Btw I was just wondering and it could be a stupid question ..... but the color of RFE or I mean the page on which its printed mean anything? I mean are there more colors and do they use different colors for different reasons? For the most part I think I have herd or received blue RFE (in my case) but I was just thinking if the color has any association with what phase the process is in right now?

USCIS Step:
04/19/2013: NOA1 for both parents
04/17/2013: PD
11/26/2013: Transferred to California Service Center

01/14/2014: Reply to RFE Received by CSC

01/28/2014: Email Update/Txt Received for Approval

02/01/2014: Approval Notice received in Mail

****** Both I-130s approved in about 9.5 months ******

NVC Step:

02/07/2014: Case Received by NVC

03/17/2014: Received Case/Invoice Number

03/18/2014: Submitted DS261

03/19/2014: Paid AOS online (one payment for both cases)

03/22/2014: Sent AOS Packages to NVC (separately for each parent)

03/24/2014: AOS Packages delivered to NVC (as per the USPS Tracking)

03/27/2014: IV Fees Available and Paid Online

04/05/2014: IV Documents sent to NVC

04/06/2014: DS260 submitted online

04/07/2014: IV Documents delivered to NVC

05/01/2014: AOS Approved

05/29/2014: Case Complete !!!

06/11/2014: Interview Letter Received via email

****** Took about 4 months at this NVC stage ******

06/18/2014: Medical/Physical Exam Completed

07/03/2014: Interview Completed

07/09/2014: Visas Issued :dancing:

********** Entire process took 14 Months 2 weeks and 6 days *************

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Statistics for MAY filers:

CSC APPROVALS PERCENTAGE = 80

TSC APPROVAL PERCENTAGE = 32

NSC APPROVALS PERCENTAGE = 17

TSC APPROVAL : out of 19 petitions 6 got approved at

------------------------

17 APRIL 2013 : NOA1 Priority date
27 NOV: TSC; Transfered from NBC

3 Feb : NOA2 ( 296 days)

4 March: Shipped to NVC

11 March : Received at NVC

11 April: Case # assigned

18 April: paid both fees

9May: mailed AOS & IV packages

8May: DS260 completed

16May: packets scanned in NVC system

13 June: check list : missing page 7 of i864.

25 June : scan date AOS checklist

7 Aug: Case Complete...... BIG ACCOMPLISHMENT

14 Aug: interview date assigned

16 Aug: Email interview appointment received

18 Aug: Medical completed

23 Aug: biometric done,DS260 stamped, fingerprints taken.

10 Sep: interview day; interview took 511 days from I-130 NOA1

====================================================

11. 9/17/2016: I-751 packet received by CSC

12.Check Cashed : 9/21/2016

13. NOA1: 9/23/2016

14. BIOMETRICS : 10/12/2016

---------------------------

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

#Attached image are those people who have been left out by TSC without approval according to the excel sheet.

post-154288-0-65505100-1390672316_thumb.png

------------------------

17 APRIL 2013 : NOA1 Priority date
27 NOV: TSC; Transfered from NBC

3 Feb : NOA2 ( 296 days)

4 March: Shipped to NVC

11 March : Received at NVC

11 April: Case # assigned

18 April: paid both fees

9May: mailed AOS & IV packages

8May: DS260 completed

16May: packets scanned in NVC system

13 June: check list : missing page 7 of i864.

25 June : scan date AOS checklist

7 Aug: Case Complete...... BIG ACCOMPLISHMENT

14 Aug: interview date assigned

16 Aug: Email interview appointment received

18 Aug: Medical completed

23 Aug: biometric done,DS260 stamped, fingerprints taken.

10 Sep: interview day; interview took 511 days from I-130 NOA1

====================================================

11. 9/17/2016: I-751 packet received by CSC

12.Check Cashed : 9/21/2016

13. NOA1: 9/23/2016

14. BIOMETRICS : 10/12/2016

---------------------------

Link to comment
Share on other sites

#Attached image are those people who have been left out by TSC without approval according to the excel sheet.

Left out is exactly right.... How sad

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Left out is exactly right.... How sad

Hey lovemytico, came back especially to check in on you! So sorry to see you still haven't budged... if it's any consolation, we haven't got any further and are still waiting for our case number at NVC, it's taking an age... By the time you get to NVC I think you'll fly right through. I'll say a little prayer for you tonight!

USCIS (239 days):

04.18.2013 - NOA1

12.13.2013 - NOA2 via email; I-130 approved. Shipped to NVC

NVC (274 days):

12.30.2013 - Arrived at NVC

01.27.2014 - Received case no. & IIN

02.07.2014 - Completed & submitted DS-261 form online

02.13.2014 - Paid AOS bill

02.18.2014 - AOS showing as 'paid'

03.18.2014 - Invoiced for IV bill (finally!)

03.19.2014 - Made payment for IV bill

03.21.2014 - IV bill showing PAID

03.24.2014 - Completed DS-260 online

03.29.2014 - Mailed IV Packet

04.26.2014 - IV packet all approved, false checklist from NVC for AOS packet

05.07.2014 - AOS packet sent

06.12.2014 - AOS packet scanned in (took them THAT LONG to do it)

07.29.2014 - Received checklist via email

07.30.2014 - Sent re-filled AOS form, as per checklist instructions

09.24.2014 - Case Complete (FINALLY)

09.30.2014 - Case leaves NVC

Embassy:

10.29.2014 - Medical

11.04.2014 - Interview in London - APPROVED

11.05.2014 - CEAC - Issued

11.07.2014 - Courier email

11.10.2014 - Passport and visa received via DX courier

In the USA:

12.02.2014 - POE (Denver)

12.24.2014 - ELIS changed to "In Process"

01.05.2015 - Greencard received in mail

ROC:
10.05.2016 - NOA1

12.13.2016 - Biometrics

11.13.2017 - Infopass Appt.

03.30.2018 - Approval

04.05.2018 - Greencard Arrived

Link to comment
Share on other sites

Hey lovemytico, came back especially to check in on you! So sorry to see you still haven't budged... if it's any consolation, we haven't got any further and are still waiting for our case number at NVC, it's taking an age... By the time you get to NVC I think you'll fly right through. I'll say a little prayer for you tonight!

Thanks Katie... I'm still here ( not by choice) We were transferred to TSC on November 27th.

I heard conflicting statements about calendar days or business days. Senator's office says business days, USCIS tier 1 & 2 say calendar days. Either way, its been 2 months since we were transferred. I have 2 service requests in with the USCIS and an inquiry from the Sentor's office . They all gave specific dates they would respond by. This week , my mission is to get SOMEBODY to do SOMETHING.

Pray for my K-3 to go threw . Of course if they refuse, I have no choice but to take the I-130... I would really rather skip the NVC and go on to our interview, file our waiver and worry about adjusting after the waiver is approved....

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Btw I was just wondering and it could be a stupid question ..... but the color of RFE or I mean the page on which its printed mean anything? I mean are there more colors and do they use different colors for different reasons? For the most part I think I have herd or received blue RFE (in my case) but I was just thinking if the color has any association with what phase the process is in right now?

I have not heard about the color coding on the RFE. However, i have heard on Administrative processing slip after interview at the consulate has multiple colors and it is coded etc.

Mailed I-130 overnight-8/28/2013

Delivered to the USCIS PO Box Chicago 8/29/2013

NOA1 date-8/29/2013 Got as of 9/4/2013

Transfer Date : 2/24/2014

Transferred to Vermont

NOA2 3/7/2014

NVC received 3/19/2014

Case number Assigned 4/18/2014

DS-261 filed 4/26/2014

AOS paid 4/28/2014

AOS shows paid 4/30/2014

IV paid 4/30/2014

AOS and IV packages overnighted sent 5/2/2014

Packages at NVC 5/5/2014, system date of 5/7/2014

Case Complete 6/2/2014

Interview assigned 6/11/2014

Interview 7/18/2014 at Mumbai, India

POE 8/28/2014

Twins-7/19/2015 (Boy and Girl)!!

I-751 mailed in 6/1/2016 (two day priority)

Link to comment
Share on other sites

Hi all! Good luck this week I hope to see all April filers approved soon. Specially lovemytico

USCIS

04/22/2013—Sent I-130

04/25/2013—I-130 NOA

11/27/2013—I-130 Transferred to NSC

01/21/2014—I-130 Approved

01/22/2014—I -130 shipped to NVC

NVC

02/03/2014—NVC Received file

03/11/2014—Case Number Assigned

03/12/2014—IIN BIN Provided

03/14/2014—DS-261 Submitted

03/14/2014—AOS invoice available and paid

03/17/2014—AOS cleared bank

03/18/2014—AOS shows Paid

03/21/2014—AOS Package sent to NVC overnight

03/24/2014—AOS Package delivered at NVC

03/24/2014—DS-261 Accepted

03/24/2014—IV Invoice available

03/25/2014—IV fee paid

03/26/2014—IV Package sent to NVC overnight

03/26/2014—AOS entered in the system

03/27/2014—IV Delivered at NVC

03/27/2014—DS-260 submitted

03/31/2014—IV entered in the system

04/01/2014—Corrected I-864 sent (I found out that I have put the wrong address in part 2)

04/04/2014—Corrected I-864 delivered

04/08/2014— Corrected I-864 entered in the system.

04/09/2014— Received a false check list for the IV documents

04/10/2014— Case Complete (L)

04/30/2014— Interview scheduled

05/01/2014-- Interview email received

05/27/2014— Medical

06/09/2014— Interview/AP Joint sponsor required

07/18/2014-- Visa Issued

07/22/2014-- Visa on hand

Link to comment
Share on other sites

Hi all! Good luck this week I hope to see all April filers approved soon. Specially lovemytico

thanks! luv.gif

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Hey Lovemytico, I'm so sorry you're still dealing with USCI's BS, I'll be praying for you tonight. Hopefully you'll be out of that soon. But NVC is the same, nothing happening yet :(

Fania & Nelson

Met: 02/14/08
Married: 04/04/13
I-130 sent: 04/15/13
Rcvd by USCIS: 04/18/13
NOA1: 04/22/13
NOA2: 12/10/13

NVC Case complete: 04/04/14

Appointment assigned: 04/17/14
Appointment: 05/16/14

Arrival to NYC: 07/03/14

Sent I-751 to VSC 04/04/16

Link to comment
Share on other sites

Hang in there everyone.

We were approved today!

It's been 10 months.

And since our transfer to the NSC, it's been 63 days.

The NSC approvals are seeming formulaic now.

Married 2013

Rcvd by USCIS: 4/23/13

NOA 1: 4/24/13

Transfer to NSC: 11/27/13

NOA 2: 1/27/14

File sent to NVC: 1/27/14

Does anyone know how long to expect the NVC to process papers?

NOA1: APRIL 23, 2013

SHIPPED TO NEBRASKA: NOV 27, 2013

NOA2: JAN 27, 2014

NVC: MARCH 16, 2014

CASE #: APRIL 15, 2014

AOS FEE PAID: APRIL 26, 2014

IV FEE PAID: MAY 1, 2014

DS-261: MAY 5, 2014

AOS/IV PACKAGE RECEIVED @ NVC: MAY 8, 2014

AOS FALSE CHECKLIST: JUNE 6, 2014

AOS CHECKLIST: JUNE 7, 2014

AOS CHECKLIST SCANNED: jUNE 16, 2014

CASE COMPLETE: jULY 24, 2014

INTERVIEW DATE RECEIVED: jULY 30, 2014

INTERVIEW DATE: SEPTEMBER 2, 2014

Link to comment
Share on other sites

Hey Lovemytico, I'm so sorry you're still dealing with USCI's BS, I'll be praying for you tonight. Hopefully you'll be out of that soon. But NVC is the same, nothing happening yet sad.png

THANKS luv.gif I was wondering where you were hiding lately !

I can use all the prayers you can give !ClockWatch2.gifClockWatch2.gif

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Hang in there everyone.

We were approved today!

It's been 10 months.

And since our transfer to the NSC, it's been 63 days.

The NSC approvals are seeming formulaic now.

Married 2013

Rcvd by USCIS: 4/23/13

NOA 1: 4/24/13

Transfer to NSC: 11/27/13

NOA 2: 1/27/14

File sent to NVC: 1/27/14

Does anyone know how long to expect the NVC to process papers?

Congrats!!!! PL. FILL YOUR TIME LINE.

USCIS
2013/04/27 : Mailed I-130 petition to USCIS Phoenix Lockbox, Arizona.
2013/04/30 : I-130 PETITION PRIORITY DATE (NOA1).
2013/05/02 : Received (NOA1) hardcopy by mail from National Benefits Center (NBC).
2013/12/04 : I-130 petition transferred from National Benefits Center (NBC) to Nebraska Service Center (NSC).
2014/02/12 : I-130 PETITION APPROVED (NOA2) at Nebraska Service Center (NSC).
2014/02/13 : Approved I-130 petition shipped from Nebraska Service Center (NSC) to National Visa Center (NVC).
2014/02/18 : Received (NOA2) hardcopy by mail from Nebraska Service Center (NSC).
NATIONAL VISA CENTER (NVC)
2014/02/25 : National Visa Center (NVC) received approved I130 petition from Nebraska Service Center (NSC).
2014/03/31 : Case Number, IIN & BIN generated.
2014/04/01 : DS-261 available. Completed & submitted online.
2014/04/01 : AOS fee bill invoiced & paid online.

2014/04/04 : AOS fee payment status appears as PAID.

2014/04/08 : IV fee bill invoiced & paid online.

2014/04/11 : IV fee payment status appears as PAID.

2014/04/12 : DS-260 available. Completed & submitted online.

2014/06/24 : IV packet delivered at National Visa Center (NVC).

2014/07/01 : IV packet scanned into system.

2014/07/28 : AOS packet delivered at National Visa Center (NVC).

2014/07/30 : AOS packet scanned into system.

2014/08/13 : IV packet reviewed & accepted by National Visa Center (NVC).

2014/09/23 : AOS checklist email received from National Visa Center (NVC).

2014/09/24 : AOS checklist correction mailed to National Visa Center (NVC).

2014/09/29 : AOS checklist correction scanned into system at National Visa Center (NVC).

2014/11/17 : CASE COMPLETED at National Visa Center (NVC).

2014/12/03 : Interview scheduled by National Visa Center (NVC).

2014/12/09 : Received interview letter (P4) email from National Visa Center (NVC).

2014/12/19 : Case shipped from National Visa Center (NVC) to US consulate Mumbai. CEAC status says 'In Transit'.

INTERVIEW & POE

2014/12/15 : Medicals completed.

2014/12/22 : Case received at US consulate Mumbai. CEAC status says 'Ready'.

2015/01/05 : Biometrics appointment scheduled.

2015/01/20 : INTERVIEW at US consulate Mumbai.

Link to comment
Share on other sites

Filed: IR-5 Country: Pakistan
Timeline

I have not heard about the color coding on the RFE. However, i have heard on Administrative processing slip after interview at the consulate has multiple colors and it is coded etc.

Thank you mza001. Yeah I mean I was just thinking whatsup with the blue papers or what is so special about blue color . Well I guess it just soothes their eyes ..... lol

Wow only one approval today here at VJ from April ..... simply speechless !!!!

USCIS Step:
04/19/2013: NOA1 for both parents
04/17/2013: PD
11/26/2013: Transferred to California Service Center

01/14/2014: Reply to RFE Received by CSC

01/28/2014: Email Update/Txt Received for Approval

02/01/2014: Approval Notice received in Mail

****** Both I-130s approved in about 9.5 months ******

NVC Step:

02/07/2014: Case Received by NVC

03/17/2014: Received Case/Invoice Number

03/18/2014: Submitted DS261

03/19/2014: Paid AOS online (one payment for both cases)

03/22/2014: Sent AOS Packages to NVC (separately for each parent)

03/24/2014: AOS Packages delivered to NVC (as per the USPS Tracking)

03/27/2014: IV Fees Available and Paid Online

04/05/2014: IV Documents sent to NVC

04/06/2014: DS260 submitted online

04/07/2014: IV Documents delivered to NVC

05/01/2014: AOS Approved

05/29/2014: Case Complete !!!

06/11/2014: Interview Letter Received via email

****** Took about 4 months at this NVC stage ******

06/18/2014: Medical/Physical Exam Completed

07/03/2014: Interview Completed

07/09/2014: Visas Issued :dancing:

********** Entire process took 14 Months 2 weeks and 6 days *************

Link to comment
Share on other sites

At NSC, got an RFE today :( I guess at least someone touched the file. Not sure what its about, hopefully something that is easily obtained. I'm thinking it might be for the original marriage certificate, at the time we filed we only had a temporary copy. I have the certificate now though, so it would be an easy fix. *prays*

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...