Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

so, I guess TSC is working on the NOV 27th transfers???? They can pick up my file any time now... Today is good ! I really need to hear something soon or I'm going to end up at the FUNNY FARM...

If only they could work on the cases in order!

Case History (parents):
 
USCIS / I-130
 
02/03/2018: Submitted I-130 packages to USPS
02/06/2018: I-130 delivered to USCIS Chicago Lockbox by USPS
02/14/2018: Checks cashed by USCIS
02/14/2018: Emails/ SMS received that USCIS has accepted the 2 cases and routed them to the Potomac Service Center
02/14/2018: NOA1
02/20/2018: NOA1 letter received
10/24/2018 NOA 2: I-130 approved!
11/04/2018: Case sent to Department of State for processing
12/17/2018: Case received by NVC
 
Case History:
 

 

USCIS/ I-130

04/05/2013- USCIS text(priority date 04/04/2013)
04/05/2013- NOA 1
04/08/2013-"Touched"
04/10/2013- NOA 1: Hardcopy Received: Transferred to USCIS NBC
11/14/2013- Case transferred to another office
11/15/2013- Case transferred to local office
11/15/2013-"Touched"
11/19/2013- Case being processed at a USCIS office
11/19/2013-"Touched"
11/19/2013-Received hard copy of the transfer notice. Transferred to NSC
01/10/2014-Alien Registration Number changed notice
01/13/2014-NOA 2!
01/16/2014-Case shipped to Department of State
 
NVC
 
01/28/2014-Case received by NVC
03/07/2014-Case entered by NVC into the system
03/10/2014-Called NVC and received the NVC Case Number and Invoice Identification Number (IIN)
03/11/2014-DS-261 became available and submitted
03/12/2014-AOS invoice received and paid online. Status shows 'IN PROCESS'
03/21/2014-AOS Fees appears as PAID
03/20/2014-IV invoice received and paid online. Status shows 'IN PROCESS'
03/24/2014-IV Fees appears as PAID
03/25/2014-AOS package mailed to NVC
03/29/2014-IV package mailed to NVC
03/29/2014- DS-260 submitted

03/31/2014- AOS and NVC packets DELIVERED to NVC by the courier

04/02/2014- AOS packet RECEIVED by NVC

04/02/2014- NVC packet RECEIVED by NVC

04/16/2014- False checklist generated for AOS form not received by NVC

04/18/2014- AOS Checklist received.

04/19/2014- Checklist response prepared and mailed to NVC

04/23/2014- Checklist response received by NVC

05/09/2014- Case Complete at NVC!

05/16/2014- Case Complete email received from NVC.

05/28/2014- Interview scheduled for 7/22/2014!.

05/29/2014- Interview letter received from NVC.

07/22/2014- Interview - APPROVED :D

07/28/2014-Case status changed to Administrative Processing

08/04/2014-Case status changed to Issued

08/06/2014-Passport/ Visa in hand!

Link to comment
Share on other sites

Filed: Timeline

All tier 2 operators are not helpful...my case has been transferred three times now since November 18 when it was originally transferred from nebraska to Texas service center. ..then it was transferred again on the 30th of December and again on January 3rd to the same service center...I called yesterday and the tier 2 operator a lady was extremely rude and kept telling me she had no way of telling anything different than what I already knew to just wait for a correspondence from the service centerToday I called and got a really nice man who told me he would check to see what was going on then when he couldn't find exactly what was going on..he wrote the texas service center explaining that I haf received multiple transfers to the same service center within the last two months and that my case had been waiting for processing since April 8th.. he gave me a confirmation number and told me they should send me a reply before the 24th of this month. .. two different days...two different operators...major differences in response given 0

event.png

event.png

event.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Russia
Timeline

I just emailed a request for support from the Office of the Citizenship and Immigration Services Ombudsman. There is something not right at TSC...and this may sound bad, but I wonder if the employees there are from the south of Texas and are politically motivated to hold up petitions for spouses from other countries and just cause us all grief. There needs to be a serious investigation from the Office of the Citizenship and Immigration Services Ombudsman!

event.png

USCIS:

Service Center : National Benefits Center

Consulate : Moscow

03-07-2013: Marriage

04-16-2013: I-130 NOA1

05-01-2013: I-129F NOA1

11-18-2013: Transfer date to TSC

02-26-2014: NOA2 (I-130 and I-129F)

03-26-2014: Shipped to NVC (I-130 and I-129F)

NVC:

03-28-2014: NVC received case

04-29-2014: Case Number assigned

05-15-2014: AOS packet arrived at NVC

05-15-2014: IV Packet received by NVC

xx-xx-2014: Case Complete

xx-xx-2014: Interview scheduled

Link to comment
Share on other sites

If only they could work on the cases in order!

If you have not, it is time to contact your state's senator/congressman; USCIS Ombudsman, NSC. You are coming close to the 60 day mark since transfer, and your applicaiton is beyond the 8.7 months timeline.

Good luck.

CR-1 Timeline (USCIS)
NOA-1 (PD): 05/16/2013

NOA-2: 02/03/2014

CR-1 Timeline (NVC)

NVC Received: 02/14/2014

Case# and IIN# assigned: 03/20/2014

Case Completed: 05/15/2014

CR-1 Timeline (ISL Consulate)

Interview Scheduled: 05/28/2014

Day of Interview: 07/22/2014

Interview result: Approved

Visa Received 08/07/2014 :dancing:

Link to comment
Share on other sites

If you have not, it is time to contact your state's senator/congressman; USCIS Ombudsman, NSC. You are coming close to the 60 day mark since transfer, and your applicaiton is beyond the 8.7 months timeline.

Good luck.

Will that even help? I sent a letter to my senator and she told me they are processing feb 13, 2013, sending another letter tomorrow. protest6wz.gif

When they realize that the application is over the time frame of 8.7 months, they just use the feb 13, 21023 date and tell you to wait. ranting33va.gif

 

 

 
 
 
July 28 2011- Married :dancing:
 
April 1 2013- Sent I-130
 
April 2 2013- NOA1
 
Nov 14 2013-Transferred to NSC
 
Nov 21- File touched
 
Jan 10, 2014- Approved! (NOA2)
 
Jan 13, 2014- Shipped out to NVC
 
Jan 27, 2014- Received by NVC
 
March 6,2014- Received Case Number and requested Case Number Change
 
March 9, 2014 -Sent in DS-261
 
March 10,2014 - Paid AOS Fee
 
March 22, 2014 - Sent in AOS Package
 
March 25,2014 - Paid IV Fee
 
March 26, 2014 - AOS Package picked up by a B.Standish
 
March 28, 2014 - IV fee shown as PAid
 
March 31, 2014 - Send corrections to AOS Package
 
April 1, 2014 - Corrected Aos Package received and signed by N Visa Center
 
April 5, 2014 - Case number changed finally
 
April 11, 2014- Got checklist for AOS
 
April 17, 2014- Submitted DS-260
 
April 18, 2014- Sent in IV package and AOS checklist
 
May 14, 2014- IV Checklist
 
May 16, 2014- Sent in IV Checklist
 
May 23, 2014- IV Checklist received
 
June 25, 2014- Case Complete
 
July 2, 2014- Receive CC email
 
July 11, 2014- Interview email received
 
July 21, 2014- Medical Done
 
Aug 26, 2014- Interview
 
Case in AP :ranting::ranting:
 
Oct 23, turned in needed documents
 
 
 
Case Updated- July 22, 30, Aug 5, Nov 2, Nov 4, Nov 8, Nov 15+16 (2015)
 
Nov 16-told to go to Embassy
 
 
 
Update Nov 29 + 30
 
Nov 29 - Gave Refusal Sheet :cry:
 
Informed that Case is being sent back to USCIS with intent to revoke :ranting::ranting::ranting:
 
 
 
Jan 12-13, 216 Case Date Update on CEAC
 
Feb 12,2016-Update on USCIS, case under review
 
Oct 14, 2016 NOIR sent out, received OCT 18, 2016
 
 
 
 

 

 Dream-dj.png

 

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Russia
Timeline

I did...their reply to congresmman's office on Monday is that my case us undergoing background checks and it is assigned to someone and that I should hear something in two weeks, which just happens to be at the end of the 60 days listed on my transfer notice. Someone in authority needs to wake up and start an investigation into the nonsense!

event.png

USCIS:

Service Center : National Benefits Center

Consulate : Moscow

03-07-2013: Marriage

04-16-2013: I-130 NOA1

05-01-2013: I-129F NOA1

11-18-2013: Transfer date to TSC

02-26-2014: NOA2 (I-130 and I-129F)

03-26-2014: Shipped to NVC (I-130 and I-129F)

NVC:

03-28-2014: NVC received case

04-29-2014: Case Number assigned

05-15-2014: AOS packet arrived at NVC

05-15-2014: IV Packet received by NVC

xx-xx-2014: Case Complete

xx-xx-2014: Interview scheduled

Link to comment
Share on other sites

That's because that processing date, averages, and times are not supposed to be used to judge individual cases, according to them. They, however, have no problem quoting those figures when dealing with individual cases.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

I did...their reply to congresmman's office on Monday is that my case us undergoing background checks and it is assigned to someone and that I should hear something in two weeks, which just happens to be at the end of the 60 days listed on my transfer notice. Someone in authority needs to wake up and start an investigation into the nonsense!

My congressional inquiry came back saying pretty much the same ####### which so happens to be the 60 days too. Im going to see what kind of inquiry I can do with the ombudsman.

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Filed: Timeline

If you have not, it is time to contact your state's senator/congressman; USCIS Ombudsman, NSC. You are coming close to the 60 day mark since transfer, and your applicaiton is beyond the 8.7 months timeline.

Good luck.

I have my letter to my state senator ready and will be taking it directly to his office tomorrow...I am at 9 months...3 transfers within the original 60 days given and no answers from anyone at USCIS

event.png

event.png

event.png

Link to comment
Share on other sites

remember the letter we all sent on Dec 19th?

I finally received a return receipt form the Ombudsmans office this afternoon.

Your message

To: cisombudsman
Subject: Unacceptable I-130 Processing Time Update
Sent: Thursday, December 19, 2013 10:00:35 PM (UTC-05:00) Eastern Time (US & Canada)

was deleted without being read on Thursday, January 09, 2014 4:22:40 PM (UTC-05:00) Eastern Time (US & Canada).

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

remember the letter we all sent on Dec 19th?

I finally received a return receipt form the Ombudsmans office this afternoon.

Your message

To: cisombudsman

Subject: Unacceptable I-130 Processing Time Update

Sent: Thursday, December 19, 2013 10:00:35 PM (UTC-05:00) Eastern Time (US & Canada)

was deleted without being read on Thursday, January 09, 2014 4:22:40 PM (UTC-05:00) Eastern Time (US & Canada).

USCIS is atleast getting very predictable in one regard!

Mailed I-130 overnight-8/28/2013

Delivered to the USCIS PO Box Chicago 8/29/2013

NOA1 date-8/29/2013 Got as of 9/4/2013

Transfer Date : 2/24/2014

Transferred to Vermont

NOA2 3/7/2014

NVC received 3/19/2014

Case number Assigned 4/18/2014

DS-261 filed 4/26/2014

AOS paid 4/28/2014

AOS shows paid 4/30/2014

IV paid 4/30/2014

AOS and IV packages overnighted sent 5/2/2014

Packages at NVC 5/5/2014, system date of 5/7/2014

Case Complete 6/2/2014

Interview assigned 6/11/2014

Interview 7/18/2014 at Mumbai, India

POE 8/28/2014

Twins-7/19/2015 (Boy and Girl)!!

I-751 mailed in 6/1/2016 (two day priority)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Japan
Timeline

remember the letter we all sent on Dec 19th?

I finally received a return receipt form the Ombudsmans office this afternoon.

Your message

To: cisombudsman

Subject: Unacceptable I-130 Processing Time Update

Sent: Thursday, December 19, 2013 10:00:35 PM (UTC-05:00) Eastern Time (US & Canada)

was deleted without being read on Thursday, January 09, 2014 4:22:40 PM (UTC-05:00) Eastern Time (US & Canada).

Seriously? Kinda deepens that feeling that they don't really care about stress and heartache the people behind the applications are going through.

Marriage: March 4, 2013

I-130 sent: April 11, 2013

NOA1: April 15, 2013

I-130 approved (NOA2): January 6, 2014

NVC Received: January 27, 2014

AOS Bill Generated: March 11, 2014

AOS Bill Paid: March 11, 2014

AOS Package Sent: March 12, 2014

IV Bill Generated: March 25, 2014

IV Bill Paid: March 25, 2014

IV Package Sent: March 25, 2014

D-260 Completed: March 26, 2014

Case Complete: April 9, 2014

Interview Scheduled: April 15, 2014

Interview rescheduled: April 28, 2014

Link to comment
Share on other sites

remember the letter we all sent on Dec 19th?

I finally received a return receipt form the Ombudsmans office this afternoon.

Your message

To: cisombudsman

Subject: Unacceptable I-130 Processing Time Update

Sent: Thursday, December 19, 2013 10:00:35 PM (UTC-05:00) Eastern Time (US & Canada)

was deleted without being read on Thursday, January 09, 2014 4:22:40 PM (UTC-05:00) Eastern Time (US & Canada).

They actually said that?! How rude! sleep.png

Edited by R<3S
 

 

 
 
 
July 28 2011- Married :dancing:
 
April 1 2013- Sent I-130
 
April 2 2013- NOA1
 
Nov 14 2013-Transferred to NSC
 
Nov 21- File touched
 
Jan 10, 2014- Approved! (NOA2)
 
Jan 13, 2014- Shipped out to NVC
 
Jan 27, 2014- Received by NVC
 
March 6,2014- Received Case Number and requested Case Number Change
 
March 9, 2014 -Sent in DS-261
 
March 10,2014 - Paid AOS Fee
 
March 22, 2014 - Sent in AOS Package
 
March 25,2014 - Paid IV Fee
 
March 26, 2014 - AOS Package picked up by a B.Standish
 
March 28, 2014 - IV fee shown as PAid
 
March 31, 2014 - Send corrections to AOS Package
 
April 1, 2014 - Corrected Aos Package received and signed by N Visa Center
 
April 5, 2014 - Case number changed finally
 
April 11, 2014- Got checklist for AOS
 
April 17, 2014- Submitted DS-260
 
April 18, 2014- Sent in IV package and AOS checklist
 
May 14, 2014- IV Checklist
 
May 16, 2014- Sent in IV Checklist
 
May 23, 2014- IV Checklist received
 
June 25, 2014- Case Complete
 
July 2, 2014- Receive CC email
 
July 11, 2014- Interview email received
 
July 21, 2014- Medical Done
 
Aug 26, 2014- Interview
 
Case in AP :ranting::ranting:
 
Oct 23, turned in needed documents
 
 
 
Case Updated- July 22, 30, Aug 5, Nov 2, Nov 4, Nov 8, Nov 15+16 (2015)
 
Nov 16-told to go to Embassy
 
 
 
Update Nov 29 + 30
 
Nov 29 - Gave Refusal Sheet :cry:
 
Informed that Case is being sent back to USCIS with intent to revoke :ranting::ranting::ranting:
 
 
 
Jan 12-13, 216 Case Date Update on CEAC
 
Feb 12,2016-Update on USCIS, case under review
 
Oct 14, 2016 NOIR sent out, received OCT 18, 2016
 
 
 
 

 

 Dream-dj.png

 

 

 

Link to comment
Share on other sites

Congrats on your approval :)

do you know how to contact Nebraska via email?

Just be a little more patient. I just got approved today from Nebraska after filing on March 29th. I'm sure your only a month or so away.

USCIS

04/22/2013—Sent I-130

04/25/2013—I-130 NOA

11/27/2013—I-130 Transferred to NSC

01/21/2014—I-130 Approved

01/22/2014—I -130 shipped to NVC

NVC

02/03/2014—NVC Received file

03/11/2014—Case Number Assigned

03/12/2014—IIN BIN Provided

03/14/2014—DS-261 Submitted

03/14/2014—AOS invoice available and paid

03/17/2014—AOS cleared bank

03/18/2014—AOS shows Paid

03/21/2014—AOS Package sent to NVC overnight

03/24/2014—AOS Package delivered at NVC

03/24/2014—DS-261 Accepted

03/24/2014—IV Invoice available

03/25/2014—IV fee paid

03/26/2014—IV Package sent to NVC overnight

03/26/2014—AOS entered in the system

03/27/2014—IV Delivered at NVC

03/27/2014—DS-260 submitted

03/31/2014—IV entered in the system

04/01/2014—Corrected I-864 sent (I found out that I have put the wrong address in part 2)

04/04/2014—Corrected I-864 delivered

04/08/2014— Corrected I-864 entered in the system.

04/09/2014— Received a false check list for the IV documents

04/10/2014— Case Complete (L)

04/30/2014— Interview scheduled

05/01/2014-- Interview email received

05/27/2014— Medical

06/09/2014— Interview/AP Joint sponsor required

07/18/2014-- Visa Issued

07/22/2014-- Visa on hand

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

http://www.uscis.gov/archive/archive-news/uscis-update-case-status-inquiries-service-centers

Congrats on your approval :)

do you know how to contact Nebraska via email?

------------------------

17 APRIL 2013 : NOA1 Priority date
27 NOV: TSC; Transfered from NBC

3 Feb : NOA2 ( 296 days)

4 March: Shipped to NVC

11 March : Received at NVC

11 April: Case # assigned

18 April: paid both fees

9May: mailed AOS & IV packages

8May: DS260 completed

16May: packets scanned in NVC system

13 June: check list : missing page 7 of i864.

25 June : scan date AOS checklist

7 Aug: Case Complete...... BIG ACCOMPLISHMENT

14 Aug: interview date assigned

16 Aug: Email interview appointment received

18 Aug: Medical completed

23 Aug: biometric done,DS260 stamped, fingerprints taken.

10 Sep: interview day; interview took 511 days from I-130 NOA1

====================================================

11. 9/17/2016: I-751 packet received by CSC

12.Check Cashed : 9/21/2016

13. NOA1: 9/23/2016

14. BIOMETRICS : 10/12/2016

---------------------------

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×