27-Jan-12 Received NVC Case Number. 10 days after NOA2.

31-Jan-12 Received DS-3032 and AOS Fee. Paid AOS Fee and sent DS-3032 by email.

1-Feb-12 DS-3032 approved.

2-Feb-12 Received Immigrant Visa Fee. Paid IV Fee.

4-Feb-12 Sent I-864 AOS and DS-230 IV.

6-Feb-12 USPS delivered and signed.

8-Feb-12 NVC Case complete. 12 days after NVC received case.

If mine goes the same way, I should get the AOS invoice today (I hope). The main difference is that I shot them the DS-3032 as soon as I had the case number, they seemed to accept it practically immediately, then we switched to the EP process (for China) and got our new case number. I was able to get them to cough up the IIN yesterday. Nothing new today so far.

Trips:

Jan2010 - First Trip, met in person

Jul2010 - Trip two!

Nov2010 - Trip Three, Got engaged :)

Feb2011 - Trip Four. Spring Festival, Lucky Money all around :D

April2011 - Trip Five... Going to the chapel...

July2011 - Trip Six... Honeymoon in Xiamen :D

October2011 - Trip Seven... Beijing and the Great Wall :)

January2012 - Trip Eight... Chinese New Years and Spring Festival! More Lucky Money! :D

April2012 - Trip Nine... Interview?

Paper work for CR1:

28 July 2011 - 20January 2012 - Day 175... USCIS at CSC finally processed our paper work.

30January2012 - NVC 'received' the paperwork

6February2012 - NVC GUZ case number assigned - Attempted to OPTIN to EP.

7February2012 - NVC GZO (EP) case number assigned

8February2012 - 27February Massive delay caused by sending the EP OPTIN email too soon :(

28February2012 - AOS Fee Paid

29February2012 - AOS Fee shows paid, AOS Package sent in

5March2012 - IV Fee shows paid (paid on 3March), IV (DS-230) Package sent in

6March2012 - AOS Rejected due to minor error, corrected version emailed in

8March2012 - Email received indicating AOS correction and DS-230 review in process

9March2012 - Case Complete Email - END NVC PROCESS

15March2012 - Interview Scheduled: 18April2012 (Document turn-in: 17April2012)

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Haiti
Timeline

27-Jan-12 Received NVC Case Number. 10 days after NOA2.

31-Jan-12 Received DS-3032 and AOS Fee. Paid AOS Fee and sent DS-3032 by email.

1-Feb-12 DS-3032 approved.

2-Feb-12 Received Immigrant Visa Fee. Paid IV Fee.

4-Feb-12 Sent I-864 AOS and DS-230 IV.

6-Feb-12 USPS delivered and signed.

8-Feb-12 NVC Case complete. 12 days after NVC received case.

Wow that was really fast. i am praying God that mine goes fast as well

Married---07/30/2011

USCIS Stage

11/07/2011-----I-130 Sent

11/10/2011---- NOA1 email received

11/14/2011---- Touched

1/4/2012 ------ RFE ( Request for Evidence ) email received

1/13/2012------ RFE document mailed to USCIS

1/25/2012------ NOA2 APPROVED ( Yahoooooooo )

NVC Stage

1/31/2012-------Case received at NVC

2/08/2012------- Case number received, IIN, both petitionner and benificiary email given

2/08/2012------- DS 3032 ( choice of agent ) emailed to NVC

2/10/2012------- AOS fee bill paid ( status: in progress)

2/13/2012--------DS 3032 accepted

2/14/2012-------- AOS fee bill shows " PAID" and IV fee bill invoiced

2/16/2012-------- IV fee bill shows " PAID"

2/17/2012-------- IV package sent via USPS

2/24/2012-------- IV package reviewed and accepted

3/27/2012-------- AOS checklist express mailed via USPS

3/28/2012-------- AOS Checklist received by NVC

3/30/2012-------- Case Complete ( Thank you Lord )

Medical / Consulate / POE

5/11/2012-------- Medical Exam

6/12/2012-------- Interview date / APPROVED

6/21/2012 -------- POE Newark, NJ

Link to comment
Share on other sites

This is a silly question but i'm gonna ask anyway. Do you think if I called NVC and requested to have my interview during a certain time frame like sayyy between May 7th- May 25th they would take it serious? Like is this even possible?? Just wondering. :blink:

Edited by francis y steph

01/01/2008 - Met
04/27/2010 - Engaged
08/23/2011 - Married
USCIS
10/03/2011 - I-130 Sent (USPS priority w/ delivery confirmation)
10/05/2011 - Package arrived at chicago lockbox
10/06/2011 - NOA1
11/09/2011 - NOA2 (no RFE's)
NVC
11/14/2011 - Petition received by NVC/ Received NOA2 by mail
11/21/2011 - NVC case # received by email/ Got AOS fee by email/ Called NVC to provide beneficiary email
11/27/2011 - Choice of agent (DS-3023) sent to NVC by email
.....took a break from process to delay interview....
01/26/2012 - Payed IV fee
01/27/2012 - IV fee status shown as PAID
02/07/2012 - Payed AOS fee
02/08/2012 - AOS fee status shown as PAID
02/09/ 2012 - DS-230 package sent to NVC (priority mail)
03/06/2012 - AOS package sent to NVC (priority mail)
03/12/2012 - Called NVC and found out about checklist. Sent revision to NVC that same day.
03/16/2012 - CASE COMPLETE!
04/11/2012 - Informed of interview via phone by DOS/ Got P4 email from NVC a few hours later that same day (May 4th)
SANTO DOMINGO CONSULATE
04/19/2012 - Medical
05/04/2012 - Interview (APPROVED)
05/10/2012 - Visa ready and picked up at domex
05/15/2012 - POE in Boston (together)
U. S. A
05/29/2012 - Went to SS office to apply for SS card
06/01/2012 - Welcome letter arrived (Received about 3 of these)
06/05/2012 - Green card arrived
06/15/2012- Back to SS office with green card to reapply and inquire about delay
06/18/2012 - Picked up SSN at SSA office
06/22/2012 - SS card arrived by mail

04/24/14 - Sent I-751 to remove conditions

06/09/14 - Biometrics

11/2014 - RFE from USCIS requesting more evidence before approval

Late Jan - Sent further evidence of marriage

03/05/2015 - Got letter of approval for removal of conditions

03/15/2015 - Permanent 10 yr green card received via mail

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Paraguay
Timeline

So, I e-mailed the DS-3032 the same day I got my case number and I just got this response:

"We are unable to add third party contact information to the case record at this time. Please continue to notify the NVC of any change in the petitioner's or principal applicant's address."

Err...does that mean I sent it to early? When should I resend it?

11-19-2011 Married in Paraguay

USCIS - 10 days

01-09-2012 NOA1 email

01-19-2012 NOA2 email (USC living abroad with spouse)

NVC - 33 days

02-08-2012 Case number and IIN assigned (9 days after NVC received)

03-12-2012 Case completed

04-06-2012 Received interview letter in e-mail (25 days after case complete)

Consulate

04-10-2012 Medical in Asuncion

04-30-2012 Interview-APPROVED

05-02-2012 Visa available for pickup

USA

05-10-2012 POE-Bahamas

05-25-2012 Welcome Letter received

05-31-2012 Green Card received

06-08-2012 Applied for SSN at local office

06-16-2012 SSN received

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Haiti
Timeline

So, I e-mailed the DS-3032 the same day I got my case number and I just got this response:

"We are unable to add third party contact information to the case record at this time. Please continue to notify the NVC of any change in the petitioner's or principal applicant's address."

Err...does that mean I sent it to early? When should I resend it?

I emailed them DS 3032 the same day too, i did not get this message via email only the NVC automated response.

Married---07/30/2011

USCIS Stage

11/07/2011-----I-130 Sent

11/10/2011---- NOA1 email received

11/14/2011---- Touched

1/4/2012 ------ RFE ( Request for Evidence ) email received

1/13/2012------ RFE document mailed to USCIS

1/25/2012------ NOA2 APPROVED ( Yahoooooooo )

NVC Stage

1/31/2012-------Case received at NVC

2/08/2012------- Case number received, IIN, both petitionner and benificiary email given

2/08/2012------- DS 3032 ( choice of agent ) emailed to NVC

2/10/2012------- AOS fee bill paid ( status: in progress)

2/13/2012--------DS 3032 accepted

2/14/2012-------- AOS fee bill shows " PAID" and IV fee bill invoiced

2/16/2012-------- IV fee bill shows " PAID"

2/17/2012-------- IV package sent via USPS

2/24/2012-------- IV package reviewed and accepted

3/27/2012-------- AOS checklist express mailed via USPS

3/28/2012-------- AOS Checklist received by NVC

3/30/2012-------- Case Complete ( Thank you Lord )

Medical / Consulate / POE

5/11/2012-------- Medical Exam

6/12/2012-------- Interview date / APPROVED

6/21/2012 -------- POE Newark, NJ

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

DS-3032 has been emailed to NVC, yeeeee, so now what guys?

go back to post #1. Read all of the content in those links.

You should already 'know whats next'.

Sometimes my language usage seems confusing - please feel free to 'read it twice', just in case !
Ya know, you can find the answer to your question with the advanced search tool, when using a PC? Ditch the handphone, come back later on a PC, and try again.

-=-=-=-=-=R E A D ! ! !=-=-=-=-=-

Whoa Nelly ! Want NVC Info? see http://www.visajourney.com/wiki/index.php/NVC_Process

Congratulations on your approval ! We All Applaud your accomplishment with Most Wonderful Kissies !

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

Hum... i emailed DS-3032 yesterday before they ask me.

yup.

Sometimes my language usage seems confusing - please feel free to 'read it twice', just in case !
Ya know, you can find the answer to your question with the advanced search tool, when using a PC? Ditch the handphone, come back later on a PC, and try again.

-=-=-=-=-=R E A D ! ! !=-=-=-=-=-

Whoa Nelly ! Want NVC Info? see http://www.visajourney.com/wiki/index.php/NVC_Process

Congratulations on your approval ! We All Applaud your accomplishment with Most Wonderful Kissies !

 

Link to comment
Share on other sites

I have most of the docs prepared since July and the payment was easy. I think my longest wait was the DS-3032 acceptance, it took about 3 days for them to reply to my email (which was still fast nonetheless :D)

Thanks. Case completed on 8 Feb.

What's DOS?

Thanks for the date. You've officially moved from the "Do not have case complete's" to the ones that do :)

And if you had sent in your DS-3032 a couple days earlier, you might have gotten a faster CC ;) Although, you made it through NVC in 12 days, just one day short of the fastest record (11 days).

DOS = Department of State. It's another source I'd recommend calling as they'll know of the interview date as well. They're also the ones to call if you ever get into AP/AR after an interview. They'd also know if/when your visa is issued.

This is a silly question but i'm gonna ask anyway. Do you think if I called NVC and requested to have my interview during a certain time frame like sayyy between May 7th- May 25th they would take it serious? Like is this even possible?? Just wondering. :blink:

Nope. NVC schedules interviews according to the schedule that each embassy/consulate gives them. They then fill the slots in the order of the cases in the queue.

After you get your date, you can always try contacting your embassy/consulate and requesting an interview change to that range, but it might not be granted.

So, I e-mailed the DS-3032 the same day I got my case number and I just got this response:

"We are unable to add third party contact information to the case record at this time. Please continue to notify the NVC of any change in the petitioner's or principal applicant's address."

Err...does that mean I sent it to early? When should I resend it?

It means it got sent too early. This happens every now and then. I'd suggest re-sending it again asap and hopefully, by the time they get around to that email, they've finished inputting your case and are ready for document intake.

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Haiti
Timeline

It means it got sent too early. This happens every now and then. I'd suggest re-sending it again asap and hopefully, by the time they get around to that email, they've finished inputting your case and are ready for document intake.

howcome they didnt send me this message, we got case number same day and emailed ds 3032 same day too

Married---07/30/2011

USCIS Stage

11/07/2011-----I-130 Sent

11/10/2011---- NOA1 email received

11/14/2011---- Touched

1/4/2012 ------ RFE ( Request for Evidence ) email received

1/13/2012------ RFE document mailed to USCIS

1/25/2012------ NOA2 APPROVED ( Yahoooooooo )

NVC Stage

1/31/2012-------Case received at NVC

2/08/2012------- Case number received, IIN, both petitionner and benificiary email given

2/08/2012------- DS 3032 ( choice of agent ) emailed to NVC

2/10/2012------- AOS fee bill paid ( status: in progress)

2/13/2012--------DS 3032 accepted

2/14/2012-------- AOS fee bill shows " PAID" and IV fee bill invoiced

2/16/2012-------- IV fee bill shows " PAID"

2/17/2012-------- IV package sent via USPS

2/24/2012-------- IV package reviewed and accepted

3/27/2012-------- AOS checklist express mailed via USPS

3/28/2012-------- AOS Checklist received by NVC

3/30/2012-------- Case Complete ( Thank you Lord )

Medical / Consulate / POE

5/11/2012-------- Medical Exam

6/12/2012-------- Interview date / APPROVED

6/21/2012 -------- POE Newark, NJ

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

Still not invoiced :(

Trips:

Jan2010 - First Trip, met in person

Jul2010 - Trip two!

Nov2010 - Trip Three, Got engaged :)

Feb2011 - Trip Four. Spring Festival, Lucky Money all around :D

April2011 - Trip Five... Going to the chapel...

July2011 - Trip Six... Honeymoon in Xiamen :D

October2011 - Trip Seven... Beijing and the Great Wall :)

January2012 - Trip Eight... Chinese New Years and Spring Festival! More Lucky Money! :D

April2012 - Trip Nine... Interview?

Paper work for CR1:

28 July 2011 - 20January 2012 - Day 175... USCIS at CSC finally processed our paper work.

30January2012 - NVC 'received' the paperwork

6February2012 - NVC GUZ case number assigned - Attempted to OPTIN to EP.

7February2012 - NVC GZO (EP) case number assigned

8February2012 - 27February Massive delay caused by sending the EP OPTIN email too soon :(

28February2012 - AOS Fee Paid

29February2012 - AOS Fee shows paid, AOS Package sent in

5March2012 - IV Fee shows paid (paid on 3March), IV (DS-230) Package sent in

6March2012 - AOS Rejected due to minor error, corrected version emailed in

8March2012 - Email received indicating AOS correction and DS-230 review in process

9March2012 - Case Complete Email - END NVC PROCESS

15March2012 - Interview Scheduled: 18April2012 (Document turn-in: 17April2012)

Link to comment
Share on other sites

howcome they didnt send me this message, we got case number same day and emailed ds 3032 same day too

Because they probably haven't gotten to your email yet. Please keep in mind, there are THOUSANDS of people going through NVC right now. And if each one sends an email, then NVC has to deal with THOUSANDS of emails.

Please, just remain patient and keep checking your inbox (and junk) folder in your email. And keep checking the payment portal as well.

Still not invoiced :(

:(

Have you called up NVC and asked for the AOS to be invoiced?

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Haiti
Timeline

Because they probably haven't gotten to your email yet. Please keep in mind, there are THOUSANDS of people going through NVC right now. And if each one sends an email, then NVC has to deal with THOUSANDS of emails.

Please, just remain patient and keep checking your inbox (and junk) folder in your email. And keep checking the payment portal as well.

I keep checking everything lol but i would not love to get this message, but it seems unavoidable

Married---07/30/2011

USCIS Stage

11/07/2011-----I-130 Sent

11/10/2011---- NOA1 email received

11/14/2011---- Touched

1/4/2012 ------ RFE ( Request for Evidence ) email received

1/13/2012------ RFE document mailed to USCIS

1/25/2012------ NOA2 APPROVED ( Yahoooooooo )

NVC Stage

1/31/2012-------Case received at NVC

2/08/2012------- Case number received, IIN, both petitionner and benificiary email given

2/08/2012------- DS 3032 ( choice of agent ) emailed to NVC

2/10/2012------- AOS fee bill paid ( status: in progress)

2/13/2012--------DS 3032 accepted

2/14/2012-------- AOS fee bill shows " PAID" and IV fee bill invoiced

2/16/2012-------- IV fee bill shows " PAID"

2/17/2012-------- IV package sent via USPS

2/24/2012-------- IV package reviewed and accepted

3/27/2012-------- AOS checklist express mailed via USPS

3/28/2012-------- AOS Checklist received by NVC

3/30/2012-------- Case Complete ( Thank you Lord )

Medical / Consulate / POE

5/11/2012-------- Medical Exam

6/12/2012-------- Interview date / APPROVED

6/21/2012 -------- POE Newark, NJ

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

Because they probably haven't gotten to your email yet. Please keep in mind, there are THOUSANDS of people going through NVC right now. And if each one sends an email, then NVC has to deal with THOUSANDS of emails.

Please, just remain patient and keep checking your inbox (and junk) folder in your email. And keep checking the payment portal as well.

:(

Have you called up NVC and asked for the AOS to be invoiced?

Multiple times. They just keep saying that it may take up to 10 days and will go out any day now. One lady actually told me it would be up to 6 weeks. I had to suppress both a shudder and laugh on that one.

I'm not sure what else to ask them about it. I admit I'm already getting tired of hearing 'We just received this case Monday' or some form of it. As if I'm not keenly aware of it.

I'm not being unreasonable am I? It is normal to expect it to have been invoiced by this juncture, no?

Edited by foobaz123

Trips:

Jan2010 - First Trip, met in person

Jul2010 - Trip two!

Nov2010 - Trip Three, Got engaged :)

Feb2011 - Trip Four. Spring Festival, Lucky Money all around :D

April2011 - Trip Five... Going to the chapel...

July2011 - Trip Six... Honeymoon in Xiamen :D

October2011 - Trip Seven... Beijing and the Great Wall :)

January2012 - Trip Eight... Chinese New Years and Spring Festival! More Lucky Money! :D

April2012 - Trip Nine... Interview?

Paper work for CR1:

28 July 2011 - 20January 2012 - Day 175... USCIS at CSC finally processed our paper work.

30January2012 - NVC 'received' the paperwork

6February2012 - NVC GUZ case number assigned - Attempted to OPTIN to EP.

7February2012 - NVC GZO (EP) case number assigned

8February2012 - 27February Massive delay caused by sending the EP OPTIN email too soon :(

28February2012 - AOS Fee Paid

29February2012 - AOS Fee shows paid, AOS Package sent in

5March2012 - IV Fee shows paid (paid on 3March), IV (DS-230) Package sent in

6March2012 - AOS Rejected due to minor error, corrected version emailed in

8March2012 - Email received indicating AOS correction and DS-230 review in process

9March2012 - Case Complete Email - END NVC PROCESS

15March2012 - Interview Scheduled: 18April2012 (Document turn-in: 17April2012)

Link to comment
Share on other sites

I keep checking everything lol but i would not love to get this message, but it seems unavoidable

Don't be negative. Start thinking positively. When they get to your email, it's very possible for them to have finished inputting your case and are ready for document intake from you.

Multiple times. They just keep saying that it may take up to 10 days and will go out any day now. One lady actually told me it would be up to 6 weeks. I had to suppress both a shudder and laugh on that one.

I'm not sure what else to ask them about it. I admit I'm already getting tired of hearing 'We just received this case Monday' or some form of it. As if I'm not keenly aware of it.

I'm not being unreasonable am I? It is normal to expect it to have been invoiced by this juncture, no?

Yeah, I remember hating hearing they're timelines. I just ignored them, and continued calling every day.

As for being reasonable, keep in mind, you JUST got your case number like two days ago. It does take time for them to invoice bills.

All I can say is to keep signing into the payment portal every few hours.

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Haiti
Timeline

Don't be negative. Start thinking positively. When they get to your email, it's very possible for them to have finished inputting your case and are ready for document intake from you.

Yeah, I remember hating hearing they're timelines. I just ignored them, and continued calling every day.

As for being reasonable, keep in mind, you JUST got your case number like two days ago. It does take time for them to invoice bills.

All I can say is to keep signing into the payment portal every few hours.

Foobaz do like me, click on sign every single second :lol:

Married---07/30/2011

USCIS Stage

11/07/2011-----I-130 Sent

11/10/2011---- NOA1 email received

11/14/2011---- Touched

1/4/2012 ------ RFE ( Request for Evidence ) email received

1/13/2012------ RFE document mailed to USCIS

1/25/2012------ NOA2 APPROVED ( Yahoooooooo )

NVC Stage

1/31/2012-------Case received at NVC

2/08/2012------- Case number received, IIN, both petitionner and benificiary email given

2/08/2012------- DS 3032 ( choice of agent ) emailed to NVC

2/10/2012------- AOS fee bill paid ( status: in progress)

2/13/2012--------DS 3032 accepted

2/14/2012-------- AOS fee bill shows " PAID" and IV fee bill invoiced

2/16/2012-------- IV fee bill shows " PAID"

2/17/2012-------- IV package sent via USPS

2/24/2012-------- IV package reviewed and accepted

3/27/2012-------- AOS checklist express mailed via USPS

3/28/2012-------- AOS Checklist received by NVC

3/30/2012-------- Case Complete ( Thank you Lord )

Medical / Consulate / POE

5/11/2012-------- Medical Exam

6/12/2012-------- Interview date / APPROVED

6/21/2012 -------- POE Newark, NJ

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...