I have been waiting to write this post for 8 months - we've been approved!!!!

Actually got NOA2 yesterday (Friday the 13th smirteenth indeed) but I only found out today! Transferred to CSC and got last transfer notice on 2nd Dec. NOA1 was 18th April.

Good luck to those still waiting, your time is close I can feel it. (Especially Lovemytico, I don't like to have faves, but I really hope you get yours before christmas!) Will update my timeline and spreadsheet now (before anuspras reminds me wink.png )

Congrats dear. Am so happy for u. Common TSC!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

We finally got transferred (filed April 12) on December 12. Hoping it goes to CSC. They seem to be the fastest. An approval by the end of the year would be great.

Pl. fill your Time Line first and what is your PD?

USCIS
2013/04/27 : Mailed I-130 petition to USCIS Phoenix Lockbox, Arizona.
2013/04/30 : I-130 PETITION PRIORITY DATE (NOA1).
2013/05/02 : Received (NOA1) hardcopy by mail from National Benefits Center (NBC).
2013/12/04 : I-130 petition transferred from National Benefits Center (NBC) to Nebraska Service Center (NSC).
2014/02/12 : I-130 PETITION APPROVED (NOA2) at Nebraska Service Center (NSC).
2014/02/13 : Approved I-130 petition shipped from Nebraska Service Center (NSC) to National Visa Center (NVC).
2014/02/18 : Received (NOA2) hardcopy by mail from Nebraska Service Center (NSC).
NATIONAL VISA CENTER (NVC)
2014/02/25 : National Visa Center (NVC) received approved I130 petition from Nebraska Service Center (NSC).
2014/03/31 : Case Number, IIN & BIN generated.
2014/04/01 : DS-261 available. Completed & submitted online.
2014/04/01 : AOS fee bill invoiced & paid online.

2014/04/04 : AOS fee payment status appears as PAID.

2014/04/08 : IV fee bill invoiced & paid online.

2014/04/11 : IV fee payment status appears as PAID.

2014/04/12 : DS-260 available. Completed & submitted online.

2014/06/24 : IV packet delivered at National Visa Center (NVC).

2014/07/01 : IV packet scanned into system.

2014/07/28 : AOS packet delivered at National Visa Center (NVC).

2014/07/30 : AOS packet scanned into system.

2014/08/13 : IV packet reviewed & accepted by National Visa Center (NVC).

2014/09/23 : AOS checklist email received from National Visa Center (NVC).

2014/09/24 : AOS checklist correction mailed to National Visa Center (NVC).

2014/09/29 : AOS checklist correction scanned into system at National Visa Center (NVC).

2014/11/17 : CASE COMPLETED at National Visa Center (NVC).

2014/12/03 : Interview scheduled by National Visa Center (NVC).

2014/12/09 : Received interview letter (P4) email from National Visa Center (NVC).

2014/12/19 : Case shipped from National Visa Center (NVC) to US consulate Mumbai. CEAC status says 'In Transit'.

INTERVIEW & POE

2014/12/15 : Medicals completed.

2014/12/22 : Case received at US consulate Mumbai. CEAC status says 'Ready'.

2015/01/05 : Biometrics appointment scheduled.

2015/01/20 : INTERVIEW at US consulate Mumbai.

Link to comment
Share on other sites

Pl. fill your Time Line first and what is your PD?

Done. Priority date: 4/12/2013

Married: February 7, 2011

USCIS Timeline

4/10/2013: Mailed I-30 to Chicago, IL Lockbox

4/12/2013: NOA1

12/12/2013: 1st Transfer Notice Email

12/13/2013: 2nd Transfer Notice Email

12/18/2013: 3rd Transfer Notice Email

12/18/2013: Transfer hard copy received (Texas Service Center)

1/23/2014: NOA2

1/31/2014: Case shipped to DOS/NVC

NVC

2/10/2014: Case received by NVC

3/17/2014: Case Number received

3/18/2014: IIN (Invoice ID Number) and BIN (Beneficiary ID Number) received

3/19/2014: AOS paid

3/19/2014: Submitted DS-261

3/28/2014: IV paid

4/09/2014: DS-260 submitted

4/09/2014: AOS & IV packets mailed via FedEx

4/11/2014: AOS & IV packets arrived at NVC

4/16/2014: AOS & IV packets entered into NVC system
4/29/2014: Case Complete

5/1/2014: Interview Scheduled for June 5

5/2/2014: Interview Confirmation Email (P4) Received

6/5/2014: Interview (Visa Approved)

6/10/2014: Passport with visa & sealed packet received

6/18/2014: POE (Seattle-Tacoma International Airport)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Done. Priority date: 4/12/2013

Thank you. Please let us know your service center once you receive the hard copy of your transfer letter. Shall update the spread sheet... By the way I also hail from Colombo, Sri Lanka. Was born in Colombo and then moved to India....

USCIS
2013/04/27 : Mailed I-130 petition to USCIS Phoenix Lockbox, Arizona.
2013/04/30 : I-130 PETITION PRIORITY DATE (NOA1).
2013/05/02 : Received (NOA1) hardcopy by mail from National Benefits Center (NBC).
2013/12/04 : I-130 petition transferred from National Benefits Center (NBC) to Nebraska Service Center (NSC).
2014/02/12 : I-130 PETITION APPROVED (NOA2) at Nebraska Service Center (NSC).
2014/02/13 : Approved I-130 petition shipped from Nebraska Service Center (NSC) to National Visa Center (NVC).
2014/02/18 : Received (NOA2) hardcopy by mail from Nebraska Service Center (NSC).
NATIONAL VISA CENTER (NVC)
2014/02/25 : National Visa Center (NVC) received approved I130 petition from Nebraska Service Center (NSC).
2014/03/31 : Case Number, IIN & BIN generated.
2014/04/01 : DS-261 available. Completed & submitted online.
2014/04/01 : AOS fee bill invoiced & paid online.

2014/04/04 : AOS fee payment status appears as PAID.

2014/04/08 : IV fee bill invoiced & paid online.

2014/04/11 : IV fee payment status appears as PAID.

2014/04/12 : DS-260 available. Completed & submitted online.

2014/06/24 : IV packet delivered at National Visa Center (NVC).

2014/07/01 : IV packet scanned into system.

2014/07/28 : AOS packet delivered at National Visa Center (NVC).

2014/07/30 : AOS packet scanned into system.

2014/08/13 : IV packet reviewed & accepted by National Visa Center (NVC).

2014/09/23 : AOS checklist email received from National Visa Center (NVC).

2014/09/24 : AOS checklist correction mailed to National Visa Center (NVC).

2014/09/29 : AOS checklist correction scanned into system at National Visa Center (NVC).

2014/11/17 : CASE COMPLETED at National Visa Center (NVC).

2014/12/03 : Interview scheduled by National Visa Center (NVC).

2014/12/09 : Received interview letter (P4) email from National Visa Center (NVC).

2014/12/19 : Case shipped from National Visa Center (NVC) to US consulate Mumbai. CEAC status says 'In Transit'.

INTERVIEW & POE

2014/12/15 : Medicals completed.

2014/12/22 : Case received at US consulate Mumbai. CEAC status says 'Ready'.

2015/01/05 : Biometrics appointment scheduled.

2015/01/20 : INTERVIEW at US consulate Mumbai.

Link to comment
Share on other sites

Thank you. Please let us know your service center once you receive the hard copy of your transfer letter. Shall update the spread sheet... By the way I also hail from Colombo, Sri Lanka. Was born in Colombo and then moved to India....

No problem. Will keep it updated. Wow, small world. I'm here with my wife and son at the moment, but have to go back to the states soon.

Married: February 7, 2011

USCIS Timeline

4/10/2013: Mailed I-30 to Chicago, IL Lockbox

4/12/2013: NOA1

12/12/2013: 1st Transfer Notice Email

12/13/2013: 2nd Transfer Notice Email

12/18/2013: 3rd Transfer Notice Email

12/18/2013: Transfer hard copy received (Texas Service Center)

1/23/2014: NOA2

1/31/2014: Case shipped to DOS/NVC

NVC

2/10/2014: Case received by NVC

3/17/2014: Case Number received

3/18/2014: IIN (Invoice ID Number) and BIN (Beneficiary ID Number) received

3/19/2014: AOS paid

3/19/2014: Submitted DS-261

3/28/2014: IV paid

4/09/2014: DS-260 submitted

4/09/2014: AOS & IV packets mailed via FedEx

4/11/2014: AOS & IV packets arrived at NVC

4/16/2014: AOS & IV packets entered into NVC system
4/29/2014: Case Complete

5/1/2014: Interview Scheduled for June 5

5/2/2014: Interview Confirmation Email (P4) Received

6/5/2014: Interview (Visa Approved)

6/10/2014: Passport with visa & sealed packet received

6/18/2014: POE (Seattle-Tacoma International Airport)

Link to comment
Share on other sites

I, for one, am wishing for TONS of approvals this coming week. We all need a little Christmas magic this week.

Let's go service centers ! ! ! ! ! ! ( especially TSC where our file resides right now) We need some magic dust from Santa Claus and his Old Lady ( HA HA Cheech and Chong)

I just listened to that in the car with my kids. They pulled it up on Youtube while I was driving.

Edited by LoveMyTico

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Filed: IR-5 Country: Pakistan
Timeline

congrats everyone!

seems like the CSC is the fastest

Congratulations to you too. I hope you are right about CSV. I also applied April (NOA April 16) but since I am IR-5, I am still hoping my turn will come soon. My cases were transferred to CSV on Nov 25. Btw Just wondering how much time do you have before the I-130 gets approved, paying for the immigrant visa and I-864 and to send in the civil documents to NVC?

USCIS Step:
04/19/2013: NOA1 for both parents
04/17/2013: PD
11/26/2013: Transferred to California Service Center

01/14/2014: Reply to RFE Received by CSC

01/28/2014: Email Update/Txt Received for Approval

02/01/2014: Approval Notice received in Mail

****** Both I-130s approved in about 9.5 months ******

NVC Step:

02/07/2014: Case Received by NVC

03/17/2014: Received Case/Invoice Number

03/18/2014: Submitted DS261

03/19/2014: Paid AOS online (one payment for both cases)

03/22/2014: Sent AOS Packages to NVC (separately for each parent)

03/24/2014: AOS Packages delivered to NVC (as per the USPS Tracking)

03/27/2014: IV Fees Available and Paid Online

04/05/2014: IV Documents sent to NVC

04/06/2014: DS260 submitted online

04/07/2014: IV Documents delivered to NVC

05/01/2014: AOS Approved

05/29/2014: Case Complete !!!

06/11/2014: Interview Letter Received via email

****** Took about 4 months at this NVC stage ******

06/18/2014: Medical/Physical Exam Completed

07/03/2014: Interview Completed

07/09/2014: Visas Issued :dancing:

********** Entire process took 14 Months 2 weeks and 6 days *************

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

I am trying to file a service request online. However, when I get to this point I am not sure which to select.

Does anyone know what I should select at this point?

Typographical error on a notice you received
Non-Delivery of ASC Appointment Notice

I am trying to file a service request to simply get an update on my case. PD April 4th, transferred to NSC on November 15th and now sitting there!

Many thanks for any help you can provide.

Link to comment
Share on other sites

I am trying to file a service request online. However, when I get to this point I am not sure which to select.

Does anyone know what I should select at this point?

Typographical error on a notice you received
Non-Delivery of ASC Appointment Notice

I am trying to file a service request to simply get an update on my case. PD April 4th, transferred to NSC on November 15th and now sitting there!

Many thanks for any help you can provide.

if you didn't file before Feb 12th I doubt VERY much they will let you file a service request.

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

if you didn't file before Feb 12th I doubt VERY much they will let you file a service request.

Thanks for the response LoveMyTico. I did not know that, so good information.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Russia
Timeline

If an approval doesn't come from TSC this week for me, I am going to be very discouraged going into the holidays....I really don't understand why they are so so slow compared to other service centers....

event.png

USCIS:

Service Center : National Benefits Center

Consulate : Moscow

03-07-2013: Marriage

04-16-2013: I-130 NOA1

05-01-2013: I-129F NOA1

11-18-2013: Transfer date to TSC

02-26-2014: NOA2 (I-130 and I-129F)

03-26-2014: Shipped to NVC (I-130 and I-129F)

NVC:

03-28-2014: NVC received case

04-29-2014: Case Number assigned

05-15-2014: AOS packet arrived at NVC

05-15-2014: IV Packet received by NVC

xx-xx-2014: Case Complete

xx-xx-2014: Interview scheduled

Link to comment
Share on other sites

Filed: IR-5 Country: Pakistan
Timeline

If an approval doesn't come from TSC this week for me, I am going to be very discouraged going into the holidays....I really don't understand why they are so so slow compared to other service centers....

True. It is very discouraging at times the way things are processed at USCIS. On positive note last couple of weeks things have picked up and people have been hearing some sort of responses from these these service centers. In my case it has been almost 9 months but now I also hope that before they go on holidays, they should atleast get done with all April filers.

USCIS Step:
04/19/2013: NOA1 for both parents
04/17/2013: PD
11/26/2013: Transferred to California Service Center

01/14/2014: Reply to RFE Received by CSC

01/28/2014: Email Update/Txt Received for Approval

02/01/2014: Approval Notice received in Mail

****** Both I-130s approved in about 9.5 months ******

NVC Step:

02/07/2014: Case Received by NVC

03/17/2014: Received Case/Invoice Number

03/18/2014: Submitted DS261

03/19/2014: Paid AOS online (one payment for both cases)

03/22/2014: Sent AOS Packages to NVC (separately for each parent)

03/24/2014: AOS Packages delivered to NVC (as per the USPS Tracking)

03/27/2014: IV Fees Available and Paid Online

04/05/2014: IV Documents sent to NVC

04/06/2014: DS260 submitted online

04/07/2014: IV Documents delivered to NVC

05/01/2014: AOS Approved

05/29/2014: Case Complete !!!

06/11/2014: Interview Letter Received via email

****** Took about 4 months at this NVC stage ******

06/18/2014: Medical/Physical Exam Completed

07/03/2014: Interview Completed

07/09/2014: Visas Issued :dancing:

********** Entire process took 14 Months 2 weeks and 6 days *************

Link to comment
Share on other sites

Hope this week bring many approvals! cray5ol.gifcray5ol.gif

 

 

 
 
 
July 28 2011- Married :dancing:
 
April 1 2013- Sent I-130
 
April 2 2013- NOA1
 
Nov 14 2013-Transferred to NSC
 
Nov 21- File touched
 
Jan 10, 2014- Approved! (NOA2)
 
Jan 13, 2014- Shipped out to NVC
 
Jan 27, 2014- Received by NVC
 
March 6,2014- Received Case Number and requested Case Number Change
 
March 9, 2014 -Sent in DS-261
 
March 10,2014 - Paid AOS Fee
 
March 22, 2014 - Sent in AOS Package
 
March 25,2014 - Paid IV Fee
 
March 26, 2014 - AOS Package picked up by a B.Standish
 
March 28, 2014 - IV fee shown as PAid
 
March 31, 2014 - Send corrections to AOS Package
 
April 1, 2014 - Corrected Aos Package received and signed by N Visa Center
 
April 5, 2014 - Case number changed finally
 
April 11, 2014- Got checklist for AOS
 
April 17, 2014- Submitted DS-260
 
April 18, 2014- Sent in IV package and AOS checklist
 
May 14, 2014- IV Checklist
 
May 16, 2014- Sent in IV Checklist
 
May 23, 2014- IV Checklist received
 
June 25, 2014- Case Complete
 
July 2, 2014- Receive CC email
 
July 11, 2014- Interview email received
 
July 21, 2014- Medical Done
 
Aug 26, 2014- Interview
 
Case in AP :ranting::ranting:
 
Oct 23, turned in needed documents
 
 
 
Case Updated- July 22, 30, Aug 5, Nov 2, Nov 4, Nov 8, Nov 15+16 (2015)
 
Nov 16-told to go to Embassy
 
 
 
Update Nov 29 + 30
 
Nov 29 - Gave Refusal Sheet :cry:
 
Informed that Case is being sent back to USCIS with intent to revoke :ranting::ranting::ranting:
 
 
 
Jan 12-13, 216 Case Date Update on CEAC
 
Feb 12,2016-Update on USCIS, case under review
 
Oct 14, 2016 NOIR sent out, received OCT 18, 2016
 
 
 
 

 

 Dream-dj.png

 

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

If an approval doesn't come from TSC this week for me, I am going to be very discouraged going into the holidays....I really don't understand why they are so so slow compared to other service centers....

At least TSC is showing us glimpses that they are surviving and alive..... Not sure if NSC even exists... Just take a look at the April spread sheet..... I am stuck in that hell hole....

USCIS
2013/04/27 : Mailed I-130 petition to USCIS Phoenix Lockbox, Arizona.
2013/04/30 : I-130 PETITION PRIORITY DATE (NOA1).
2013/05/02 : Received (NOA1) hardcopy by mail from National Benefits Center (NBC).
2013/12/04 : I-130 petition transferred from National Benefits Center (NBC) to Nebraska Service Center (NSC).
2014/02/12 : I-130 PETITION APPROVED (NOA2) at Nebraska Service Center (NSC).
2014/02/13 : Approved I-130 petition shipped from Nebraska Service Center (NSC) to National Visa Center (NVC).
2014/02/18 : Received (NOA2) hardcopy by mail from Nebraska Service Center (NSC).
NATIONAL VISA CENTER (NVC)
2014/02/25 : National Visa Center (NVC) received approved I130 petition from Nebraska Service Center (NSC).
2014/03/31 : Case Number, IIN & BIN generated.
2014/04/01 : DS-261 available. Completed & submitted online.
2014/04/01 : AOS fee bill invoiced & paid online.

2014/04/04 : AOS fee payment status appears as PAID.

2014/04/08 : IV fee bill invoiced & paid online.

2014/04/11 : IV fee payment status appears as PAID.

2014/04/12 : DS-260 available. Completed & submitted online.

2014/06/24 : IV packet delivered at National Visa Center (NVC).

2014/07/01 : IV packet scanned into system.

2014/07/28 : AOS packet delivered at National Visa Center (NVC).

2014/07/30 : AOS packet scanned into system.

2014/08/13 : IV packet reviewed & accepted by National Visa Center (NVC).

2014/09/23 : AOS checklist email received from National Visa Center (NVC).

2014/09/24 : AOS checklist correction mailed to National Visa Center (NVC).

2014/09/29 : AOS checklist correction scanned into system at National Visa Center (NVC).

2014/11/17 : CASE COMPLETED at National Visa Center (NVC).

2014/12/03 : Interview scheduled by National Visa Center (NVC).

2014/12/09 : Received interview letter (P4) email from National Visa Center (NVC).

2014/12/19 : Case shipped from National Visa Center (NVC) to US consulate Mumbai. CEAC status says 'In Transit'.

INTERVIEW & POE

2014/12/15 : Medicals completed.

2014/12/22 : Case received at US consulate Mumbai. CEAC status says 'Ready'.

2015/01/05 : Biometrics appointment scheduled.

2015/01/20 : INTERVIEW at US consulate Mumbai.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...