Transferred from NBC to Texas on October 24th

Updated to "now being processed" on October 29th

Approved November 8th.

wooot wooott!!!

congrats!!

so maybe??!!! hopefully!!! its really 14 days including sat & sun

wishfully thinking....our got approve the soonest......

2013-02-28 i-130 filed @ phoenix lockbox 2013-11-06 transferred to "ANOTHER ofc 2013-12-09 to "alien number changed"
2013-03-05 check cashed 2013-11-07 transferred to "NEBRASKA ofc 2013-12-10 APPROVED
2013-03-09 NOA hardcopy rcvd w/ msc# PD march 4 2013-11-08 at USCIS ofc 2013-12-11 Shipped to DOS
2013-03-10 checked USCIS site - initial review 2013-12-17 NOA2 hardcopy rcvd


NVC STAGE
2014-01-09 NVC rcvd case (all 3)
2014-02-03 CASE number assigned (all 3)
2014-02-11 DS261 available filled out
2014-02-15 AOS fee paid
2014-02-21 AOS shows paid
2014-02-27 IV fee invoiced / paid (all 3)
2014-03-04 IV documents sent (UPS tracking 03-07)
2014-03-05 IV shows PAID / DS260 filled out (SPOUSE)
2014-03-06 IV fee for 1minor not accepted ERROR
2014-03-07 IV shows PAID / DS260 filled out (1 minor)
2014-03-07 IV fee invoiced again
2014-03-11 error IV rejected was able to pay again
2014-03-15 IV shows PAID / DS260 filled out (all 3 cases done)
2014-03-26 IV documents approved / false checklist for AOS
2014-04-01 AOS sent via certified mail (USPS tracking 04-07)
2014-04-09 AOS logged into the system
2014-04-23 CASE COMPLETE for 2 minor
2014-04-23 AOS checklist ( petitioner line13.a & joint sponsor tax extension)
2014-05-20 Checklist response mailed (FEDEX tracking 05-23)
2014-05-28 Checklist response scanned into system
2014-06-30 CASE COMPLETE

2014-07-01 CC EMAIL RCVD
2014-07-10 INTERVIEW SCHED GIVEN (by calling) (07/09 US date)
2014-07-11 INTERVIEW LETTER RCVD (07/10 US date)
2014-07-11 MEDICAL (07/09 - 07/11 PPD reading for minor)

2014-08-05 INTERVIEW @ USEM (221g NSO reverification)

2014-08-14 attached & send to CO for review

2014-08-19 VISA ISSUED

2014-08-20 visa printed

2014-08-26 VISA ON HAND!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Yesterday, our attorney called USCIS to find out where our case was transferred, seems it was transferred to Nebraska. He then called the Nebraska SC to know how long it would take for approval and they said a minimum of 4 weeks.

Yesterday, our attorney called USCIS to find out where our case was transferred, seems it was transferred to Nebraska. He then called the Nebraska SC to know how long it would take for approval and they said a minimum of 4 weeks.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Guys,

I was checking eBay when I received this:

Your Case Status: Post Decision Activity

On November 8, 2013, we mailed you a notice that we have approved this I130 IMMIGRANT PETITION FOR RELATIVE, FIANCE(E), OR ORPHAN. Please follow any instructions on the notice. If you move before you receive the notice, call customer service at 1-800-375-5283.

Wooooohoooo. Just got mine approved. It was also at the CSC. I don't know if it has to do with anything but I called Monday asking for military expedite due to future deployment. Then I got an email Wednesday asking for my military ID (which was already in the file). Normally they ask for orders or notification letter so the lack of need for it made me think that it was already toward the top. I faxed my ID in and tonight at 2220 CST. I got that in my email. My pd was 14 March I think.

CONGRATS ! ! ! !

so you received the notice at 11pm? Makes sense because CSC is on PST.

I hope everything goes super fast for you !

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Congrats!!!

congratulations !!!

ich_liebe_dich_103.jpg
March 29,2013-------Notice of Action "1st"
November 14,2013-------Notice of Action ( Notice of transferred NSC )
December 20,2013-------Notice of Action "Approval"
December 26,2013-------Case was Shipped to National Visa Center
January 13,2014 -------Case received at NVC
February 12, 2014-------NVC Assigned Case Number

February 25,2014------- Paid AOS & IV bill

February 27,2014------ -AOS & IV documents was submitted to NVC ( Completed DS-260 )

March 4, 2014 --------- NVC received AOS & IV documents

March 10 & 11,2014 -----( Done Advanced Medical at SLEC ) = Passed

March 21,2014---------- Case Completed

April 04,2014---------Received Interview Date ( P4)

May 5,2014-------- -Interview ( APPROVED )

event.png
event.png
event.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

wow approval after approval!!! the flood is coming guys!!!!! woohhoooooo!!!!! i miss my wife!!! cant wait to take her to Disneyland!!kicking.gifkicking.gifkicking.gifkicking.gifkicking.gifkicking.gif

It is my wish also to go to Disneyland once I visit The U.S.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

wow approval after approval!!! the flood is coming guys!!!!! woohhoooooo!!!!! i miss my wife!!! cant wait to take her to Disneyland!!kicking.gifkicking.gifkicking.gifkicking.gifkicking.gifkicking.gif

i want to go to Disneyland too :)

ich_liebe_dich_103.jpg
March 29,2013-------Notice of Action "1st"
November 14,2013-------Notice of Action ( Notice of transferred NSC )
December 20,2013-------Notice of Action "Approval"
December 26,2013-------Case was Shipped to National Visa Center
January 13,2014 -------Case received at NVC
February 12, 2014-------NVC Assigned Case Number

February 25,2014------- Paid AOS & IV bill

February 27,2014------ -AOS & IV documents was submitted to NVC ( Completed DS-260 )

March 4, 2014 --------- NVC received AOS & IV documents

March 10 & 11,2014 -----( Done Advanced Medical at SLEC ) = Passed

March 21,2014---------- Case Completed

April 04,2014---------Received Interview Date ( P4)

May 5,2014-------- -Interview ( APPROVED )

event.png
event.png
event.png

Link to comment
Share on other sites

Yay a Texas approval! Congrats Mizzy!!! :D

N-400 May 2017 Google Doc

Full timeline- 

 

Filed from abroad- Costa Rica

NOA1- NOA2: 316 days

Jan 12, 2013: Married!!
Mar 19, 2013: NOA1

Jan 28, 2014: I-130 approved

NVC- Green Card in Hand: 189 days

Feb 3, 2014: TSC sends case to NVC
April 14: Real checklist for AOS (saying tax number was incorrect when it wasn't)
April 30: Another AOS checklist, for proof of employment (which was already sent)
May 1: Checklist for IV- certified marriage certificate (even though I sent a certified one originally)
July 1: INTERVIEW!!! - APPROVED!
July 16: POE through Miami
July 22: SSN card in the mail
August 30, 2014: Green card arrives in the mail!!!
 
ROC: 366 days
April 27, 2016: Sent 300 page ROC packet to VSC via overnight mail
May 16: Check shown as charged online, received NOA 1 dated April 29
June 20, 2016- Biometrics
April 28, 2017: Approval
May 4, 2017: Approval letter arrived
May 15, 2017: GC arrives in mail
 
N-400: 190 days
May 8: Sent packet to Dallas Lockbox
May 12: NOA 1, Credit card charged
June 7: Biometrics
June 16: "In line"
Oct 2: Interview letter arrives (online status still says ''in line'')
Oct 31: Interview- Approved!
Nov 13: Oath ceremony!  Applied for passport & registered to vote on site.
Nov 22: Passport arrives (paid for expedited service and overnight delivery)
 
Journey complete! A total of 1701 days or 4 years, 7 months and 26 days.
Link to comment
Share on other sites

Yup!

Woohoo!! Me too, but transferred on 5 November to CSC, looks like 2 weeks or so for that too. So we could be seeing a lot more approvals this month, YAY!!!

Personal
July 3, 2011 - Met
July, 2012 - Proposed (Skype - Texas/Cavite, Philippines)
Nov, 2012 - Formal Proposal in Tagaytay, Philippines
Feb 3, 2013 - Married in Batangas, Philippines
Dec 22, 2013 thru Jan 4, 2014 - Spent Christmas and New Years holiday in Philippines (Cavite, Tagaytay, Marinduque, Rizal)
USCIS - Serviced by National Benefits Center / California Service Center
- called USCIS one to two times a week asking about status update, after about the third month
Mar 15, 2013 - I-130 Sent
Mar 18, 2013 - I-130 NOA1
Nov 5, 2013 - Transfer to local office according to USCIS web site, but customer service couldn't verify location (I'm assuming Houston)
Nov 5, 2013 - Set up infopass appointment for 11/13/13
Nov 8, 2013 - Received transfer letter, case at CSC
Nov 18, 2013 - Received initial approval by email/text
Nov 21, 2013 - Received hard copy approval (797C) in the mail
NVC
- called NVC every single day from November 18th to January 30th asking about status update
Dec 4, 2013 - Case received at NVC
Dec 19, 2013 - Received case number by calling NVC
Dec 21, 2013 - Submitted DS-261 online
Dec 25, 2013 - Paid AOS fee online (Merry Christmas!!!)
Dec 27, 2013 - AOS fee payment cleared bank, so mailed AOS package to NVC. Paid IV package fee online
Dec 30, 2013 - IV fee payment cleared bank, so mailed IV package to NVC
Dec 31, 2013 - AOS package arrived at NVC
Jan 6, 2014 - IV package arrived at NVC
Jan 7, 2014 - Submitted DS-260 online
Jan 24, 2014 - Received checklist via email (said reviewed DS-260 and instructed me to send in civil documents). I called NVC to verify I can ignore checklist and they said yes, to ignore it.
Jan 27, 2014 - Called NVC and was told that our case is complete and that we're just waiting for an interview appointment date.
Jan 29, 2014- Called NVC and was told that our interview was scheduled for March 10, 2014. Also registered for St Luke medical exam online.
Jan 30, 2014 - Received P4 letter in email.
US Embassy (Manila) / Medical (St. Luke's)
- called embassy every day after the interview, during AP status and after visa status changed to "Issued," asking about status update and visa delivery timeframe
Feb 4-5, 2014 - Wife went to medical exam (took two days), results mailed to US Embassy in Manila.
Feb 7, 2014, Package sent from NVC to US Embassy in Manila (according to NVC phone operator).
Feb 10, 2014 - CEAC website updated case as "In Transit."
Feb 11, 2014 - DHL website shows case as delivered to US Embassy in Manila.
Feb 12, 2014 - Called US Embassy in Manila and interview rescheduled for Feb 25th.
Feb 25, 2014 - "Approved," but we have to submit CENOMAR then wait for visa after it's processed, so I guess technically it's in Administrative Processing (AP).
Mar 17, 2014 - CEAC website, visa status changed to "Issued." Now we wait for pickup/delivery.
Mar 21, 2014 - Juvy picked up visa from 2GO location, got CFO stamp, and I booked her ticket.
Mar 22, 2014 - Juvy left Manila, through Japan and Detroit, and finally onto Houston!! :-)
THE REST OF MY LIFE CAN NOW OFFICIALLY BEGIN!!!
event.png
event.png

Link to comment
Share on other sites

Got Two e-Mails ......

On November 7, 2013, we transferred this case I130 IMMIGRANT PETITION FOR
RELATIVE, FIANCE(E), OR ORPHAN to another office for processing and sent you a notice
explaining this action. Please follow any instructions provided on the notice. We will notify
you by mail when a decision is made. If you move while this case is pending, please use our
Change of Address online tool to update your case with your new address or call our
customer service center at 1-800-375-5283.
On November 8, 2013, we transferred your I130, IMMIGRANT PETITION FOR RELATIVE,
FIANCE(E), OR ORPHAN, to your local USCIS Office for further processing. The new office
has jurisdiction over your case and will send you a decision as soon as processing is
complete or you will be notified if further information or action is needed. If you move, please
use our Change of Address online tool to update your case with your new address.

When will i get third number e-mail? Any one idea ?

_________________________________________________________________________________
USCIS Stage:
(IR-1/CR-1- I130 IMMIGRANT PETITION FOR RELATIVE, FIANCE(E), OR ORPHAN)
_________________________________________________________________________________
Priority Date of NOA 1 ( NBC/MSC )- March 22, 2013
_________________________________________________________________________________
07 November 13 : Case transferred NBC to another office for processing.
08 November 13 : Case transferred to your local USCIS Office for further processing.
13 November 13 : Got our transfer notice in mail. Mine was transfer in Texas Service Center
15 November 13 : Case was transferred and is now being processed at a USCIS office

02 December 13 : Got a notice that Case was approved ( NOA2 )

17 December 13 : Shipped this approved or re-affirmed case to the Department of State for visa processing.

_________________________________________________________________________________
NVC Stage :
_________________________________________________________________________________

29 December 13 : NVC received Case

30 December 13 : NVC Assigned Case Number and Invoice # (Call)

30 December 13 : DS-261 Available and completed

31 December 13 : Received e-mail to pay AOS Fee

02 January 14 : AOS bill invoice available and paid (AOS Fee Payment Status-IN PROCESS)

06 January 14 : AOS Fee 'Payment Status' changed from 'in process' to 'PAID'.

06 January 14 : IV bill invoice available and paid (IV Fee Payment Status-IN PROCESS)

08 January 14 : IV Fee 'Payment Status' changed from 'in process' to 'PAID'.

08 January 14 : DS-260 Available and completed

17 January 14 : IV package mailed

21 January 14 : IV package received (Based on USPS tracking)

22 January 14 : NVC Scanned The IV Package

28 January 14 : AOS package mailed

30 January 14 : AOS package received (Based on USPS tracking)

31 January 14 : NVC Scanned The AOS Package

10 February 14 : Received IV false checklist

24 February 14 : Received AOS checklist via e-mail

25 February 14 : Respond to AOS checklist

27 February 14 : AOS Checklist Response Received by NVC (Based on USPS tracking)

28 February 14 : NVC Scanned The AOS Checklist

17 March 14 : Case Complete

02 April 14 : Interview Date confirmed for May 06 2014 (Phone Call)

03 April 14 : Received an email about my interview appointment (P4 letter)

_________________________________________________________________________________

Consulate Stage:
_________________________________________________________________________________
08 April 14 : Medical
10 April 14 : CEAC status-Case is in TRANSIT to the Consular Section
15 April 14 : CEAC status changed to READY
06 May 14 : Interview and Approved !!!! (Thanks to Almighty Allah)

08 May 14 : Received Passport, Visa and POE Sealed file from Embassy

23 May 14 : Port of Entry @ JFK

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

Got Two e-Mails ......

When will i get third number e-mail? Any one idea ?

I HAVE THE SAME MARCH 22 PD AND RECEIVED THE SAME TWO EMAILS ON THE SAME TWO DAYS AS WELL AND HAVEN'T GOTTEN THE THIRD EMAIL AS OF YET EITHER. FROM WHAT I'VE BEEN SEEING WE SHOULD MAYBE GET THEM IN ANOTHER BUSINESS DAY OR TWO

Link to comment
Share on other sites

I still havent got any news. i checked my case status and it says initial review. my pd is march 25. im getting mad..

NOA 1- March 25, 2013

NOA 2- Dec 23, 2013

Dec 27, 2013 Case shipped from NSC to NVC

Case in NVC building-Jan 13,2013

National Visa Center Processing

Case # and IIN- 02/14/2014

DS-261 completed: 2/19/2014

AOS Invoiced and shows IN PROGRESS: 2/20/2014

AOS shows PAID: 2/24/2014 AOS- packet added to the case: 3/17/2014

DS 261 Accepted: 03/20/2014IV fee yellow triangle with exclamation mark seen on CEAC- 03/18/2014

IV fee available to pay and shows IN PROGRESS: 3/20/2014

IV packet received by NVC 03/7/2014

IV packet FALSE checklist-(Checklist shows: I need to complete the DS 261 form): 03/17/2014

IV Packet FALSE checklist (Checklist shows: pay IV fee): 3/20/2014

IV fee shows PAID 3/24/2014IV packet accepted 3/24/2014 (all civil documents reviewed per NVC rep 4/1, currently waiting on DS 260 to be reviewed)

DS-260 - SUBMITTED 3/25/2014

Checklist for Court record and Indian PCC- April

Submitted Court Record document and NVC scanned into system- 4/23
NVC received Indian PCC at their door on 5/9/2014
PCC scanned into system- 5/12/2014
Mysterious Second Package scanned into system- 5/16/2014
Case complete- 06/11/2014
interview Date: 07/08/2014 changed from 7/15/14
delivery of Child #1- 6/11/2014
Medical Completed 4/4/2014 at knightsbridge doctors

Link to comment
Share on other sites

I HAVE THE SAME MARCH 22 PD AND RECEIVED THE SAME TWO EMAILS ON THE SAME TWO DAYS AS WELL AND HAVEN'T GOTTEN THE THIRD EMAIL AS OF YET EITHER. FROM WHAT I'VE BEEN SEEING WE SHOULD MAYBE GET THEM IN ANOTHER BUSINESS DAY OR TWO

Is there 3 emails all in all?what is the third one?if you received 3 emails meaning you are neary in approval?
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

Is there 3 emails all in all?what is the third one?if you received 3 emails meaning you are neary in approval?

THE THIRD EMAIL SHOULD TELL YOU THE SERVICE CENTER THEY'VE SENT YOUR CASE TO FOR PROCESSING. AFTER ABOUT TWO WEEKS (GIVE OR TAKE A FEW DAYS) YOUR CASE'LL BE APPROVED THEN SENT TO THE VISA CENTER. THIS IS FROM WHAT I'VE BEEN GATHERING ON HERE

Link to comment
Share on other sites

are they going to tell you specfically what service center?the third notice will see in the status online?cause i just saw my tranfered in online status

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...