OK, we just went through the (almost) 4 month wait to receive our NOA2 which seemed like torture LOL. Now we're wondering what's taking the NVC so long -- or are we just being impatient again? :bonk: It's been 3 weeks today since our NOA2 (9/30). I called the NVC and they did tell me that it was entered into their system on 10/17/11 and that "they typically don't hold them too long". How "long" is long? LOL

So, I'm posing the question:

How long does it typically take for the NVC to process K1s and get them sent to the Consulate? I see a lot of people's timelines state approximately 10 days ... why so long for ours? Just wondering and would love some feedback from all my fellow VJers on how long yours took.

Thanks everyone ~ you guys are the best!!

Our CR1 Journey

Met - 1/14/2010 // Engaged - 3/6/2011

K1 filed - 6/8/11 // Interview @ Mumbai Consulate - 1/5/2012: Denied // USCIS final decision - 3/15/2013; administratively closed and free to file again without prejudice

Married in Delhi - 1/30/2014

Sent I-130: 4/7/2014 NOA 1: 4/10/2014

NOA 2: 11/13/2014 (after 217 days)

NVC Received: 11/26/2014 (13 days from USCIS to the NVC)  // Case # & IIN # received - 12/29/2014 (via phone to NVC) Also sent email to get case transferred to New Delhi

NVC Welcome Letter received: 12/30/2014

Submit DS-261: 12/30/2014 // Paid AOS Bill: 1/2/2015  // Received IV Bill & Paid: 1/13/2015 (CEAC shows PAID 1/15/15) // DS-260 submitted: 1/17/2015

AOS & IV packages sent via FedEx: 1/19/2015  // AOS/IV packages received: 1/21/2015 @ 9:58 am (Signed for by: G. Waters) Scan date: 1/21/2015

60-Day Email from NVC: 1/24/2015 2nd 60-Day Email from NVC: 1/26/2015 (OK...I get it, it's taking 60 days.... sigh)

Reply from NVC re: Transfer to New Delhi : 2/16/2015 (Told to contact New Delhi...49 days wasted for no help at all!)

CASE COMPLETE!!: 3/12/2015 (50 days) // Case Complete Email Received: 3/19/2015 (7 days from CC date)

Interview Date Received via phone inquiry to NVC: 3/24/2015 // Packet 4 (Interview letter/Instructions) received: 3/25/2015

Medical Completed: 3/30/2015 // CEAC status: In transit to Mumbai and shows READY as of 4/1/2015

Biometrics Completed: 5/4/2015 // Received call from Embassy 5/11/2015 asking if we want to transfer to Delhi.....huh? One week prior to interview? Ummm.... no thanks!

INTERVIEW!! 5/18/2015 @ 7:30 am ~ Mumbai Consulate  RESULT: APPROVED!!!

Visa in hand: 05/20/2015 (Yay!) ELIS Fee ($165) paid this day as well

POE: 05/29/2015 Newark 

SSN card received: 6/8/2015 (processed on 6/2/2015) // ELIS shows "Optimized" since 5/30/2015  // ELIS changed to "In Process" 07/14/2015. (E-file received 06/25/15)

GREEN CARD RECEIVED!! 7/30/2015

ROC

Sent:  3/22/2017 | $680 Check cashed: 4/3/2017

NOA1: 3/30/2017 (Rcvd 4/3/2017)

Biometrics Appt letter received: 4/22/2017 - Biometrics date:  5/3/2017 - Done. Hubby said they were super friendly in the Pittsburgh field office! 

Link to comment
Share on other sites

Well, we were put into AP on our K1. We were there for over 7 weeks.

I can explain it to you. But I can't understand it for you.

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Belarus
Timeline

Everybody is different. Everything seems to be going smoothly. According to your time line the NVC received your paperwork on the 17th. Today is the 21st.You need to relax a bit.

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Kenya
Timeline

We waited over five months for our NOA 2 so almost four is "really" good! :) Our NOA 2 was on 4-5-11...the NVC received our package on 4-12. They sent it on to the Embassy on 4-15, so the NVC had it for three days. They will send it on soon, no worries. It moves a lot faster now...thank goodness. Good luck with everything and God Bless. :D

Edited by Ben and Jill

Men are like stars ~ there are a million of them, but only ONE can make your dreams come true. I found my STAR...

event.png

~K E N Y A~

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Thanks Ben and Jill! The NVC moved very quickly for you! I know we just need to be patient (like we haven't perfected that at this stage of the game so far! LOL) It's just you tend to get a little "antsy" after waiting for the "longest stage - the NOA2 approval" along with everyone saying it moves much faster at this point ~ which I guess is all relative :P

We will sit idly by and .... wait and wait and wait :hehe:

Our CR1 Journey

Met - 1/14/2010 // Engaged - 3/6/2011

K1 filed - 6/8/11 // Interview @ Mumbai Consulate - 1/5/2012: Denied // USCIS final decision - 3/15/2013; administratively closed and free to file again without prejudice

Married in Delhi - 1/30/2014

Sent I-130: 4/7/2014 NOA 1: 4/10/2014

NOA 2: 11/13/2014 (after 217 days)

NVC Received: 11/26/2014 (13 days from USCIS to the NVC)  // Case # & IIN # received - 12/29/2014 (via phone to NVC) Also sent email to get case transferred to New Delhi

NVC Welcome Letter received: 12/30/2014

Submit DS-261: 12/30/2014 // Paid AOS Bill: 1/2/2015  // Received IV Bill & Paid: 1/13/2015 (CEAC shows PAID 1/15/15) // DS-260 submitted: 1/17/2015

AOS & IV packages sent via FedEx: 1/19/2015  // AOS/IV packages received: 1/21/2015 @ 9:58 am (Signed for by: G. Waters) Scan date: 1/21/2015

60-Day Email from NVC: 1/24/2015 2nd 60-Day Email from NVC: 1/26/2015 (OK...I get it, it's taking 60 days.... sigh)

Reply from NVC re: Transfer to New Delhi : 2/16/2015 (Told to contact New Delhi...49 days wasted for no help at all!)

CASE COMPLETE!!: 3/12/2015 (50 days) // Case Complete Email Received: 3/19/2015 (7 days from CC date)

Interview Date Received via phone inquiry to NVC: 3/24/2015 // Packet 4 (Interview letter/Instructions) received: 3/25/2015

Medical Completed: 3/30/2015 // CEAC status: In transit to Mumbai and shows READY as of 4/1/2015

Biometrics Completed: 5/4/2015 // Received call from Embassy 5/11/2015 asking if we want to transfer to Delhi.....huh? One week prior to interview? Ummm.... no thanks!

INTERVIEW!! 5/18/2015 @ 7:30 am ~ Mumbai Consulate  RESULT: APPROVED!!!

Visa in hand: 05/20/2015 (Yay!) ELIS Fee ($165) paid this day as well

POE: 05/29/2015 Newark 

SSN card received: 6/8/2015 (processed on 6/2/2015) // ELIS shows "Optimized" since 5/30/2015  // ELIS changed to "In Process" 07/14/2015. (E-file received 06/25/15)

GREEN CARD RECEIVED!! 7/30/2015

ROC

Sent:  3/22/2017 | $680 Check cashed: 4/3/2017

NOA1: 3/30/2017 (Rcvd 4/3/2017)

Biometrics Appt letter received: 4/22/2017 - Biometrics date:  5/3/2017 - Done. Hubby said they were super friendly in the Pittsburgh field office! 

Link to comment
Share on other sites

Filed: K-1 Visa Country: England
Timeline

I know we just need to be patient (like we haven't perfected that at this stage of the game so far! LOL)

well obviously you havent quite perfected it yet :lol:

if it is in there system then it will soon be on its way hopefully... can you get your case number now??

I-129F SENT............................................08/15/2011

NOA1 TEXT/EMAIL...................................08/22/2011

NOA2 TEXT/EMAIL. NO RFE.....................01/05/2012

NVC RECEIVED......................................01/21/2012

NVC LEFT...............................................01/24/2012

PACKET 3 RECEIVED..............................02/01/2012

PACKET 3 RETURNED.............................02/04/2012

MEDICAL................................................02/17/2012

DS-2001 MAILED.....................................02/23/2012

PACKET 4 RECEIVED..............................03/02/2012

INTERVIEW............................................03/14/2012 APPROVED

POE ATLANTA.........................................04/03/2012

AOS approved 3/29/13 after almost 10 months of waiting. No RFE's and no interview.

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Kenya
Timeline

Thanks Ben and Jill! The NVC moved very quickly for you! I know we just need to be patient (like we haven't perfected that at this stage of the game so far! LOL) It's just you tend to get a little "antsy" after waiting for the "longest stage - the NOA2 approval" along with everyone saying it moves much faster at this point ~ which I guess is all relative :P

We will sit idly by and .... wait and wait and wait :hehe:

Yes, the wait is really, really hard. I think back about the whole process and I feel the waiting for the petition approval is the worst part...it just feels like foreverrrrrr. Dan and Jenni made a very good point...if it's been logged into the system at the NVC, you should have your case number :)

Edited by Ben and Jill

Men are like stars ~ there are a million of them, but only ONE can make your dreams come true. I found my STAR...

event.png

~K E N Y A~

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

That's funny Dan and Jenni! :rofl: and do you know that I have called them twice this week checking on the status (yes I know - patience is a virtue!) because the automated system tells us nothing and not once did I even think to ask if a number had been assigned! :bonk: LOL

All this time I thought the case number didn't get assigned until it left NVC for the embassy! So your posting actually prompted me to make a 3rd call and lo and behold - yes we have a case number! Sometimes we can get tunnel vision with these processes! I feel a little better about that now so thank you! Also, just in case anyone else didn't know - the lady at the NVC said you don't receive any information from the automated system for K1s. Now I wonder why the other 2 people I talked to didn't mention that before? I even specifically asked them if that system would be updated with our case number info once it left the NVC and they both said "not always". Hmmmmm . . . Many lessons to be learned here on VJ! :wacko:

Our CR1 Journey

Met - 1/14/2010 // Engaged - 3/6/2011

K1 filed - 6/8/11 // Interview @ Mumbai Consulate - 1/5/2012: Denied // USCIS final decision - 3/15/2013; administratively closed and free to file again without prejudice

Married in Delhi - 1/30/2014

Sent I-130: 4/7/2014 NOA 1: 4/10/2014

NOA 2: 11/13/2014 (after 217 days)

NVC Received: 11/26/2014 (13 days from USCIS to the NVC)  // Case # & IIN # received - 12/29/2014 (via phone to NVC) Also sent email to get case transferred to New Delhi

NVC Welcome Letter received: 12/30/2014

Submit DS-261: 12/30/2014 // Paid AOS Bill: 1/2/2015  // Received IV Bill & Paid: 1/13/2015 (CEAC shows PAID 1/15/15) // DS-260 submitted: 1/17/2015

AOS & IV packages sent via FedEx: 1/19/2015  // AOS/IV packages received: 1/21/2015 @ 9:58 am (Signed for by: G. Waters) Scan date: 1/21/2015

60-Day Email from NVC: 1/24/2015 2nd 60-Day Email from NVC: 1/26/2015 (OK...I get it, it's taking 60 days.... sigh)

Reply from NVC re: Transfer to New Delhi : 2/16/2015 (Told to contact New Delhi...49 days wasted for no help at all!)

CASE COMPLETE!!: 3/12/2015 (50 days) // Case Complete Email Received: 3/19/2015 (7 days from CC date)

Interview Date Received via phone inquiry to NVC: 3/24/2015 // Packet 4 (Interview letter/Instructions) received: 3/25/2015

Medical Completed: 3/30/2015 // CEAC status: In transit to Mumbai and shows READY as of 4/1/2015

Biometrics Completed: 5/4/2015 // Received call from Embassy 5/11/2015 asking if we want to transfer to Delhi.....huh? One week prior to interview? Ummm.... no thanks!

INTERVIEW!! 5/18/2015 @ 7:30 am ~ Mumbai Consulate  RESULT: APPROVED!!!

Visa in hand: 05/20/2015 (Yay!) ELIS Fee ($165) paid this day as well

POE: 05/29/2015 Newark 

SSN card received: 6/8/2015 (processed on 6/2/2015) // ELIS shows "Optimized" since 5/30/2015  // ELIS changed to "In Process" 07/14/2015. (E-file received 06/25/15)

GREEN CARD RECEIVED!! 7/30/2015

ROC

Sent:  3/22/2017 | $680 Check cashed: 4/3/2017

NOA1: 3/30/2017 (Rcvd 4/3/2017)

Biometrics Appt letter received: 4/22/2017 - Biometrics date:  5/3/2017 - Done. Hubby said they were super friendly in the Pittsburgh field office! 

Link to comment
Share on other sites

Filed: K-1 Visa Country: Pakistan
Timeline

Call them, speak to a live person.. They can instantly tell you when your NOA 2 reached NVC and what the case # is. Their email automated system is running a week behind to notify petitioners.

I-129F Sent : 2011-07-06

I-129F NOA1 : 2011-07-08

I-129F NOA2 : 2011-09-29

NOA2 Approved: 2011-10-01

NOA2 Paper Recv: 2011-10-03

NVC Recv: 2011-10-17

NVC to Embassy Sent: 2011-10-19

Embassy Recv Packet: 2011-10-21

Packet 3.5 Recv'ed: 2011-11-03

Packet 3.5 Sent: 2011-11-05

Interview Date: 2011-12-19

K1 Issued 2012-01-13

POE 2012 -03-14

Marriage 2012-03-19

SSN Received 2012-04-09

Filing AOS 2012-04-11

Biometrics Completed 2012-05-17

EAD Card Received 2012-07-02

Green Card Interview 2012-08-02

Card in Hand 2012-08-14

*******************************************

DONE WITH K1!!!!!!!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Sucasa - yes I did that, as you can see from my last post LOL Wow, yours moved quickly! Lucky you! Thanks for the reply and best of luck to you! Inshallah all goes well! :thumbs:

Our CR1 Journey

Met - 1/14/2010 // Engaged - 3/6/2011

K1 filed - 6/8/11 // Interview @ Mumbai Consulate - 1/5/2012: Denied // USCIS final decision - 3/15/2013; administratively closed and free to file again without prejudice

Married in Delhi - 1/30/2014

Sent I-130: 4/7/2014 NOA 1: 4/10/2014

NOA 2: 11/13/2014 (after 217 days)

NVC Received: 11/26/2014 (13 days from USCIS to the NVC)  // Case # & IIN # received - 12/29/2014 (via phone to NVC) Also sent email to get case transferred to New Delhi

NVC Welcome Letter received: 12/30/2014

Submit DS-261: 12/30/2014 // Paid AOS Bill: 1/2/2015  // Received IV Bill & Paid: 1/13/2015 (CEAC shows PAID 1/15/15) // DS-260 submitted: 1/17/2015

AOS & IV packages sent via FedEx: 1/19/2015  // AOS/IV packages received: 1/21/2015 @ 9:58 am (Signed for by: G. Waters) Scan date: 1/21/2015

60-Day Email from NVC: 1/24/2015 2nd 60-Day Email from NVC: 1/26/2015 (OK...I get it, it's taking 60 days.... sigh)

Reply from NVC re: Transfer to New Delhi : 2/16/2015 (Told to contact New Delhi...49 days wasted for no help at all!)

CASE COMPLETE!!: 3/12/2015 (50 days) // Case Complete Email Received: 3/19/2015 (7 days from CC date)

Interview Date Received via phone inquiry to NVC: 3/24/2015 // Packet 4 (Interview letter/Instructions) received: 3/25/2015

Medical Completed: 3/30/2015 // CEAC status: In transit to Mumbai and shows READY as of 4/1/2015

Biometrics Completed: 5/4/2015 // Received call from Embassy 5/11/2015 asking if we want to transfer to Delhi.....huh? One week prior to interview? Ummm.... no thanks!

INTERVIEW!! 5/18/2015 @ 7:30 am ~ Mumbai Consulate  RESULT: APPROVED!!!

Visa in hand: 05/20/2015 (Yay!) ELIS Fee ($165) paid this day as well

POE: 05/29/2015 Newark 

SSN card received: 6/8/2015 (processed on 6/2/2015) // ELIS shows "Optimized" since 5/30/2015  // ELIS changed to "In Process" 07/14/2015. (E-file received 06/25/15)

GREEN CARD RECEIVED!! 7/30/2015

ROC

Sent:  3/22/2017 | $680 Check cashed: 4/3/2017

NOA1: 3/30/2017 (Rcvd 4/3/2017)

Biometrics Appt letter received: 4/22/2017 - Biometrics date:  5/3/2017 - Done. Hubby said they were super friendly in the Pittsburgh field office! 

Link to comment
Share on other sites

Filed: K-1 Visa Country: Pakistan
Timeline

Sucasa - yes I did that, as you can see from my last post LOL Wow, yours moved quickly! Lucky you! Thanks for the reply and best of luck to you! Inshallah all goes well! :thumbs:

Thanks,

Documents just arrived PK Embassy today. My fiance should be getting her papers from embassy by end of next week. Frankly I have been very happy w/ VSC and their response time to my questions

Do this.. send a scanned copy of your NOA2 to the following address:

NVCResearch@state.gov

provide Beneficiary Name / DOB

Your Name / DOB

Ask them to investigate where in NOA 2 approval in the system

Will get an answer to you.

I-129F Sent : 2011-07-06

I-129F NOA1 : 2011-07-08

I-129F NOA2 : 2011-09-29

NOA2 Approved: 2011-10-01

NOA2 Paper Recv: 2011-10-03

NVC Recv: 2011-10-17

NVC to Embassy Sent: 2011-10-19

Embassy Recv Packet: 2011-10-21

Packet 3.5 Recv'ed: 2011-11-03

Packet 3.5 Sent: 2011-11-05

Interview Date: 2011-12-19

K1 Issued 2012-01-13

POE 2012 -03-14

Marriage 2012-03-19

SSN Received 2012-04-09

Filing AOS 2012-04-11

Biometrics Completed 2012-05-17

EAD Card Received 2012-07-02

Green Card Interview 2012-08-02

Card in Hand 2012-08-14

*******************************************

DONE WITH K1!!!!!!!!!

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...