People on phone has no clue other than what they read online. I would make sure he sends his birth certificate along with passport copy just incase. I hope you get good news soon!

You are so right.

Thank you for your advice and support! I think it's a good idea to send in both.

Link to comment
Share on other sites

I would also contact the Ombudsman Liaison Unit. I was reading through their report from 2010, and it appears that RFE's like this were commonplace, and they made suggestions to fix that problem. If you're still having that problem, then the USCIS *still* hasn't fixed it. The Ombudsman may be able to address that either with you, or with the USCIS and Congress in their report.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Germany
Timeline

I would also contact the Ombudsman Liaison Unit. I was reading through their report from 2010, and it appears that RFE's like this were commonplace, and they made suggestions to fix that problem. If you're still having that problem, then the USCIS *still* hasn't fixed it. The Ombudsman may be able to address that either with you, or with the USCIS and Congress in their report.

OK, thank you. That might not just help us but others too. I really think it is something that should be fixed permanently. What a waste of time and energy. Thanks.

Link to comment
Share on other sites

Congratulations on all approvals!

Unfortunately our process remains unbelievably frustrating. After receiving an email on Nov. 25th that an RFE has been sent out, we found out yesterday (hard copy arrived) what they 'want' from us.

The letter stated that my husband (USC) doesn't seem to be eligible to file an I-130, since he has not provided enough proof that he actually is a US citizen. It seems that the complete copy of his passport he sent in (according to the instructions) is not satisfactory to them.

On top they said we didn't send any photos of either him or myself.

No words.

Phone calls to the USCIS didn't help. They even refused to transfer my husband to a Tier 2 officer. I guess we will have to send in 'the basics' that we provided to start with (9 months ago) again.

Sorry for venting. Has anybody experienced anything similar?

That's quite a hassle, maybe try to call tier 2 again, some are more helpful than others. If that doesn't work , I guess you have to send more papers in.

 

 

 
 
 
July 28 2011- Married :dancing:
 
April 1 2013- Sent I-130
 
April 2 2013- NOA1
 
Nov 14 2013-Transferred to NSC
 
Nov 21- File touched
 
Jan 10, 2014- Approved! (NOA2)
 
Jan 13, 2014- Shipped out to NVC
 
Jan 27, 2014- Received by NVC
 
March 6,2014- Received Case Number and requested Case Number Change
 
March 9, 2014 -Sent in DS-261
 
March 10,2014 - Paid AOS Fee
 
March 22, 2014 - Sent in AOS Package
 
March 25,2014 - Paid IV Fee
 
March 26, 2014 - AOS Package picked up by a B.Standish
 
March 28, 2014 - IV fee shown as PAid
 
March 31, 2014 - Send corrections to AOS Package
 
April 1, 2014 - Corrected Aos Package received and signed by N Visa Center
 
April 5, 2014 - Case number changed finally
 
April 11, 2014- Got checklist for AOS
 
April 17, 2014- Submitted DS-260
 
April 18, 2014- Sent in IV package and AOS checklist
 
May 14, 2014- IV Checklist
 
May 16, 2014- Sent in IV Checklist
 
May 23, 2014- IV Checklist received
 
June 25, 2014- Case Complete
 
July 2, 2014- Receive CC email
 
July 11, 2014- Interview email received
 
July 21, 2014- Medical Done
 
Aug 26, 2014- Interview
 
Case in AP :ranting::ranting:
 
Oct 23, turned in needed documents
 
 
 
Case Updated- July 22, 30, Aug 5, Nov 2, Nov 4, Nov 8, Nov 15+16 (2015)
 
Nov 16-told to go to Embassy
 
 
 
Update Nov 29 + 30
 
Nov 29 - Gave Refusal Sheet :cry:
 
Informed that Case is being sent back to USCIS with intent to revoke :ranting::ranting::ranting:
 
 
 
Jan 12-13, 216 Case Date Update on CEAC
 
Feb 12,2016-Update on USCIS, case under review
 
Oct 14, 2016 NOIR sent out, received OCT 18, 2016
 
 
 
 

 

 Dream-dj.png

 

 

 

Link to comment
Share on other sites

congrats on all the approvals

today is the 5 week mark since my case was transferred.

my pd is march 13 and my transfer datw is oct 31 to nebraska. does anyone have a similar time line and have been approved

08/28/2012: Married

03/13/2013: Priorty date Noa1

03/24/2013: i-797c NOA1 hard copy received

10/30/2013: notice date of transfer

11/02/2013: received hard copy of transfer

event.png

event.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ukraine
Timeline

my guess for tonight: 6 approvals from VJ. 1 TSC 3 NSC and 2 CSC....

heart.gifdevil.gifoops8rh.gifranting33va.gifdevil.gifheart.gif

Mar 26 - NOA1

Nov 07 - Transfer to TSC

Dec 16 - RFE

Dec 23 - RFE Replied

Dec 30 - RFE finally made it to TSC

Jan 11 - Initial review (again)

Jan 13 - I130 Approved

Jan 21 - Transfer TSC -> NVC

Jan 28 - NVC RCV'd

Feb 06 - NVC/IIN #'s RCV'd

Feb 11 - AOS updated as paid/AOS sent

Feb 20 - AOS received by NVC

Feb 21 - IV Bill Paid

Feb 25 - IV FDEX

Feb 26 - IV RCV'd by NVC

Feb 27 - Expedite Approved - NVC Complete

Mar 05 - Embassy Rcv'd Packet

Mar 06 - Scheduled Interview

Mar 12 - Interview Date

Link to comment
Share on other sites

my guess for tonight: 6 approvals from VJ. 1 TSC 3 NSC and 2 CSC....

Which members and from which months?

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ukraine
Timeline

i was thinking between us I130 folks... feb/mar/apr....

heart.gifdevil.gifoops8rh.gifranting33va.gifdevil.gifheart.gif

Mar 26 - NOA1

Nov 07 - Transfer to TSC

Dec 16 - RFE

Dec 23 - RFE Replied

Dec 30 - RFE finally made it to TSC

Jan 11 - Initial review (again)

Jan 13 - I130 Approved

Jan 21 - Transfer TSC -> NVC

Jan 28 - NVC RCV'd

Feb 06 - NVC/IIN #'s RCV'd

Feb 11 - AOS updated as paid/AOS sent

Feb 20 - AOS received by NVC

Feb 21 - IV Bill Paid

Feb 25 - IV FDEX

Feb 26 - IV RCV'd by NVC

Feb 27 - Expedite Approved - NVC Complete

Mar 05 - Embassy Rcv'd Packet

Mar 06 - Scheduled Interview

Mar 12 - Interview Date

Link to comment
Share on other sites

Filed: Lift. Cond. (pnd) Country: Japan
Timeline

congrats on all the approvals

today is the 5 week mark since my case was transferred.

my pd is march 13 and my transfer datw is oct 31 to nebraska. does anyone have a similar time line and have been approved

Yes, according to the March spreadsheet, there have been Nebraska transfers with both PD and transfer dates later than us who already have NoA2.

Click 'Show' for my timeline

USCIS
03/13/2013: I-130 sent
03/14/2013: Priority Date on I-797C
03/15/2013: Notice Date & Received Date on I-797C (NoA1)
03/17/2013: Acceptance Confirmation email received
03/20/2013: I-797C received in the mail
10/31/2013: Transfer email "to your local USCIS office"; also Notice Date on transfer I-797C
11/01/2013: Transfer email "at a USCIS office"
11/04/2013: I-797C received in the mail; transferred to Nebraska Service Center
12/04/2013: Changed ARN
12/05/2013: NoA2
12/13/2013: Shipped to DoS

NVC
01/06/2014: NVC received
01/08/2014: NVC received (inside building)
02/10/2014: Case#/IIN assigned
02/12/2014: DS-261 available and submitted
02/13/2014: AoS fee available and paid
02/17/2014: AoS package sent (from abroad)
02/20/2014: AoS package delivered
03/20/2014: IV fee available and paid
03/26/2014: IV fee shows Paid and DS-260 is available
03/27/2014: IV package sent and DS-260 submitted
03/31/2014: IV package delivered
04/02/2014: NVC recorded IV package receipt
04/14/2014: Case complete
04/21/2014: Case complete email
04/30/2014: Interview date assigned
06/02/2014: Interview

06/22/2014: PoE

I-751
04/27/2016: Sent to CSC
04/28/2016: NOA1
05/10/2016: Check cashed
05/13/2016: NOA1 Received

06/03/2015: Biometrics

Link to comment
Share on other sites

i was thinking between us I130 folks... feb/mar/apr....

Oh, you're guessing. Has anyone reported getting approved today?

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

I called uscis today and asking For request and the tier 2 said i dont need a service request cause my petition is already near for aproval just wait for it cause it will come sooner she said

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline

One off topic post removed.

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Link to comment
Share on other sites

I called uscis today and asking For request and the tier 2 said i dont need a service request cause my petition is already near for aproval just wait for it cause it will come sooner she said

What a load of #######. I've gotten some version of that response for the past 3 months.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

Can I ask a serious question? Does anyone have any idea why I-129Fs for K-1s are being processed so quickly at the Service Centers? Can someone please enlighten me? I just don't get it and probably never will unless someone can give me an explanation.

Married in Edinburgh, Scotland: 07-06-2013

I-130 Package Sent to Chicago Lockbox: 09-04-2013

NOA1 from the National Benefits Center: 09-05-2013

I-130 Package Transferred to California Service Center: 02-25-2014

NOA2: 03-05-2014

NVC Received: 03-17-2014

Case # and IIN Assigned: 04-18-2014

DS-261 Generated and Completed: 04-26-2014

AOS Fee Invoiced and Paid: 04-29-2014

IV Fee Invoiced and Paid: 05-01-2014

AOS Fee Shows as Paid: 05-01-2014

IV Fee Shows as Paid: 05-05-2014

AOS and IV Packages Sent via UPS: 05-08-2014

AOS and IV Packages Received: 05-12-2014

AOS and IV Packages Input Into System: 05-14-2014

DS-260 Completed: 05-16-2014

Case Complete: 06-11-2014

Medical Exam: 07-08-2014

Interview in Warsaw, Poland: 08-28-2014 @ 8:30AM - APPROVED!

Visa Package Received: 09-01-2014

POE at Chicago O'Hare International Airport: 09-23-2014

I-751 Package Received: 07-11-2016

NOA1: 07-16-2016

I-751 Biometrics Apointment: 08-01-2016

ROC Approval (during citizenship interview): 12-20-2017

10-Year Green Card Received: N/A due to approved N-400

N-400 Filed Online: 08-28-2017

N-400 NOA1 Date: 08-29-2017

N-400 Biometrics Appointment: 09-22-2017

Status Changed to Interview Scheduled: 09-22-2017

Status Change to Interview Scheduled, read the letter we mailed: 11-15-2017

N-400 Interview: 12-20-2017 - APPROVED!

Oath of Allegiance Scheduled: 12-29-2017

Oath of Allegiance: 01-18-2018 

Link to comment
Share on other sites

Can I ask a serious question? Does anyone have any idea why I-129Fs for K-1s are being processed so quickly at the Service Centers? Can someone please enlighten me? I just don't get it and probably never will unless someone can give me an explanation.

Well, obviously it's because their future family unity is important, and there's much less of a chance of a fiance coming here with a sham relationship to immigrate. Duh. /sarcasm

Honestly, I have no idea. I don't think it should take forever for them either. Being separated from the one you love sucks big time. But you would think that they could have equalized the processing times between the two visa types by now.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...