"Aboyum, congrats! But why does your profile say K3 visa?"

I just took a look at my profile, not sure why it said K3, but I have updated it with correct information and updated the timeline as well.

Sorry about that :/

No worries! It was just kinda confusing hehe.. Pls update us when u receive ur noa2 hardcopy, if it really came from Lee's Summit. I really hope we see more approvals in the following days. Good luck on your NVC journey! :)

08.24.2013 - got married in the Philippines!

09.25.2013 - NOA1 via email

11.18.2013 - requested expedite due to typhoon

12.02.2013 - CFO seminar

12.12.2013 - I-130 approved, NOA2 via email (never transferred); shipped to NVC

12.30.2013 - NVC received the case

01.06.2014 - requested expedite due to typhoon and PCS

01.08.2014 - Case # and IIN; submitted DS-261; NVC asked for 2 contact #s of beneficiary

01.09.2014 - AOS fee billed

01.14.2014 - AOS fee showed paid

01.15.2014 - IV fee billed; expedite approved

01.18.2014 - sent AOS package

01.22.2014 - IV fee showed paid; AOS arrived at NVC as per UPS (10:18am by FNU)

01.24.2014 - sent IV package

01.27.2014 - submitted DS-260; IV docs delivered to NVC as per DHL (10:52am by PETERS G)

01.29.2014 - CASE COMPLETE (via phonecall)

01.30.2014 - received checklist for Dutch Police Record (VOG) via email

01.31.2014 - left NVC, sent to embassy

02.04.2014 - received at embassy, READY as per CEAC

02.10-11.2014 - medical done, passed!

02.24.2014 - interview: APPROVED!!

02.27.2014 - Received SMS from 2Go, ready for pick up

02.28.2014 - visa on hand; CFO sticker

03.01.2014 - paid ELIS

03.06.2014 - POE Hawaii...Aloooohaaa! :)

04.10.2014 - 2yr green card received

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Many congrats!

Approval ! ! ! ! ! biggrin.pngyes.gif

NBC received my case for my husband's i130 on April 22nd of 2013, and

on October 29th of 2013 I opened my email and saw it!

Then I checked the USCIS website to make sure I wasn't going crazy and starting to see things.

When I realized this was true I had tears of happiness streaming down my face and I was at work so I couldn't post then but as soon as I got home I came to let all of you know that they must be working on April filers more, and that it seems like April filers aren't being transferred.

My case was at Lee Summit, MO and I never had a transfer.

I'm honestly in shock, I was preparing to wait a few more months from what I have been reading.

This gives me hope that all of you will get your approvals soon also!

Don't give up hope yet!

Case History (parents):
 
USCIS / I-130
 
02/03/2018: Submitted I-130 packages to USPS
02/06/2018: I-130 delivered to USCIS Chicago Lockbox by USPS
02/14/2018: Checks cashed by USCIS
02/14/2018: Emails/ SMS received that USCIS has accepted the 2 cases and routed them to the Potomac Service Center
02/14/2018: NOA1
02/20/2018: NOA1 letter received
10/24/2018 NOA 2: I-130 approved!
11/04/2018: Case sent to Department of State for processing
12/17/2018: Case received by NVC
 
Case History:
 

 

USCIS/ I-130

04/05/2013- USCIS text(priority date 04/04/2013)
04/05/2013- NOA 1
04/08/2013-"Touched"
04/10/2013- NOA 1: Hardcopy Received: Transferred to USCIS NBC
11/14/2013- Case transferred to another office
11/15/2013- Case transferred to local office
11/15/2013-"Touched"
11/19/2013- Case being processed at a USCIS office
11/19/2013-"Touched"
11/19/2013-Received hard copy of the transfer notice. Transferred to NSC
01/10/2014-Alien Registration Number changed notice
01/13/2014-NOA 2!
01/16/2014-Case shipped to Department of State
 
NVC
 
01/28/2014-Case received by NVC
03/07/2014-Case entered by NVC into the system
03/10/2014-Called NVC and received the NVC Case Number and Invoice Identification Number (IIN)
03/11/2014-DS-261 became available and submitted
03/12/2014-AOS invoice received and paid online. Status shows 'IN PROCESS'
03/21/2014-AOS Fees appears as PAID
03/20/2014-IV invoice received and paid online. Status shows 'IN PROCESS'
03/24/2014-IV Fees appears as PAID
03/25/2014-AOS package mailed to NVC
03/29/2014-IV package mailed to NVC
03/29/2014- DS-260 submitted

03/31/2014- AOS and NVC packets DELIVERED to NVC by the courier

04/02/2014- AOS packet RECEIVED by NVC

04/02/2014- NVC packet RECEIVED by NVC

04/16/2014- False checklist generated for AOS form not received by NVC

04/18/2014- AOS Checklist received.

04/19/2014- Checklist response prepared and mailed to NVC

04/23/2014- Checklist response received by NVC

05/09/2014- Case Complete at NVC!

05/16/2014- Case Complete email received from NVC.

05/28/2014- Interview scheduled for 7/22/2014!.

05/29/2014- Interview letter received from NVC.

07/22/2014- Interview - APPROVED :D

07/28/2014-Case status changed to Administrative Processing

08/04/2014-Case status changed to Issued

08/06/2014-Passport/ Visa in hand!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Poland
Timeline

Replying to questions :

Blueberry Pancake - I only filed a i130, along with all of the proof. when stacked together the proof was probably about 4 inches thick.

Mine was about the same ;) Again, congrats! :)

4533828f9f.png

When two people are meant for each other, no time is too long, no distance is too far, no one can ever tear them apart.

USCIS: NVC:

6/21/2013 -Married in Stockholm, Sweden 4/16/2014- Case received at NVC

9/6/2013 -Priority Date 5/13 /2014- Case number and IIN assigned

2/25/2014 -Transferred to NSC 5/20/2014- DS-261 completed

3/31/2014 -Approved 5/21/2014- AOS fee invoiced and paid

5/22/2014- AOS package overnighted to NVC

5/28/2014- AOS scanned into the system

6/20/2014- IV invoice email (but fee still locked on CEAC )

6/23/2014- IV fee finally unlocked and paid.

IV package overnighted to NVC

6/30/2014- IV scanned in. DS260 completed.

7/1/2014- AOS accepted

7/2/2014- False checklist (AOS reviewed)

8/1/2014 False checklist (attorney's G28 reviewed)

8/2/2014 False checklist (NVC not sure why it was generated)

I am the beneficiary. 8/12/2014 CASE COMPLETE!

8/26/2014 Medical

9/2/2014 Interview... APPROVED!!!

9/5/2014 Visa in hand

Removal Of Conditions:

10/29- Package sent to VSC

11/1 - NOA1

11/17- Received biometrics appointment letter

11/30- Biometrics appointment

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Canada
Timeline

Approval ! ! ! ! ! biggrin.pngyes.gif

NBC received my case for my husband's i130 on April 22nd of 2013, and

on October 29th of 2013 I opened my email and saw it!

Then I checked the USCIS website to make sure I wasn't going crazy and starting to see things.

When I realized this was true I had tears of happiness streaming down my face and I was at work so I couldn't post then but as soon as I got home I came to let all of you know that they must be working on April filers more, and that it seems like April filers aren't being transferred.

My case was at Lee Summit, MO and I never had a transfer.

I'm honestly in shock, I was preparing to wait a few more months from what I have been reading.

This gives me hope that all of you will get your approvals soon also!

Don't give up hope yet!

YAY! Congrats!

Link to comment
Share on other sites

Wow congrats.. happy to hear that

June 2 2013 priority date
december 2013 Rfe
february 2014 sent Rfe
March 2014 approved at USCIS
june 2014 NVC received
march 2 2015 sent aos and iv package
march 8 i emailed nvc request to expedite my case
march 13 approved expedite request
march 17 in transit status in CEAC
march 19 case file at US embassy
march 23 first day of medical at Slec
march 29 personal evaluation...passed!
April 6 immunization
april 13 interview at USEM. under Administrative Processing Reason; Medical result was still not forwarded by SLEC.
After my interview i called SLEC they told me they forwarded it at USEM same day of my interview.
July 29 I emailed SLEC to confirm again when did they forwarded my Medical Result at USEM. They replied...forwarded April 13.
July 30 status update date change FINALLY.
September 2015 went in US embassy to withdraw my passport coz I've waited for how many months and no approval yet. Only to find out my case file has been sitting in the corner ...no one reviewed my medical result. to make the story short, I took medical again for the second time , then after a my medical result released, I have my visa on my hands.

October 28 2015 POE Sam Francisco
November 7, 2015 SSN
December 2015... 10 year green card arrived
December 2015 Driver's license issued..yay! <p>




NATURALIZATION N400 SECTION 319B
January 29,2016 Application for N400 section 319b sent at Phoenix AZ
February 1 Priority date
February 9 NOA
February 23 Biometric done, walk in (March 2 original schedule
February 28 Inline for interview
March 30 interview was scheduled
May 4, 2016 INTERVIEW APPROVED


Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

I was hoping for more April approvals this month :| they were showing some action in the beginning of the month and now again back to their sleeping mode.

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

No new...even my senator hasn't written me back lol :(.

1/15/2013 - Married

USCIS:
4/11: Mailed out IR-30 via FedEx Ground
4/15: Forms received by USCIS Chicago (Signed)

12/2: Case Transferred to CSC

12/17/2013: NOA-2!!!! (8 Months, 2 days)

NVC:

12/27/2013: Case received by NVC

1/23/2014: NVC Case #, BIN, & IIN received.

1/31/2014: DS-261 Available & filled out.

2/4/2014: AOS Invoice available & paid

2/7/2014: I-864(AOS) completed & sent

2/11/2014: IV Bill availiable and paid.

2/14/2014: DS-260 completed (IV)

2/14/2014: DS-260 support documents sent

2/26/2014: I-864 (AOS) documents received and logged by NVC.

3/4/2014: Checklist for AOS ( I knew it :|a)

3/5/2014: Checklist for AOS submitted

3/7/2014: DS-260 documents received & logged by NVC

3/13/2014: IV packet + documents approved and logged

4/14:2014: Case Complete!!! (3 months 2 weeks 4 days @NVC)

Consulate:

Medical: 05/28/2014

Interview: 06/03/2014 (?)

Consulate didn't like our police records, have to resend--> AP

APPROVED: 07/02/2014

visa in hand: 07/11/2014

PoE: Halifax Stanfield International (07/25/2014)

REMOVING CONDITIONS:

06/10/2016: Packet Mailed

06/16/2016: Check Cashed

7/11/2016: Biometrics Appointment

Link to comment
Share on other sites

Replying to questions :

Blueberry Pancake - I only filed a i130, along with all of the proof. when stacked together the proof was probably about 4 inches thick.

Congrats!!! Wow 4" thick! They probably tripped over it when they went to transfer some files or didn't want to pay for shipping! Haha I wish you the best of luck with the rest and may it go fast

Finished for now!!

NOA1 4-1-13

NOA2 11-14-13

NVC case # 12-9-13

Case complete 1-21-14

Interview 3-3-14

Visa Received 3-6-14

US Entry 03-09-14

Link to comment
Share on other sites

Filed: Country: Canada
Timeline

Congrats!! I'm very happy for you and tremendously jealous!! I'm a Apr 19 PD, so hopefully they're working on that week. Best of luck in the next steps.

event.png

NOA1 - April 19, 2013

Case Transfer - November 25, 2013

NOA2 - December 4, 2013 (via CSC)

NVC rec'd - December 16, 2013

NVC case number - January 7, 2014

Email from NVC confirming EP - January 10, 2014

DS-261 avail and completed - January 15, 2014

AOS fee avail and paid - January 17, 2014

AOS fee shows "paid" - January 22, 2014

AOS/i-864 package sent - January 24, 2014

IV invoiced and paid - January 24, 2014

IV shows "paid" - January 29, 2014

DS-260 avail and completed - January 29, 2014

IV package sent - Janaury 31, 2014

Case COMPLETE!! - February 27, 2014 dancin5hr.gifdancin5hr.gifdancin5hr.gifdancin5hr.gifdancin5hr.gifdancin5hr.gif

Medical Complete - March 24, 2014

Interview - April 2, 2014

APPROVED!! at April 2, 2014 interview, husband comes to Canada April 10th to cross over once my passport is returned. :wow:

April 13, 2014 - All moved in and even welcomed with a big surprise 'welcome to America party' by my husband and friends I've made here over the last year.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Congrats!!!!! Mine is April 30 and expecting soon

USCIS
2013/04/27 : Mailed I-130 petition to USCIS Phoenix Lockbox, Arizona.
2013/04/30 : I-130 PETITION PRIORITY DATE (NOA1).
2013/05/02 : Received (NOA1) hardcopy by mail from National Benefits Center (NBC).
2013/12/04 : I-130 petition transferred from National Benefits Center (NBC) to Nebraska Service Center (NSC).
2014/02/12 : I-130 PETITION APPROVED (NOA2) at Nebraska Service Center (NSC).
2014/02/13 : Approved I-130 petition shipped from Nebraska Service Center (NSC) to National Visa Center (NVC).
2014/02/18 : Received (NOA2) hardcopy by mail from Nebraska Service Center (NSC).
NATIONAL VISA CENTER (NVC)
2014/02/25 : National Visa Center (NVC) received approved I130 petition from Nebraska Service Center (NSC).
2014/03/31 : Case Number, IIN & BIN generated.
2014/04/01 : DS-261 available. Completed & submitted online.
2014/04/01 : AOS fee bill invoiced & paid online.

2014/04/04 : AOS fee payment status appears as PAID.

2014/04/08 : IV fee bill invoiced & paid online.

2014/04/11 : IV fee payment status appears as PAID.

2014/04/12 : DS-260 available. Completed & submitted online.

2014/06/24 : IV packet delivered at National Visa Center (NVC).

2014/07/01 : IV packet scanned into system.

2014/07/28 : AOS packet delivered at National Visa Center (NVC).

2014/07/30 : AOS packet scanned into system.

2014/08/13 : IV packet reviewed & accepted by National Visa Center (NVC).

2014/09/23 : AOS checklist email received from National Visa Center (NVC).

2014/09/24 : AOS checklist correction mailed to National Visa Center (NVC).

2014/09/29 : AOS checklist correction scanned into system at National Visa Center (NVC).

2014/11/17 : CASE COMPLETED at National Visa Center (NVC).

2014/12/03 : Interview scheduled by National Visa Center (NVC).

2014/12/09 : Received interview letter (P4) email from National Visa Center (NVC).

2014/12/19 : Case shipped from National Visa Center (NVC) to US consulate Mumbai. CEAC status says 'In Transit'.

INTERVIEW & POE

2014/12/15 : Medicals completed.

2014/12/22 : Case received at US consulate Mumbai. CEAC status says 'Ready'.

2015/01/05 : Biometrics appointment scheduled.

2015/01/20 : INTERVIEW at US consulate Mumbai.

Link to comment
Share on other sites

yea i was hoping this week the approvals would start to pick up, but no dice

Been thinking this same thing for over a month. See you next month for more disappointments!

07/29/2014 - NOA1

11/19/2014 - Transfer to TSC

12/19/2014 - NOA2

01/15/2014 - NVC Received (TSC held it for 3 weeks...)

02/19/2014 - Case no. and IIN assigned; requested embassy change

02/27/2014 - DS-261 available and submitted

02/28/2014 - AOS available and paid

03/19/2014 - AOS mailed

03/27/2014 - AOS entered into system

03/24/2014 - New case no. assigned

03/25/2014 - IV fee invoiced and paid

03/28/2014 - IV package sent via FedEx

04/26/2014 - case complete

06/01/2014 - passed interview

Link to comment
Share on other sites

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

So if a MAY filer is being told they should see NOA2 around December/early Jan, April filers should be flooded with NOA2s around now. Ugh I'm kind of tired of every week something like this which gives so much hope and so much disappointment as the months roll on.

crying.gif

Thank you though LoveMyTico, very interesting for sure.

event.png
Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...