Nothing for me still and now I'm a bit nervous. I had a job lined up for the Fall and I assumed they would hire like they did last year, November 1st. But I got an email and they're thinking about September 17th now. It should be fine with the EAD but we never know... I meet them next week but I don't necessarily want to mention that EAD thing because I should have it by then, except that I don't have it right now... Hopefully they'll start the training a little later to give me a little more time.

Have you try expediting the EAD?

AOS Journey

Day 00 (06/05/2012) Package mailed
Day 01 (06/06/2012) Package delivered
Day 03 (06/08/2012) NOA e-notifications received
Day 06 (06/11/2012) NOA hard copies received
Day 13 (06/18/2012) Biometrics appointment for July 11
Day 36 (07/11/2012) Biometrics completed
Day 48 (07/23/2012) Interview notice received for August 27
Day 67 (08/11/2012) First notification for EAD production
Day 71 (08/15/2012) Second notification for EAD production
Day 72 (08/16/2012) Third notification for EAD production
Day 74 (08/18/2012) EAD card received
Day 83 (08/27/2012) Interview @ 10:15
Day 83 (08/27/2012) Email notification they have registered new permanent resident status
Day 84 (08/28/2012) Email notification that the I-130 is approved
Day 86 (08/30/2012) First notification for GC production
Day 87 (08/31/2012) Welcome letter received
Day 87 (08/31/2012) Second notification for GC production
Day 87 (08/31/2012) Third notification for GC production
Day 88 (09/01/2012) I-130 approval letter received
Day 91 (09/04/2012) Green card received

ROC Journey

Day 00 (06/21/2014) Package mailed

Day 02 (06/23/2014) Package delivered

Day 05 (06/26/2014) NOA received

Day 12 (07/03/2014) Biometrics notice received

Day 27 (07/18/2014) Biometrics completed

Day 48 (08/08/2014) Email/text notification of approval

Day 49 (08/09/2014) First notification for GC production

Day 54 (08/14/2014) Second notification for GC production

Day 54 (08/14/2014) Third notification for GC production

Day 54 (08/14/2014) I-751 approval letter received

Day 55 (08/15/2014) Green card received

Link to comment
Share on other sites

Filed: AOS (pnd) Country: France
Timeline

Have you try expediting the EAD?

No because I thought I had more time. Can I do it now or is it too late?

Adjustment of status from F-1

May 14th, 2012: wedding in Vancouver, WA :)

June 6th, 2012: mailed AOS/EAD/AP

June 8th, 2012: packet delivered

June 11th, 2012: acceptance

June 13th, 2012: received text messages and emails confirming application reception

June 14th, 2012: checks cashed

June 15th, 2012: received hard copies of NOAs (dated June 12th)

July 2nd, 2012: received biometrics appointment letter, scheduled on July 17th

July 17th, 2012: biometrics appointment completed at 10am

August 12th, 2012: interview notice received, scheduled on September 17th

August 15th, 2012: EAD and AP card production (on the 70 day mark!)

August 24th, 2012: EAD card received

September 17th, 2012: AOS interview - Approved!

September 27th, 2012: Green card received

Link to comment
Share on other sites

No because I thought I had more time. Can I do it now or is it too late?

I don't think it would be too late but I would double check on that. I know you can expedite it under certain conditions. One of them is if you have a job offer. I imagine you would need to have the job offer in writing though.

AOS Journey

Day 00 (06/05/2012) Package mailed
Day 01 (06/06/2012) Package delivered
Day 03 (06/08/2012) NOA e-notifications received
Day 06 (06/11/2012) NOA hard copies received
Day 13 (06/18/2012) Biometrics appointment for July 11
Day 36 (07/11/2012) Biometrics completed
Day 48 (07/23/2012) Interview notice received for August 27
Day 67 (08/11/2012) First notification for EAD production
Day 71 (08/15/2012) Second notification for EAD production
Day 72 (08/16/2012) Third notification for EAD production
Day 74 (08/18/2012) EAD card received
Day 83 (08/27/2012) Interview @ 10:15
Day 83 (08/27/2012) Email notification they have registered new permanent resident status
Day 84 (08/28/2012) Email notification that the I-130 is approved
Day 86 (08/30/2012) First notification for GC production
Day 87 (08/31/2012) Welcome letter received
Day 87 (08/31/2012) Second notification for GC production
Day 87 (08/31/2012) Third notification for GC production
Day 88 (09/01/2012) I-130 approval letter received
Day 91 (09/04/2012) Green card received

ROC Journey

Day 00 (06/21/2014) Package mailed

Day 02 (06/23/2014) Package delivered

Day 05 (06/26/2014) NOA received

Day 12 (07/03/2014) Biometrics notice received

Day 27 (07/18/2014) Biometrics completed

Day 48 (08/08/2014) Email/text notification of approval

Day 49 (08/09/2014) First notification for GC production

Day 54 (08/14/2014) Second notification for GC production

Day 54 (08/14/2014) Third notification for GC production

Day 54 (08/14/2014) I-751 approval letter received

Day 55 (08/15/2014) Green card received

Link to comment
Share on other sites

Filed: AOS (pnd) Country: France
Timeline

I don't think it would be too late but I would double check on that. I know you can expedite it under certain conditions. One of them is if you have a job offer. I imagine you would need to have the job offer in writing though.

Ok, thanks a lot, I'm going to do a little research and see what I can do :)

Adjustment of status from F-1

May 14th, 2012: wedding in Vancouver, WA :)

June 6th, 2012: mailed AOS/EAD/AP

June 8th, 2012: packet delivered

June 11th, 2012: acceptance

June 13th, 2012: received text messages and emails confirming application reception

June 14th, 2012: checks cashed

June 15th, 2012: received hard copies of NOAs (dated June 12th)

July 2nd, 2012: received biometrics appointment letter, scheduled on July 17th

July 17th, 2012: biometrics appointment completed at 10am

August 12th, 2012: interview notice received, scheduled on September 17th

August 15th, 2012: EAD and AP card production (on the 70 day mark!)

August 24th, 2012: EAD card received

September 17th, 2012: AOS interview - Approved!

September 27th, 2012: Green card received

Link to comment
Share on other sites

Filed: AOS (apr) Country: Philippines
Timeline

Hohn and Johanna--Thank you for the good wishes. Regarding CSC transfer, you may be interested in the following thread:

http://www.visajourney.com/forums/topic/367592-aos-transferrees-thread/page__st__160__p__5581589__fromsearch__1#entry5581589

Wishing you best of luck and speediest journey possible on your own visa journey.

RK and Inday

Thank you for giving me the link.

You are very welcome!! --RK&Inday

Edited by RK_and_Inday

K-1
May 4, 2006 - We first meet in Singapore
[March 2008 to October 2011] - RK visits Inday in Philippines; multiple visits
April 11, 2010 - RK proposes on Palawan Island; Inday says "Yes! Yes!"
Apr 4, 2011 - I-129F mailed
Apr 11, 2011 - petition received, NOA1, application routed to VSC
Aug 3, 2011 - NOA2! I-129F petition approved!! Yahoo!!!
Aug 10, 2011 - NVC forwards petition to Manila
Aug 17, 2011 - Petition arrives Manila
October 4, 2011 - Medical passed; thank you for answered prayer!
October 12, 2011 - K-1 Visa approved!! Thank you for more prayers anwswered!!
November 24, 2011 - POE! (Thanksgiving Day) Prayers answered!!!! Many Thanks!!!!
Feb 5, 2012 - Wedding Ceremony!

AOS
June 14, 2012 - AOS filed (EAD & AP concurrently filed also); sent via FedEx courier
June 19, 2012 - text notification indicating receipt AOS package
June 25, 2012 - hardcopy AOS, EAD, AP "NOA1"s (I-797C) received
June 29, 2012 - appointment letter for biometrics received (appointment: mid-July)
July 14, 2012 - Biometrics appointment: complete
July 18, 2012 - Case transferred to California Service Center notice received
August 27, 2012 - Combo EAD & AP card received

April 25, 2012 - Permanent Resident card (conditional) received; Yahoo!!! (no interview)

REMOVAL OF CONDITONS
March 28, 2015 - I-751 filed; sent via USPS priority mail, signature upon delivery requested

Link to comment
Share on other sites

Just had my biometrics completed. In and out in ~35 minutes in Saint Paul, MN. Hopefully now the USCIS can get us the EAD and Interview notice.

Edited by slidingdoors

06/2011 - Moved to Minneapolis, MN

10/2011 - Met for the first time

11/2011 - First date

02/2012 - Engaged :D

06/2012 - Married :')

06/25/2012 (Day 00) - Sent AOS Package to Chicago Lockbox

06/30/2012 (Day 03) - Received E-mail Receipt #s

07/10/2012 (Day 14) - Received NOAs in mail + Biometrics Appt. Notice

08/03/2012 (Day 38) - Biometrics completed

08/29/2012 (Day 65) - EAD/AP Card Production Ordered

08/30/2012 (Day 66) - I131 Approval Notice Mailed

09/05/2012 (Day 72) - EAD/AP Card Mailed

09/07/2012 (Day 74) - EAD/AP Card Received

11/4/2012 (Day 132) - Interview Notice Received (Date: Dec. 7th)

Link to comment
Share on other sites

Filed: AOS (apr) Country: Canada
Timeline

So... how was the interview?? :)

It was good! I was a bit of a baby because we didn't get approved on the spot, but we got approved later.

Here's my description of the interview:

http://www.visajourney.com/forums/topic/381339-interview-sacramento-ca/

AOS

5/16/2012 - Package delivered to Chicago Lockbox at 1:33pm

5/21/2012 - Email/text notifications received at 4:50 p.m.

5/26/2012 - NOA hard copies received for I-130, I-485 and I-765

6/19/2012 - Biometrics completed.

7/02/2012 - Text/email/hard copy notification of interview.

7/30/2012 - EAD card production ordered.

8/02/2012 - Interview @ 2:00

8/02/2012 - Email notification of GC production at 5:30pm

8/07/2012 - Second GC production email

8/07/2012 - EAD received.

8/08/2012 - GC mailed.

8/09/2012 - Welcome letter and I-130 approval letter received.

8/10/2012 - Green card received. :)

Link to comment
Share on other sites

Congratulations! Looks like it took a little less than 3 months for it all to get done for you guys. Let's hope we all get the same (or shorter) timeline.

06/2011 - Moved to Minneapolis, MN

10/2011 - Met for the first time

11/2011 - First date

02/2012 - Engaged :D

06/2012 - Married :')

06/25/2012 (Day 00) - Sent AOS Package to Chicago Lockbox

06/30/2012 (Day 03) - Received E-mail Receipt #s

07/10/2012 (Day 14) - Received NOAs in mail + Biometrics Appt. Notice

08/03/2012 (Day 38) - Biometrics completed

08/29/2012 (Day 65) - EAD/AP Card Production Ordered

08/30/2012 (Day 66) - I131 Approval Notice Mailed

09/05/2012 (Day 72) - EAD/AP Card Mailed

09/07/2012 (Day 74) - EAD/AP Card Received

11/4/2012 (Day 132) - Interview Notice Received (Date: Dec. 7th)

Link to comment
Share on other sites

Filed: AOS (apr) Country: Canada
Timeline

Congratulations! Looks like it took a little less than 3 months for it all to get done for you guys. Let's hope we all get the same (or shorter) timeline.

Thanks. We actually had the interview before even receiving the EAD, so it did move pretty quick.

I don't think our local office is terribly busy. It serves a lot of California, but not the areas with higher immigrant populations.

And of course, this site helped a lot. I think we sent in an error free packet because of the help we received here.

Good Luck!

AOS

5/16/2012 - Package delivered to Chicago Lockbox at 1:33pm

5/21/2012 - Email/text notifications received at 4:50 p.m.

5/26/2012 - NOA hard copies received for I-130, I-485 and I-765

6/19/2012 - Biometrics completed.

7/02/2012 - Text/email/hard copy notification of interview.

7/30/2012 - EAD card production ordered.

8/02/2012 - Interview @ 2:00

8/02/2012 - Email notification of GC production at 5:30pm

8/07/2012 - Second GC production email

8/07/2012 - EAD received.

8/08/2012 - GC mailed.

8/09/2012 - Welcome letter and I-130 approval letter received.

8/10/2012 - Green card received. :)

Link to comment
Share on other sites

Filed: AOS (pnd) Country: China
Timeline

Woot! We just got our text/email notification for our interview!

Nikki!!! We are on the same date!!! =D Congrats!

CURRENT TIMELINE OF LATE MAY-JUNE AOS FILERS can be found in this link:

https://docs.google.com/spreadsheet/pub?key=0As1sGrZ2MVKJdHB6WmNNdXN3UjBoamtZZUdldUNPSEE&single=true&gid=0&output=html

08/21/2009 - Came to US for graduate school (F1)

12/21/2010 - became a couple

05/30/2011 - graduated and on F1-OPT =)

02/14/2012 - THE proposal

03/26/2012 - Married

04/4/2012 - Went to Civil Surgeon for med exam

04/6/2012 - TB results negative and received the sealed envelope for i-693 (medical records)

AOS Journey

Day 0 05/29/2012 TUES - Finally mailed the package to Chicago, around 1pm

Day 1 05/30/2012 WEDS - Package delivered to USCIS office, signed by John Chybs @ 4+pm

Day 4 06/04/2012 MON - Email and text notification that application has been received @ 7+pm

Day 5 06/05/2012 Tues - Checks cashed

Day 7 06/07/2012 Thurs - Hard copies of i-797 (NOA) received

Day 9 06/09/2012 - Sat - Biometrics hard copy received, appointment for July 2nd.

Day 11 06/11/2012 - Mon - Walk-in Biometrics in Boston successful (exactly 3 weeks early)

Day 43 07/26/2012 - Thu - Got text and email message about scheduled interview date for August 30th.

Day 52 08/08/2012 Weds - Received notification for EAD Production and Post Decision Activity for AP

Day 58 08/16/2012 Thu - EAD/AP card on hand

Day 68 08/30/2012 - Thurs - INTERVIEW DATE!- approved on the spot.

Link to comment
Share on other sites

Filed: AOS (apr) Country: Ecuador
Timeline

my local officer is atlanta

*VISA K1 I-129F*

November 2010: Started talking on a christian forum online

May 10 2011: He came to Ecuador to met me in person (He made a promise to marry me)

June 18 2011: Send I-129F

June 25 2011: NOA1

November 23 2011: Proposed in Guayaquil, in a magical place (I totally accepted!)

November 23 2011: RFE (for the passport style pics)

January 22 2012: they resent the RFE we had a problem with the mail

January 25 2012: We send the RFE

March 01 2012: Approved

April 11 2012: Interview (APPROVED) I was crying and laughing at the same time

April 24 2012: POE Miami

May 11, 2012: Finally married to my handsome baby

* ADJUSTMENT OF STATUS*

May 23 2012: Filed for the SNN

June 21, 2012: AOS filed

June 23, 2012: I got my SNN

June 28, 2012: I got an enotification with the case number :)

July 13, 2012: RFE for the i485

July 20,2012: Biometrics Appointment, same day done

July 25, 2012: Overnight the RFE

JuLY 30, 2012: Notice they got my RFE and they will be processing my case

August 8, 2012: Got a text/email RFE :( :(

Link to comment
Share on other sites

Filed: AOS (pnd) Country: China
Timeline

I REALLY thought I saw a name mrsGORE when I was combing through the forum to list the USCIS Local office. Now I can't find her entry.. I feel creeped out!!

The somewhat updated timeline is up. =)

edit: alright, i found mrsGORE xD Apologies!!

Edited by Angeltots

CURRENT TIMELINE OF LATE MAY-JUNE AOS FILERS can be found in this link:

https://docs.google.com/spreadsheet/pub?key=0As1sGrZ2MVKJdHB6WmNNdXN3UjBoamtZZUdldUNPSEE&single=true&gid=0&output=html

08/21/2009 - Came to US for graduate school (F1)

12/21/2010 - became a couple

05/30/2011 - graduated and on F1-OPT =)

02/14/2012 - THE proposal

03/26/2012 - Married

04/4/2012 - Went to Civil Surgeon for med exam

04/6/2012 - TB results negative and received the sealed envelope for i-693 (medical records)

AOS Journey

Day 0 05/29/2012 TUES - Finally mailed the package to Chicago, around 1pm

Day 1 05/30/2012 WEDS - Package delivered to USCIS office, signed by John Chybs @ 4+pm

Day 4 06/04/2012 MON - Email and text notification that application has been received @ 7+pm

Day 5 06/05/2012 Tues - Checks cashed

Day 7 06/07/2012 Thurs - Hard copies of i-797 (NOA) received

Day 9 06/09/2012 - Sat - Biometrics hard copy received, appointment for July 2nd.

Day 11 06/11/2012 - Mon - Walk-in Biometrics in Boston successful (exactly 3 weeks early)

Day 43 07/26/2012 - Thu - Got text and email message about scheduled interview date for August 30th.

Day 52 08/08/2012 Weds - Received notification for EAD Production and Post Decision Activity for AP

Day 58 08/16/2012 Thu - EAD/AP card on hand

Day 68 08/30/2012 - Thurs - INTERVIEW DATE!- approved on the spot.

Link to comment
Share on other sites

Filed: AOS (pnd) Country: China
Timeline

Thanks. We actually had the interview before even receiving the EAD, so it did move pretty quick.

I don't think our local office is terribly busy. It serves a lot of California, but not the areas with higher immigrant populations.

And of course, this site helped a lot. I think we sent in an error free packet because of the help we received here.

Good Luck!

Saw on your timeline you have had a great past few days! Congratulations!! =)

CURRENT TIMELINE OF LATE MAY-JUNE AOS FILERS can be found in this link:

https://docs.google.com/spreadsheet/pub?key=0As1sGrZ2MVKJdHB6WmNNdXN3UjBoamtZZUdldUNPSEE&single=true&gid=0&output=html

08/21/2009 - Came to US for graduate school (F1)

12/21/2010 - became a couple

05/30/2011 - graduated and on F1-OPT =)

02/14/2012 - THE proposal

03/26/2012 - Married

04/4/2012 - Went to Civil Surgeon for med exam

04/6/2012 - TB results negative and received the sealed envelope for i-693 (medical records)

AOS Journey

Day 0 05/29/2012 TUES - Finally mailed the package to Chicago, around 1pm

Day 1 05/30/2012 WEDS - Package delivered to USCIS office, signed by John Chybs @ 4+pm

Day 4 06/04/2012 MON - Email and text notification that application has been received @ 7+pm

Day 5 06/05/2012 Tues - Checks cashed

Day 7 06/07/2012 Thurs - Hard copies of i-797 (NOA) received

Day 9 06/09/2012 - Sat - Biometrics hard copy received, appointment for July 2nd.

Day 11 06/11/2012 - Mon - Walk-in Biometrics in Boston successful (exactly 3 weeks early)

Day 43 07/26/2012 - Thu - Got text and email message about scheduled interview date for August 30th.

Day 52 08/08/2012 Weds - Received notification for EAD Production and Post Decision Activity for AP

Day 58 08/16/2012 Thu - EAD/AP card on hand

Day 68 08/30/2012 - Thurs - INTERVIEW DATE!- approved on the spot.

Link to comment
Share on other sites

Filed: AOS (pnd) Country: China
Timeline

She certainly has something on her mind! :rofl:

Thanks for the giggle Trefletatoo...with less than 24 hours until my interview, I needed it!

Oh my! I can't believe I missed that fun part in the forum! xD

Congrats again DandT14~ !

CURRENT TIMELINE OF LATE MAY-JUNE AOS FILERS can be found in this link:

https://docs.google.com/spreadsheet/pub?key=0As1sGrZ2MVKJdHB6WmNNdXN3UjBoamtZZUdldUNPSEE&single=true&gid=0&output=html

08/21/2009 - Came to US for graduate school (F1)

12/21/2010 - became a couple

05/30/2011 - graduated and on F1-OPT =)

02/14/2012 - THE proposal

03/26/2012 - Married

04/4/2012 - Went to Civil Surgeon for med exam

04/6/2012 - TB results negative and received the sealed envelope for i-693 (medical records)

AOS Journey

Day 0 05/29/2012 TUES - Finally mailed the package to Chicago, around 1pm

Day 1 05/30/2012 WEDS - Package delivered to USCIS office, signed by John Chybs @ 4+pm

Day 4 06/04/2012 MON - Email and text notification that application has been received @ 7+pm

Day 5 06/05/2012 Tues - Checks cashed

Day 7 06/07/2012 Thurs - Hard copies of i-797 (NOA) received

Day 9 06/09/2012 - Sat - Biometrics hard copy received, appointment for July 2nd.

Day 11 06/11/2012 - Mon - Walk-in Biometrics in Boston successful (exactly 3 weeks early)

Day 43 07/26/2012 - Thu - Got text and email message about scheduled interview date for August 30th.

Day 52 08/08/2012 Weds - Received notification for EAD Production and Post Decision Activity for AP

Day 58 08/16/2012 Thu - EAD/AP card on hand

Day 68 08/30/2012 - Thurs - INTERVIEW DATE!- approved on the spot.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
“;}
×
×
  • Create New...