Jump to content
oohpartiv

I-130 MARCH 2013 FILERS!! NBC

 Share

4,812 posts in this topic

Recommended Posts

woot woooot!!! finally!! heart.gifdancin5hr.gifdancin5hr.gifdancin5hr.gif

On December 10, 2013, we mailed you a notice that we have approved this I130 IMMIGRANT PETITION FOR RELATIVE, FIANCE(E), OR ORPHAN.

Congrats!!!! So very happy for you.?

08/28/2012: Married

03/13/2013: Priorty date Noa1

03/24/2013: i-797c NOA1 hard copy received

10/30/2013: notice date of transfer

11/02/2013: received hard copy of transfer

event.png

event.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ghana
Timeline

Any approvals from Texas yet?

-Met in Ghana August 2011

-Went back to Ghana April 2012

-Went back to Ghana December 2012

-Married to the man God created just for me on January 4th, 2013.

-Filed the CR-1 in February 2013

-Petition Transfered from National Benefits Center to Texas Service Center October 2013

-Petition APPROVED January 2014 (*Took 10 Months 19 Calendar Days)

-Case Number/Invoice Identification Number Assigned February 2014 (*Took 33 Calendar Days)

-Approved Interview May 2014

-Arrival May 2014

Now, We are Prayerfully taking everything 1 day at a time. Thanking God for his blessings and grace.

Link to comment
Share on other sites

woot woooot!!! finally!! heart.gifdancin5hr.gifdancin5hr.gifdancin5hr.gif

On December 10, 2013, we mailed you a notice that we have approved this I130 IMMIGRANT PETITION FOR RELATIVE, FIANCE(E), OR ORPHAN.

SO AWESOME!!!! CONGRATULATIONS!!!

2013-02-18

Married

2013-03-15

Sent I-130 Packet to USCIS

2013-03-28

NOA1

2013-11-13

Case transferred to NSC

2014-01-23

NOA2 given by USCIS

2014-01-24

Case sent to NVC

2014-02-06

Case received by NVC

2014-03-14

NVC case number assigned

2014-03-17

DS-261 completed

2014-06-25

NVC Case Complete

2014-07-09

Interview Appointment Scheduled

2014-08-07

Interview Appointment Date

Link to comment
Share on other sites

So no one got approvals from the Nebraska service center today? This is getting really outrageous! I understand that the weather is bad, but hospitals are not closing down, neither are grocery stores.. Why does the government think they can shutdown and cause separated families heartache when the USCIS are with their families! ugh!!!

NOA 1- March 25, 2013

NOA 2- Dec 23, 2013

Dec 27, 2013 Case shipped from NSC to NVC

Case in NVC building-Jan 13,2013

National Visa Center Processing

Case # and IIN- 02/14/2014

DS-261 completed: 2/19/2014

AOS Invoiced and shows IN PROGRESS: 2/20/2014

AOS shows PAID: 2/24/2014 AOS- packet added to the case: 3/17/2014

DS 261 Accepted: 03/20/2014IV fee yellow triangle with exclamation mark seen on CEAC- 03/18/2014

IV fee available to pay and shows IN PROGRESS: 3/20/2014

IV packet received by NVC 03/7/2014

IV packet FALSE checklist-(Checklist shows: I need to complete the DS 261 form): 03/17/2014

IV Packet FALSE checklist (Checklist shows: pay IV fee): 3/20/2014

IV fee shows PAID 3/24/2014IV packet accepted 3/24/2014 (all civil documents reviewed per NVC rep 4/1, currently waiting on DS 260 to be reviewed)

DS-260 - SUBMITTED 3/25/2014

Checklist for Court record and Indian PCC- April

Submitted Court Record document and NVC scanned into system- 4/23
NVC received Indian PCC at their door on 5/9/2014
PCC scanned into system- 5/12/2014
Mysterious Second Package scanned into system- 5/16/2014
Case complete- 06/11/2014
interview Date: 07/08/2014 changed from 7/15/14
delivery of Child #1- 6/11/2014
Medical Completed 4/4/2014 at knightsbridge doctors

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

woot woooot!!! finally!! heart.gifdancin5hr.gifdancin5hr.gifdancin5hr.gif

On December 10, 2013, we mailed you a notice that we have approved this I130 IMMIGRANT PETITION FOR RELATIVE, FIANCE(E), OR ORPHAN.

Congratulations.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

So no one got approvals from the Nebraska service center today? This is getting really outrageous! I understand that the weather is bad, but hospitals are not closing down, neither are grocery stores.. Why does the government think they can shutdown and cause separated families heartache when the USCIS are with their families! ugh!!!

I don't think the office is closed today. There was a Nebraska approval yesterday when it was even colder than today.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: Timeline

Congrats and wish you all the very best!!! To which service center were you transferred to? Please update your time line as well.....

thanks!!!

transferred to nebraska nov. 6

So no one got approvals from the Nebraska service center today? This is getting really outrageous! I understand that the weather is bad, but hospitals are not closing down, neither are grocery stores.. Why does the government think they can shutdown and cause separated families heartache when the USCIS are with their families! ugh!!!

got approved at nebraska today / all 3 petitions

2013-02-28 i-130 filed @ phoenix lockbox 2013-11-06 transferred to "ANOTHER ofc 2013-12-09 to "alien number changed"
2013-03-05 check cashed 2013-11-07 transferred to "NEBRASKA ofc 2013-12-10 APPROVED
2013-03-09 NOA hardcopy rcvd w/ msc# PD march 4 2013-11-08 at USCIS ofc 2013-12-11 Shipped to DOS
2013-03-10 checked USCIS site - initial review 2013-12-17 NOA2 hardcopy rcvd


NVC STAGE
2014-01-09 NVC rcvd case (all 3)
2014-02-03 CASE number assigned (all 3)
2014-02-11 DS261 available filled out
2014-02-15 AOS fee paid
2014-02-21 AOS shows paid
2014-02-27 IV fee invoiced / paid (all 3)
2014-03-04 IV documents sent (UPS tracking 03-07)
2014-03-05 IV shows PAID / DS260 filled out (SPOUSE)
2014-03-06 IV fee for 1minor not accepted ERROR
2014-03-07 IV shows PAID / DS260 filled out (1 minor)
2014-03-07 IV fee invoiced again
2014-03-11 error IV rejected was able to pay again
2014-03-15 IV shows PAID / DS260 filled out (all 3 cases done)
2014-03-26 IV documents approved / false checklist for AOS
2014-04-01 AOS sent via certified mail (USPS tracking 04-07)
2014-04-09 AOS logged into the system
2014-04-23 CASE COMPLETE for 2 minor
2014-04-23 AOS checklist ( petitioner line13.a & joint sponsor tax extension)
2014-05-20 Checklist response mailed (FEDEX tracking 05-23)
2014-05-28 Checklist response scanned into system
2014-06-30 CASE COMPLETE

2014-07-01 CC EMAIL RCVD
2014-07-10 INTERVIEW SCHED GIVEN (by calling) (07/09 US date)
2014-07-11 INTERVIEW LETTER RCVD (07/10 US date)
2014-07-11 MEDICAL (07/09 - 07/11 PPD reading for minor)

2014-08-05 INTERVIEW @ USEM (221g NSO reverification)

2014-08-14 attached & send to CO for review

2014-08-19 VISA ISSUED

2014-08-20 visa printed

2014-08-26 VISA ON HAND!!!

Link to comment
Share on other sites

Filed: Timeline

Congratulations.

actually dilmera im always looking at your post and waited for you to get approved causse we have the same timeline.

trobably you'll get yours this week also and so to other vj'ers waiting

2013-02-28 i-130 filed @ phoenix lockbox 2013-11-06 transferred to "ANOTHER ofc 2013-12-09 to "alien number changed"
2013-03-05 check cashed 2013-11-07 transferred to "NEBRASKA ofc 2013-12-10 APPROVED
2013-03-09 NOA hardcopy rcvd w/ msc# PD march 4 2013-11-08 at USCIS ofc 2013-12-11 Shipped to DOS
2013-03-10 checked USCIS site - initial review 2013-12-17 NOA2 hardcopy rcvd


NVC STAGE
2014-01-09 NVC rcvd case (all 3)
2014-02-03 CASE number assigned (all 3)
2014-02-11 DS261 available filled out
2014-02-15 AOS fee paid
2014-02-21 AOS shows paid
2014-02-27 IV fee invoiced / paid (all 3)
2014-03-04 IV documents sent (UPS tracking 03-07)
2014-03-05 IV shows PAID / DS260 filled out (SPOUSE)
2014-03-06 IV fee for 1minor not accepted ERROR
2014-03-07 IV shows PAID / DS260 filled out (1 minor)
2014-03-07 IV fee invoiced again
2014-03-11 error IV rejected was able to pay again
2014-03-15 IV shows PAID / DS260 filled out (all 3 cases done)
2014-03-26 IV documents approved / false checklist for AOS
2014-04-01 AOS sent via certified mail (USPS tracking 04-07)
2014-04-09 AOS logged into the system
2014-04-23 CASE COMPLETE for 2 minor
2014-04-23 AOS checklist ( petitioner line13.a & joint sponsor tax extension)
2014-05-20 Checklist response mailed (FEDEX tracking 05-23)
2014-05-28 Checklist response scanned into system
2014-06-30 CASE COMPLETE

2014-07-01 CC EMAIL RCVD
2014-07-10 INTERVIEW SCHED GIVEN (by calling) (07/09 US date)
2014-07-11 INTERVIEW LETTER RCVD (07/10 US date)
2014-07-11 MEDICAL (07/09 - 07/11 PPD reading for minor)

2014-08-05 INTERVIEW @ USEM (221g NSO reverification)

2014-08-14 attached & send to CO for review

2014-08-19 VISA ISSUED

2014-08-20 visa printed

2014-08-26 VISA ON HAND!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

How to add my signature at the bottom with colour?

USCIS
2013/04/27 : Mailed I-130 petition to USCIS Phoenix Lockbox, Arizona.
2013/04/30 : I-130 PETITION PRIORITY DATE (NOA1).
2013/05/02 : Received (NOA1) hardcopy by mail from National Benefits Center (NBC).
2013/12/04 : I-130 petition transferred from National Benefits Center (NBC) to Nebraska Service Center (NSC).
2014/02/12 : I-130 PETITION APPROVED (NOA2) at Nebraska Service Center (NSC).
2014/02/13 : Approved I-130 petition shipped from Nebraska Service Center (NSC) to National Visa Center (NVC).
2014/02/18 : Received (NOA2) hardcopy by mail from Nebraska Service Center (NSC).
NATIONAL VISA CENTER (NVC)
2014/02/25 : National Visa Center (NVC) received approved I130 petition from Nebraska Service Center (NSC).
2014/03/31 : Case Number, IIN & BIN generated.
2014/04/01 : DS-261 available. Completed & submitted online.
2014/04/01 : AOS fee bill invoiced & paid online.

2014/04/04 : AOS fee payment status appears as PAID.

2014/04/08 : IV fee bill invoiced & paid online.

2014/04/11 : IV fee payment status appears as PAID.

2014/04/12 : DS-260 available. Completed & submitted online.

2014/06/24 : IV packet delivered at National Visa Center (NVC).

2014/07/01 : IV packet scanned into system.

2014/07/28 : AOS packet delivered at National Visa Center (NVC).

2014/07/30 : AOS packet scanned into system.

2014/08/13 : IV packet reviewed & accepted by National Visa Center (NVC).

2014/09/23 : AOS checklist email received from National Visa Center (NVC).

2014/09/24 : AOS checklist correction mailed to National Visa Center (NVC).

2014/09/29 : AOS checklist correction scanned into system at National Visa Center (NVC).

2014/11/17 : CASE COMPLETED at National Visa Center (NVC).

2014/12/03 : Interview scheduled by National Visa Center (NVC).

2014/12/09 : Received interview letter (P4) email from National Visa Center (NVC).

2014/12/19 : Case shipped from National Visa Center (NVC) to US consulate Mumbai. CEAC status says 'In Transit'.

INTERVIEW & POE

2014/12/15 : Medicals completed.

2014/12/22 : Case received at US consulate Mumbai. CEAC status says 'Ready'.

2015/01/05 : Biometrics appointment scheduled.

2015/01/20 : INTERVIEW at US consulate Mumbai.

Link to comment
Share on other sites

How to add my signature at the bottom with colour?

signature here?

How to add my signature at the bottom with colour?

signature here?

ich_liebe_dich_103.jpg
March 29,2013-------Notice of Action "1st"
November 14,2013-------Notice of Action ( Notice of transferred NSC )
December 20,2013-------Notice of Action "Approval"
December 26,2013-------Case was Shipped to National Visa Center
January 13,2014 -------Case received at NVC
February 12, 2014-------NVC Assigned Case Number

February 25,2014------- Paid AOS & IV bill

February 27,2014------ -AOS & IV documents was submitted to NVC ( Completed DS-260 )

March 4, 2014 --------- NVC received AOS & IV documents

March 10 & 11,2014 -----( Done Advanced Medical at SLEC ) = Passed

March 21,2014---------- Case Completed

April 04,2014---------Received Interview Date ( P4)

May 5,2014-------- -Interview ( APPROVED )

event.png
event.png
event.png

Link to comment
Share on other sites

Filed: Timeline

How to add my signature at the bottom with colour?

go to your PROFILE - edit profile - signature - choose font color in the dialogue box

2013-02-28 i-130 filed @ phoenix lockbox 2013-11-06 transferred to "ANOTHER ofc 2013-12-09 to "alien number changed"
2013-03-05 check cashed 2013-11-07 transferred to "NEBRASKA ofc 2013-12-10 APPROVED
2013-03-09 NOA hardcopy rcvd w/ msc# PD march 4 2013-11-08 at USCIS ofc 2013-12-11 Shipped to DOS
2013-03-10 checked USCIS site - initial review 2013-12-17 NOA2 hardcopy rcvd


NVC STAGE
2014-01-09 NVC rcvd case (all 3)
2014-02-03 CASE number assigned (all 3)
2014-02-11 DS261 available filled out
2014-02-15 AOS fee paid
2014-02-21 AOS shows paid
2014-02-27 IV fee invoiced / paid (all 3)
2014-03-04 IV documents sent (UPS tracking 03-07)
2014-03-05 IV shows PAID / DS260 filled out (SPOUSE)
2014-03-06 IV fee for 1minor not accepted ERROR
2014-03-07 IV shows PAID / DS260 filled out (1 minor)
2014-03-07 IV fee invoiced again
2014-03-11 error IV rejected was able to pay again
2014-03-15 IV shows PAID / DS260 filled out (all 3 cases done)
2014-03-26 IV documents approved / false checklist for AOS
2014-04-01 AOS sent via certified mail (USPS tracking 04-07)
2014-04-09 AOS logged into the system
2014-04-23 CASE COMPLETE for 2 minor
2014-04-23 AOS checklist ( petitioner line13.a & joint sponsor tax extension)
2014-05-20 Checklist response mailed (FEDEX tracking 05-23)
2014-05-28 Checklist response scanned into system
2014-06-30 CASE COMPLETE

2014-07-01 CC EMAIL RCVD
2014-07-10 INTERVIEW SCHED GIVEN (by calling) (07/09 US date)
2014-07-11 INTERVIEW LETTER RCVD (07/10 US date)
2014-07-11 MEDICAL (07/09 - 07/11 PPD reading for minor)

2014-08-05 INTERVIEW @ USEM (221g NSO reverification)

2014-08-14 attached & send to CO for review

2014-08-19 VISA ISSUED

2014-08-20 visa printed

2014-08-26 VISA ON HAND!!!

Link to comment
Share on other sites

actually dilmera im always looking at your post and waited for you to get approved causse we have the same timeline.

trobably you'll get yours this week also and so to other vj'ers waiting

I'm doing something similar. :P You're probably in the same box as us. Or possibly a neighboring box. :P

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Belarus
Timeline

Congratulations to all who got approvals!!!! kicking.gif

30 January 2013 - married in Mexico (Cancun)

1 March 2013 - sent I-130

22 March 2013 - NOA1

5 November 2013 - transferred to Nebraska

17 December 2013 - NOA2

19 December 2013 - NOA2 package sent to NVC

NVC

2014-01-08 NVC received

2014-02-10 Case number assigned case

2014-02-13 Completed DS-261 online

2014-02-19 I-864 (AOS) Bill generated and paid

2014-03-07 AOS package sent

2014-03-11 Package received by NVC

2014-03-04 IV Bill invoiced and paid

2014-03-24 IV package sent

2014-03-25 IV package received

2014-03-07 DS-260 completed online

2014-03-28 Checklist for AOS

2014-03-31 Checklist response sent (by FedEx next day delivery)

2014-04-03 New corrected AOS in the system

2014-04-11 Received False Checklist

2014-04-18 Case completed :dance:

2014-05-16 Medical :bonk:

2014-06-24 Interview

event.png

Link to comment
Share on other sites

Filed: Timeline

I'm doing something similar. tongue.png You're probably in the same box as us. Or possibly a neighboring bo

tlhey are playing lucky pick idea9dv.gif

do you have the link to the spreadsheet...

2013-02-28 i-130 filed @ phoenix lockbox 2013-11-06 transferred to "ANOTHER ofc 2013-12-09 to "alien number changed"
2013-03-05 check cashed 2013-11-07 transferred to "NEBRASKA ofc 2013-12-10 APPROVED
2013-03-09 NOA hardcopy rcvd w/ msc# PD march 4 2013-11-08 at USCIS ofc 2013-12-11 Shipped to DOS
2013-03-10 checked USCIS site - initial review 2013-12-17 NOA2 hardcopy rcvd


NVC STAGE
2014-01-09 NVC rcvd case (all 3)
2014-02-03 CASE number assigned (all 3)
2014-02-11 DS261 available filled out
2014-02-15 AOS fee paid
2014-02-21 AOS shows paid
2014-02-27 IV fee invoiced / paid (all 3)
2014-03-04 IV documents sent (UPS tracking 03-07)
2014-03-05 IV shows PAID / DS260 filled out (SPOUSE)
2014-03-06 IV fee for 1minor not accepted ERROR
2014-03-07 IV shows PAID / DS260 filled out (1 minor)
2014-03-07 IV fee invoiced again
2014-03-11 error IV rejected was able to pay again
2014-03-15 IV shows PAID / DS260 filled out (all 3 cases done)
2014-03-26 IV documents approved / false checklist for AOS
2014-04-01 AOS sent via certified mail (USPS tracking 04-07)
2014-04-09 AOS logged into the system
2014-04-23 CASE COMPLETE for 2 minor
2014-04-23 AOS checklist ( petitioner line13.a & joint sponsor tax extension)
2014-05-20 Checklist response mailed (FEDEX tracking 05-23)
2014-05-28 Checklist response scanned into system
2014-06-30 CASE COMPLETE

2014-07-01 CC EMAIL RCVD
2014-07-10 INTERVIEW SCHED GIVEN (by calling) (07/09 US date)
2014-07-11 INTERVIEW LETTER RCVD (07/10 US date)
2014-07-11 MEDICAL (07/09 - 07/11 PPD reading for minor)

2014-08-05 INTERVIEW @ USEM (221g NSO reverification)

2014-08-14 attached & send to CO for review

2014-08-19 VISA ISSUED

2014-08-20 visa printed

2014-08-26 VISA ON HAND!!!

Link to comment
Share on other sites

tlhey are playing lucky pick idea9dv.gif

do you have the link to the spreadsheet...

Sure. Your approval has already been keyed in: https://docs.google.com/spreadsheet/ccc?key=0Anpi244OAt_IdGJxVU9tVVpXRkVZVlVMcjVwMGowOUE&usp=drive_web#gid=19

Edit: wrong sheet!

Edited by En-oh-eh-to now

07/29/2014 - NOA1

11/19/2014 - Transfer to TSC

12/19/2014 - NOA2

01/15/2014 - NVC Received (TSC held it for 3 weeks...)

02/19/2014 - Case no. and IIN assigned; requested embassy change

02/27/2014 - DS-261 available and submitted

02/28/2014 - AOS available and paid

03/19/2014 - AOS mailed

03/27/2014 - AOS entered into system

03/24/2014 - New case no. assigned

03/25/2014 - IV fee invoiced and paid

03/28/2014 - IV package sent via FedEx

04/26/2014 - case complete

06/01/2014 - passed interview

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...