HI Miacarmela,

Can you please share your timeline? Please let us know when was your AOS and IV documents were mailed and when they entered into system for review.

Thanks,

My AOS checklist was delivered on Sep 23 before 10:00 AM and entered into system on Sep 25th. So now they are finishing not in 15 days but 13 days.

Miacarmela's one post tells that NVC entered his AOS checklist into system on Sep 20th that means he got his AOS checklist reviewed in just 13 days. I hope they continue to do so in these timelines :-).

Thanks,

10/31/2012: NOA1 07/18/2013: NOA2

08/06/2013: NVC received our case

08/14/2013: Case number assigned

08/14/2013: Sent filled DS3032 via email

08/19/2013: Received I864/DS3032 via e-mail

08/19/2013: Paid I864 bill

08/19/2013: Sent I864 package

08/20/2013: I864 package delivered

08/22/2013: I864 entered into System for Review.

08/29/2013: Received IV bill

08/29/2013: Paid IV bill.

09/03/2013: Sent IV package

09/04/2013: IV Package Delivered

09/05/2013: DS-260 submitted

09/06/2013: IV Package entered into System for Review

09/18/2013: Checklist for AOS

09/19/2013: AOS Checklist response Sent

09/23/2013: AOS Checklist response delivered

09/25/2013: AOS Checklist Response entered into System for review

09/30/2013: IV Checklist received (for Passport Police Clearance)

09/30/2013: IV Package accepted (NVC Rep told me that ignore IV checklist - It is needed at the time of the Interview)

10/17/2013: AOS accepted

10/17/2013: Case complete

10/22/2013: Sent expedite request ( Interview scheduling for medical condition)

10/24/2013: Email notification about case being complete

10/24/2013: Expedite request Approved.

10/25/2013: NVC Case status in Transit ( Case file is sent to Embassy)

10/29/2013: I/L Received

12/02/2013: Interview day

Filed: F-2A Visa Country: Colombia
Timeline
Posted

My AOS checklist was delivered on Sep 23 before 10:00 AM and entered into system on Sep 25th. So now they are finishing not in 15 days but 13 days.

Miacarmela's one post tells that NVC entered his AOS checklist into system on Sep 20th that means he got his AOS checklist reviewed in just 13 days. I hope they continue to do so in these timelines :-).

Thanks,

Hi l2lovemywife,

I've seen a lot of people getting AOS checklists and I see you got one too. Would you mind sharing what was the checklist about? I'm a bit concern I might get one and I just wanna be prepared if I do (I hope I don't though).

Thanks!

PD: 07/12/12

NOA1: 07/15/12

NOA2: 09/04/13

NVC Received: 09/20/13

NVC case No. & IIN: 09/23/13

DS-261 Submitted: 09/23/13

AOS Fee Received and Paid: 09/23/13

AOS Package Sent: 09/25/13

AOS Package Received by NVC: 09/26/13

AOS Entered into System for Review: 09/30/13

IV Fee Received and Paid: 10/08/13

IV Package Sent: 10/09/13

DS-260 Submitted: 10/09/13

IV Package Received by NVC: 10/10/13

IV Package Entered into System for Review: 10/11/13

CASE COMPLETED: 11/05/13

I/L: 12/02/13

Interview Date: 01/02/14.

VISA APPROVED!

Filed: F-2A Visa Country: India
Timeline
Posted

Hi l2lovemywife,

I've seen a lot of people getting AOS checklists and I see you got one too. Would you mind sharing what was the checklist about? I'm a bit concern I might get one and I just wanna be prepared if I do (I hope I don't though).

Thanks!

HI Garciandres87,

I got for two things. 1. The mailing address for Sponsor: I put it blank. It should be N/A if the mailing address is same as present address. 2. My Total Income I put was AGI but I think they wanted to put it before any deduction.

I hope to get it accepted this time. 13th day is this Friday. 15th Day will be Tuesday unless Columbus day is a holiday. I hope to get CC next week.

Thanks,

10/31/2012: NOA1 07/18/2013: NOA2

08/06/2013: NVC received our case

08/14/2013: Case number assigned

08/14/2013: Sent filled DS3032 via email

08/19/2013: Received I864/DS3032 via e-mail

08/19/2013: Paid I864 bill

08/19/2013: Sent I864 package

08/20/2013: I864 package delivered

08/22/2013: I864 entered into System for Review.

08/29/2013: Received IV bill

08/29/2013: Paid IV bill.

09/03/2013: Sent IV package

09/04/2013: IV Package Delivered

09/05/2013: DS-260 submitted

09/06/2013: IV Package entered into System for Review

09/18/2013: Checklist for AOS

09/19/2013: AOS Checklist response Sent

09/23/2013: AOS Checklist response delivered

09/25/2013: AOS Checklist Response entered into System for review

09/30/2013: IV Checklist received (for Passport Police Clearance)

09/30/2013: IV Package accepted (NVC Rep told me that ignore IV checklist - It is needed at the time of the Interview)

10/17/2013: AOS accepted

10/17/2013: Case complete

10/22/2013: Sent expedite request ( Interview scheduling for medical condition)

10/24/2013: Email notification about case being complete

10/24/2013: Expedite request Approved.

10/25/2013: NVC Case status in Transit ( Case file is sent to Embassy)

10/29/2013: I/L Received

12/02/2013: Interview day

Posted

I think it's safe to say that i got CC!!

I got a checklist email today and freaked out but continued to read it and they are making me (petitioner) let my husband bring the required documents at his interview! <3

So, yes? We're CC right? hehe.

BUT, i wonder if my final CC will change because i sent 2 AOSs and this email was after they reviewed the first one ONLY. I sent my Joint Sponsor's AOS a couple of days after. So i guess i still have to wait for what they say about that... But nevertheless, i think my case is blue now? biggrin.png What do you guys think?

P.S. I'm still unsure on how to edit the list.. but i can someone change mine to CC, please? <3

CONGRATS!!!1

Filed: F-2A Visa Country: Colombia
Timeline
Posted

HI Garciandres87,

I got for two things. 1. The mailing address for Sponsor: I put it blank. It should be N/A if the mailing address is same as present address. 2. My Total Income I put was AGI but I think they wanted to put it before any deduction.

I hope to get it accepted this time. 13th day is this Friday. 15th Day will be Tuesday unless Columbus day is a holiday. I hope to get CC next week.

Thanks,

Thanks for your quick response.

I seems to me like they're kind of picky about these forms. I tried to answer every question on the I-864. Hope I didn't miss anything. I hope you get CC next week.

Good luck!

PD: 07/12/12

NOA1: 07/15/12

NOA2: 09/04/13

NVC Received: 09/20/13

NVC case No. & IIN: 09/23/13

DS-261 Submitted: 09/23/13

AOS Fee Received and Paid: 09/23/13

AOS Package Sent: 09/25/13

AOS Package Received by NVC: 09/26/13

AOS Entered into System for Review: 09/30/13

IV Fee Received and Paid: 10/08/13

IV Package Sent: 10/09/13

DS-260 Submitted: 10/09/13

IV Package Received by NVC: 10/10/13

IV Package Entered into System for Review: 10/11/13

CASE COMPLETED: 11/05/13

I/L: 12/02/13

Interview Date: 01/02/14.

VISA APPROVED!

Filed: F-2A Visa Country: India
Timeline
Posted

Thanks for your quick response.

I seems to me like they're kind of picky about these forms. I tried to answer every question on the I-864. Hope I didn't miss anything. I hope you get CC next week.

Good luck!

Thanks Garciandres87!

10/31/2012: NOA1 07/18/2013: NOA2

08/06/2013: NVC received our case

08/14/2013: Case number assigned

08/14/2013: Sent filled DS3032 via email

08/19/2013: Received I864/DS3032 via e-mail

08/19/2013: Paid I864 bill

08/19/2013: Sent I864 package

08/20/2013: I864 package delivered

08/22/2013: I864 entered into System for Review.

08/29/2013: Received IV bill

08/29/2013: Paid IV bill.

09/03/2013: Sent IV package

09/04/2013: IV Package Delivered

09/05/2013: DS-260 submitted

09/06/2013: IV Package entered into System for Review

09/18/2013: Checklist for AOS

09/19/2013: AOS Checklist response Sent

09/23/2013: AOS Checklist response delivered

09/25/2013: AOS Checklist Response entered into System for review

09/30/2013: IV Checklist received (for Passport Police Clearance)

09/30/2013: IV Package accepted (NVC Rep told me that ignore IV checklist - It is needed at the time of the Interview)

10/17/2013: AOS accepted

10/17/2013: Case complete

10/22/2013: Sent expedite request ( Interview scheduling for medical condition)

10/24/2013: Email notification about case being complete

10/24/2013: Expedite request Approved.

10/25/2013: NVC Case status in Transit ( Case file is sent to Embassy)

10/29/2013: I/L Received

12/02/2013: Interview day

Filed: F-2A Visa Country: Philippines
Timeline
Posted

I think it's safe to say that i got CC!!

I got a checklist email today and freaked out but continued to read it and they are making me (petitioner) let my husband bring the required documents at his interview! <3

So, yes? We're CC right? hehe.

BUT, i wonder if my final CC will change because i sent 2 AOSs and this email was after they reviewed the first one ONLY. I sent my Joint Sponsor's AOS a couple of days after. So i guess i still have to wait for what they say about that... But nevertheless, i think my case is blue now? biggrin.png What do you guys think?

P.S. I'm still unsure on how to edit the list.. but i can someone change mine to CC, please? <3

Instructions for adding/updating yourself (or assisting others) to this list:

1. DO NOT DELETE THESE INSTRUCTIONS.

2. Please make sure you are using Rich Text Editor as your message setting.

3. Click "Reply" on the most recent/updated posting version of this list.

4. Remove the "Quote Coding" at the top and bottom of the list.

5. INSERT YOUR NAME ACCORDING TO PRIORITY DATE.

6. Color code: RED = with I/L, BLUE = CC waiting for I/L, BLACK = waiting for CC

NAME--------PRIORITY DATE-----CASE COMPLETED------I/L RECEIVED------INTERVIEW-----COUNTRY

SAUDADE21---------03MAR11-----------26SEP13---------------XXX----------------XXX---------JAMAICA

DADO REEM---------11JUL11------------XXX-------------------XXX----------------XXX---------LEBANON

RAININA------------28JUL11------------XXX-------------------XXX----------------XXX---------RUSSIA

K&V FOREVER--------05AUG11-----------01AUG13--------------10SEP13-----------16OCT13-----GUYANA

HEARTLIP-----------13SEP11------------26AUG13--------------02OCT13----------26NOV13-----NEPAL

OMNIA-------------19SEP11------------19SEP13---------------03OCT13----------30NOV13------ARMENIA

TEBESSUM-----------23SEP11------------26SEP13-----------------XXX-------------XXX----------TURKEY

2HONI--------------28SEP11------------01OCT13-----------------XXX-------------XXX---------VIETNAM

JANETTBRUA---------29SEP11--------------26SEP13--------------XXX-------------XXX----------PHILIPPINES

SAFA8783-----------03OCT11-------------09SEP13------------03OCT13----------27NOV13------MOROCCO

MOURAD81----------04OCT11------------16JUL13---------------29JUL13---------26SEP13-------MOROCCO

KARACHIF2A---------11OCT11 ------------17SEP13--------------02OCT13--------08NOV13-------PAKISTAN

BEATKA-------------13OCT11---------------XXX------------------XXX------------XXX-----------ITALY

JEBIEN--------------13OCT11-------------17SEP13--------------02OCT13--------18NOV13------PHILIPPINES

SINGJAY-------------25OCT11--------------XXX-----------------XXX-------------XXX------------JAMAICA

MILY7--------------28OCT11--------------24SEP13--------------XXX-------------XXX-----------EL SALVADOR

NOBRAINS-----------05NOV11-------------12SEP13--------------XXX-------------XXX-----------EGYPT

PALLU2013----------09NOV11-------------20SEP13--------------02OCT13--------12NOV13------INDIA

SONAMAR31--------02DEC11--------------19SEP13--------------01OCT13--------14NOV13------INDIA

BOB2013-----------05DEC11--------------12SEP13-------------03OCT13--------21NOV13-------MOROCCO

BOYBOY0812--------28DEC11--------------30SEP13--------------XXX--------------XXX----------PHILIPPINES

JIMMY84------------06JAN12---------------XXX------------------XXX--------------XXX----------JAMAICA

KIWIPOUPOU--------19JAN12--------------06SEP13--------------03OCT13---------3NOV13-----------IRAN

IVANA99------------24JAN12--------------04SEP13--------------02OCT13--------19NOV13-------PHILIPPINES

YES2A--------------27JAN12--------------12SEP13--------------02OCT13--------21NOV13-------INDIA

LEI_LANI------------27JAN12--------------24SEP13---------------XXX--------------XXX-----------PHILIPPINES

ANTIBODY18--------27JAN12--------------23AUG13--------------02OCT13--------27NOV13-------PHILIPPINES

BUNINGNING---------06FEB12--------------06SEP13-------------03OCT13--------20NOV13--------PHILIPPINES

WAITING SUCKS------20FEB12---------------25SEP13---------------XXX------------XXX----------TRINIDAD

MARGA_20----------13MAR12--------------24SEP13---------------XXX------------XXX----------PHILIPPINES

MIMI20-------------??APR12---------------18SEP13-------------03OCT13--------07NOV13--------MOROCCO

SHABBERA-----------03APR12--------------13SEP13-------------02OCT13--------19NOV13-------PAKISTAN

SHTU---------------09APR12--------------03SEP13-------------02OCT13--------18NOV13--------UKRAINE

TINJF10-------------07MAY12---------------26SEP13--------------XXX-------------XXX----------PHILIPPINES

TIDUS402-----------11MAY12--------------03OCT13---------------XXX------------XXX----------VIETNAM

ATELAR-------------14MAY12--------------12SEP13-------------02OCT13-------12NOV13-------NICARAGUA

APPLE21-------------21MAY12--------------30SEP13--------------XXX-------------XXX---------PHILIPPINES

BINASHI--------------24MAY12---------------XXX-----------------XXX-------------XXX---------PHILIPPINES

YAMPIAZKDANIEL------04JUN12----------------XXX----------------XXX-------------XXX----------PHILIPPINES

PERUVIAN83----------06JUL12----------------XXX------------------XXX-------------XXX----------PERU

JAYCEEANCHETA-------16JUL12---------------XXX------------------XXX------------XXX----------PHILIPPINES

KAI26----------------18JUL12---------------23SEP13--------------XXX-------------XXX---------PHILIPPINES

AMERICA DEL SUR------25JUL12--------------07OCT13----------------XXX------------XXX-----------ECUADOR

ALWAYSALONE---------29JUL12--------------23SEP13---------------XXX------------XXX------------INDIA

F2AFORCONSULAR------17AUG12---------------XXX------------------XXX-----------XXX-----------INDIA

MIACARMELA----------26SEP12--------------09OCT13--------------XXX------------XXX-----------PHILIPPINES

MPESIAO--------------28SEP12--------------XXX-----------------XXX-------------XXX------------PHILIPPINES

CAT21---------------15OCT12--------------XXX------------------XXX------------XXX-----------PHILIPPINES

i2LOVEMYWIFE---------31OCT12--------------XXX------------------XXX------------XXX-----------INDIA

MS. MATIC------------13NOV12---------------XXX-----------------XXX-------------XXX----------PHILIPPINES

MUTU----------------14NOV12---------------XXX-----------------XXX-------------XXX----------NEPAL

JUSTOLEME------------07JAN13---------------XXX-----------------XXX------------XXX---------UNITED KINGDOM

UKP88----------------12MAR13--------------XXX-----------------XXX------------XXX----------PAKISTAN

Filed: F-2A Visa Country: India
Timeline
Posted

My AOS checklist was delivered on Sep 23 before 10:00 AM and entered into system on Sep 25th. So now they are finishing not in 15 days but 13 days.

Miacarmela's one post tells that NVC entered his AOS checklist into system on Sep 20th that means he got his AOS checklist reviewed in just 13 days. I hope they continue to do so in these timelines :-).

Thanks,

Hi Miacarmela,

Typically when called and asked about when they received any package then they let us know about the latest one. So I would assume the package they received (entered into system) on SEP 20 was the latest one and the one sent 2 days before was enetered into system on SEP 18. So I think the old AOS was approved for you on 15th day starting 18th SEP.

Please confirm us these dates once you come back on line. I would also suggest to add your signature like us so that everyone uses that information for guestimate.

Thanks,

10/31/2012: NOA1 07/18/2013: NOA2

08/06/2013: NVC received our case

08/14/2013: Case number assigned

08/14/2013: Sent filled DS3032 via email

08/19/2013: Received I864/DS3032 via e-mail

08/19/2013: Paid I864 bill

08/19/2013: Sent I864 package

08/20/2013: I864 package delivered

08/22/2013: I864 entered into System for Review.

08/29/2013: Received IV bill

08/29/2013: Paid IV bill.

09/03/2013: Sent IV package

09/04/2013: IV Package Delivered

09/05/2013: DS-260 submitted

09/06/2013: IV Package entered into System for Review

09/18/2013: Checklist for AOS

09/19/2013: AOS Checklist response Sent

09/23/2013: AOS Checklist response delivered

09/25/2013: AOS Checklist Response entered into System for review

09/30/2013: IV Checklist received (for Passport Police Clearance)

09/30/2013: IV Package accepted (NVC Rep told me that ignore IV checklist - It is needed at the time of the Interview)

10/17/2013: AOS accepted

10/17/2013: Case complete

10/22/2013: Sent expedite request ( Interview scheduling for medical condition)

10/24/2013: Email notification about case being complete

10/24/2013: Expedite request Approved.

10/25/2013: NVC Case status in Transit ( Case file is sent to Embassy)

10/29/2013: I/L Received

12/02/2013: Interview day

Posted

Thank you, everyone!

& to those who asked, here's a little "timeline" of my last package sent to NVC.

I lost track of how many days it took for them to review my husband's DS-230 with Civil Documents, so i'll skip that..

But with the AOS checklist, I sent two. One was received on Sept 16 (Assuming they entered it on Sept 17, maybe 18?) and i got a response today, so that would make it 16 business days since they RECEIVED it (like i said, i don't know when they started to enter it in the system). I got another checklist but they asked me to have my husband bring it to his interview, which would mean i am CC, today, Oct 8, US time.

My 2nd AOS (Joint Sponsor) was received on Sept 20 and since that's a Friday, i am just expecting that they started to enter that one on Sept 23, Monday, and expecting to hear back from them on Oct 14. I hope nothing changes with my CC and they will ask all other required documents during his interview like with my 1st CC email. hehe

Now.. is it November yet? :D I cannot wait for our I/L.

Posted (edited)

Instructions for adding/updating yourself (or assisting others) to this list:

1. DO NOT DELETE THESE INSTRUCTIONS.

2. Please make sure you are using Rich Text Editor as your message setting.

3. Click "Reply" on the most recent/updated posting version of this list.

4. Remove the "Quote Coding" at the top and bottom of the list.

5. INSERT YOUR NAME ACCORDING TO PRIORITY DATE.

6. Color code: RED = with I/L, BLUE = CC waiting for I/L, BLACK = waiting for CC

NAME--------PRIORITY DATE-----CASE COMPLETED------I/L RECEIVED------INTERVIEW-----COUNTRY

SAUDADE21---------03MAR11-----------26SEP13---------------XXX----------------XXX---------JAMAICA

DADO REEM---------11JUL11------------XXX-------------------XXX----------------XXX---------LEBANON

RAININA------------28JUL11------------XXX-------------------XXX----------------XXX---------RUSSIA

K&V FOREVER--------05AUG11-----------01AUG13--------------10SEP13-----------16OCT13-----GUYANA

HEARTLIP-----------13SEP11------------26AUG13--------------02OCT13----------26NOV13-----NEPAL

OMNIA-------------19SEP11------------19SEP13---------------03OCT13----------30NOV13------ARMENIA

TEBESSUM-----------23SEP11------------26SEP13-----------------XXX-------------XXX----------TURKEY

2HONI--------------28SEP11------------01OCT13-----------------XXX-------------XXX---------VIETNAM

JANETTBRUA---------29SEP11--------------26SEP13--------------XXX-------------XXX----------PHILIPPINES

SAFA8783-----------03OCT11-------------09SEP13------------03OCT13----------27NOV13------MOROCCO

MOURAD81----------04OCT11------------16JUL13---------------29JUL13---------26SEP13-------MOROCCO

KARACHIF2A---------11OCT11 ------------17SEP13--------------02OCT13--------08NOV13-------PAKISTAN

BEATKA-------------13OCT11---------------XXX------------------XXX------------XXX-----------ITALY

JEBIEN--------------13OCT11-------------17SEP13--------------02OCT13--------18NOV13------PHILIPPINES

SINGJAY-------------25OCT11--------------XXX-----------------XXX-------------XXX------------JAMAICA

MILY7--------------28OCT11--------------24SEP13--------------XXX-------------XXX-----------EL SALVADOR

NOBRAINS-----------05NOV11-------------12SEP13--------------XXX-------------XXX-----------EGYPT

PALLU2013----------09NOV11-------------20SEP13--------------02OCT13--------12NOV13------INDIA

SONAMAR31--------02DEC11--------------19SEP13--------------01OCT13--------14NOV13------INDIA

BOB2013-----------05DEC11--------------12SEP13-------------03OCT13--------21NOV13-------MOROCCO

BOYBOY0812--------28DEC11--------------30SEP13--------------XXX--------------XXX----------PHILIPPINES

JIMMY84------------06JAN12---------------XXX------------------XXX--------------XXX----------JAMAICA

KIWIPOUPOU--------19JAN12--------------06SEP13--------------03OCT13---------3NOV13-----------IRAN

IVANA99------------24JAN12--------------04SEP13--------------02OCT13--------19NOV13-------PHILIPPINES

YES2A--------------27JAN12--------------12SEP13--------------02OCT13--------21NOV13-------INDIA

LEI_LANI------------27JAN12--------------24SEP13---------------XXX--------------XXX-----------PHILIPPINES

ANTIBODY18--------27JAN12--------------23AUG13--------------02OCT13--------27NOV13-------PHILIPPINES

BUNINGNING---------06FEB12--------------06SEP13-------------03OCT13--------20NOV13--------PHILIPPINES

WAITING SUCKS------20FEB12---------------25SEP13---------------XXX------------XXX----------TRINIDAD

MARGA_20----------13MAR12--------------24SEP13---------------XXX------------XXX----------PHILIPPINES

MIMI20-------------??APR12---------------18SEP13-------------03OCT13--------07NOV13--------MOROCCO

SHABBERA-----------03APR12--------------13SEP13-------------02OCT13--------19NOV13-------PAKISTAN

SHTU---------------09APR12--------------03SEP13-------------02OCT13--------18NOV13--------UKRAINE

TINJF10-------------07MAY12---------------26SEP13--------------XXX-------------XXX----------PHILIPPINES

TIDUS402-----------11MAY12--------------03OCT13---------------XXX------------XXX----------VIETNAM

ATELAR-------------14MAY12--------------12SEP13-------------02OCT13-------12NOV13-------NICARAGUA

APPLE21-------------21MAY12--------------30SEP13--------------XXX-------------XXX---------PHILIPPINES

BINASHI--------------24MAY12---------------XXX-----------------XXX-------------XXX---------PHILIPPINES

YAMPIAZKDANIEL------04JUN12----------------XXX----------------XXX-------------XXX----------PHILIPPINES

PERUVIAN83----------06JUL12----------------XXX------------------XXX-------------XXX----------PERU

JAYCEEANCHETA-------16JUL12---------------XXX------------------XXX------------XXX----------PHILIPPINES

KAI26----------------18JUL12---------------23SEP13--------------XXX-------------XXX---------PHILIPPINES

AMERICA DEL SUR------25JUL12--------------07OCT13----------------XXX------------XXX-----------ECUADOR

ALWAYSALONE---------29JUL12--------------23SEP13---------------XXX------------XXX------------INDIA

F2AFORCONSULAR------17AUG12---------------XXX------------------XXX-----------XXX-----------INDIA

MEENO1988-----------13SEP12---------------XXX-------------------XXX-----------XXX-----------EGYPT

MIACARMELA----------26SEP12--------------08OCT13--------------XXX------------XXX-----------PHILIPPINES

MPESIAO--------------28SEP12--------------XXX-----------------XXX-------------XXX------------PHILIPPINES

CAT21---------------15OCT12--------------XXX------------------XXX------------XXX-----------PHILIPPINES

i2LOVEMYWIFE---------31OCT12--------------XXX------------------XXX------------XXX-----------INDIA

MS. MATIC------------13NOV12---------------XXX-----------------XXX-------------XXX----------PHILIPPINES

MUTU----------------14NOV12---------------XXX-----------------XXX-------------XXX----------NEPAL

JUSTOLEME------------07JAN13---------------XXX-----------------XXX------------XXX---------UNITED KINGDOM

UKP88----------------12MAR13--------------XXX-----------------XXX------------XXX----------PAKISTAN

Hello again, Apple.

What information did SLEC need for you to have an advance medical? I want to have my husband do his medical ASAP since we are now CC.

Do you think the email stating CC is fine? or it has to be the email addressed in his name (beneficiary).

Thank you!

Edited by Miacarmela
Filed: F-2A Visa Country: Philippines
Timeline
Posted

Hello again, Apple.

What information did SLEC need for you to have an advance medical? I want to have my husband do his medical ASAP since we are now CC.

Do you think the email stating CC is fine? or it has to be the email addressed in his name (beneficiary).

Thank you!

The CC email is okay. It has the beneficiary's name and MNL case number.

Filed: F-2A Visa Country: India
Timeline
Posted

Thank you, everyone!

& to those who asked, here's a little "timeline" of my last package sent to NVC.

I lost track of how many days it took for them to review my husband's DS-230 with Civil Documents, so i'll skip that..

But with the AOS checklist, I sent two. One was received on Sept 16 (Assuming they entered it on Sept 17, maybe 18?) and i got a response today, so that would make it 16 business days since they RECEIVED it (like i said, i don't know when they started to enter it in the system). I got another checklist but they asked me to have my husband bring it to his interview, which would mean i am CC, today, Oct 8, US time.

My 2nd AOS (Joint Sponsor) was received on Sept 20 and since that's a Friday, i am just expecting that they started to enter that one on Sept 23, Monday, and expecting to hear back from them on Oct 14. I hope nothing changes with my CC and they will ask all other required documents during his interview like with my 1st CC email. hehe

Now.. is it November yet? biggrin.png I cannot wait for our I/L.

Thanks Miacarmela for the answers.

So it is clear. Your 1st AOS package was entered into system on SEP 18 and it is accepted on OCT 8, i.e. 15th Business Day.

The 2nd AOS package might have been entered on SEP 24th. So if at all they have to review/respond on that they will do so on OCT 14 Monday or OCT 15 Tuesday if Monday is Holiday.

Thanks once again!

10/31/2012: NOA1 07/18/2013: NOA2

08/06/2013: NVC received our case

08/14/2013: Case number assigned

08/14/2013: Sent filled DS3032 via email

08/19/2013: Received I864/DS3032 via e-mail

08/19/2013: Paid I864 bill

08/19/2013: Sent I864 package

08/20/2013: I864 package delivered

08/22/2013: I864 entered into System for Review.

08/29/2013: Received IV bill

08/29/2013: Paid IV bill.

09/03/2013: Sent IV package

09/04/2013: IV Package Delivered

09/05/2013: DS-260 submitted

09/06/2013: IV Package entered into System for Review

09/18/2013: Checklist for AOS

09/19/2013: AOS Checklist response Sent

09/23/2013: AOS Checklist response delivered

09/25/2013: AOS Checklist Response entered into System for review

09/30/2013: IV Checklist received (for Passport Police Clearance)

09/30/2013: IV Package accepted (NVC Rep told me that ignore IV checklist - It is needed at the time of the Interview)

10/17/2013: AOS accepted

10/17/2013: Case complete

10/22/2013: Sent expedite request ( Interview scheduling for medical condition)

10/24/2013: Email notification about case being complete

10/24/2013: Expedite request Approved.

10/25/2013: NVC Case status in Transit ( Case file is sent to Embassy)

10/29/2013: I/L Received

12/02/2013: Interview day

Filed: F-2A Visa Country: Pakistan
Timeline
Posted

This is a complete joke with NVC, all the cases they inputted 2 days before mine and even 3 weeks after mine have all been CC complete, the day before mine and the day on mine being inputted by date NOT ONE case has been CC. Oh i am so upset right now its is so sad, My husband is phoning to speak to a supervisor right now. its like they have missed completley 2 days out !!!!!! ;(((((((((((((((((

hey what r the updates???

Filed: F-2A Visa Country: Jamaica
Timeline
Posted

Hi Guys

I sent an email to embassy about my interview schedule and i asked them when they will schedule me an interview and this is what they respond.. Anyone have any idea whats going on?

Btw i put my correct nvc case# on there.

Dear Sir / Madam,

After a thorough search of our files, we are unable to locate a record/file at our office under the case number given in your e-mail. It appears that your file is in the line at National Visa Center to receive an appointment date. You may contact the National Visa Center at NVCINQUIRY@STATE.GOV to inquire about the status of this file.

Sincerely,

Immigrant Visa Unit

Hi tebessum you have to be scheduled for an interview by nvc before the embassy can have an actual case on your file, so just wait patiently it's coming the greatest thing is that you got case complete while some are still waiting to be completed. Goodluckyes.gif

USCIS

PRIORITY DATE - OCT 25, 2011

NOA2 EMAIL/TEXT - JULY 26, 2013

NVC PROCESS

NVC RECEIVED CASE - AUG 12, 2013

SENT AOS PACKAGE - SEPT 4, 2013

IV PACKAGE SENT - SEPT 25, 2013

CASE COMPLETED - OCT 31, 2013

RECEIVED I/L - NOV 29, 2013

INTERVIEW DATE - JAN 23, 2014

VISA APPROVED - JAN 23, 2014

CEAC ISSUED - JAN 24, 2014

VISA IN HAND - JAN 29, 2014

IMMIGRANT FEE PAID $165 - FEB 12,2014

POE - MARCH 24, 2014

ELIS ACCEPTED - FEB 12, 2014

ELIS OPTIMIZED - APRIL 24, 2014

RECEIVED GREEN CARD - APRIL 25, 2014

Filed: F-2A Visa Country: Philippines
Timeline
Posted

Hi Guys

I sent an email to embassy about my interview schedule and i asked them when they will schedule me an interview and this is what they respond.. Anyone have any idea whats going on?

Btw i put my correct nvc case# on there.

Dear Sir / Madam,

After a thorough search of our files, we are unable to locate a record/file at our office under the case number given in your e-mail. It appears that your file is in the line at National Visa Center to receive an appointment date. You may contact the National Visa Center at NVCINQUIRY@STATE.GOV to inquire about the status of this file.

Sincerely,

Immigrant Visa Unit

Don't panic. Your case is still with NVC.

You will receive interview letter probably last week of October or first week of November. Your interview will be in December.

NVC does not give out I/L for F2A all month long.

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...