To be honest I don't think anything I do does any good.. Starting to think everything I do slows it down!!

Contact congressman (yes)

Contact senator (no)

Call tier 2 (yes)

File expedite (yes)

Place service requests (yes)

I have gotten zero from service requests (maybe done 6 so far). No letter or anything.

I am though disappointed in my expedite request.. I have many valid reasons as to why to approve it based on the safety of my wife but when I filed it the tier 2 just said she living in dangerous situation and conditions which did not include any details. Said I should get something in 5 days with decision or requesting documentation. I did get the letter in 2 days after I did request saying my "case was under review" and they "received my expedite request". I talked to a tier 2 about it and they told me I will get something again in 30 days that it should go fast..

VJ timeline shows I should get adjusticated anytime from now to mid November.

Reading everything it seems like I'm back where I started.. First waiting to be transferred to local office and now waiting to be transferred to different service center..

So far all efforts are wasted and looking for that light at the end of the tunnel

Have a wonderful day everyone and I hope this week brings many families together

Finished for now!!

NOA1 4-1-13

NOA2 11-14-13

NVC case # 12-9-13

Case complete 1-21-14

Interview 3-3-14

Visa Received 3-6-14

US Entry 03-09-14

Link to comment
Share on other sites

Filed: Timeline

Hey, i'm a April filer (NOA1 on the 9th). I'll share my progress...

My wife's sisters got their CR1 6-7 months after NOA1, so we were thinking it would be the same for us. I went over to visit my wife in China for 3 weeks, came back and spoke with a tier 2. He said that I should hear something by October, and if I didn't to go ahead and call back. I called back 10/9/13, asked for a tier 2, and he said "Oh, you need to wait at least an additional 60 to 90 days". I asked if they transferred my (MSC) case file to "the local office" and he said no.

90 days places the new hopeful expectation out to January. I hope I don't have to call them back by them and hear them quote another 3 months!

My new favorite song

http://www.youtube.com/watch?v=M3X_ZpL_Hxc

Sent I-130 - 4/2/13

NOA1 - 4/9/13

RFE - 12/21/13

NOA2 - 2/28/14

NVC - 4/23/14

I864EZ Checklist (no N/A) - 7/22/14

Notice of 60 day delay - 8/1/14

Case Complete - 9/19/14

Interview Date - 10/27/14

Link to comment
Share on other sites

Filed: Timeline

Hey, i'm a April filer (NOA1 on the 9th). I'll share my progress...

My wife's sisters got their CR1 6-7 months after NOA1, so we were thinking it would be the same for us. I went over to visit my wife in China for 3 weeks, came back and spoke with a tier 2. He said that I should hear something by October, and if I didn't to go ahead and call back. I called back 10/9/13, asked for a tier 2, and he said "Oh, you need to wait at least an additional 60 to 90 days". I asked if they transferred my (MSC) case file to "the local office" and he said no.

90 days places the new hopeful expectation out to January. I hope I don't have to call them back by them and hear them quote another 3 months!

My new favorite song

http://www.youtube.com/watch?v=M3X_ZpL_Hxc

thanks for sharing, we are april 10, so guess in the same boat as you

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Off topic, but pertinent. I was hoping my wife will get over here by April next year, in time for filing taxes, and that she would have gotten a SSN by then. I think reaistically that is no longer going to happen. I would like to file joint taxes next year. My understanding is that I can get a tax ID number for her. Does anyone know how to do that, especally with the logistics of she being overseas and me being here? Thanks.

Link to comment
Share on other sites

Off topic, but pertinent. I was hoping my wife will get over here by April next year, in time for filing taxes, and that she would have gotten a SSN by then. I think reaistically that is no longer going to happen. I would like to file joint taxes next year. My understanding is that I can get a tax ID number for her. Does anyone know how to do that, especally with the logistics of she being overseas and me being here? Thanks.

http://www.irs.gov/Individuals/International-Taxpayers/Taxpayer-Identification-Numbers-(TIN) The directions are all right there

But why would you want to file for someone who doesn't even live here yet?

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Filed: Timeline

Hey Folks...Luk , goldensky99 and lovemytico........ just chill guys..... If you don't like my post, just don't answer to that. I am not asking you specifically to comment on the same. There are other sensible VJers also who can give an answer. I didn't asked you for your expert comments. Behave like mature guys...okayyyy... All of us here know that we all are frustrated and want just a way out to get out from this waiting process.

Go ahead guys, i am not stopping you from filing for an expedite for any blah blah... reason. Everybody is trying on their own and so i am. I filed for this just caz of a suggestion from a VJer only, otherwise there was no need to wait for 7 months, i wud have filed it longggg back.

Dear Luk, thank you so much for your kind wishes, but even then i will pray that your petition should got approved as soon as possible. Ur hopes doesn't matter for me dude. If your hopes wud have been so strong your case might have got approved by now. Just calm down buddy.

Dear goldensky99, even if you won't file for an expedite, your case will be processed normally only, i think there is no harm in trying. U never know wt will work out for you. Even sitting idle won't make any difference.

Dear lovemytiko, its been a while now that i am reading your posts. U r very right, this is public forum, everybody has the right to write anything, but we all are here just to share information/updates and not to depress anyone or to protest a specific person. U have your case and i don't have any problem whatever way you choose to make processing fast. everyone wants to be with their partners ASAP and it was just a step taken for that. I have asked just for OPINIONS NOT DECISIONS. Even i am stresses as you, i am taking my steps, you take your own.

All of us here know that we all are frustrated and want just a way out to get out from this waiting process.

Here is the reason people are being mean to you after reading your post.

It may have come off as you filing the expedite request in your interest rather than National Interest, and lost sight of what expedite is really for.

This especially if your wife did not take any other notable measures, to save the people for ex quit her job.

It looks like you are looking for a fast way out, and a maybe unethical one, and it is unfortunate that you are using the interest of patients for your own benefit.

The reason why people hoped that you don't get it is because in all these stress they have tried to maintain a ethical and genuine path so that the people really in need of expeditions dont not suffer and then you come up with this.........

I hope you get your approval soon , but not this way, sorry cant be supportive

Link to comment
Share on other sites

Filed: Timeline

Hi everyone - so I finally tried the Tier 2 operator call, and got pretty much the same response as everyone else. Both operators were perfectly nice, but can't say anything other than, "You haven't been transferred to a local office" (which is actually useful information) and the same "They're working on October 2012" that everyone else has gotten.

Obviously we all know that October 2012 aren't the only files getting approved right now, so my theory is that in order to avoid complaints, they are basing their standard processing times off of the OLDEST files that are currently being processed and not the AVERAGE age of the files being approved. That gives the MSC the largest window of time before people can start complaining about being outside "standard processing times".

Not that it makes it okay - and I'm just guessing - but I suspect that's the reasoning behind it.

It does start to make me really nervous that he won't get here before next summer - even though we are legally married, we are planning a family wedding ceremony for next June, and we had thought initially that there was no way this process would take longer than that. Now it looks like our worst-case scenario might come true - and we have to start planning for it just in case. Luckily, I am in a position to possibly take a month off in the summer (skype in for work meetings and such) and go be with him in Germany, which we might have to do if it comes to that.

Let's hope that it doesn't, and we all start to hear more April approvals soon. And let's send some good thoughts to those poor people from October 2012 who might still be waiting for approvals!

em

Did they happen to mention whether they would adjudicate in the NBC's?

Link to comment
Share on other sites

Hi everyone - so I finally tried the Tier 2 operator call, and got pretty much the same response as everyone else. Both operators were perfectly nice, but can't say anything other than, "You haven't been transferred to a local office" (which is actually useful information) and the same "They're working on October 2012" that everyone else has gotten.

Obviously we all know that October 2012 aren't the only files getting approved right now, so my theory is that in order to avoid complaints, they are basing their standard processing times off of the OLDEST files that are currently being processed and not the AVERAGE age of the files being approved. That gives the MSC the largest window of time before people can start complaining about being outside "standard processing times".

Not that it makes it okay - and I'm just guessing - but I suspect that's the reasoning behind it.

It does start to make me really nervous that he won't get here before next summer - even though we are legally married, we are planning a family wedding ceremony for next June, and we had thought initially that there was no way this process would take longer than that. Now it looks like our worst-case scenario might come true - and we have to start planning for it just in case. Luckily, I am in a position to possibly take a month off in the summer (skype in for work meetings and such) and go be with him in Germany, which we might have to do if it comes to that.

Let's hope that it doesn't, and we all start to hear more April approvals soon. And let's send some good thoughts to those poor people from October 2012 who might still be waiting for approvals!

em

I read somwhere that the Oct 2012 information was from the VSC... so in my mind, that doesn't even apply to the NBC.... They just took the oldest file in the pipeline and used that... It only really buys them time so they aren't flooded with inquiries because they are past the posted timeframe... That's it.

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I read somwhere that the Oct 2012 information was from the VSC... so in my mind, that doesn't even apply to the NBC.... They just took the oldest file in the pipeline and used that... It only really buys them time so they aren't flooded with inquiries because they are past the posted timeframe... That's it.

In the first week of september, I had send an email to USCIS ombudsman stating that there is no processing time for NBC and therefore we do not know if our file is beyond normal time. I am not claiming that my email was the reason that they recently added the processing time for NBC. But if it is, please stone me to death.

Link to comment
Share on other sites

In the first week of september, I had send an email to USCIS ombudsman stating that there is no processing time for NBC and therefore we do not know if our file is beyond normal time. I am not claiming that my email was the reason that they recently added the processing time for NBC. But if it is, please stone me to death.

I also sent a letter to the same effect in September. Maybe they got a bunch of them and that's why they added their ridiculous date, so avoid having to deal with petitions who are obviously outside of normal processing times since there are so many of us.

I just see it as another slap in the face. The one small amount of recourse we have in the system, and they work as hard as they can to shut that right down instead of actually fixing the problem.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I also sent a letter to the same effect in September. Maybe they got a bunch of them and that's why they added their ridiculous date, so avoid having to deal with petitions who are obviously outside of normal processing times since there are so many of us.

I just see it as another slap in the face. The one small amount of recourse we have in the system, and they work as hard as they can to shut that right down instead of actually fixing the problem.

Why not we send individual emails to Ombudsman stating our plight about the long delay. If someone there is humane they might act.

Also if you look the time frames, i-130 petitions are the ones that are backed up forever. All those petitions for non-immigrants are taking very short time.

Edited by scienceworks
Link to comment
Share on other sites

Why not we send individual emails to Ombudsman stating our plight about the long delay. If someone there is humane they might act.

Also if you look the time frames, i-130 petitions are the ones that are backed up forever. All those petitions for non-immigrants are taking very short time.

Don't hold your breath on the Ombudsman's office.. I placed a complaint on Sept 11th and then there was the shutdown... and then I called ( several times) and was told they are super behind in their processing and that mine will be looked at soon... And a few more phone calls later... today included, All I get is a voice message asking for my name and number and they will get back to me shortly....

Married March 9, 2013
NOA1 I-130 April 12, 2013

Transferred to TSC Nov 27, 2013
APPROVED March 18, 2014 FINALLY ! ! ! !! 11 MONTHS & 6 LONG DAYS FOR MY NOA2
Case shipped from TSC to NVC March 21, 2014
Rec'd NOA2 hard copy March 22, 2014
Case rec'd & Case Number assigned April 1, 2014
AMAZING !!!
PAID IV and AOS fees online April 5, 2014
Fees show paid/DS 260 avail. /DS260 submitted/AOS&IV pkg sent April 9, 2014
FEDEX delivered @ NVC April 11, 2014
Revised AOS pkg delivered April 15, 2014
AOS & IV rec'd& scanned in @ NVC April 15, 2014
Revised AOS scanned April 18, 2014
AOS checklist for income and IV pkg April 30, 2014 (checklist expected due to Lawyers mistakes)
DS260 accepted April 30, 2014
Checklist for Birth cert/police cert May 1, 2014
AOS accepted May 5, 2014

Birth cert scanned MAY 8, 2014

CASE COMPLETE JUNE 4, 2014 CC letter received via email June 11, 2014

INTERVIEW JULY 15, 2014

Waiver finally FedEx'd to Phoenix Lockbox August 21, 2014

WAIVER APPROVED December 17, 2014

Received Instruction Letter via email December 23, 2014

Final Embassy Appointment January 5, 2015 YAY !

Visa ISSUED January 12, 2015

event.png

event.png







Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

First, fill your Time Line please.

USCIS
2013/04/27 : Mailed I-130 petition to USCIS Phoenix Lockbox, Arizona.
2013/04/30 : I-130 PETITION PRIORITY DATE (NOA1).
2013/05/02 : Received (NOA1) hardcopy by mail from National Benefits Center (NBC).
2013/12/04 : I-130 petition transferred from National Benefits Center (NBC) to Nebraska Service Center (NSC).
2014/02/12 : I-130 PETITION APPROVED (NOA2) at Nebraska Service Center (NSC).
2014/02/13 : Approved I-130 petition shipped from Nebraska Service Center (NSC) to National Visa Center (NVC).
2014/02/18 : Received (NOA2) hardcopy by mail from Nebraska Service Center (NSC).
NATIONAL VISA CENTER (NVC)
2014/02/25 : National Visa Center (NVC) received approved I130 petition from Nebraska Service Center (NSC).
2014/03/31 : Case Number, IIN & BIN generated.
2014/04/01 : DS-261 available. Completed & submitted online.
2014/04/01 : AOS fee bill invoiced & paid online.

2014/04/04 : AOS fee payment status appears as PAID.

2014/04/08 : IV fee bill invoiced & paid online.

2014/04/11 : IV fee payment status appears as PAID.

2014/04/12 : DS-260 available. Completed & submitted online.

2014/06/24 : IV packet delivered at National Visa Center (NVC).

2014/07/01 : IV packet scanned into system.

2014/07/28 : AOS packet delivered at National Visa Center (NVC).

2014/07/30 : AOS packet scanned into system.

2014/08/13 : IV packet reviewed & accepted by National Visa Center (NVC).

2014/09/23 : AOS checklist email received from National Visa Center (NVC).

2014/09/24 : AOS checklist correction mailed to National Visa Center (NVC).

2014/09/29 : AOS checklist correction scanned into system at National Visa Center (NVC).

2014/11/17 : CASE COMPLETED at National Visa Center (NVC).

2014/12/03 : Interview scheduled by National Visa Center (NVC).

2014/12/09 : Received interview letter (P4) email from National Visa Center (NVC).

2014/12/19 : Case shipped from National Visa Center (NVC) to US consulate Mumbai. CEAC status says 'In Transit'.

INTERVIEW & POE

2014/12/15 : Medicals completed.

2014/12/22 : Case received at US consulate Mumbai. CEAC status says 'Ready'.

2015/01/05 : Biometrics appointment scheduled.

2015/01/20 : INTERVIEW at US consulate Mumbai.

Link to comment
Share on other sites

Have any April filers been transferred to a different service centre like to Feb/March folks are reporting??

USCIS (239 days):

04.18.2013 - NOA1

12.13.2013 - NOA2 via email; I-130 approved. Shipped to NVC

NVC (274 days):

12.30.2013 - Arrived at NVC

01.27.2014 - Received case no. & IIN

02.07.2014 - Completed & submitted DS-261 form online

02.13.2014 - Paid AOS bill

02.18.2014 - AOS showing as 'paid'

03.18.2014 - Invoiced for IV bill (finally!)

03.19.2014 - Made payment for IV bill

03.21.2014 - IV bill showing PAID

03.24.2014 - Completed DS-260 online

03.29.2014 - Mailed IV Packet

04.26.2014 - IV packet all approved, false checklist from NVC for AOS packet

05.07.2014 - AOS packet sent

06.12.2014 - AOS packet scanned in (took them THAT LONG to do it)

07.29.2014 - Received checklist via email

07.30.2014 - Sent re-filled AOS form, as per checklist instructions

09.24.2014 - Case Complete (FINALLY)

09.30.2014 - Case leaves NVC

Embassy:

10.29.2014 - Medical

11.04.2014 - Interview in London - APPROVED

11.05.2014 - CEAC - Issued

11.07.2014 - Courier email

11.10.2014 - Passport and visa received via DX courier

In the USA:

12.02.2014 - POE (Denver)

12.24.2014 - ELIS changed to "In Process"

01.05.2015 - Greencard received in mail

ROC:
10.05.2016 - NOA1

12.13.2016 - Biometrics

11.13.2017 - Infopass Appt.

03.30.2018 - Approval

04.05.2018 - Greencard Arrived

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...