Hi guys,

I'm wondering if anyone else is in the same/has been in the same boat as me.

My I-130 was approved on May 14th at the Philadelphia field office, and when we rang the NVC a week later were told the 15 working days story, and that our case was there but we would need to wait the 15 days until we got our number. However on the 15th working day we were told that our case was NOT at the NVC and we should wait 90 days until we receive a case number from them as it can take that long for them to get the case?!? #######!

My husband then phoned the USCIS and spoke to a tier 2 supervisor and was told by the guy that he "does not have the information" as to where our case is. I thought they were supposed to be able to tell where it is?!? I'm assuming it should still be at the field office? I'm really scared that it may have been lost!

We have asked our senators office to try and track it down and ask why we were told one thing then another, but I just wondered if this is normal or how I should proceed? I cannot believe they say it takes 3 months to post a stupid case file!!! My hopeful hopeful dreams of a July or August interview are slipping away sad.png

I highly recommend an infopass!

darnell's threads have all the questions you will need

be nice, but be relentless

I was approved april 19 and after shaking trees, it finally got to nvc last friday


8/16/2012 I-129F NOA1
11/8/2012 Married
1/3/2013 I-129F cancelled
1/29/2013 withdrawal notice received
2/5/2013 I-130 NOA1 with error on wife's name
Case status not available
2/5/2013 Unable to generate service request

3/13/2013 transferred to local office
3/26/2013 Service request generated
4/12/2013 Infopass, file in workflow March 28
4/19/2013 Case status available - APPROVED!

Detour to the NVC via NRC

For information on my detour and the steps I took to free my petition, check
"about me"

NVC

6/7/2013 NVC logs file as received

6/11/2013 Case number and IIN assigned

6/12/2013 DS-3032 emailed

6/13/21013 AOS paid

6/14/2013 DS-3032 emailed attention superuser (stupid me)

6/23/2013 DS-3032 emailed attention supervisor

6/24/2013 DS-3032 accepted

6/25/2013 IV bill generated and paid

07/06/2013 IV & AOS sent; 07/11/2013 NVC logs received

07/30/2013 IV Accepted; AOS Checklist

08/01/2013 AOS Checklist received

08/02/2013 AOS resent; 08/07/2013 NVC logs received

08/28/2013 Case Complete

09/10/2013 Interview date assigned

Embassy

08/14/2013 Medical; 08/19/2013 Medical Ready

08/07/2013 Police cert ordered (Fiji delivers straight to the embassy)

10/02/2013 Interview

xx/xx/2013 Visa in Hand

xx/xx/2013 POE Los Angeles International Airport

Posted

Hi guys,

I'm wondering if anyone else is in the same/has been in the same boat as me.

My I-130 was approved on May 14th at the Philadelphia field office, and when we rang the NVC a week later were told the 15 working days story, and that our case was there but we would need to wait the 15 days until we got our number. However on the 15th working day we were told that our case was NOT at the NVC and we should wait 90 days until we receive a case number from them as it can take that long for them to get the case?!? #######!

My husband then phoned the USCIS and spoke to a tier 2 supervisor and was told by the guy that he "does not have the information" as to where our case is. I thought they were supposed to be able to tell where it is?!? I'm assuming it should still be at the field office? I'm really scared that it may have been lost!

We have asked our senators office to try and track it down and ask why we were told one thing then another, but I just wondered if this is normal or how I should proceed? I cannot believe they say it takes 3 months to post a stupid case file!!! My hopeful hopeful dreams of a July or August interview are slipping away

Edited by JennyWhiteley, Today, 04:26 PM.

01-12-2008 - Met at University in Scotland

01-09-2009 - Moved in together

10-10-2012 - Married in South Africa

05-02-2013 - I-130 Sent

08-02-2013 - I-130 NOA1 email

11-02-2013 - Online case status change - Initial Review

14-02-2013 - I-130 NOA1 hard copy I-797

14-05-2013 - I-130 APPROVED ONLINE!!

10-06-2013 - NVC received case

21-06-2013 - Case number

21-06-2013 - DS3032 emailed, Supervisor review 27-01-2013

27-06-2013 - AOS invoiced

27-06-2013 - AOS paid

29-06-2013 - AOS sent

01-07-2013 - DS3032 approved

02-07-2013 - IV invoiced

02-07-2013 - IV paid

03-07-2013 - IV sent

24-07-2013 - AOS approved

29-07-2013 - IV approved

26-07-2013 - Case complete

25/07/2013: Medical Test

08/08/2013: Package sent to embassy

12/08/2013: Package received by embassy(In the UK on 10/08/2013, but embassy not open Saturday)

10/09/2013: Interview Date

13/09/2013: Passport in hand

16/09/2013: Ticket to USA

mazapoint.com*wp-content*uploads*2011*03

Filed: IR-1/CR-1 Visa Country: Fiji
Timeline
Posted

UPDATE

I got a email this afternoon from my Congressman's office with an update on our case. They sent me the correspondence they received from an Immigration Officer at the field office:

So it is STILL at Newark. I hope there is not much to review since, well...they already approved it. My Congressman's office said they will keep me updated on the developments, so hopefully I'll hear something more soon.

this is good news.. uscis hates to deal with congressional inquiries


8/16/2012 I-129F NOA1
11/8/2012 Married
1/3/2013 I-129F cancelled
1/29/2013 withdrawal notice received
2/5/2013 I-130 NOA1 with error on wife's name
Case status not available
2/5/2013 Unable to generate service request

3/13/2013 transferred to local office
3/26/2013 Service request generated
4/12/2013 Infopass, file in workflow March 28
4/19/2013 Case status available - APPROVED!

Detour to the NVC via NRC

For information on my detour and the steps I took to free my petition, check
"about me"

NVC

6/7/2013 NVC logs file as received

6/11/2013 Case number and IIN assigned

6/12/2013 DS-3032 emailed

6/13/21013 AOS paid

6/14/2013 DS-3032 emailed attention superuser (stupid me)

6/23/2013 DS-3032 emailed attention supervisor

6/24/2013 DS-3032 accepted

6/25/2013 IV bill generated and paid

07/06/2013 IV & AOS sent; 07/11/2013 NVC logs received

07/30/2013 IV Accepted; AOS Checklist

08/01/2013 AOS Checklist received

08/02/2013 AOS resent; 08/07/2013 NVC logs received

08/28/2013 Case Complete

09/10/2013 Interview date assigned

Embassy

08/14/2013 Medical; 08/19/2013 Medical Ready

08/07/2013 Police cert ordered (Fiji delivers straight to the embassy)

10/02/2013 Interview

xx/xx/2013 Visa in Hand

xx/xx/2013 POE Los Angeles International Airport

Posted

I highly recommend an infopass!

darnell's threads have all the questions you will need

be nice, but be relentless

I was approved april 19 and after shaking trees, it finally got to nvc last friday

Thanks for the advice!! Did you go through your senators office too, or just an info pass? That's such a long time, I'm so sorry it took forever to get to the NVC, hopefully now you can carry on with the next stage!!

01-12-2008 - Met at University in Scotland

01-09-2009 - Moved in together

10-10-2012 - Married in South Africa

05-02-2013 - I-130 Sent

08-02-2013 - I-130 NOA1 email

11-02-2013 - Online case status change - Initial Review

14-02-2013 - I-130 NOA1 hard copy I-797

14-05-2013 - I-130 APPROVED ONLINE!!

10-06-2013 - NVC received case

21-06-2013 - Case number

21-06-2013 - DS3032 emailed, Supervisor review 27-01-2013

27-06-2013 - AOS invoiced

27-06-2013 - AOS paid

29-06-2013 - AOS sent

01-07-2013 - DS3032 approved

02-07-2013 - IV invoiced

02-07-2013 - IV paid

03-07-2013 - IV sent

24-07-2013 - AOS approved

29-07-2013 - IV approved

26-07-2013 - Case complete

25/07/2013: Medical Test

08/08/2013: Package sent to embassy

12/08/2013: Package received by embassy(In the UK on 10/08/2013, but embassy not open Saturday)

10/09/2013: Interview Date

13/09/2013: Passport in hand

16/09/2013: Ticket to USA

mazapoint.com*wp-content*uploads*2011*03

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

OMG!!! I just called NVC and our case is complete as of today!!! Wooohoooo!!! kicking.gifkicking.gifkicking.gif

Congrats... How long did it take for your AOS package to show up in the system and processed?

USC here yes.gif
------------------------------
I130

11/30/2012 - NOA1 - NBC
01/09/2013 - Transfer to local office(Newark, NJ)
03/11/2013 - INFO Pass
04/04/2013 - INFO Pass

04/30/2013 - RFE - Properly complete and re-submit G-325A.
05/09/2013 - RFE hand delivered to Local office.

05/10/2013 - NOA2 - Newark NJ

NVC
05/13/2013 - NVC Received.
05/30/2013 - Case & IIN # Received.
05/30/2013 - DS3032 & E-mail sent to remove Attorney and appoint petitioner as choice of Agent.
05/30/2013 - NVC accepted request and stated that further communication will now directed to petitioner.
06/04/2013 - AOS & IV bill e-mail received, generated and paid.
06/05/2013 - AOS & IV status paid.
06/05/2013 - AOS package sent
06/12/2013 - IV package sent
06/25/2013 - AOS Accepted
07/03/2013 - IV accepted
07/03/2013 - Case Complete
07/30/2013 - Interview Date received

09/30/2013 - Interview

09/30/2013 - Approved

10/02/2013 - Visa in hand

10/05/2013 - POE




Filed: IR-1/CR-1 Visa Country: Fiji
Timeline
Posted

Thanks for the advice!! Did you go through your senators office too, or just an info pass? That's such a long time, I'm so sorry it took forever to get to the NVC, hopefully now you can carry on with the next stage!!

I went through every avenue available but eventually it was uscis that took care of it, albeit pretty high up on the food chain and no I do not have any special contacts, I can be.. let's say extremely difficult to deal with. I contacted my rep and congressman, nvc, spscatta, omnibudsman, and a few others which shall be nameless. I was able to generate a service request within uscis before their scripted 90 day window. I have filed two service requests for different things there, never got paper confirmation, but both items were resolved. all agencies needed some stupid time frame of three weeks minimum until they got back to me.. that was not acceptable to me since I knew exactly where the file was.

the most important thing you can do is argue from facts. my argument was two fold: 1. my noa2 statement that it was sent to the nvc; 2. confirmation at my infopass that the file was in the local office still.

in hindsight I should have sat at the office until it was resolved.. requesting the supervisor of the 130 unit which I did not do. the week after my infopass and after contacting everyone imaginable, I finally started getting some action.

every time I went for an infopass, I would reschedule another appointment.

spend a good deal of time searching threads for additional information.. do not argue that so and so's petition reached nvc or make mention of visa journey members. if I referenced anything it was a reference to a friend.


8/16/2012 I-129F NOA1
11/8/2012 Married
1/3/2013 I-129F cancelled
1/29/2013 withdrawal notice received
2/5/2013 I-130 NOA1 with error on wife's name
Case status not available
2/5/2013 Unable to generate service request

3/13/2013 transferred to local office
3/26/2013 Service request generated
4/12/2013 Infopass, file in workflow March 28
4/19/2013 Case status available - APPROVED!

Detour to the NVC via NRC

For information on my detour and the steps I took to free my petition, check
"about me"

NVC

6/7/2013 NVC logs file as received

6/11/2013 Case number and IIN assigned

6/12/2013 DS-3032 emailed

6/13/21013 AOS paid

6/14/2013 DS-3032 emailed attention superuser (stupid me)

6/23/2013 DS-3032 emailed attention supervisor

6/24/2013 DS-3032 accepted

6/25/2013 IV bill generated and paid

07/06/2013 IV & AOS sent; 07/11/2013 NVC logs received

07/30/2013 IV Accepted; AOS Checklist

08/01/2013 AOS Checklist received

08/02/2013 AOS resent; 08/07/2013 NVC logs received

08/28/2013 Case Complete

09/10/2013 Interview date assigned

Embassy

08/14/2013 Medical; 08/19/2013 Medical Ready

08/07/2013 Police cert ordered (Fiji delivers straight to the embassy)

10/02/2013 Interview

xx/xx/2013 Visa in Hand

xx/xx/2013 POE Los Angeles International Airport

Posted

How long dose it take to review a checklist email I got a checklist yesterday fixed the problem and I sent it back today

Can i ask you what you write in space in empty ?

None or n/a

USCIS

02/08/2013 Sent I-130 & G-325a

02/12/2013 Priority Date

02/20/2013 NOA1

03/22/2013 I-130 APPROVED dancin5hr.gif

NVC

04/08/2013 Got my case number NVC

04/10/2013 Got my invoiced ID number

04/17/2013 Paid AOS Bill

04/10/2013 Sent email DS-3032

04/18/2013 ACCEPTED DS-3032

04/25/2013 Paid IV bill

05/08/2013 Delivered IV Packet

05/13/2013 Delivered AOS packet

05/22/2013 False Checklist IV packet

06/12/2013 reviewed new I-864 version but i got checklist cray5ol.gif

06/13/2013 i got email checklist

06/15/2013 checklist AOS delivered to NVC

06/19/2013 sent other checklist AOS because i looked that i make mistake and first checklist i sent

07/03/2013 Finally CASE COMPLETE.....Thank GOD dancin5hr.gifdancin5hr.gifdancin5hr.gif

07/15/2013 CASE COMPLETE AGAIN

07/30/2013 Received packet 4

09/16/2013 INTERVIEW DATE THANK GOD dancin5hr.gifdancin5hr.gifdancin5hr.gif

Filed: IR-1/CR-1 Visa Country: Fiji
Timeline
Posted

i would like to confirm that the NVC ERROR MSG is normal, i don't feel like sitting on hold ;)

got case/iin yesterday

log in today

"This case is in the process of termination"

let it be for a day or three?? yes??


8/16/2012 I-129F NOA1
11/8/2012 Married
1/3/2013 I-129F cancelled
1/29/2013 withdrawal notice received
2/5/2013 I-130 NOA1 with error on wife's name
Case status not available
2/5/2013 Unable to generate service request

3/13/2013 transferred to local office
3/26/2013 Service request generated
4/12/2013 Infopass, file in workflow March 28
4/19/2013 Case status available - APPROVED!

Detour to the NVC via NRC

For information on my detour and the steps I took to free my petition, check
"about me"

NVC

6/7/2013 NVC logs file as received

6/11/2013 Case number and IIN assigned

6/12/2013 DS-3032 emailed

6/13/21013 AOS paid

6/14/2013 DS-3032 emailed attention superuser (stupid me)

6/23/2013 DS-3032 emailed attention supervisor

6/24/2013 DS-3032 accepted

6/25/2013 IV bill generated and paid

07/06/2013 IV & AOS sent; 07/11/2013 NVC logs received

07/30/2013 IV Accepted; AOS Checklist

08/01/2013 AOS Checklist received

08/02/2013 AOS resent; 08/07/2013 NVC logs received

08/28/2013 Case Complete

09/10/2013 Interview date assigned

Embassy

08/14/2013 Medical; 08/19/2013 Medical Ready

08/07/2013 Police cert ordered (Fiji delivers straight to the embassy)

10/02/2013 Interview

xx/xx/2013 Visa in Hand

xx/xx/2013 POE Los Angeles International Airport

Posted

I called yesterday and the lady told me i have mistake form i-864 and i called today for ask what was mistake and the guy told me they haven't finished of review :( what can i do?

USCIS

02/08/2013 Sent I-130 & G-325a

02/12/2013 Priority Date

02/20/2013 NOA1

03/22/2013 I-130 APPROVED dancin5hr.gif

NVC

04/08/2013 Got my case number NVC

04/10/2013 Got my invoiced ID number

04/17/2013 Paid AOS Bill

04/10/2013 Sent email DS-3032

04/18/2013 ACCEPTED DS-3032

04/25/2013 Paid IV bill

05/08/2013 Delivered IV Packet

05/13/2013 Delivered AOS packet

05/22/2013 False Checklist IV packet

06/12/2013 reviewed new I-864 version but i got checklist cray5ol.gif

06/13/2013 i got email checklist

06/15/2013 checklist AOS delivered to NVC

06/19/2013 sent other checklist AOS because i looked that i make mistake and first checklist i sent

07/03/2013 Finally CASE COMPLETE.....Thank GOD dancin5hr.gifdancin5hr.gifdancin5hr.gif

07/15/2013 CASE COMPLETE AGAIN

07/30/2013 Received packet 4

09/16/2013 INTERVIEW DATE THANK GOD dancin5hr.gifdancin5hr.gifdancin5hr.gif

Posted

Thank you! Just wanted to get an assurance.

me too I also send old form. nvc recieved it last May 30. As Darnel and Saylin says prepared the new version form prior to the interview. Good luck to us

Cool! We're sticking with the old form too.

Hi luisa! Yes, we also filled out the new form for me to take to the interview. Good luck to us! smile.png

I called NVC to see what's going on and the operator said it doesn't even show pending in their system but I also checked my bank account to see if it was deducted out of my account and it does since this Tuesday! So should I just send my AOS packet?

Ours is also still showing In Process but payment cleared yesterday. My husband just sent our packet earlier. smile.png My DS-3032 hasn't been accepted yet though. sad.png I kept checking my email all day waiting for it.

For our full timeline, please see "About Me".
 

N-400

02-18-2017 - Submitted to USCIS Dallas, TX

02-25-2017 - NOA

03-05-2017 - NOA for Biometrics

03-21-2017 - Biometrics

12-21-2017 - In Line for Interview

03-05-2018 - Received text & email notifications that interview was scheduled. 

03-10-2018 - Received interview letter by mail. 

04-13-2018 - Interview

 

Posted

I went through every avenue available but eventually it was uscis that took care of it, albeit pretty high up on the food chain and no I do not have any special contacts, I can be.. let's say extremely difficult to deal with. I contacted my rep and congressman, nvc, spscatta, omnibudsman, and a few others which shall be nameless. I was able to generate a service request within uscis before their scripted 90 day window. I have filed two service requests for different things there, never got paper confirmation, but both items were resolved. all agencies needed some stupid time frame of three weeks minimum until they got back to me.. that was not acceptable to me since I knew exactly where the file was.

the most important thing you can do is argue from facts. my argument was two fold: 1. my noa2 statement that it was sent to the nvc; 2. confirmation at my infopass that the file was in the local office still.

in hindsight I should have sat at the office until it was resolved.. requesting the supervisor of the 130 unit which I did not do. the week after my infopass and after contacting everyone imaginable, I finally started getting some action.

every time I went for an infopass, I would reschedule another appointment.

spend a good deal of time searching threads for additional information.. do not argue that so and so's petition reached nvc or make mention of visa journey members. if I referenced anything it was a reference to a friend.

Thank you for taking the time to reply to me. It's so frustrating for me because I am so much like you, I do not take no for an answer and I will continue to push until I get my way, however my husband is totally useless when it comes to that sort of thing. He keeps telling me there is nothing he can do and we will just have to wait the 90 days!!!

Because of your reply I have now sent it on to him and told him to do all of the things that you did, and be more forceful about the situation.

Also, how long after you started to ask questions and call etc did your case arrive at the NVC? I see you were approved on April 19th and your case was received 7th June, but at what stage did you start asking for answers?

Thank you again for taking the time to reply to me!

01-12-2008 - Met at University in Scotland

01-09-2009 - Moved in together

10-10-2012 - Married in South Africa

05-02-2013 - I-130 Sent

08-02-2013 - I-130 NOA1 email

11-02-2013 - Online case status change - Initial Review

14-02-2013 - I-130 NOA1 hard copy I-797

14-05-2013 - I-130 APPROVED ONLINE!!

10-06-2013 - NVC received case

21-06-2013 - Case number

21-06-2013 - DS3032 emailed, Supervisor review 27-01-2013

27-06-2013 - AOS invoiced

27-06-2013 - AOS paid

29-06-2013 - AOS sent

01-07-2013 - DS3032 approved

02-07-2013 - IV invoiced

02-07-2013 - IV paid

03-07-2013 - IV sent

24-07-2013 - AOS approved

29-07-2013 - IV approved

26-07-2013 - Case complete

25/07/2013: Medical Test

08/08/2013: Package sent to embassy

12/08/2013: Package received by embassy(In the UK on 10/08/2013, but embassy not open Saturday)

10/09/2013: Interview Date

13/09/2013: Passport in hand

16/09/2013: Ticket to USA

mazapoint.com*wp-content*uploads*2011*03

Filed: IR-1/CR-1 Visa Country: Fiji
Timeline
Posted

i would like to confirm that the NVC ERROR MSG is normal, i don't feel like sitting on hold wink.png

got case/iin yesterday

log in today

"This case is in the process of termination"

let it be for a day or three?? yes??

facepalm disregard stevieb should read the guides more thoroughly .. thanks saylin


8/16/2012 I-129F NOA1
11/8/2012 Married
1/3/2013 I-129F cancelled
1/29/2013 withdrawal notice received
2/5/2013 I-130 NOA1 with error on wife's name
Case status not available
2/5/2013 Unable to generate service request

3/13/2013 transferred to local office
3/26/2013 Service request generated
4/12/2013 Infopass, file in workflow March 28
4/19/2013 Case status available - APPROVED!

Detour to the NVC via NRC

For information on my detour and the steps I took to free my petition, check
"about me"

NVC

6/7/2013 NVC logs file as received

6/11/2013 Case number and IIN assigned

6/12/2013 DS-3032 emailed

6/13/21013 AOS paid

6/14/2013 DS-3032 emailed attention superuser (stupid me)

6/23/2013 DS-3032 emailed attention supervisor

6/24/2013 DS-3032 accepted

6/25/2013 IV bill generated and paid

07/06/2013 IV & AOS sent; 07/11/2013 NVC logs received

07/30/2013 IV Accepted; AOS Checklist

08/01/2013 AOS Checklist received

08/02/2013 AOS resent; 08/07/2013 NVC logs received

08/28/2013 Case Complete

09/10/2013 Interview date assigned

Embassy

08/14/2013 Medical; 08/19/2013 Medical Ready

08/07/2013 Police cert ordered (Fiji delivers straight to the embassy)

10/02/2013 Interview

xx/xx/2013 Visa in Hand

xx/xx/2013 POE Los Angeles International Airport

Filed: Lift. Cond. (pnd) Country: Japan
Timeline
Posted

this is good news.. uscis hates to deal with congressional inquiries

That's good to know. It angers me to think how long our case would be sitting there doing nothing had Congress not inquired on my behalf. All I need to hear now is that it's being sent to the NVC.

01/04/2013 - Married in Tokyo

USCIS
01/24/2013 - Mailed I-130
01/30/2013 - NOA1

03/14/2013 - Case transferred to Newark field office

05/16/2013 - NOA2

NVC

06/20/2013 - NVC received file

06/27/2013 - Case Number and IIN assigned

06/28/2013 - DS-3032 email sent

07/02/2013 - Received DS-3032 and I-864 bill

07/02/2013 - Submitted AOS bill payment

07/05/2013 - AOS bill status PAID

07/06/2013 - Mailed AOS package

07/08/2013 - AOS delivered

07/09/2013 - DS-3032 accepted

07/10/2013 - Received IV bill

07/11/2013 - Submitted IV bill payment

07/13/2013 - IV bill status PAID

07/16/2013 - Mailed IV package

07/17/2013 - IV package delivered

08/01/2013 - AOS approved

08/12/2013 - IV approved & Case Complete

Embassy & POE

08/21/2013 - Casefile confirmed at Tokyo Embassy

09/03/2013 - Interview - APPROVED!

09/16/2013 - Paid Immigrant Fee

10/06/2013 - POE via Toronto

01/07/2014 - Green card received

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...