Filed: K-1 Visa Country: Vietnam
Timeline

Haha I know! Going by fast whooo hoo :D

you know its funny...everyone says time is going by fast...but i dont see it -__-

I-129F sent on 12/18/2012
Delivery confirmation confirmed from USPS 12/20/2012
Text/email NOA1 received 12/26/2012 Off to VSC we go!
Check cashed 12/28/2012
NOA1 Hardcopy received 12/29/2012 Priority Date 12/21/2012
Touched, still in Initial Review 01/02/2013

Touched, still in Initial Review 05/24/2013 transferred

Touched, still in Initial Review 05/29/2013 transferred to local office (New Orleans?)

Touched, still in Initial Review 05/30/2013 File now processing

NOA2!!! 06/19/2013

NOA2 Hardcopy received 06/22/2013

Touched, 07/10/2013 sent to DOS

Received case number from NVC 07/15/2013

Case sent to US Consulate in Ho Chi Minh City, Vietnam 07/30/2013

Sent online form to Us Consulate to inquire about packet 3 08/20/2013

Packet 3 Received @ consulate 9/26/2013

Packet 4 Sent via email 01/03/2014

Interview Date 01/27/2014 (submitted requested documents and medical exams records received 03/30 )

VISA APPROVED (Received in hand on April 22)
May 18, 2014 Arrive in US

Wedding date 06/02/2015

AOS Sent: TBD

Link to comment
Share on other sites

Filed: K-1 Visa Country: Turkey
Timeline

you know its funny...everyone says time is going by fast...but i dont see it -__-

Its going by not too slow for me :)

But I know when it hits that time when I could be getting approved ill be pulling my hair out!!

September 5th, 2010: Met
July 26th 2012: Engaged
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
I-129F Sent: December 14th, 2012
December 18th 2012: I-129f received at dallas po box
DECEMBER 20th: NOA1 (only found out once hardcopy came in the mail)
December 21st, 2012: Check cashed
Dec 27, 2012: Fiances alien registration number was changed. Proven.
December 29th 2012: Received Noa1 Hard-copy(no txt or email was sent)
Jan. 10th 2013: Happy birthday to my Sweety, first birthday apart in years!
January 15 2013: "mailing adress was changed" (touched?)
May-20-2013 NOA2!!! Exactly 5 months!
May-23-2013 Noa2 hard copy recieved!
June-05-2013 Called NVC, casre recieved, forwared to Ankara

June-10-2013-Ankara revieved packet! *signed by MEHMET* THANKS MEHMET!

June-10-2013-Recieve NVC letter
June-13-2013 Email(Packet) recieved from embassy!!
00-00-2013 Sent packet back to embassy
00-00-13 Interview date set (00-00-13 INTERVIEW,)
00-00-2013 Medical
00-00-2013 Interview(...........!)
00-00-2013 Visa Approved
00-00-2013 US Entry

NEXT STEPS IN US....
00-00-13 Wedding
00-00-13 SSN
00-00-13 AOS packet sent out
event.png event.png <p>

Link to comment
Share on other sites

Filed: K-1 Visa Country: Vietnam
Timeline

Its going by not too slow for me :)

But I know when it hits that time when I could be getting approved ill be pulling my hair out!!

i think we both will..heck im no where near NOA2 and I'm pulling my hair out -_-

I-129F sent on 12/18/2012
Delivery confirmation confirmed from USPS 12/20/2012
Text/email NOA1 received 12/26/2012 Off to VSC we go!
Check cashed 12/28/2012
NOA1 Hardcopy received 12/29/2012 Priority Date 12/21/2012
Touched, still in Initial Review 01/02/2013

Touched, still in Initial Review 05/24/2013 transferred

Touched, still in Initial Review 05/29/2013 transferred to local office (New Orleans?)

Touched, still in Initial Review 05/30/2013 File now processing

NOA2!!! 06/19/2013

NOA2 Hardcopy received 06/22/2013

Touched, 07/10/2013 sent to DOS

Received case number from NVC 07/15/2013

Case sent to US Consulate in Ho Chi Minh City, Vietnam 07/30/2013

Sent online form to Us Consulate to inquire about packet 3 08/20/2013

Packet 3 Received @ consulate 9/26/2013

Packet 4 Sent via email 01/03/2014

Interview Date 01/27/2014 (submitted requested documents and medical exams records received 03/30 )

VISA APPROVED (Received in hand on April 22)
May 18, 2014 Arrive in US

Wedding date 06/02/2015

AOS Sent: TBD

Link to comment
Share on other sites

Filed: K-1 Visa Country: United Kingdom
Timeline

My fiance and I booked my trip to go see him in a few weeks! Going for 15 days to London and hoping that it doesn't mess up my work schedule too much :P

I am the USC/petitioner.

Our K-1 Journey
12/19/2012 - Mailed I-129F via USPS Express
12/21/2012 - I-129F arrives in Lewisville, TX according to USPS tracking (delayed because it's the USPS)
12/21/2012 - NOA1 date of receipt
12/26/2012 - NOA1 received via text/email
12/27/2012 - Checked cashed by USCIS
12/31/2012 - Alien Number changed (NOA1 hardcopy in post, but was away for 2 weeks prior)

05/16/2013 - NOA2 received via text/email

05/20/2013 - NOA2 hardcopy received in post

05/28/2013 - NVC receives packet and assigns London case number

07/15/2013 - Sent all paperwork/medical complete

08/23/2013 - Receive Interview Date

09/19/2013 - Interview

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline

My fiance and I booked my trip to go see him in a few weeks! Going for 15 days to London and hoping that it doesn't mess up my work schedule too much :P

Enjoy guys! How i wished that i traveled too when he asked me to go to South Africa, unfortunately they didn't allow me to file a vacation leave at work. He is always busy at work so the best way to be with him is to follow him to countries where he is scheduled for work.

Anyway, have a great time together and have a safe trip... :) good luck to all of us!!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Turkey
Timeline

My fiance and I booked my trip to go see him in a few weeks! Going for 15 days to London and hoping that it doesn't mess up my work schedule too much :P

Ya have fun :D have extra fun for all of us who arent able to see our fiance :) maybe it will somehow send strength to us :D

September 5th, 2010: Met
July 26th 2012: Engaged
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
I-129F Sent: December 14th, 2012
December 18th 2012: I-129f received at dallas po box
DECEMBER 20th: NOA1 (only found out once hardcopy came in the mail)
December 21st, 2012: Check cashed
Dec 27, 2012: Fiances alien registration number was changed. Proven.
December 29th 2012: Received Noa1 Hard-copy(no txt or email was sent)
Jan. 10th 2013: Happy birthday to my Sweety, first birthday apart in years!
January 15 2013: "mailing adress was changed" (touched?)
May-20-2013 NOA2!!! Exactly 5 months!
May-23-2013 Noa2 hard copy recieved!
June-05-2013 Called NVC, casre recieved, forwared to Ankara

June-10-2013-Ankara revieved packet! *signed by MEHMET* THANKS MEHMET!

June-10-2013-Recieve NVC letter
June-13-2013 Email(Packet) recieved from embassy!!
00-00-2013 Sent packet back to embassy
00-00-13 Interview date set (00-00-13 INTERVIEW,)
00-00-2013 Medical
00-00-2013 Interview(...........!)
00-00-2013 Visa Approved
00-00-2013 US Entry

NEXT STEPS IN US....
00-00-13 Wedding
00-00-13 SSN
00-00-13 AOS packet sent out
event.png event.png <p>

Link to comment
Share on other sites

Filed: K-1 Visa Country: United Kingdom
Timeline

Enjoy guys! How i wished that i traveled too when he asked me to go to South Africa, unfortunately they didn't allow me to file a vacation leave at work. He is always busy at work so the best way to be with him is to follow him to countries where he is scheduled for work.

Anyway, have a great time together and have a safe trip... :) good luck to all of us!!!

That's cool that you get to follow him to new places sometimes! The best part about being a freelancer is not having to answer to anyone when I want a holiday. The worst part is never knowing how much money will be made day by day XD

Ya have fun :D have extra fun for all of us who arent able to see our fiance :) maybe it will somehow send strength to us :D

Thank you! Maybe while I'm over there we'll see some progress at CSC and maybe a silver lining.

I am the USC/petitioner.

Our K-1 Journey
12/19/2012 - Mailed I-129F via USPS Express
12/21/2012 - I-129F arrives in Lewisville, TX according to USPS tracking (delayed because it's the USPS)
12/21/2012 - NOA1 date of receipt
12/26/2012 - NOA1 received via text/email
12/27/2012 - Checked cashed by USCIS
12/31/2012 - Alien Number changed (NOA1 hardcopy in post, but was away for 2 weeks prior)

05/16/2013 - NOA2 received via text/email

05/20/2013 - NOA2 hardcopy received in post

05/28/2013 - NVC receives packet and assigns London case number

07/15/2013 - Sent all paperwork/medical complete

08/23/2013 - Receive Interview Date

09/19/2013 - Interview

Link to comment
Share on other sites

Filed: K-1 Visa Country: Turkey
Timeline

I love our little December filers group :D I feel at home here!

Edited by Ismail+Cassie

September 5th, 2010: Met
July 26th 2012: Engaged
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
I-129F Sent: December 14th, 2012
December 18th 2012: I-129f received at dallas po box
DECEMBER 20th: NOA1 (only found out once hardcopy came in the mail)
December 21st, 2012: Check cashed
Dec 27, 2012: Fiances alien registration number was changed. Proven.
December 29th 2012: Received Noa1 Hard-copy(no txt or email was sent)
Jan. 10th 2013: Happy birthday to my Sweety, first birthday apart in years!
January 15 2013: "mailing adress was changed" (touched?)
May-20-2013 NOA2!!! Exactly 5 months!
May-23-2013 Noa2 hard copy recieved!
June-05-2013 Called NVC, casre recieved, forwared to Ankara

June-10-2013-Ankara revieved packet! *signed by MEHMET* THANKS MEHMET!

June-10-2013-Recieve NVC letter
June-13-2013 Email(Packet) recieved from embassy!!
00-00-2013 Sent packet back to embassy
00-00-13 Interview date set (00-00-13 INTERVIEW,)
00-00-2013 Medical
00-00-2013 Interview(...........!)
00-00-2013 Visa Approved
00-00-2013 US Entry

NEXT STEPS IN US....
00-00-13 Wedding
00-00-13 SSN
00-00-13 AOS packet sent out
event.png event.png <p>

Link to comment
Share on other sites

Filed: K-1 Visa Country: United Kingdom
Timeline

I very nearly changed my flight to tomorrow about four hours ago :P The show I'm currently working on is going over to London for the next two weeks and I almost went with them to work it. Just couldn't justify the cost of changing flights to be out of LA for a whole month right now - it's pilot season after all.

I am the USC/petitioner.

Our K-1 Journey
12/19/2012 - Mailed I-129F via USPS Express
12/21/2012 - I-129F arrives in Lewisville, TX according to USPS tracking (delayed because it's the USPS)
12/21/2012 - NOA1 date of receipt
12/26/2012 - NOA1 received via text/email
12/27/2012 - Checked cashed by USCIS
12/31/2012 - Alien Number changed (NOA1 hardcopy in post, but was away for 2 weeks prior)

05/16/2013 - NOA2 received via text/email

05/20/2013 - NOA2 hardcopy received in post

05/28/2013 - NVC receives packet and assigns London case number

07/15/2013 - Sent all paperwork/medical complete

08/23/2013 - Receive Interview Date

09/19/2013 - Interview

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Germany
Timeline

Hey my lovely fellow December-filers :)

How are you all doing?

I had a very bad yesterday. I missed my fiancé more than usual. :crying:

But then he texted me this: "I know. It sucks. But it is what it is right now. C'est la vie. Either way it's still "us". And distance won't break that! :) "

Sentences like that make me feel a little better again. What do you say to each other to keep yourselves sane?

Nov 30th 2012.....Filed Petition I-129F

Dec 6th 2012.......NOA1 (VSC)

May 29th 2013.....File got transferred to TSC

June 18th 2013....NOA2 (after 196 days!!!)

July 9th 2013.......Case is sent to NVC

July 18th 2013.....Medical in Munich

Aug 28th 2013.....Interview in FRN - Approved!

Aug 30th 2013.....Visa in mail!

Sep 13th 2013.....POE Boston

Nov 12th 2013.....Wedding in Old City Hall, Boston

Dec 02nd 2013....Sent AOS package

Dec 04th 2013.....Package received

Jan 02nd 2014.....Requested expedite for EAD due to severe financial loss (pending job offer)
Jan 06th 2014......Biometrics Appointment
Jan 07th 2014......EAD/AP Combo Card in production
Jan 13th 2014......Combo Card received in mail
Mar 12th 2014.....Potential Interview Waiver Letter
Apr 23rd 2014......Status update to "Card Production"
Apr 25th 2014......Status update to "Decision"
Apr 28th 2014......Welcome Letter arrived
May 3rd 2014.......Green Card arrived
Link to comment
Share on other sites

Filed: K-1 Visa Country: Honduras
Timeline

Hey my lovely fellow December-filers :)

How are you all doing?

I had a very bad yesterday. I missed my fiancé more than usual. :crying:

But then he texted me this: "I know. It sucks. But it is what it is right now. C'est la vie. Either way it's still "us". And distance won't break that! :) "

Sentences like that make me feel a little better again. What do you say to each other to keep yourselves sane?

Well someone on this site said if you are positive you are in this (relationship) for foreverrrrrrr these months are nothing compared to the rest of your life. Not only do i agree but its brought my anxiety down :)

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Jamaica
Timeline

you know its funny...everyone says time is going by fast...but i dont see it -__-

me either...

09/27/2012 Engaged in Jamaica

12/4/2012 Texas Service Center received paperwork USPS delivery conf

12/5/2012 Touched

12/7/2012 Check cashed

12/7/2012 NOA1 sent email and SMS text..forwarded to California Service Center

12/11/2012 Website updated initial review

12/13/2012 NOA1 hardcopy received

04/16/2013 Website updated*** APPROVED!!

04/19/2013 NOA2 Hardcopy recieved

05/30/2013 medical appt

06/13/2013 interview day!! ---APPROVED!!!!

Ceac website: two weeks in "ready "

Ceac website: one week in "AP"

Ceac website: one week back in "ready"

07/10/2013 ceac website -visa:issued..no airbill number

07/15/2013 still no visa kng embassy is ran by incompetent baboons

07/17/2013 notified visa w/dhl

07/18/2013 fiance picked up visa

08/04/2013 POE

08/08/2013 Wedding Day

08/26/2013 mailed AOS,EAD,AP paperwork

08/28/2013 tracking conf papers delivered

09/04/2013 3 txt msgs recvd with cases #s

09/06/2013 check cashed

09/09/2013 recvd all (3) Noa1 hardcopies

10/01/2013 Biometrics appt (hoping to do a walk in)--successful walk in done 9-16

10/31/2013 EAD/AP approved

11/09/2013 EAD/AP in hand!

01/27/2013 Green Card in production!!

01/31/2013 Received a "welcome to America "letter

02/05/2014 GREEN CARD IN HAND!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Turkey
Timeline

Ya exactly, recently I've been keeping myself so busy, friends, work, family, I don't even think about it as much. I know that these months are nothing compared to when he gets here, I have him everyday, forever and ever....every every day. Jut make sure years from now u all remember this pain and remember this wait. We r lucky we get to feel this early right now, don't take advantage later when u get bored of him or her like other couples. Other couples got to always be together(most of them) and I constant,y tell them how lucky they r for many things and to stop taking each other for granted before its too late!

September 5th, 2010: Met
July 26th 2012: Engaged
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
I-129F Sent: December 14th, 2012
December 18th 2012: I-129f received at dallas po box
DECEMBER 20th: NOA1 (only found out once hardcopy came in the mail)
December 21st, 2012: Check cashed
Dec 27, 2012: Fiances alien registration number was changed. Proven.
December 29th 2012: Received Noa1 Hard-copy(no txt or email was sent)
Jan. 10th 2013: Happy birthday to my Sweety, first birthday apart in years!
January 15 2013: "mailing adress was changed" (touched?)
May-20-2013 NOA2!!! Exactly 5 months!
May-23-2013 Noa2 hard copy recieved!
June-05-2013 Called NVC, casre recieved, forwared to Ankara

June-10-2013-Ankara revieved packet! *signed by MEHMET* THANKS MEHMET!

June-10-2013-Recieve NVC letter
June-13-2013 Email(Packet) recieved from embassy!!
00-00-2013 Sent packet back to embassy
00-00-13 Interview date set (00-00-13 INTERVIEW,)
00-00-2013 Medical
00-00-2013 Interview(...........!)
00-00-2013 Visa Approved
00-00-2013 US Entry

NEXT STEPS IN US....
00-00-13 Wedding
00-00-13 SSN
00-00-13 AOS packet sent out
event.png event.png <p>

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Jamaica
Timeline

im being realistic, if we're done before 9 months, i will be utterly shocked and surprised... human beings are created quicker than the time its taking to bring over our loved ones... ugh

frequent trips.. its killing my pockets, but its the only way i can survive this distance and time its taking.

i got a second job to keep myself busy, but all im doing it using the extra funds to travel, defeating the purpose i know but oh well lol

09/27/2012 Engaged in Jamaica

12/4/2012 Texas Service Center received paperwork USPS delivery conf

12/5/2012 Touched

12/7/2012 Check cashed

12/7/2012 NOA1 sent email and SMS text..forwarded to California Service Center

12/11/2012 Website updated initial review

12/13/2012 NOA1 hardcopy received

04/16/2013 Website updated*** APPROVED!!

04/19/2013 NOA2 Hardcopy recieved

05/30/2013 medical appt

06/13/2013 interview day!! ---APPROVED!!!!

Ceac website: two weeks in "ready "

Ceac website: one week in "AP"

Ceac website: one week back in "ready"

07/10/2013 ceac website -visa:issued..no airbill number

07/15/2013 still no visa kng embassy is ran by incompetent baboons

07/17/2013 notified visa w/dhl

07/18/2013 fiance picked up visa

08/04/2013 POE

08/08/2013 Wedding Day

08/26/2013 mailed AOS,EAD,AP paperwork

08/28/2013 tracking conf papers delivered

09/04/2013 3 txt msgs recvd with cases #s

09/06/2013 check cashed

09/09/2013 recvd all (3) Noa1 hardcopies

10/01/2013 Biometrics appt (hoping to do a walk in)--successful walk in done 9-16

10/31/2013 EAD/AP approved

11/09/2013 EAD/AP in hand!

01/27/2013 Green Card in production!!

01/31/2013 Received a "welcome to America "letter

02/05/2014 GREEN CARD IN HAND!!

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...