bringing-500-new-jobs-overland-park-267149/

Here is an excerpt:

"The additional federal jobs coming to the metro are partly the result of the flood of applications prompted by President Barack Obama’s decision in June to allow young undocumented immigrants to stay in the U.S. without being deported. The CIS began accepting applications for the program in mid-August.

At the time, the Associated Press reported the new policy would lead to more than 1 million applications during its first year with about 890,000 people being immediately eligible."

It looks a lot like our applications are being left behind while they work on assisting people who have immigrated illegally. If this is the case, I really do not understand how they can allow an illegal immigrant's application to take precedence over the application of a paying US citizen who is petitioning for the right to bring his/her spouse into the country!

The new applications are called 'deferred action' applications (I-821D) in case anyone is interested.

The fact that these changes have come right from the top (i.e. Mr Obama) means that it is unlikely to change any time soon. So, anyone else have any thoughts on this? Short of writing to the USCIS, I am pretty much stumped.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Fiji
Timeline

Hi guys,

I don't usually post much on forums but last month I submitted my I-130 application and I have been reading in horror about the 12 month wait times that we have been told to expect. So I did some research and came up with some articles regarding the new processing facilities in Overland Park, MO. It looks like most of our I-130 applications have been going straight to the NBC (either Overland Park or Lee's Summit). It also looks like basically none of the applications that have gone to the NBC in the past months have been approved. The only ones being approved are the ones that are going to the service centres (particularly Texas).

there are no 130's at service centers other than nbc, it has been like that for over a year. texas has nothing to do with 130s

all petitions since some arbitrary date in may have been going to the new facility

dribs and drabs of approvals from local offices continue to come in with certain local offices so severely backlogged that they are running one year for approval

expect to see a lot of transfers and approvals beginning the first week of October

my first inclination is that most if not all of the recent petitions are being used for training and will be the first to see their approvals


8/16/2012 I-129F NOA1
11/8/2012 Married
1/3/2013 I-129F cancelled
1/29/2013 withdrawal notice received
2/5/2013 I-130 NOA1 with error on wife's name
Case status not available
2/5/2013 Unable to generate service request

3/13/2013 transferred to local office
3/26/2013 Service request generated
4/12/2013 Infopass, file in workflow March 28
4/19/2013 Case status available - APPROVED!

Detour to the NVC via NRC

For information on my detour and the steps I took to free my petition, check
"about me"

NVC

6/7/2013 NVC logs file as received

6/11/2013 Case number and IIN assigned

6/12/2013 DS-3032 emailed

6/13/21013 AOS paid

6/14/2013 DS-3032 emailed attention superuser (stupid me)

6/23/2013 DS-3032 emailed attention supervisor

6/24/2013 DS-3032 accepted

6/25/2013 IV bill generated and paid

07/06/2013 IV & AOS sent; 07/11/2013 NVC logs received

07/30/2013 IV Accepted; AOS Checklist

08/01/2013 AOS Checklist received

08/02/2013 AOS resent; 08/07/2013 NVC logs received

08/28/2013 Case Complete

09/10/2013 Interview date assigned

Embassy

08/14/2013 Medical; 08/19/2013 Medical Ready

08/07/2013 Police cert ordered (Fiji delivers straight to the embassy)

10/02/2013 Interview

xx/xx/2013 Visa in Hand

xx/xx/2013 POE Los Angeles International Airport

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

there are no 130's at service centers other than nbc, it has been like that for over a year. texas has nothing to do with 130s

all petitions since some arbitrary date in may have been going to the new facility

dribs and drabs of approvals from local offices continue to come in with certain local offices so severely backlogged that they are running one year for approval

expect to see a lot of transfers and approvals beginning the first week of October

my first inclination is that most if not all of the recent petitions are being used for training and will be the first to see their approvals

Stevie b I sure hope you are right! I am hoping and praying that we will see a ton of approvals in October, trying not to freak out until then.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Fiji
Timeline

Stevie b I sure hope you are right! I am hoping and praying that we will see a ton of approvals in October, trying not to freak out until then.

oh gosh a feb filer :( so sorry for that

again this is only an opinion and a guess based on what happened over the last year with daca mess

the new facility will start approving petitions they have on file.. this will mean you will see a flood of the may-june filers go through

then the local office transfers will begin unless your file is on a desk already. these files will transfer to the new facility and get processed for approval.

have you gone for an infopass or anything? you are really overdue


8/16/2012 I-129F NOA1
11/8/2012 Married
1/3/2013 I-129F cancelled
1/29/2013 withdrawal notice received
2/5/2013 I-130 NOA1 with error on wife's name
Case status not available
2/5/2013 Unable to generate service request

3/13/2013 transferred to local office
3/26/2013 Service request generated
4/12/2013 Infopass, file in workflow March 28
4/19/2013 Case status available - APPROVED!

Detour to the NVC via NRC

For information on my detour and the steps I took to free my petition, check
"about me"

NVC

6/7/2013 NVC logs file as received

6/11/2013 Case number and IIN assigned

6/12/2013 DS-3032 emailed

6/13/21013 AOS paid

6/14/2013 DS-3032 emailed attention superuser (stupid me)

6/23/2013 DS-3032 emailed attention supervisor

6/24/2013 DS-3032 accepted

6/25/2013 IV bill generated and paid

07/06/2013 IV & AOS sent; 07/11/2013 NVC logs received

07/30/2013 IV Accepted; AOS Checklist

08/01/2013 AOS Checklist received

08/02/2013 AOS resent; 08/07/2013 NVC logs received

08/28/2013 Case Complete

09/10/2013 Interview date assigned

Embassy

08/14/2013 Medical; 08/19/2013 Medical Ready

08/07/2013 Police cert ordered (Fiji delivers straight to the embassy)

10/02/2013 Interview

xx/xx/2013 Visa in Hand

xx/xx/2013 POE Los Angeles International Airport

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Shoot! I just realized my timeline says Feb (I will fix that), should be received March 28, NOA1 on April 5. No, I have not called yet or done an info pass. Plus, my application should be staying at the NBC as we are filing from Canada. I say "should" as from what I can tell it could still be sent god knows where. From what I have seen no one is getting any info on their cases right now when they call. Do you think there is any point trying? Any advice would be great, I am so lost and so pissed.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Fiji
Timeline

Shoot! I just realized my timeline says Feb (I will fix that), should be received March 28, NOA1 on April 5. No, I have not called yet or done an info pass. Plus, my application should be staying at the NBC as we are filing from Canada. I say "should" as from what I can tell it could still be sent god knows where. From what I have seen no one is getting any info on their cases right now when they call. Do you think there is any point trying? Any advice would be great, I am so lost and so pissed.

well I am sure you already know that dcf was supposed to be fast. I have seen quite a few dcf's that for whatever reason have slowed considerably.

I believe that at the six month mark you can start a service request but sometimes they give you a hard time about that one. best to do this with an IO rather than a CSR.. the IO may be able to give you an update.. but again maybe not... no saying that to get you any more riled than you already are ;)


8/16/2012 I-129F NOA1
11/8/2012 Married
1/3/2013 I-129F cancelled
1/29/2013 withdrawal notice received
2/5/2013 I-130 NOA1 with error on wife's name
Case status not available
2/5/2013 Unable to generate service request

3/13/2013 transferred to local office
3/26/2013 Service request generated
4/12/2013 Infopass, file in workflow March 28
4/19/2013 Case status available - APPROVED!

Detour to the NVC via NRC

For information on my detour and the steps I took to free my petition, check
"about me"

NVC

6/7/2013 NVC logs file as received

6/11/2013 Case number and IIN assigned

6/12/2013 DS-3032 emailed

6/13/21013 AOS paid

6/14/2013 DS-3032 emailed attention superuser (stupid me)

6/23/2013 DS-3032 emailed attention supervisor

6/24/2013 DS-3032 accepted

6/25/2013 IV bill generated and paid

07/06/2013 IV & AOS sent; 07/11/2013 NVC logs received

07/30/2013 IV Accepted; AOS Checklist

08/01/2013 AOS Checklist received

08/02/2013 AOS resent; 08/07/2013 NVC logs received

08/28/2013 Case Complete

09/10/2013 Interview date assigned

Embassy

08/14/2013 Medical; 08/19/2013 Medical Ready

08/07/2013 Police cert ordered (Fiji delivers straight to the embassy)

10/02/2013 Interview

xx/xx/2013 Visa in Hand

xx/xx/2013 POE Los Angeles International Airport

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

well I am sure you already know that dcf was supposed to be fast. I have seen quite a few dcf's that for whatever reason have slowed considerably.

I believe that at the six month mark you can start a service request but sometimes they give you a hard time about that one. best to do this with an IO rather than a CSR.. the IO may be able to give you an update.. but again maybe not... no saying that to get you any more riled than you already are wink.png

Can you explain to me what IO and CSR mean? Thanks!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Fiji
Timeline

Can you explain to me what IO and CSR mean? Thanks!

oh my :(

you have been on far too long for that question ;)

IO - Immigration Officer

CSR - Idiot answering the phone


8/16/2012 I-129F NOA1
11/8/2012 Married
1/3/2013 I-129F cancelled
1/29/2013 withdrawal notice received
2/5/2013 I-130 NOA1 with error on wife's name
Case status not available
2/5/2013 Unable to generate service request

3/13/2013 transferred to local office
3/26/2013 Service request generated
4/12/2013 Infopass, file in workflow March 28
4/19/2013 Case status available - APPROVED!

Detour to the NVC via NRC

For information on my detour and the steps I took to free my petition, check
"about me"

NVC

6/7/2013 NVC logs file as received

6/11/2013 Case number and IIN assigned

6/12/2013 DS-3032 emailed

6/13/21013 AOS paid

6/14/2013 DS-3032 emailed attention superuser (stupid me)

6/23/2013 DS-3032 emailed attention supervisor

6/24/2013 DS-3032 accepted

6/25/2013 IV bill generated and paid

07/06/2013 IV & AOS sent; 07/11/2013 NVC logs received

07/30/2013 IV Accepted; AOS Checklist

08/01/2013 AOS Checklist received

08/02/2013 AOS resent; 08/07/2013 NVC logs received

08/28/2013 Case Complete

09/10/2013 Interview date assigned

Embassy

08/14/2013 Medical; 08/19/2013 Medical Ready

08/07/2013 Police cert ordered (Fiji delivers straight to the embassy)

10/02/2013 Interview

xx/xx/2013 Visa in Hand

xx/xx/2013 POE Los Angeles International Airport

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

oh my sad.png

you have been on far too long for that question wink.png

IO - Immigration Officer

CSR - Idiot answering the phone

Ha! Thanks. I try not to come on here too much, it just makes me sad and frustrated.

Link to comment
Share on other sites

Filed: Citizen (apr) Country: China
Timeline

This isn't anything new. I knew about this when my I-129f was still in processing. The deferred action processing started in August, 2012. I was told around January, 2013 that all of the deferred action applications were going through CSC which was delaying the i-129f's. It sounds like it's only gotten worse since then. :(

I really hope that everyone is having to wait for their fair turn, but it doesn't sound like it's like this at all still.

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Australia
Timeline

this is ridiculous. why he wanna make illegal immigrants as legal only to increase crime and make unsafe usa

While I am impatient too, I find it hard to get upset at an illegal immigrant whose parents brought him or her here as a child. It's not like they had a choice. But now they can be legal in the country in which they were raised. Based on what happened in Washington, DC at the Navy Yard today, I don't think crime is limited to illegal immigrants.

I assume that when Division XIII at Overland Park becomes operational (sometime before the end of September) we'll see some movement. Division XIII will handle stand-alone I-130s ONLY - so hopefully that will streamline the process. Those of you with I-130s with other forms, or doing DCF will go through another processing center.

Spoiler

 

Spoiler

Our Prior Journey

N-400 Naturalization

18-Feb-2018 - submitted N-400 online, credit card charged

18-Feb-2018 - NOA1

12-Mar-2018 - Biometrics 

18-June-2018 - Notice of interview received

26-July-2018 - Interview  - APPROVED!!!

26-July-2018 - Oath Ceremony Scheduled

17-Aug-2018 - Oath Ceremony

 

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Australia
Timeline

oh my sad.png

you have been on far too long for that question wink.png

IO - Immigration Officer

CSR - Idiot answering the phone

Oh my, stevie b! You crack me up!

Sukie

Spoiler

 

Spoiler

Our Prior Journey

N-400 Naturalization

18-Feb-2018 - submitted N-400 online, credit card charged

18-Feb-2018 - NOA1

12-Mar-2018 - Biometrics 

18-June-2018 - Notice of interview received

26-July-2018 - Interview  - APPROVED!!!

26-July-2018 - Oath Ceremony Scheduled

17-Aug-2018 - Oath Ceremony

 

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: England
Timeline

While I am impatient too, I find it hard to get upset at an illegal immigrant whose parents brought him or her here as a child. It's not like they had a choice. But now they can be legal in the country in which they were raised. Based on what happened in Washington, DC at the Navy Yard today, I don't think crime is limited to illegal immigrants.

I assume that when Division XIII at Overland Park becomes operational (sometime before the end of September) we'll see some movement. Division XIII will handle stand-alone I-130s ONLY - so hopefully that will streamline the process. Those of you with I-130s with other forms, or doing DCF will go through another processing center.

Phew. That gives me some hope!

Our Visa Journey(s)

K-1 Visa
01/15/2013 - Sent I-129F overnight via Fedex
07/17/2013 - Sent to London
*** Abandoned K1 Visa route due to wedding plans that could NOT be changed**

07/27/2013 - Married in TX!!

CR-1 Visa
09/12/2013 - Sent I-130 overnight via Fedex
09/18/2013 - NOA1 - E-mail and text - Sent to NBC Overland Park
03/03/2014 - Case Transferred to CSC
03/27/2014 - NOA2 - E-mail and text - APPROVED!!!
04/04/2014 - NVC Received

05/05/2014 - Case Number & IIN Assigned

05/08/2014 - Submitted DS-261

05/10/2014 - AOS Available/Paid/Sent Package

05/13/2014 - AOS Package Received/Fee withdrawn (Scanned on 5/15) - Happy bday to me! :)

05/14/2014 - AOS Shows as PAID

05/19/2014 - IV Available/Paid/Sent Package

05/20/2014 - IV Fee withdrawn/Shows as PAID/DS-260 Available & Submitted

05/21/2014 - IV Package Received (Scanned on 5/23)

06/13/2014 - AOS Approved

06/26/2014 - CASE COMPLETE!!! (Confirmed by call, AOS changed to N/A)

07/10/2014 - Interview date assigned!!!! (August 19th)

07/11/2014 - Received Interview letter via e-mail

07/21/2014 - Hubby's medical (Passed!)/E-mail sent to embassy requesting earlier date

07/23/2014 - Interview rescheduled!!

08/04/2014 - INTERVIEW IN LONDON!! - APPROVED!!!!! :luv:

08/12/2014 - VISA IN HAND!!

08/30/2014 - POE in Houston!!

352 days from filing to POE

*Full timeline in profile

Removal of Conditions (I-751)

07/07/2016 - Sent I-751 overnight via USPS

07/08/2016 - CSC received & NOA1

07/21/2016 - Biometrics letter received
07/25/2016 - Walk-in Biometrics Appt (Org. appt - 8/2)

"Love knows not distance; it hath no continent; its eyes are for the stars."

- Gilbert Parker

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Fiji
Timeline

Oh my, stevie b! You crack me up!

Sukie

this process is so hard, if you don't keep a sense of humor.. it will drive you crazy aye??

keep your optimism up !!!! I read a few of your posts and I think you got the right frame of mind.. you will need it to help calm others :)

good luck!


8/16/2012 I-129F NOA1
11/8/2012 Married
1/3/2013 I-129F cancelled
1/29/2013 withdrawal notice received
2/5/2013 I-130 NOA1 with error on wife's name
Case status not available
2/5/2013 Unable to generate service request

3/13/2013 transferred to local office
3/26/2013 Service request generated
4/12/2013 Infopass, file in workflow March 28
4/19/2013 Case status available - APPROVED!

Detour to the NVC via NRC

For information on my detour and the steps I took to free my petition, check
"about me"

NVC

6/7/2013 NVC logs file as received

6/11/2013 Case number and IIN assigned

6/12/2013 DS-3032 emailed

6/13/21013 AOS paid

6/14/2013 DS-3032 emailed attention superuser (stupid me)

6/23/2013 DS-3032 emailed attention supervisor

6/24/2013 DS-3032 accepted

6/25/2013 IV bill generated and paid

07/06/2013 IV & AOS sent; 07/11/2013 NVC logs received

07/30/2013 IV Accepted; AOS Checklist

08/01/2013 AOS Checklist received

08/02/2013 AOS resent; 08/07/2013 NVC logs received

08/28/2013 Case Complete

09/10/2013 Interview date assigned

Embassy

08/14/2013 Medical; 08/19/2013 Medical Ready

08/07/2013 Police cert ordered (Fiji delivers straight to the embassy)

10/02/2013 Interview

xx/xx/2013 Visa in Hand

xx/xx/2013 POE Los Angeles International Airport

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...