Guys, a few of us are almost there - waiting for interview dates.

I read almost all the reviews posted by those that had been to Chennai for interview in VJ. However somethings like - is it good to take the large marraige/ reception/ honeymoon albums ro is is good to take a few pictures from each in smaller size.... There may be several other things that are specific to Chennai or may be to all Consulates in India that we could share with our touches and inter-action.....

Thanks for sharing.

USA

01/08/13 - Approved and GC is order for production on 1/8/14

09/12/13 - Case transferred to CSC. NOA2 received on 09/18/13

08/30/13 - Biometrics Done - No walk ins allowed at this LSC (received on 8/16/13).

08/05/13 - NOA1 (received on 08/10/13)

08/01/13 - Mailed I-751 (received on 8/2/13 - check cashed on 8/5/13)

12/28/11 - Received SSN (applied on 12/20/11, as we didn't get based on DS-230 options)
11/28/11 - Received Green Card (Expires on 10/30/13) - Welcome Letter on 11/17/11
10/30/11 - POE - Houston, TX

Chennai Consulate (40 days)
10/28/11 - Received Visa papers and Passport at VFS
10/25/11 - Interview Cleared Successfully (Spouse was not allowed in)

NVC: (90 days from NOA2 to Consulate)
08/31/11 - Case Completed (Interview 10/25/11) - Received at Chennai on 09/19/11
07/22/11 - NVC Case Number

USCIS: (92 days)

6/21/11 - NOA2 (NOA1 on 3/25/11) - took a month to get to NVC
3/21/11 - I-130 sent to USCIS Lockbox, Chicago.

Link to comment
Share on other sites

  • Replies 519
  • Created
  • Last Reply

Top Posters In This Topic

Filed: Citizen (apr) Country: India
Timeline

Guys, a few of us are almost there - waiting for interview dates.

I read almost all the reviews posted by those that had been to Chennai for interview in VJ. However somethings like - is it good to take the large marraige/ reception/ honeymoon albums ro is is good to take a few pictures from each in smaller size.... There may be several other things that are specific to Chennai or may be to all Consulates in India that we could share with our touches and inter-action.....

Thanks for sharing.

We can not schedule a medical interview until we get the interview date/ letter - a copy of interview letter is required for medical.

USA

01/08/13 - Approved and GC is order for production on 1/8/14

09/12/13 - Case transferred to CSC. NOA2 received on 09/18/13

08/30/13 - Biometrics Done - No walk ins allowed at this LSC (received on 8/16/13).

08/05/13 - NOA1 (received on 08/10/13)

08/01/13 - Mailed I-751 (received on 8/2/13 - check cashed on 8/5/13)

12/28/11 - Received SSN (applied on 12/20/11, as we didn't get based on DS-230 options)
11/28/11 - Received Green Card (Expires on 10/30/13) - Welcome Letter on 11/17/11
10/30/11 - POE - Houston, TX

Chennai Consulate (40 days)
10/28/11 - Received Visa papers and Passport at VFS
10/25/11 - Interview Cleared Successfully (Spouse was not allowed in)

NVC: (90 days from NOA2 to Consulate)
08/31/11 - Case Completed (Interview 10/25/11) - Received at Chennai on 09/19/11
07/22/11 - NVC Case Number

USCIS: (92 days)

6/21/11 - NOA2 (NOA1 on 3/25/11) - took a month to get to NVC
3/21/11 - I-130 sent to USCIS Lockbox, Chicago.

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Subscribed to this thread....

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

This is what my wife and I have come up with to show bonafide evidence.

  1. Jewelry Receipts (both sides) for the wedding.
  2. Receipts for the party plot where the wedding was held.
  3. Pictures of the Wedding in a small flip book album with family members on both sides and specific important religious parts of the ceremony (Hasta Melap, Fire Rounds, Sindoor, Mangal Sutra etc.) THIS IS VERY VERY VERY IMPORTANT!
  4. Hand Written Cards and letters
  5. Phone Records
  6. Skype Screen Shots and call history
  7. Summary of Instant Messaging transcripts. Will be done on a month by month basis. (I would have over 500-600 pages if I printed it all).
  8. E-mail transcripts
  9. Photos showing after wedding relationship (Her parents marriage anniversary we had a small party etc)
  10. Wedding Invitation from USA that is addressed and invited and recognizes both of us as a couple.
  11. Facebook profiles showing relationship status as married to each other.

So far thats all we have come up with and it's quite a lot considering we had an arranged marriage.

Edited by Dave and Kinnari

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

This is what my wife and I have come up with to show bonafide evidence.

  1. Jewelry Receipts (both sides) for the wedding.
  2. Receipts for the party plot where the wedding was held.
  3. Pictures of the Wedding in a small flip book album with family members on both sides and specific important religious parts of the ceremony (Hasta Melap, Fire Rounds, Sindoor, Mangal Sutra etc.) THIS IS VERY VERY VERY IMPORTANT!
  4. Hand Written Cards and letters
  5. Phone Records
  6. Skype Screen Shots and call history
  7. Summary of Instant Messaging transcripts. Will be done on a month by month basis. (I would have over 500-600 pages if I printed it all).
  8. E-mail transcripts
  9. Photos showing after wedding relationship (Her parents marriage anniversary we had a small party etc)
  10. Wedding Invitation from USA that is addressed and invited and recognizes both of us as a couple.
  11. Facebook profiles showing relationship status as married to each other.

So far thats all we have come up with and it's quite a lot considering we had an arranged marriage.

Hi Dav

I have all that you mentions. But Mine is love marriage.

How did you print or get face book profile. Moreover i have honeymoon hotel receipt, boarding pass of same day flight for honeymoon, my birthday pic with her family.

Only things i was wounder about if they ask that you have love or arrange marriage, then when would be my wife ans. I have been know her since 8 years and she is from same city and street. I have been talking to her since i got to US, but i have my phone bill records for 9 months. We did not have plan to get married, but our families are finally agree so we got married.

Let say my wife will tell to CO that we got love marriage and i have been known him since 8 years, then what would be the proof for our relationship before marriage.

I have all proof after wedding. I just wrote couples emails and greetings cards ( but cards did not have date)before marriage.

So it kinds of confusion about one question that love or arrange marriage.

Advise are appropriated.

Thankx

Edited by hitu
Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Just tell the truth like I said in private messaging a while ago.

I took a screen shot of both of our profiles and printed them out.

You can also add to our list number 12.

12. Honeymoon Hotel and Room Service Receipts.

Edited by Dave and Kinnari

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Ok so my wife and I were kinda having a tussle over the actual medical appointment date.

She states that NVC will setup an appointment time for her (Specfic date and time). She is basing this on others that have done it in the past...

I read and am pretty sure once you get your official interview letter from DOS that you can request the medical on your own anytime before the visa interview

Which one is correct?

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline

Ok so my wife and I were kinda having a tussle over the actual medical appointment date.

She states that NVC will setup an appointment time for her (Specfic date and time). She is basing this on others that have done it in the past...

I read and am pretty sure once you get your official interview letter from DOS that you can request the medical on your own anytime before the visa interview

Which one is correct?

NVC doesn't schedule medical exams, that's the beneficiary's responsibility.

Dave, you are correct.

Edited by Ryan H

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

NVC doesn't schedule medical exams, that's the beneficiary's responsibility.

Dave, you are correct.

Thats what I thought.

Thanks for the clearing that up Ryan.

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

http://www.visajourney.com/forums/topic/256469-cr-1-interview-review/page__hl__mumbai+cr-1+interview

This is the link to my interview review @ Mumbai.

This is the link to my interview/evidence packet that I took with me.

http://www.visajourney.com/forums/topic/252797-my-interview-packet/page__p__3884717__hl__mumbai+cr-1+interview__fromsearch__1#entry3884717

Hope this is helpful! Good luck to all those waiting for their loved ones.

03/27/2009: Engaged in Ithaca, New York.
08/17/2009: Wedding in Calcutta, India.
09/29/2009: I-130 NOA1
01/25/2010: I-130 NOA2
03/23/2010: Case completed.
05/12/2010: CR-1 interview at Mumbai, India.
05/20/2010: US Entry, Chicago.
03/01/2012: ROC NOA1.
03/26/2012: Biometrics completed.
12/07/2012: 10 year card production ordered.

09/25/2013: N-400 NOA1

10/16/2013: Biometrics completed

12/03/2013: Interview

12/20/2013: Oath ceremony

event.png

Link to comment
Share on other sites

Filed: Citizen (apr) Country: India
Timeline

http://www.visajourn...+cr-1+interview

This is the link to my interview review @ Mumbai.

This is the link to my interview/evidence packet that I took with me.

http://www.visajourn..._1#entry3884717

Hope this is helpful! Good luck to all those waiting for their loved ones.

Sachinky, I have gone throuh the links provided - thanks.

Did Co nsulate ask for any of those hotel receipts....... What docuemnts did they ask for! We are getting ready for October interview (missed september by whisker) and appreciate your reply.

USA

01/08/13 - Approved and GC is order for production on 1/8/14

09/12/13 - Case transferred to CSC. NOA2 received on 09/18/13

08/30/13 - Biometrics Done - No walk ins allowed at this LSC (received on 8/16/13).

08/05/13 - NOA1 (received on 08/10/13)

08/01/13 - Mailed I-751 (received on 8/2/13 - check cashed on 8/5/13)

12/28/11 - Received SSN (applied on 12/20/11, as we didn't get based on DS-230 options)
11/28/11 - Received Green Card (Expires on 10/30/13) - Welcome Letter on 11/17/11
10/30/11 - POE - Houston, TX

Chennai Consulate (40 days)
10/28/11 - Received Visa papers and Passport at VFS
10/25/11 - Interview Cleared Successfully (Spouse was not allowed in)

NVC: (90 days from NOA2 to Consulate)
08/31/11 - Case Completed (Interview 10/25/11) - Received at Chennai on 09/19/11
07/22/11 - NVC Case Number

USCIS: (92 days)

6/21/11 - NOA2 (NOA1 on 3/25/11) - took a month to get to NVC
3/21/11 - I-130 sent to USCIS Lockbox, Chicago.

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Nothing. I was not asked to provide a single scrap of evidence despite the fact that I carried nearly 10lbs of paperwork.

Edited by sachinky

03/27/2009: Engaged in Ithaca, New York.
08/17/2009: Wedding in Calcutta, India.
09/29/2009: I-130 NOA1
01/25/2010: I-130 NOA2
03/23/2010: Case completed.
05/12/2010: CR-1 interview at Mumbai, India.
05/20/2010: US Entry, Chicago.
03/01/2012: ROC NOA1.
03/26/2012: Biometrics completed.
12/07/2012: 10 year card production ordered.

09/25/2013: N-400 NOA1

10/16/2013: Biometrics completed

12/03/2013: Interview

12/20/2013: Oath ceremony

event.png

Link to comment
Share on other sites

Filed: Citizen (apr) Country: India
Timeline

Nothing. I was not asked to provide a single scrap of evidence despite the fact that I carried nearly 10lbs of paperwork.

Somehow I thought so. I saw that a lot of questions were asked i) where there were divorces involved or ii) there is age gap or iii) where there was bare minimum required evidence sent in I-130/ DS-230 or iv) CO smelled/ felt what was submitted not sufficient (specially on income front).

Thanks a lot for your quick response.

I am not sure whether the big albums are worth taking or should she take a couple of pictures from weddig, reception & honeymoon trip.... Of course the Itineraries, telephone call lists, 401K beneficiary nominations, joint lease papers, along with I-130, DS-230, I864 copies.... What do you think!

Edited by NavyK

USA

01/08/13 - Approved and GC is order for production on 1/8/14

09/12/13 - Case transferred to CSC. NOA2 received on 09/18/13

08/30/13 - Biometrics Done - No walk ins allowed at this LSC (received on 8/16/13).

08/05/13 - NOA1 (received on 08/10/13)

08/01/13 - Mailed I-751 (received on 8/2/13 - check cashed on 8/5/13)

12/28/11 - Received SSN (applied on 12/20/11, as we didn't get based on DS-230 options)
11/28/11 - Received Green Card (Expires on 10/30/13) - Welcome Letter on 11/17/11
10/30/11 - POE - Houston, TX

Chennai Consulate (40 days)
10/28/11 - Received Visa papers and Passport at VFS
10/25/11 - Interview Cleared Successfully (Spouse was not allowed in)

NVC: (90 days from NOA2 to Consulate)
08/31/11 - Case Completed (Interview 10/25/11) - Received at Chennai on 09/19/11
07/22/11 - NVC Case Number

USCIS: (92 days)

6/21/11 - NOA2 (NOA1 on 3/25/11) - took a month to get to NVC
3/21/11 - I-130 sent to USCIS Lockbox, Chicago.

Link to comment
Share on other sites

Filed: Timeline

Hi,

My wife went to VFS and they did not accept photos. Howver, my question they accepted phone calls and skype history, yet they did not accept the itenary when I visited to India in summer. VFS did not even take the hotel reciept nor the join financial statements. Any ideas?

Also our situation is that we had registered marriage and a big ring ceremony. What if the CO asks for vidhi photos? What should we tell them? Any ideas would be much appreciated.

Thanks.

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Somehow I thought so. I saw that a lot of questions were asked i) where there were divorces involved or ii) there is age gap or iii) where there was bare minimum required evidence sent in I-130/ DS-230 or iv) CO smelled/ felt what was submitted not sufficient (specially on income front).

Thanks a lot for your quick response.

I am not sure whether the big albums are worth taking or should she take a couple of pictures from weddig, reception & honeymoon trip.... Of course the Itineraries, telephone call lists, 401K beneficiary nominations, joint lease papers, along with I-130, DS-230, I864 copies.... What do you think!

I took two albums. They weren't terribly big or heavy. One was the wedding album and had the professional pictures. I chose mostly the ones that had us posing with other people or family members. The other one was casual snap-shots from college with friends.

Frankly, I'd err on the side of caution. I took every damn thing I could think of and probably went over-board but even though nothing was asked for, the big bag of evidence gave me the confidence I needed not to collapse to my knees that morning. Also, I sat in the consulate for three hours and watched a TON of people getting grilled. That was NOT fun.

03/27/2009: Engaged in Ithaca, New York.
08/17/2009: Wedding in Calcutta, India.
09/29/2009: I-130 NOA1
01/25/2010: I-130 NOA2
03/23/2010: Case completed.
05/12/2010: CR-1 interview at Mumbai, India.
05/20/2010: US Entry, Chicago.
03/01/2012: ROC NOA1.
03/26/2012: Biometrics completed.
12/07/2012: 10 year card production ordered.

09/25/2013: N-400 NOA1

10/16/2013: Biometrics completed

12/03/2013: Interview

12/20/2013: Oath ceremony

event.png

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...