We all hope for that Vroum! :)

I was just looking at Igor's list and only 15 VJ petitions approved since June 26th?

6 of those were December

2 of those were February

7 from January....

What the heck are they doing?? :bonk::bonk:

they are probably working on their backlog which might be huge at this stage and not only I129F petitions but the rest too... really scary, I can't believe I say that but I am hoping I will make it for the X-Mas right now :(

Our (K1) Journey

01-17-2012: I 129F sent

01-24-2012: NOA1 date! => Vermont Service Centre

08-02-2012: NOA2 (195 days!!!)

09-24-2012: interview - Approved!

09-26-2012: visaarrow-10x10.png issued

09-28-2012: visa received by a registeredarrow-10x10.png post

11-01-2012: POE Dublin

11-17-2012: wedding

AOS Journey

11-23-2012: AOS package sent

11-27-2912: package received and signed for at the Chicago office

11-29-2012: case numbers assigned

12-03-2012: Biometrics letter sent to the old addressarrow-10x10.png (never received)

12-10-2012: NOA1 hardcopy for I 765 and I 131

12-15-2012: NOA1 hardcopy for I 485

12-28-2012: biometrics (missed)

01-17-2013: newarrow-10x10.png biometric date

01-25-2013: EAD approval

01-30-2013: EAD production

01-31-2013: EAD mailed

02-02-2013: EAD received

My ROC Journey:

03-20-2015: I751 package sent

03-23-2015: NOA1

03-25-2015: check cashedarrow-10x10.png

07-31-2015: Biometrics ( Biometrics letter sent to the old address never received, missed it on 07/06 and had to have it rescheduled after many phone calls and service requests)

09-07-2015: Card in Production email.

09-09-2015: Card mailed

09-11-2015: Card delivered

--------------------------------------------------------------------------

Filed: K-1 Visa Country: Canada
Timeline
Posted

they are probably working on their backlog which might be huge at this stage and not only I129F petitions but the rest too... really scary, I can't believe I say that but I am hoping I will make it for the X-Mas right now :(

Maybe they should send some of their backlog to CSC?? I've heard that they've done that in the past.

Kimberley and Richard
Service Center : Vermont Service Center
Consulate : Montreal, Canada
2012-01-25 : I-129F Sent
2012-01-27 : VSC Received
2012-01-31 : I-129F NOA1 Notice Date
2012-02-01 : Touch
2012-07-05 : RFE Email (after 161 days)
2012-07-11 : RFE Received in Mail
2012-07-12 : RFE Reply Sent via USPS Overnight
2012-07-13 : RFE Reply Received at VSC at 12:16 PM
2012-07-18 : Case status updated to: "Request for Evidence Response Review"
2012-09-20 : Service Request Submitted with Tier 2 ISO
2012-09-25 : NOA2 Approved after 242 days!!
2013-01-07: Medical
2013-01-22: Interview - Approved! smile.png

My blog and video review of the Montreal Hotel that we stayed in: http://fanatictourist.com/blog/travel-tales/review-le-square-phillips-hotel-and-suites-montreal-canada/

2013-04-30: POE - Sarnia / Pt. Huron

2013-05-06: Made it legal.

2013-06-10: Apply for AOS, EAD and AP

2013-08-27: EAD / AP Received
2013-09-17: Greencard Received

2013-09-28: Wedding! smile.png

2015-06-15: Sent I-751 Application - Removal of Conditions.
2015-11-23: Approved
2015-12-02: 10 yr Green Card Rec'd.

Posted

We all hope for that Vroum! :)

I was just looking at Igor's list and only 15 VJ petitions approved since June 26th?

6 of those were December

2 of those were February

7 from January....

What the heck are they doing?? :bonk::bonk:

So odd :wacko:

California service have given NOA2 for March filers , im underpressure :crying:

Our K-1 Visa Timeline

09/03/2012: I-129 sent

14/03/2012: I-129F NOA1 (Receipt)

04/10/2012: I-129F NOA2 (Approved) after 203 days of waiting !!

09/10/2012: Package Received By NVC

Good Luck for all of us :)

Posted

I really hope things speed up for everyone. If it's any consolation, it's seemingly taking much longer for the CSC to get approved petitions to the NVC and then for the NVC to get them entered. So those getting their I-129Fs approved from CSC should keep their patience hat on a bit longer.

I found a package heading to the UK this morning on DHL, so I hope our petition is in there. :unsure:

Part One: The K-1 Visa Journey:

USCIS Receipt of I-129F: January 24, 2012 | Petition Approval: June 15, 2012 (No RFEs)
Interview: October 24, 2012 - Review | Visa Delivered: October 31, 2012



Part Two: Entry and Adjusting Status:

POE: November 18, 2012 (at SFO) - Review
Wedding: December 1, 2012 | Social Security: New cards received on December 7, 2012.
AOS Package (I-485/I-765/I-131) NOA1: February 19, 2013 | Biometrics Appt.: March 18, 2013
AP/EAD Approved: April 29, 2013 | Card Received: May 6, 2013 | AOS Interview Appt.: May 16, 2013 - Approved Review Card Received: May 24, 2013

Part Three: Removal of Conditions:

Coming Soon...

"When you're born you get a ticket to the freak show. When you're born in America, you get a front row seat." – George Carlin

Filed: K-1 Visa Country: Germany
Timeline
Posted

I can't imagine how the February and March filers are feeling at this point.

they feel horrible..... :crying: especially since petitions around my date have already been approved at csc... but i guess you guys know exactly how that feels. how long does it take them to realize they can't deal with the backlog alone and send petitions off to csc? they seem to be on a run and i think they could deal with a few more petitions... the went through pretty much all of february within about 2-3 weeks :wow:

event.png

K-1 Visa:
03-08-12: Petition sent
03-12-12: Petition received (Vermont)
03-15-12: NOA1 (hardcopy)
08-30-12: NOA2 (USCIS website)
09-06-12: NOA2 (hardcopy)
09-10-12: NVC received
09-11-12: NVC Case Number
09-12-12: NVC left
09-18-12: Medical (Frankfurt)
09-22-12: NVC received (hardcopy)
09-29-12: pack 3 received
09-29-12: sent back pack 3
10-05-12: pack 3 received by embassy (thanks dhl for almost taking a week when you claim to deliver the next work-day!)
10-16-12: pack 4 received via eMail
10-17-12: pack 4 received (hardcopy)
10-24-12: Interview - APPROVED
11-02-12: Visa in hand
11-10-12: POE: Newark
12-31-12: WEDDING

AOS:
02-08-13: AOS package sent
02-11-13: AOS package delivered
02-18-13: NOA1 (eMail and text)
02-21-13: NOA1 (hardcopy)
02-27-13: Letter with Biometrics appointment
03-08-13: Biometrics
04-11-13: EAD and AP approved
04-20-13: EAD and AP combo card in the mail

08-31-13: GC approved - no Interview

09-08-13: Welcome letter in mail

09-09-13: GC in mail

Posted

Maybe they should send some of their backlog to CSC?? I've heard that they've done that in the past.

To be honest I would be actually worrying about them sending the petitions somewhere else... I can imagine how many RFE's will that cause due to lost petitions...I am just worrying about every single move in there at this stage...

Our (K1) Journey

01-17-2012: I 129F sent

01-24-2012: NOA1 date! => Vermont Service Centre

08-02-2012: NOA2 (195 days!!!)

09-24-2012: interview - Approved!

09-26-2012: visaarrow-10x10.png issued

09-28-2012: visa received by a registeredarrow-10x10.png post

11-01-2012: POE Dublin

11-17-2012: wedding

AOS Journey

11-23-2012: AOS package sent

11-27-2912: package received and signed for at the Chicago office

11-29-2012: case numbers assigned

12-03-2012: Biometrics letter sent to the old addressarrow-10x10.png (never received)

12-10-2012: NOA1 hardcopy for I 765 and I 131

12-15-2012: NOA1 hardcopy for I 485

12-28-2012: biometrics (missed)

01-17-2013: newarrow-10x10.png biometric date

01-25-2013: EAD approval

01-30-2013: EAD production

01-31-2013: EAD mailed

02-02-2013: EAD received

My ROC Journey:

03-20-2015: I751 package sent

03-23-2015: NOA1

03-25-2015: check cashedarrow-10x10.png

07-31-2015: Biometrics ( Biometrics letter sent to the old address never received, missed it on 07/06 and had to have it rescheduled after many phone calls and service requests)

09-07-2015: Card in Production email.

09-09-2015: Card mailed

09-11-2015: Card delivered

--------------------------------------------------------------------------

Filed: K-1 Visa Country: United Kingdom
Timeline
Posted (edited)

To be honest I would be actually worrying about them sending the petitions somewhere else... I can imagine how many RFE's will that cause due to lost petitions...I am just worrying about every single move in there at this stage...

I'm with you. I saw that a few files didn't go to the NVC and took a while to get redirected. At this point, I'd prefer VSC to keep the ones they have, but maybe forward all of the new K1s to CSC for the next few months so VSC can catch up.

Edited by Knope2012

K1 Visa Timeline

01/13/2012 I-129F sent via USPS

01/16/2012 I-129F delivered

01/17/2012 NOA1 date on USCIS website

01/20/2012 Text and E-Mail Notification of NOA1!

01/20/2012 Check Cashed

01/23/2012 NOA1 Hardcopy

01/23/2012 Called USCIS to report that my fiance's name was misspelled on the NOA1

01/24/2012 Touched

01/26/2012 Received response to report, e-mail states error has been corrected.

02/08/2012 Touched

07/12/2012 NOA2! It took 177 days.

07/17/2012 NOA2 Hardcopy

07/20/2012 NVC received and forwarded to London

07/23/2012 Received in London

07/31/2012 Packet 3 received

08/02/2012 Packet 3 sent

08/16/2012 Medical

10/1/2012 Interview: APPROVED!

10/3/2012 Visa Issued

10/8/2012 Visa delivery

10/24/2012 POE Dublin

11/21/2012 Wedding

event.png

[uSCIS] cannot stop true love. All it can do is delay it for a while.

Filed: K-1 Visa Country: Honduras
Timeline
Posted

Actually, the K1 visa is a non-immigrant visa. This is why you have to adjust status. The K1 is a visa to 'lawfully enter the United States with the intention of marrying' . It doesn't give any right to remain and neither does it give you any immigrant rights, this is why it expires in 90 days after entry and it's a single use visa. You then have to adjust status to an immigrant to become a CLPR (Conditional lawful permanent resident) at which point you are then on an immigrant visa.

Yes...I know it is...but like someone who kindly told me here said, the consulates treat it like an immigrant visa, at least here they do. They have it listed on the list of immigrant visas which sucks b/c it means that we have to wait for the embassy to schedule our appointment and cannot do it ourselves (the non-immigrant visas have a website and call center to schedule your own appointments...)...so apparently it's because they assume that you are going to fulfill the requirements and do the AOS and all...the website where they list the wait times says "3 to 4 months" under "scheduling immigrant visa interview." UGH. All we can do is send an email requesting it and waitttttttt. And that's just for the scheduling of it...no telling when it will actually be scheduled FOR.

January 3, 2012 Mailed I-129F

January 9, 2012 NOA1

June 11, 2012 NOA2 rec'd 154 days later...

July 5, 2012 NVC rec'd and new case number given

July 9, 2012 Left NVC en route to Honduras! :)

July 13, 2012 Received at Embassy!

Aug. 7, 2012 Interview date and Packet 4 rec'd by email

Oct. 8, 2012 Medical

Oct. 10, 2012 INTERVIEW: APPROVED!!!

Oct. 16, 2012 Visa in hand

Oct. 23, 2012 POE Atlanta

Dec. 30, 2012 Wedding! ;)

Filed: K-1 Visa Country: Canada
Timeline
Posted

I'm with you. I saw that a few files didn't go to the NVC and took a while to get redirected. At this point, I'd prefer VSC to keep the ones they have, but maybe forward all of the new K1s to CSC for the next few months so VSC can catch up.

I'm with you there Knope and Sabi... start redirecting any new K1's to CSC so VSC can catch up with what they've got..

I'm thinking they certainly have to do something soon or the 5 month average is out the window!! :blink:

Kimberley and Richard
Service Center : Vermont Service Center
Consulate : Montreal, Canada
2012-01-25 : I-129F Sent
2012-01-27 : VSC Received
2012-01-31 : I-129F NOA1 Notice Date
2012-02-01 : Touch
2012-07-05 : RFE Email (after 161 days)
2012-07-11 : RFE Received in Mail
2012-07-12 : RFE Reply Sent via USPS Overnight
2012-07-13 : RFE Reply Received at VSC at 12:16 PM
2012-07-18 : Case status updated to: "Request for Evidence Response Review"
2012-09-20 : Service Request Submitted with Tier 2 ISO
2012-09-25 : NOA2 Approved after 242 days!!
2013-01-07: Medical
2013-01-22: Interview - Approved! smile.png

My blog and video review of the Montreal Hotel that we stayed in: http://fanatictourist.com/blog/travel-tales/review-le-square-phillips-hotel-and-suites-montreal-canada/

2013-04-30: POE - Sarnia / Pt. Huron

2013-05-06: Made it legal.

2013-06-10: Apply for AOS, EAD and AP

2013-08-27: EAD / AP Received
2013-09-17: Greencard Received

2013-09-28: Wedding! smile.png

2015-06-15: Sent I-751 Application - Removal of Conditions.
2015-11-23: Approved
2015-12-02: 10 yr Green Card Rec'd.

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted

We all hope for that Vroum! :)

I was just looking at Igor's list and only 15 VJ petitions approved since June 26th?

6 of those were December

2 of those were February

7 from January....

What the heck are they doing?? :bonk::bonk:

What is your RFE about?

I-129F Sent: 02/20/12

Received at VSC: 2/27/12

NOA1 Dated: 2/27/12

RFE: 9/04/12

RFE Response: 9/11/12

RFE Response Review: 9/12/12

NOA2 (Text): 9/26/12

NOA2 Hardcopy received: 9/29/12

NVC Received our file: 10/02/12

NVC Sent our file to the embassy: 10/04/12

Embassy received our file: 10/08/12

Package 3 received: 10/15/12

Filed: K-1 Visa Country: Canada
Timeline
Posted

What is your RFE about?

Not sure, haven't received mail from Vermont yet. :(

I went through our petition the other night, and the only thing that I can see is:

On the instructions it says that if the name on the application is different than any of the other paperwork, then you must send in proof of the name change ie: marriage certificate. We only sent in our divorce certificates, so I am assuming they will want a copy of my previous marriage certificate... I have it, with copies, ready to courier to my fiance, if that is what it is!

Not only is Vermont slow... apparently the postal service is as well! :wacko:

Kimberley and Richard
Service Center : Vermont Service Center
Consulate : Montreal, Canada
2012-01-25 : I-129F Sent
2012-01-27 : VSC Received
2012-01-31 : I-129F NOA1 Notice Date
2012-02-01 : Touch
2012-07-05 : RFE Email (after 161 days)
2012-07-11 : RFE Received in Mail
2012-07-12 : RFE Reply Sent via USPS Overnight
2012-07-13 : RFE Reply Received at VSC at 12:16 PM
2012-07-18 : Case status updated to: "Request for Evidence Response Review"
2012-09-20 : Service Request Submitted with Tier 2 ISO
2012-09-25 : NOA2 Approved after 242 days!!
2013-01-07: Medical
2013-01-22: Interview - Approved! smile.png

My blog and video review of the Montreal Hotel that we stayed in: http://fanatictourist.com/blog/travel-tales/review-le-square-phillips-hotel-and-suites-montreal-canada/

2013-04-30: POE - Sarnia / Pt. Huron

2013-05-06: Made it legal.

2013-06-10: Apply for AOS, EAD and AP

2013-08-27: EAD / AP Received
2013-09-17: Greencard Received

2013-09-28: Wedding! smile.png

2015-06-15: Sent I-751 Application - Removal of Conditions.
2015-11-23: Approved
2015-12-02: 10 yr Green Card Rec'd.

Posted

Hey guys, John and I are gonna call together now to put a service request in.

What is the correct # to call please? 800 375 5283?

And should we mention we want to submit a request or just say we want to be transferred to a tier 2 person?

Thanks!

K1 PROCESS
1/14/12 - I-129f sent to Dallas, TX, 1/18/12 - received by VSC
1/20/12 - NOA 1
7/19/12 - NOA 2 - YES AFTER 183 DAYS!!!
7/27/12 - NVC received
8/02/12 - Consulate received
8/23/12 - Medical exam appt
9/06/12 - Interview @ 9am - Approved! smile.png
9/28/12 - POE - Vienna - London - Philly

Wedding - 10/6/12 @ 1:30pm ET

AOS
10/20/12 - AOS sent to Chicago lockbox
10/26/12 - NOA1s for all 3 forms
11/28/12 - Biometrics appointment
12/29/12 - EAD & AP approved
01/08/13 - EAD combo card received

06/28/13 - AOS approved

Posted

Hey guys, John and I are gonna call together now to put a service request in.

What is the correct # to call please? 800 375 5283?

And should we mention we want to submit a request or just say we want to be transferred to a tier 2 person?

Thanks!

Do not mention the request until you talk to Tier 2! Just insist on them putting you through... if they ask why, just say you have a problem with the petition and only Tier 2 can help you

Our (K1) Journey

01-17-2012: I 129F sent

01-24-2012: NOA1 date! => Vermont Service Centre

08-02-2012: NOA2 (195 days!!!)

09-24-2012: interview - Approved!

09-26-2012: visaarrow-10x10.png issued

09-28-2012: visa received by a registeredarrow-10x10.png post

11-01-2012: POE Dublin

11-17-2012: wedding

AOS Journey

11-23-2012: AOS package sent

11-27-2912: package received and signed for at the Chicago office

11-29-2012: case numbers assigned

12-03-2012: Biometrics letter sent to the old addressarrow-10x10.png (never received)

12-10-2012: NOA1 hardcopy for I 765 and I 131

12-15-2012: NOA1 hardcopy for I 485

12-28-2012: biometrics (missed)

01-17-2013: newarrow-10x10.png biometric date

01-25-2013: EAD approval

01-30-2013: EAD production

01-31-2013: EAD mailed

02-02-2013: EAD received

My ROC Journey:

03-20-2015: I751 package sent

03-23-2015: NOA1

03-25-2015: check cashedarrow-10x10.png

07-31-2015: Biometrics ( Biometrics letter sent to the old address never received, missed it on 07/06 and had to have it rescheduled after many phone calls and service requests)

09-07-2015: Card in Production email.

09-09-2015: Card mailed

09-11-2015: Card delivered

--------------------------------------------------------------------------

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...