actually i dont understand iranian and syrian applicants they can chose the embassy for ex:armenian,azerbajcan etc but we can not

in yarevan max 30 days later(most of them 3 weeks) applicants getting interwiev date

why stil they are coming to turkey for interwiev date :blink:

Edited by lastottoman
Link to comment
Share on other sites

  • Replies 77
  • Created
  • Last Reply

Top Posters In This Topic

Filed: Citizen (pnd) Country: Turkey
Timeline

actually i dont understand iranian and syrian applicants they can chose the embassy for ex:armenian,azerbajcan etc but we can not

in yarevan max 30 days later(most of them 3 weeks) applicants getting interwiev date

why stil they are coming to turkey for interwiev date :blink:

What does the NVC say when you ask about the wait time for an interview? I have asked Ankara also but I did not get a real answer.

My lawyer just told me it is normally a 1 month wait. But this doesn't see to be the case for Ankara.


USCIS - 66 days ROC - 139 days from sent to approved
12/3/2012 - I-130 delivered to Chicago 5/20/15: mailed I-751 package to California office
12/4/2012 - NOA1 NBC (Missouri Service Center MSC) 5/22/15: Date on NOA1
12/6/2012 - Check cashed 8/26/15: Bio appointment

12/8/2012 - Received paper NOA1 10/06/15: Received Email card was being processed
12/20/2012 - Case number showed up on USCIS website
1/29/2013 - Called USCIS and case is still at NBC
2/8/2013 - Received an Email that we were approved on 2/7/13
3/5/2013 - Told file may have been "misplaced" to email NOA2 to NCVresearch
3/7/2013 - ISO at the USCIS opened a service request to try to track down
if and when the file was shipped. Should hear something before 3/26 ( so she said)

NVC - 119 days NVC to Visa in hand
03/11/2013: NVC received (31 days from NOA2 at USCIS till received at NVC )
03/25/2013: NVC Case no. assigned
03/27/2013: Paid AOS fee (shows paid 3/29/13)
04/01/2013: AOS Sent
03/27/2013: Received IV Bill
03/27/2013: Paid IV Bill (shows paid 3/29/13)
04/01/2013: Sent IV Packet
04/02/2013:IV Packet Delivered
04/16/2013: Case Complete (37 days from received to case complete)
04/16/2013: Received Case Complete Email

05/13/2013: NVC status "In Transit"

051/20/2013: NVC status "Ready"
06/24/2013: Interview date - Orange card... wanted copy of USC passport

07/08/2013: Visa received in the mail

08/03/2013: POE



1XJBm5.png

Link to comment
Share on other sites

Filed: Country: Turkey
Timeline

What does the NVC say when you ask about the wait time for an interview? I have asked Ankara also but I did not get a real answer.

My lawyer just told me it is normally a 1 month wait. But this doesn't see to be the case for Ankara.

your lawyer right about waiting time

1 month for regular countries (indian also) but turkey is not normal :)

when i called to embassy they always say you are on the line nothing wrong about your case

just so many peaople waiting for interwiev

i wrote before i found somebody he was interwiev in march(cr1)

he told me i was wait 3 month 1 week to get my interwiev mail

i think waiting time not same for diffrent cases(k1,cr1)

because kazim`s( he started the topic) case completed on 23rd jan mine was 24th jan(1 day later)

he applied for his mom and he got email 8 days ago

if i am on the waiting same line next day or second day

they should sent my interwiev date

probably they have different line (cr1 line,k1 line)

what is your visa type?

Edited by lastottoman
Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Turkey
Timeline

your lawyer right about waiting time

1 month for regular countries (indian also) but turkey is not normal :)

when i called to embassy they always say you are on the line nothing wrong about your case

just so many peaople waiting for interwiev

i wrote before i found somebody he was interwiev in march(cr1)

he told me i was wait 3 month 1 week to get my interwiev mail

i think waiting time not same for diffrent cases(k1,cr1)

because kazim`s( he started the topic) case completed on 23rd jan mine was 24th jan(1 day later)

he applied for his mom and he got email 8 days ago

if i am on the waiting same line next day or second day

they should sent my interwiev date

probably they have different line (cr1 line,k1 line)

what is your visa type?

If I was you I would email the embassy in Ankara again.

On the last schedule there was on 7 CR1/IR1 interviews scheduled. There was only 1 from 2013 and 1 from 2012 the rest were 2011 or later. (which makes no since)

There was 19 K1 interview scheduled.

I think there should be an even about of CR1/IR1 and K1's scheduled. This seems off balanced to me.

It's been 3 months. If I was you.. I would email again.

and ask them to look into why you have not had an interview scheduled.

Ask them to contact the NVC and check on your case.

It doesn't hurt to ask.


USCIS - 66 days ROC - 139 days from sent to approved
12/3/2012 - I-130 delivered to Chicago 5/20/15: mailed I-751 package to California office
12/4/2012 - NOA1 NBC (Missouri Service Center MSC) 5/22/15: Date on NOA1
12/6/2012 - Check cashed 8/26/15: Bio appointment

12/8/2012 - Received paper NOA1 10/06/15: Received Email card was being processed
12/20/2012 - Case number showed up on USCIS website
1/29/2013 - Called USCIS and case is still at NBC
2/8/2013 - Received an Email that we were approved on 2/7/13
3/5/2013 - Told file may have been "misplaced" to email NOA2 to NCVresearch
3/7/2013 - ISO at the USCIS opened a service request to try to track down
if and when the file was shipped. Should hear something before 3/26 ( so she said)

NVC - 119 days NVC to Visa in hand
03/11/2013: NVC received (31 days from NOA2 at USCIS till received at NVC )
03/25/2013: NVC Case no. assigned
03/27/2013: Paid AOS fee (shows paid 3/29/13)
04/01/2013: AOS Sent
03/27/2013: Received IV Bill
03/27/2013: Paid IV Bill (shows paid 3/29/13)
04/01/2013: Sent IV Packet
04/02/2013:IV Packet Delivered
04/16/2013: Case Complete (37 days from received to case complete)
04/16/2013: Received Case Complete Email

05/13/2013: NVC status "In Transit"

051/20/2013: NVC status "Ready"
06/24/2013: Interview date - Orange card... wanted copy of USC passport

07/08/2013: Visa received in the mail

08/03/2013: POE



1XJBm5.png

Link to comment
Share on other sites

Filed: Country: Turkey
Timeline

my case comleted on 16th january

it has been 3 months

stilllllll??????

they didnt give me an interwiev date

i called nvc and us ankara embassy

they told me so many aplicants in ankara

i dont know what i am gonna do

sorry about simple sentences because of my poor english :)

Thank you so much for the English Translation. I am so sad for your long wait to get an interview date. We are still waiting to be reaffirmed for a new interview date. Case was sent back to USCIS after his first interview in Turkey on January 12, 2012. I think we are in for more waiting.

NOA 1 November 15, 2010

NOA 2 August 25, 2011

Closed NVC Ocotber 11, 2011

Interview Date: January 12,2012

Thank you my wonderful God in Heaven.

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Turkey
Timeline

Thank you so much for the English Translation. I am so sad for your long wait to get an interview date. We are still waiting to be reaffirmed for a new interview date. Case was sent back to USCIS after his first interview in Turkey on January 12, 2012. I think we are in for more waiting.

This is crazy :bonk: Why don't they understand how this effects us? To them we are just numbers on a paper. :angry:

I just went to see my husband last month. It was hard to leave him there and come home. Why don't they understand?. It's not like it's easy to save the money to go or get the time off from work. Some days I just want to scream!!!

I pray you hear something soon. Did your file go back to the NVC or to the USCIS? Are you living with your husband or apart?


USCIS - 66 days ROC - 139 days from sent to approved
12/3/2012 - I-130 delivered to Chicago 5/20/15: mailed I-751 package to California office
12/4/2012 - NOA1 NBC (Missouri Service Center MSC) 5/22/15: Date on NOA1
12/6/2012 - Check cashed 8/26/15: Bio appointment

12/8/2012 - Received paper NOA1 10/06/15: Received Email card was being processed
12/20/2012 - Case number showed up on USCIS website
1/29/2013 - Called USCIS and case is still at NBC
2/8/2013 - Received an Email that we were approved on 2/7/13
3/5/2013 - Told file may have been "misplaced" to email NOA2 to NCVresearch
3/7/2013 - ISO at the USCIS opened a service request to try to track down
if and when the file was shipped. Should hear something before 3/26 ( so she said)

NVC - 119 days NVC to Visa in hand
03/11/2013: NVC received (31 days from NOA2 at USCIS till received at NVC )
03/25/2013: NVC Case no. assigned
03/27/2013: Paid AOS fee (shows paid 3/29/13)
04/01/2013: AOS Sent
03/27/2013: Received IV Bill
03/27/2013: Paid IV Bill (shows paid 3/29/13)
04/01/2013: Sent IV Packet
04/02/2013:IV Packet Delivered
04/16/2013: Case Complete (37 days from received to case complete)
04/16/2013: Received Case Complete Email

05/13/2013: NVC status "In Transit"

051/20/2013: NVC status "Ready"
06/24/2013: Interview date - Orange card... wanted copy of USC passport

07/08/2013: Visa received in the mail

08/03/2013: POE



1XJBm5.png

Link to comment
Share on other sites

Filed: Country: Turkey
Timeline

Thank you so much for the English Translation. I am so sad for your long wait to get an interview date. We are still waiting to be reaffirmed for a new interview date. Case was sent back to USCIS after his first interview in Turkey on January 12, 2012. I think we are in for more waiting.

woowwww!!!!!!!!

why they sent your file back

and second processing in nvc done or still pending?

Link to comment
Share on other sites

Filed: Country: Turkey
Timeline

If I was you I would email the embassy in Ankara again.

On the last schedule there was on 7 CR1/IR1 interviews scheduled. There was only 1 from 2013 and 1 from 2012 the rest were 2011 or later. (which makes no since)

There was 19 K1 interview scheduled.

I think there should be an even about of CR1/IR1 and K1's scheduled. This seems off balanced to me.

It's been 3 months. If I was you.. I would email again.

and ask them to look into why you have not had an interview scheduled.

Ask them to contact the NVC and check on your case.

It doesn't hurt to ask.

i asked them many times

when ask them about my stuation they never give us spesific answer

just general things

i am not worring about my case because all cr1 applicant in 2013 have to wait more than 3 mounths

i sign up a website it is turkish visajourney(www.usa-turk.com) i recommend you

there are so many spesific experiences

there are a lot cr1 applicants waiting more than 2 months

k1 applicant more than cr1 maybe 3 times 4 times

because k1 visa easy and fast to get

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Turkey
Timeline

i asked them many times

when ask them about my stuation they never give us spesific answer

just general things

i am not worring about my case because all cr1 applicant in 2013 have to wait more than 3 mounths

i sign up a website it is turkish visajourney(www.usa-turk.com) i recommend you

there are so many spesific experiences

there are a lot cr1 applicants waiting more than 2 months

k1 applicant more than cr1 maybe 3 times 4 times

because k1 visa easy and fast to get

Thank you.. I guess we just weren't ready for a 3 month wait for an interview. We are going for a CR1. My lawyer told me it would just be 8 months from the time we filed at the USCIS till my husband got his visa. I believed that till I found this website.

When was your case completed at the NVC?


USCIS - 66 days ROC - 139 days from sent to approved
12/3/2012 - I-130 delivered to Chicago 5/20/15: mailed I-751 package to California office
12/4/2012 - NOA1 NBC (Missouri Service Center MSC) 5/22/15: Date on NOA1
12/6/2012 - Check cashed 8/26/15: Bio appointment

12/8/2012 - Received paper NOA1 10/06/15: Received Email card was being processed
12/20/2012 - Case number showed up on USCIS website
1/29/2013 - Called USCIS and case is still at NBC
2/8/2013 - Received an Email that we were approved on 2/7/13
3/5/2013 - Told file may have been "misplaced" to email NOA2 to NCVresearch
3/7/2013 - ISO at the USCIS opened a service request to try to track down
if and when the file was shipped. Should hear something before 3/26 ( so she said)

NVC - 119 days NVC to Visa in hand
03/11/2013: NVC received (31 days from NOA2 at USCIS till received at NVC )
03/25/2013: NVC Case no. assigned
03/27/2013: Paid AOS fee (shows paid 3/29/13)
04/01/2013: AOS Sent
03/27/2013: Received IV Bill
03/27/2013: Paid IV Bill (shows paid 3/29/13)
04/01/2013: Sent IV Packet
04/02/2013:IV Packet Delivered
04/16/2013: Case Complete (37 days from received to case complete)
04/16/2013: Received Case Complete Email

05/13/2013: NVC status "In Transit"

051/20/2013: NVC status "Ready"
06/24/2013: Interview date - Orange card... wanted copy of USC passport

07/08/2013: Visa received in the mail

08/03/2013: POE



1XJBm5.png

Link to comment
Share on other sites

Filed: Country: Turkey
Timeline

Thank you.. I guess we just weren't ready for a 3 month wait for an interview. We are going for a CR1. My lawyer told me it would just be 8 months from the time we filed at the USCIS till my husband got his visa. I believed that till I found this website.

When was your case completed at the NVC?

they sent me email 24th january 2013 for completed

when i called nvc she said your case complete and submit to ankara 16th january

i just check ur processing times

uscis 66 days ? excellent

i applied from newyork (vermont service center) it took exact 5 month

and 3 month nvc and more 3 month passed (total 11 month) and still dont have interwiev date :angry: also i sent all my papers overnght shipping

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Turkey
Timeline

they sent me email 24th january 2013 for completed

when i called nvc she said your case complete and submit to ankara 16th january

i just check ur processing times

uscis 66 days ? excellent

i applied from newyork (vermont service center) it took exact 5 month

and 3 month nvc and more 3 month passed (total 11 month) and still dont have interwiev date :angry: also i sent all my papers overnght shipping

Wow :( submitted to Ankara on 1/16 and still no interview date.

Yeah it only took us 66 days at the USCIS. We were at the NBC.

But it took our file 31 days to get from the USCIS to the NVC.

I'm hoping for case complete this week or next week.

Now I am hoping for a faster case complete just to get a spot in the long line.

yeah it's crazy the amount of money you have to spend during this process.

Shipping overnight saves you a day or two in the long run.

But I'm sure at this point you don't see it.

Not with already waiting so long.


USCIS - 66 days ROC - 139 days from sent to approved
12/3/2012 - I-130 delivered to Chicago 5/20/15: mailed I-751 package to California office
12/4/2012 - NOA1 NBC (Missouri Service Center MSC) 5/22/15: Date on NOA1
12/6/2012 - Check cashed 8/26/15: Bio appointment

12/8/2012 - Received paper NOA1 10/06/15: Received Email card was being processed
12/20/2012 - Case number showed up on USCIS website
1/29/2013 - Called USCIS and case is still at NBC
2/8/2013 - Received an Email that we were approved on 2/7/13
3/5/2013 - Told file may have been "misplaced" to email NOA2 to NCVresearch
3/7/2013 - ISO at the USCIS opened a service request to try to track down
if and when the file was shipped. Should hear something before 3/26 ( so she said)

NVC - 119 days NVC to Visa in hand
03/11/2013: NVC received (31 days from NOA2 at USCIS till received at NVC )
03/25/2013: NVC Case no. assigned
03/27/2013: Paid AOS fee (shows paid 3/29/13)
04/01/2013: AOS Sent
03/27/2013: Received IV Bill
03/27/2013: Paid IV Bill (shows paid 3/29/13)
04/01/2013: Sent IV Packet
04/02/2013:IV Packet Delivered
04/16/2013: Case Complete (37 days from received to case complete)
04/16/2013: Received Case Complete Email

05/13/2013: NVC status "In Transit"

051/20/2013: NVC status "Ready"
06/24/2013: Interview date - Orange card... wanted copy of USC passport

07/08/2013: Visa received in the mail

08/03/2013: POE



1XJBm5.png

Link to comment
Share on other sites

Filed: Country: Turkey
Timeline

they sent me email 24th january 2013 for completed

when i called nvc she said your case complete and submit to ankara 16th january

i just check ur processing times

uscis 66 days ? excellent

i applied from newyork (vermont service center) it took exact 5 month

and 3 month nvc and more 3 month passed (total 11 month) and still dont have interwiev date :angry: also i sent all my papers overnght shipping

Edited by lastottoman
Link to comment
Share on other sites

Filed: Country: Turkey
Timeline

Wow :( submitted to Ankara on 1/16 and still no interview date.

Yeah it only took us 66 days at the USCIS. We were at the NBC.

But it took our file 31 days to get from the USCIS to the NVC.

I'm hoping for case complete this week or next week.

Now I am hoping for a faster case complete just to get a spot in the long line.

yeah it's crazy the amount of money you have to spend during this process.

Shipping overnight saves you a day or two in the long run.

But I'm sure at this point you don't see it.

Not with already waiting so long.

i didnt impatient while uscis and nvc processing time

but this waiting time for interwiev it sucks!!!! i am getting crazy

nobody dont know how long more i am gonna wait no one help you

just wait,wait,wait

i hope when i interwiev they approve my visa

if they send ap(administrative process)maybe more 6 months

Edited by lastottoman
Link to comment
Share on other sites

Filed: Country: Turkey
Timeline

This is crazy :bonk: Why don't they understand how this effects us? To them we are just numbers on a paper. :angry:

I just went to see my husband last month. It was hard to leave him there and come home. Why don't they understand?. It's not like it's easy to save the money to go or get the time off from work. Some days I just want to scream!!!

I pray you hear something soon. Did your file go back to the NVC or to the USCIS? Are you living with your husband or apart?

Our file went back to USCIS and they received it in July and then sent a NOIR in September and then transferred the case to the Memphis field office on December 7th and we have not heard anything since then. I have been to Turkey three times and we took a trip to the Dominican Republic. Somedays I can hardly stand it. The last time I saw him was March 17, 2012.

NOA 1 November 15, 2010

NOA 2 August 25, 2011

Closed NVC Ocotber 11, 2011

Interview Date: January 12,2012

Thank you my wonderful God in Heaven.

Link to comment
Share on other sites

Filed: Country: Turkey
Timeline

woowwww!!!!!!!!

why they sent your file back

and second processing in nvc done or still pending?

They said it was because our stories about how he asked me to marry him did not match. I told them about when he first asked me to marry him and I said he was crazy and he told them about the time he asked me to marry him and I was so happy to say yes. I should never have told them about the first time he asked me.

i didnt impatient while uscis and nvc processing time

but this waiting time for interwiev it sucks!!!! i am getting crazy

nobody dont know how long more i am gonna wait no one help you

just wait,wait,wait

i hope when i interwiev they approve my visa

if they send ap(administrative process)maybe more 6 months

There have been some that have gotten Administrative Processing but it last from 2 weeks to 3 months only. But most get approval.

NOA 1 November 15, 2010

NOA 2 August 25, 2011

Closed NVC Ocotber 11, 2011

Interview Date: January 12,2012

Thank you my wonderful God in Heaven.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...