Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

we are at NSC ... anybody else is there ?

I am at NSC too. PD April 4th, transferred on November 15th. Should we start a letter to send to the head persons at NSC and TSC?

I'm at NSC too! Transfer date November 14th. NOA1 April 5th.

I wonder if it's asking too much to expect something this week unsure.png

Edited by ragex
Case History (parents):
 
USCIS / I-130
 
02/03/2018: Submitted I-130 packages to USPS
02/06/2018: I-130 delivered to USCIS Chicago Lockbox by USPS
02/14/2018: Checks cashed by USCIS
02/14/2018: Emails/ SMS received that USCIS has accepted the 2 cases and routed them to the Potomac Service Center
02/14/2018: NOA1
02/20/2018: NOA1 letter received
10/24/2018 NOA 2: I-130 approved!
11/04/2018: Case sent to Department of State for processing
12/17/2018: Case received by NVC
 
Case History:
 

 

USCIS/ I-130

04/05/2013- USCIS text(priority date 04/04/2013)
04/05/2013- NOA 1
04/08/2013-"Touched"
04/10/2013- NOA 1: Hardcopy Received: Transferred to USCIS NBC
11/14/2013- Case transferred to another office
11/15/2013- Case transferred to local office
11/15/2013-"Touched"
11/19/2013- Case being processed at a USCIS office
11/19/2013-"Touched"
11/19/2013-Received hard copy of the transfer notice. Transferred to NSC
01/10/2014-Alien Registration Number changed notice
01/13/2014-NOA 2!
01/16/2014-Case shipped to Department of State
 
NVC
 
01/28/2014-Case received by NVC
03/07/2014-Case entered by NVC into the system
03/10/2014-Called NVC and received the NVC Case Number and Invoice Identification Number (IIN)
03/11/2014-DS-261 became available and submitted
03/12/2014-AOS invoice received and paid online. Status shows 'IN PROCESS'
03/21/2014-AOS Fees appears as PAID
03/20/2014-IV invoice received and paid online. Status shows 'IN PROCESS'
03/24/2014-IV Fees appears as PAID
03/25/2014-AOS package mailed to NVC
03/29/2014-IV package mailed to NVC
03/29/2014- DS-260 submitted

03/31/2014- AOS and NVC packets DELIVERED to NVC by the courier

04/02/2014- AOS packet RECEIVED by NVC

04/02/2014- NVC packet RECEIVED by NVC

04/16/2014- False checklist generated for AOS form not received by NVC

04/18/2014- AOS Checklist received.

04/19/2014- Checklist response prepared and mailed to NVC

04/23/2014- Checklist response received by NVC

05/09/2014- Case Complete at NVC!

05/16/2014- Case Complete email received from NVC.

05/28/2014- Interview scheduled for 7/22/2014!.

05/29/2014- Interview letter received from NVC.

07/22/2014- Interview - APPROVED :D

07/28/2014-Case status changed to Administrative Processing

08/04/2014-Case status changed to Issued

08/06/2014-Passport/ Visa in hand!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

Hello,

We have been transferred to TSC as of Nov. 18th even though I live in California. This is incredibly frustrating since if it had gone to California its obvious we would have been approved already based on others who have posted their NOA1 and transfer dates of December. What a joke this system of ours is. Also of note I am now able to see my status online for the first time since we have started this process.....Our NOA1 is 4/9/2013

Same Here!Transfered to TSC on Nov. 18,No word yet..This is crazy!! waiting and waiting.I don't know of hardly any Approvals from Tx. since a Transfer..My PD is April 5
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Bulgaria
Timeline

Happy Monday everyone!! Let's see some approvals!!! Good luck! Maybe some of us will win the lottery today. :)

01/05/06-Met

04/01/13-Married

USCIS

04/15/13-PD

11/15/13-Transfered To NSC

12/11/13-NOA2

NVC

01/07/14- Received

02/06/14-Case and IIN #'s assigned

02/10/14-DS-261 available and filled out

02/11/14-Paid AOS fee

02/18/14-Sent AOS packet via Express Mail

02/19/14-NVC received AOS packet

02/26/14-IV invoice available and paid

03/03/14- IV bill shows paid-mailed IV package via Express Mail

03/04/14-IV package received

03/09/14-DS-260 submitted

03/14/14-False checklist for IV package

03/24/14- Real checklist

04/02/14-NVC received checklist response

04/18/14-CASE COMPLETE!!!!!!!!!!

06/05/14-Interview In Sofia BG

06/09/14 -Visa Approved!!!!!!!!

06/11/14-Visa in hand

06/21/14-POE

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

Same Here!Transfered to TSC on Nov. 18,No word yet..This is crazy!! waiting and waiting.I don't know of hardly any Approvals from Tx. since a Transfer..My PD is April 5

Same here transferred to TSC on 18 November and nothing yet

My PD is 9 april

Link to comment
Share on other sites

So Im back from seeing my husband for 11 days. It was hard to leave him. My connecting flight was delays 5 hours because the Philadelphia airport was closed due to the snow. I almost had to stay over night in Houston. My head hit the pillow at 1:40 am and the alarm went off at 5am. needless to say, I'm a walking zombie today. Not even close to being in the mood to be here at work.

Ok, soooo I saw some Saturday approvals... Let's hope they handed out some OT for the USCIS people and they will actually do some work and get April finished. I am disappointed in the progress at TSC. CSC is moving so fast... What is the issue over in Texas??? I broke a mirror in Costa Rica. I swear that is why I was transferred to TEXAS. let's hope that Texas wakes up. Does anyone know if the Texas office is located near DFW? If so, they might be off for the weather. THAT WOULD REALLY SUCK ! ! ! ! !

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Bulgaria
Timeline

I'm NSC. Pd date April 15th. Transferred nov 15th. Come on Nebraska let's go!!

01/05/06-Met

04/01/13-Married

USCIS

04/15/13-PD

11/15/13-Transfered To NSC

12/11/13-NOA2

NVC

01/07/14- Received

02/06/14-Case and IIN #'s assigned

02/10/14-DS-261 available and filled out

02/11/14-Paid AOS fee

02/18/14-Sent AOS packet via Express Mail

02/19/14-NVC received AOS packet

02/26/14-IV invoice available and paid

03/03/14- IV bill shows paid-mailed IV package via Express Mail

03/04/14-IV package received

03/09/14-DS-260 submitted

03/14/14-False checklist for IV package

03/24/14- Real checklist

04/02/14-NVC received checklist response

04/18/14-CASE COMPLETE!!!!!!!!!!

06/05/14-Interview In Sofia BG

06/09/14 -Visa Approved!!!!!!!!

06/11/14-Visa in hand

06/21/14-POE

Link to comment
Share on other sites

Filed: K-3 Visa Country: Montenegro
Timeline

So Im back from seeing my husband for 11 days. It was hard to leave him. My connecting flight was delays 5 hours because the Philadelphia airport was closed due to the snow. I almost had to stay over night in Houston. My head hit the pillow at 1:40 am and the alarm went off at 5am. needless to say, I'm a walking zombie today. Not even close to being in the mood to be here at work.

Ok, soooo I saw some Saturday approvals... Let's hope they handed out some OT for the USCIS people and they will actually do some work and get April finished. I am disappointed in the progress at TSC. CSC is moving so fast... What is the issue over in Texas??? I broke a mirror in Costa Rica. I swear that is why I was transferred to TEXAS. let's hope that Texas wakes up. Does anyone know if the Texas office is located near DFW? If so, they might be off for the weather. THAT WOULD REALLY SUCK ! ! ! ! !

Hey girl! Welcome back! I know what u mean, i'm going to be with my man for 12 days ard new yrs and it's always so bitter-sweet. I'm already dreading leaving him AGAIN!

So texas is bad, i mean weather wise, i live in the dfw area an i havent gotten in my car since thursday. Thanfully i can telecommute, but i wouldn't count on the uscis ( in the area, mesquite i think) to be doing much till this lets up. It's looking up tho, i think tomorrow should be a working day for all. Hang in there! I'm really holding out hope for approvals b4 xmas break!

1/7/14 - NVC received I129 and I130
2/11/14 - NVC case assigned
2/11/14 - AOS Bill invoiced and paid; DS261 completed
2/14/14 - AOS Bill showed as Paid
2/24/14 - AOS Packet arrived at NVC
2/27/14 - IV Bill Invoiced

2/28/14 - IV Bill Paid - heart.gif 1st WEDDING ANNIVERSARY (apartcray5ol.gif)

3/4/14 - IV Bill showed as Paid

3/6/14 - DS260 completed

3/11/14 - IV Packet delivered to NVC

3/13/14 - IV Packet logged in at Nvc

3/27/14 - CASE COMPLETE :dance:

__/__/14 - Interview

event.png
event.png

Link to comment
Share on other sites

And not ALL of use are charging through CSC, some of us are being used as a new door stop over there now ;)

USCIS (239 days):

04.18.2013 - NOA1

12.13.2013 - NOA2 via email; I-130 approved. Shipped to NVC

NVC (274 days):

12.30.2013 - Arrived at NVC

01.27.2014 - Received case no. & IIN

02.07.2014 - Completed & submitted DS-261 form online

02.13.2014 - Paid AOS bill

02.18.2014 - AOS showing as 'paid'

03.18.2014 - Invoiced for IV bill (finally!)

03.19.2014 - Made payment for IV bill

03.21.2014 - IV bill showing PAID

03.24.2014 - Completed DS-260 online

03.29.2014 - Mailed IV Packet

04.26.2014 - IV packet all approved, false checklist from NVC for AOS packet

05.07.2014 - AOS packet sent

06.12.2014 - AOS packet scanned in (took them THAT LONG to do it)

07.29.2014 - Received checklist via email

07.30.2014 - Sent re-filled AOS form, as per checklist instructions

09.24.2014 - Case Complete (FINALLY)

09.30.2014 - Case leaves NVC

Embassy:

10.29.2014 - Medical

11.04.2014 - Interview in London - APPROVED

11.05.2014 - CEAC - Issued

11.07.2014 - Courier email

11.10.2014 - Passport and visa received via DX courier

In the USA:

12.02.2014 - POE (Denver)

12.24.2014 - ELIS changed to "In Process"

01.05.2015 - Greencard received in mail

ROC:
10.05.2016 - NOA1

12.13.2016 - Biometrics

11.13.2017 - Infopass Appt.

03.30.2018 - Approval

04.05.2018 - Greencard Arrived

Link to comment
Share on other sites

Filed: K-3 Visa Country: Montenegro
Timeline

And not ALL of use are charging through CSC, some of us are being used as a new door stop over there now ;)

Lol, agreed! U may be a door stop - i'm pretty sure i'm a paperweight see as how it weighs a freakin ton with all the phone and skype records hihihihihi

1/7/14 - NVC received I129 and I130
2/11/14 - NVC case assigned
2/11/14 - AOS Bill invoiced and paid; DS261 completed
2/14/14 - AOS Bill showed as Paid
2/24/14 - AOS Packet arrived at NVC
2/27/14 - IV Bill Invoiced

2/28/14 - IV Bill Paid - heart.gif 1st WEDDING ANNIVERSARY (apartcray5ol.gif)

3/4/14 - IV Bill showed as Paid

3/6/14 - DS260 completed

3/11/14 - IV Packet delivered to NVC

3/13/14 - IV Packet logged in at Nvc

3/27/14 - CASE COMPLETE :dance:

__/__/14 - Interview

event.png
event.png

Link to comment
Share on other sites

Lol, agreed! U may be a door stop - i'm pretty sure i'm a paperweight see as how it weighs a freakin ton with all the phone and skype records hihihihihi

And since its so cold over there in Texas, I'm pretty sure my file is being used to fuel the fireplace so they can keep warm. One page at a time.... LOL

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Filed: K-3 Visa Country: Montenegro
Timeline

And since its so cold over there in Texas, I'm pretty sure my file is being used to fuel the fireplace so they can keep warm. One page at a time.... LOL

Lmao! They are not that insensitive! But they could be using it to make origami one page at a time to kill the boredom this 4th day of ice...! ;p U can only watch so many movies u know.... :s

1/7/14 - NVC received I129 and I130
2/11/14 - NVC case assigned
2/11/14 - AOS Bill invoiced and paid; DS261 completed
2/14/14 - AOS Bill showed as Paid
2/24/14 - AOS Packet arrived at NVC
2/27/14 - IV Bill Invoiced

2/28/14 - IV Bill Paid - heart.gif 1st WEDDING ANNIVERSARY (apartcray5ol.gif)

3/4/14 - IV Bill showed as Paid

3/6/14 - DS260 completed

3/11/14 - IV Packet delivered to NVC

3/13/14 - IV Packet logged in at Nvc

3/27/14 - CASE COMPLETE :dance:

__/__/14 - Interview

event.png
event.png

Link to comment
Share on other sites

And since its so cold over there in Texas, I'm pretty sure my file is being used to fuel the fireplace so they can keep warm. One page at a time.... LOL

haha that made me lol! I am glad we are all in this boat together, misery/madness loves company! haha

USCIS (239 days):

04.18.2013 - NOA1

12.13.2013 - NOA2 via email; I-130 approved. Shipped to NVC

NVC (274 days):

12.30.2013 - Arrived at NVC

01.27.2014 - Received case no. & IIN

02.07.2014 - Completed & submitted DS-261 form online

02.13.2014 - Paid AOS bill

02.18.2014 - AOS showing as 'paid'

03.18.2014 - Invoiced for IV bill (finally!)

03.19.2014 - Made payment for IV bill

03.21.2014 - IV bill showing PAID

03.24.2014 - Completed DS-260 online

03.29.2014 - Mailed IV Packet

04.26.2014 - IV packet all approved, false checklist from NVC for AOS packet

05.07.2014 - AOS packet sent

06.12.2014 - AOS packet scanned in (took them THAT LONG to do it)

07.29.2014 - Received checklist via email

07.30.2014 - Sent re-filled AOS form, as per checklist instructions

09.24.2014 - Case Complete (FINALLY)

09.30.2014 - Case leaves NVC

Embassy:

10.29.2014 - Medical

11.04.2014 - Interview in London - APPROVED

11.05.2014 - CEAC - Issued

11.07.2014 - Courier email

11.10.2014 - Passport and visa received via DX courier

In the USA:

12.02.2014 - POE (Denver)

12.24.2014 - ELIS changed to "In Process"

01.05.2015 - Greencard received in mail

ROC:
10.05.2016 - NOA1

12.13.2016 - Biometrics

11.13.2017 - Infopass Appt.

03.30.2018 - Approval

04.05.2018 - Greencard Arrived

Link to comment
Share on other sites

Filed: Citizen (apr) Country: India
Timeline

My file is at TSC and I received an update this past Saturday. So, maybe they are operational, in spite of the weather? We can hope right? unsure.png

My USCIS Journey...

 

I had an I-485 filing already submitted through an employment-based application. Post-marriage, I submitted an I-130, which after being approved was interfiled with the existing I-485.

Interfiling/AOS Timeline:

01/03/14 - Day 274 - Interfiling request received by USCIS

04/03/14 - Day 364 - Interfiling service request sent

04/30/14 - Day 391 - Second interfiling service request sent

05/19/14 - Day 410 - Email sent asking for case status update

06/04/14 - Day 426 - Response received that I-485 was transferred to NBC

06/05/14 - Day 427 - I-485 updated to "sent to local office for processing"

07/02/14 - Day 454 - Status changed to testing & interview. Interview date August 4!!

08/04/14 - Day 487 - Mini-Stokes interview. IO intended on approving AOS but the computer did not show I-130 approval. The wait goes on...

08/18/14 - Day 501 - Spoke with Tier 2 IO - said that my I-485 is approved but no card prodn ordered. Asked to call back in 2 weeks if no update.

08/29/14 - Day 512 - Spoke with Tier 2 IO - said that my I-485 was not approved yet, but my file was with an IO for a decision

09/03/14 - Day 517 - Wrote a request to my Congressman asking for assistance

09/09/14 - Day 523 - Status updated to Card/Document Production

09/15/14 - Day 529 - Status update - Card mailed to address on record/permanent resident status registered

09/15/14 - Day 529 - Status update - Card picked up by USPS.

09/16/14 - Day 530 - GREEN CARD RECEIVED IN THE MAIL!!

I-751 Timeline:

05/25/16 - Day 000 - I-751packet mailed to CSC

05/27/16 - Day 002 - I-751 packet received at CSC

06/02/16 - Day 008 - Check cashed

06/03/16 - Day 009 - NOA1 received. Receipt Date: 05/27/16

06/10/16 - Day 016 - Biometrics appointment notice received - appointment date 6/22/16

06/22/16 - Day 028 - Biometrics Appointment - complete

01/04/17 - Day 224 - Status update - ROC Approved!  Card production ordered.

01/09/17 - Day 229 - Status update - Approval notice letter received.  Also received a notification that the card has been mailed.

01/11/17 - Day 231 - Card received in the mail!

N-400 Timeline:

12/02/20 - Day 000 - N-400 application submitted online; case received.

01/06/20 - Day 035 - Biometrics reuse notification received.

04/01/21 - Day 119 - Voluntary withdrawal N-400 Application.

N-400 Resubmission:

11/02/22 - Day 000 - N-400 application submitted online; case received.

11/02/22 - Day 000 - Biometrics reuse notification received.

01/05/22 - Day 064 - Interview scheduled for 02/14/23.

02/14/23 - Day 104 - N-400 Approved! 

08/18/23 - Day 289 - Oath Ceremony notice received - scheduled for 09/29/23.

09/29/23 - Day 331 - Oath Ceremony

Link to comment
Share on other sites

My file is at TSC and I received an update this past Saturday. So, maybe they are operational, in spite of the weather? We can hope right? unsure.png

Oh really? what was the update??? A# ? Name Change? That is a really good sign that somebody is actually alive over there. I heard somewhere that they are allowed to take work home... Maybe that's what happened.

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Filed: K-3 Visa Country: Montenegro
Timeline

My file is at TSC and I received an update this past Saturday. So, maybe they are operational, in spite of the weather? We can hope right? unsure.png

I sure hope so. Since seeing those approvals in 6 days it tells me this CAN be done fast i'll never understand why the process is so porely managed.

1/7/14 - NVC received I129 and I130
2/11/14 - NVC case assigned
2/11/14 - AOS Bill invoiced and paid; DS261 completed
2/14/14 - AOS Bill showed as Paid
2/24/14 - AOS Packet arrived at NVC
2/27/14 - IV Bill Invoiced

2/28/14 - IV Bill Paid - heart.gif 1st WEDDING ANNIVERSARY (apartcray5ol.gif)

3/4/14 - IV Bill showed as Paid

3/6/14 - DS260 completed

3/11/14 - IV Packet delivered to NVC

3/13/14 - IV Packet logged in at Nvc

3/27/14 - CASE COMPLETE :dance:

__/__/14 - Interview

event.png
event.png

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×