Anytime! Hopefully they will assist us in getting an interview date! I am going to wait for a response from them monday and then go from there! I'll let you guys know what they say!

I received a response from the Bogota Embassy this morning.. Here are the fist two paragraphs:

Thank you for your inquiry. We have not yet received this case from the National Visa Center. Often, the applicant is notified of the petition approval before we are but unfortunately, we cannot act upon a case until we have received it from the NVC. We will contact you with instructions as soon as the case arrives at the embassy.

Bogotá's Immigrant Visa (IV) Unit schedules appointments as they become available. Generally, appointments are scheduled within two to three months of receiving a case from the NVC. We use an automatic appointment system and unfortunately, we are unable to accommodate requests outside of this system.

Pretty much what I expected - if they ran around and met everyones whim that is all they would do.. but I had to try :) OK, I'm switching modes for real now.. Push this back and not watch things closely for a few weeks.

I don't believe it.. Prove it to me and I still won't believe it. -Ford Prefect

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Kenya
Timeline

I received a response from the Bogota Embassy this morning.. Here are the fist two paragraphs:

Thank you for your inquiry. We have not yet received this case from the National Visa Center. Often, the applicant is notified of the petition approval before we are but unfortunately, we cannot act upon a case until we have received it from the NVC. We will contact you with instructions as soon as the case arrives at the embassy.

Bogotá's Immigrant Visa (IV) Unit schedules appointments as they become available. Generally, appointments are scheduled within two to three months of receiving a case from the NVC. We use an automatic appointment system and unfortunately, we are unable to accommodate requests outside of this system.

Pretty much what I expected - if they ran around and met everyones whim that is all they would do.. but I had to try :) OK, I'm switching modes for real now.. Push this back and not watch things closely for a few weeks.

I received a similar response this morning: (Email Response from the Embassy.)

-----

Thank you for your email.

Please be informed that her file has not yet been received, either electronically or physically. Unfortunately, this means that we are unable to commence processing the petition. You may want to

consider contacting the National Visa Center, NVC, for information on the possible processing period of this case, depending on its priority date.

If I can be of any further assistance, please do not hesitate to contact me.

Sincerely,

Customer Representative 3

Immigrant Visa Unit

USCIS

4-18-2011 - I-130 Sent

4-20-2011 - I-130 NOA1

7-12-2011 - I-130 Approved, NOA2

NVC

8-01-2011 - NVC Received File

9-06-2011 - Case Completed at NVC

12-05-2011 - Medical - Approved

NAIROBI EMBASSY

12-19-2011 - Interview Date - Approved

12-27-2011 - Visa Received

USA

12-28-2011 - POE - Washington Dulles Intl. Airport...

02-06-2012 - Received Welcome Letter & Permanent Resident "Green Card"

02-07-2012 - Applied for Social Security Card

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline

I received an email back from our embassy today saying that they had our info and at this time they do not have any more openings for October. They said that occassionally they do have cancelations and reschedule requests so if a date becomes available they will notify us. Otherwise we will have our interview 1st week of November. Hubby is very sad but I am going to see if work will allow me to have an extended vacation so I can still see Georgia in October!

My birthday is this upcoming weekend so I am going to relax, celebrate and ring in October on a positive note! The end of this road has finally come and another few weeks wont hurt anything except my chances of hiking in the caves in Georgia :-( Please snow hold off as long as possible for me!

02/06/2011 ~ MARRIED IN REPUBLIC OF GEORGIA

03/31/2011 ~ FILED I-130 & G325A (SENT TO CHICAGO LOCKBOX VIA UPS)

04/09/2011 ~ RECEIVED NOA1 IN MAIL :-)

07/11/2011 ~ APPROVED WOOOOOOOO HOOOOOOOO!!!!!

07/29/2011 ~ NVC RECEIVED CASE

08/22/2011 ~ RECEIVED NVC CASE# AND IIN

08/24/2011 ~ EMAILED DS-3032 SENT VIA HUBBYS EMAIL ACCOUNT

08/25/2011 ~ RECEIVED 3 EMAILS FROM NVC

08/25/2011 ~ PAID AOS FEE $88.00

08/26/2011 ~ AOS FEE SHOWS "PAID" - RECEIPT PRINTED AND READY TO MAIL

08/30/2011 ~ AOS PACKAGE SENT FEDEX OVERNIGHT

09/01/2011 ~ IV BILL INVOICED AND PAID

09/06/2011 ~ AOS PACKAGE APPROVED

09/09/2011 ~ IV PACKAGE SENT TO NVC VIA FEDEX OVERNIGHT

09/15/2011 ~ CASE CLOSED

INTERVIEW DATE ~ 11/30/2011 - APPROVED

12/04/2011 ~ ENTERED USA THROUGH JFK AIRPORT

STILL WAITING FOR GREEN CARD......

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

This is what they wrote me:

"Thank you for your inquiry. We have not yet received your husband’s case from the National Visa Center. Often, the applicant is notified of the petition approval before we are but unfortunately, we cannot act upon a case until we have received it from the NVC. We will contact your husband with instructions as soon as the case arrives at the embassy.

Bogotá's Immigrant Visa (IV) Unit schedules appointments as they become available. Generally, appointments are scheduled within two to three months of receiving a case from the NVC. You are correct in that October appointments are fully booked and it will be difficult to fit your husband in, particularly since we do not yet have his case. Regretfully, October does look unlikely in his case. We do understand that you are anxious to move forward in this process and we will act on the case as soon as it arrives.

If you both wish to get a head start on the process, download the readiness forms, see if his appointment has been scheduled, or learn more about the immigrant visa process, you may refer to our website at: http://bogota.usembassy.gov/iv-appointments.html.

You will find an instruction packet on the website with detailed information on how to prepare for the interview. However, please do not proceed with sending in the readiness forms until you have heard from us as we will not be able to do anything with them if the case is not yet here."

IR-1

Married: 12/29/2008

USCIS CSC

I-130 Sent : 11/05/2010

I-130 NOA1 :11/19/2010

I-130 NOA2 :05/20/2011

182 days - No RFE's

NVC

Received : 06/08/2011

DS-3032 / I-864 Bill : 06/08/2011

Receive I-864 Package : 06/10/2011

Completed DS-3032 : 06/11/2011 (NVC received 06/16/2011)

Pay I-864 Bill : 06/23/2011

Pay IV Bill : 07/22/2011

Return Completed I-864 & IV : 07/25/2011

NVC received: 07/27/2011

NVC RFE: 08/09/11

NVC RFE sent/NVC Received: 08/10/2011--08/12/2011

False RFE for IV: 08/10/11

False RFE for previous RFE: 08/11/11 & 08/14/2011

NVC Reviewed IV: 08/11/2011

SIF and Case Complete : 08/19/2011

Interview Date Set: 09/30/2011

EMBASSY

Medical: 11/11/2011

Interview: 11/16/2011 *APPROVED*

Visa Received: 11/21/11 (arrived on 3rd business day)

POE: 12/02/2011

Welcome Letter & SSN Arrived: 12/12/11

2nd Welcome Letter & 10-year GC Arrived: 12/17/11

-Happily Ever After-

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline

The AVR system updated to say that our case was closed on 09/15/2011. It does at least feel good to hear that. See y'all in a few weeks with an interview date!

Good luck to all of you finishing up the NVC process. Get those documents in so you can be scheduled for November too!

02/06/2011 ~ MARRIED IN REPUBLIC OF GEORGIA

03/31/2011 ~ FILED I-130 & G325A (SENT TO CHICAGO LOCKBOX VIA UPS)

04/09/2011 ~ RECEIVED NOA1 IN MAIL :-)

07/11/2011 ~ APPROVED WOOOOOOOO HOOOOOOOO!!!!!

07/29/2011 ~ NVC RECEIVED CASE

08/22/2011 ~ RECEIVED NVC CASE# AND IIN

08/24/2011 ~ EMAILED DS-3032 SENT VIA HUBBYS EMAIL ACCOUNT

08/25/2011 ~ RECEIVED 3 EMAILS FROM NVC

08/25/2011 ~ PAID AOS FEE $88.00

08/26/2011 ~ AOS FEE SHOWS "PAID" - RECEIPT PRINTED AND READY TO MAIL

08/30/2011 ~ AOS PACKAGE SENT FEDEX OVERNIGHT

09/01/2011 ~ IV BILL INVOICED AND PAID

09/06/2011 ~ AOS PACKAGE APPROVED

09/09/2011 ~ IV PACKAGE SENT TO NVC VIA FEDEX OVERNIGHT

09/15/2011 ~ CASE CLOSED

INTERVIEW DATE ~ 11/30/2011 - APPROVED

12/04/2011 ~ ENTERED USA THROUGH JFK AIRPORT

STILL WAITING FOR GREEN CARD......

Link to comment
Share on other sites

AVR says our case was closed. what's the difference of case closed to case complete?? :bonk:

Also can i beg to nvc or to whoever will assign our interview to have it on Oct? I just wanna spend our first anniv together :P

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline

This is what they wrote me:

... we will not be able to do anything with them if the case is not yet here."

Yeahhh... annnnd... I am begining to piece together NVC does not like to mail packets until closer to the assigned interview date... so wierd. so frustrating. I hope you get your date soon.

IR-1/CR-1 Spouse CA Svc Ctr 2011 (82 days) Apr07: NOA1. Jun27: NOA2 text.
Delivery from USCIS to NVC (24 days) Jul21: CSC mailed it to NVC

NVC (43 days)
Jul25: "in the NVC bldg"---->Jul26: NVC Case#,IIN# (1 day in-house, 29 days since NOA2)

AOS i-864.....Jul28: bill rcv'd (2 days)& paid ---->Aug01: "paid"/mailed (4 days). Aug3: AOS in the bldg
Aug 11: phone rep "AOS RFE: 23/24a: no blanks" (pdf won't print n/a"). Fedex'd new copy (arrived Aug 12)
Aug 22: AOS approved

IV ds-230:
Jul26: send DS-3032 ----> Jul29: DS-3032 accepted (3 days)
Aug01: bill rcv'd (2 days)& paid ---->Aug02: "paid"/mailed (1 day)
Aug04:ds-230 delivered ---> Aug 12: "under review"
Aug 15: phone rep "RFE:ds-230 #30." (16th bdate left as "----") Fedex'd new copy (arrived Aug 16)
Aug 30: phone rep: "no military record." me: "it's there!" rep: "15 biz days starting today"
Sep 06: phone rep: "needs review. 15 MORE biz days" me: "no way" Supervisor asks Mgr "open file & verify it's complete since 8/16." 6 hours later: CASE CLOSED!

Consulate
Sep 13: INTERVIEW scheduled, email letter arrived
Sep 15: MEDICAL in Stockholm
Sep 23: Packet Left NVC -> Embassy
Oct 31: INTERVIEW 4-minutes and DONE. APPROVED. Visa is "in the mail"

Nov 27: arrival in USA

DIVORCE: final May 2015 - never whould have married without dating in-person for at least a year.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline

Yes I will, sounds like a good idea! I dont really mind an october date, I just wanna know WHEN so that I can count the days down =) I have my husband with me in Sweden and I am SO happy about that. I know how hard this process have been, and I cannot imagine how hard its been for all the couple doing it apart. Visajourney have been so hepfull for us

Emelie: what date did you end up with?

IR-1/CR-1 Spouse CA Svc Ctr 2011 (82 days) Apr07: NOA1. Jun27: NOA2 text.
Delivery from USCIS to NVC (24 days) Jul21: CSC mailed it to NVC

NVC (43 days)
Jul25: "in the NVC bldg"---->Jul26: NVC Case#,IIN# (1 day in-house, 29 days since NOA2)

AOS i-864.....Jul28: bill rcv'd (2 days)& paid ---->Aug01: "paid"/mailed (4 days). Aug3: AOS in the bldg
Aug 11: phone rep "AOS RFE: 23/24a: no blanks" (pdf won't print n/a"). Fedex'd new copy (arrived Aug 12)
Aug 22: AOS approved

IV ds-230:
Jul26: send DS-3032 ----> Jul29: DS-3032 accepted (3 days)
Aug01: bill rcv'd (2 days)& paid ---->Aug02: "paid"/mailed (1 day)
Aug04:ds-230 delivered ---> Aug 12: "under review"
Aug 15: phone rep "RFE:ds-230 #30." (16th bdate left as "----") Fedex'd new copy (arrived Aug 16)
Aug 30: phone rep: "no military record." me: "it's there!" rep: "15 biz days starting today"
Sep 06: phone rep: "needs review. 15 MORE biz days" me: "no way" Supervisor asks Mgr "open file & verify it's complete since 8/16." 6 hours later: CASE CLOSED!

Consulate
Sep 13: INTERVIEW scheduled, email letter arrived
Sep 15: MEDICAL in Stockholm
Sep 23: Packet Left NVC -> Embassy
Oct 31: INTERVIEW 4-minutes and DONE. APPROVED. Visa is "in the mail"

Nov 27: arrival in USA

DIVORCE: final May 2015 - never whould have married without dating in-person for at least a year.

Link to comment
Share on other sites

AVR says our case was closed. what's the difference of case closed to case complete?? :bonk:

Also can i beg to nvc or to whoever will assign our interview to have it on Oct? I just wanna spend our first anniv together :P

You can request for an early appointment, but you need a really really good reason:

For early appointment requests and visa scheduling issues: IVMNLAppointments@state.gov

Please note, however, that early appointment requests may only be approved on a case to case basis (i.e., aging out cases, or in cases involving personal or medical emergencies), and only if visa interview slots are available.

TIMELINE

12.31.10 - Married

04.27.11 - I-130 Sent

04.29.11 - NOA1

07.23.11 - NOA2 (85 Days)

09.02.11 - Received NVC Case # and IIN

09.03.11 - DS-3032 Email Sent

09.03.11 - Received and Paid I-864 Bill

09.08.11 - DS-3032 Accepted

09.08.11 - Received and Paid IV Bill

09.12.11 - Sent IV Package

09.16.11 - Sent AOS Package

09.23.11 - Case Complete (21 Days)

09.30.11 - Assigned Interview Date

10.04.11 - Medical

11.10.11 - Interview

11.??.11 - Visa in Hand

01.17.12 - POE Guam

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jordan
Timeline

hi all..

my case was completed on Sep 7th 2011.. and stil i didnt recieve email from NVC.... i called them and they said that Sep is full and OCT 2... and that i should call them on the 2nd week of Oct to know if my interview on Nov or no.. I hope it will be on Nov.. :( ... i mean r they honest or jusy saying that...

and what the different between case completed or case closed.. i would like to know.. thx

USCIS Journey

Jun 27, 2010 Married

Jan 21, 2011 I-130 Sent

Jan 24, 2011 USCIS NOA1

May 24, 2011 I-130 RFE

Jun 08, 2011 I-130 RFE Sent

Jun 16, 2011 I-130 Approved

NVC Journey

Jul 16, 2011 NVC Received

Jul 17, 2011 NVC case number assigned & invoice number given

Jul 20, 2011 DS-3032 sent

Jul 30, 2011 IV Paid

Aug 02, 2011 IV Shows paid

Aug 05, 2011 AOS paid

Aug 08, 2011 AOS Shows paid

Aug 08, 2011 IV Package sent

Aug 23, 2011 Checklist letter for IV missing papers and AOS

Aug 23, 2011 RFE sent

Aug 24, 2011 AOS Package sent

Sep 07, 2011 Case complete

Oct 07, 2011 NVC send us an email for appointment letter

Oct 07, 2011 Case sent to the embassy

U.S. Embassy

Oct 12, 2011 Embassy recieved

Oct 12, 2011 Medical- DONE!!!!

Oct 20, 2011 Interview (Approved) :D YAAAAAAAAAAY

Oct 24, 2011 visa received

Dec 02, 2011 USA entry :D NEW LIFE

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Belgium
Timeline

I spoke with NVC yesterday and our case is closed and they "tried" to schedule our interview. They said they were told there werent any days available in October. This is a line of ####### because the embassy told me there is plenty of availability. NVC said "Well we only schedule interviews at certain times and will not try to reschedule until 1st or 2nd week of October". She told me to email the embassy our info and inform them that our case is complete and waiting for interview scheduling and to request an October date. She said the embassy will then call and request our package if there are appointments still available! Im gonna give it a try!

On a good note our case flew through NVC so I do feel blessed to have made it this far already! Thanks to everyone who has helped me along!

I got my case closed Sept 21!

Called NVC couple times last week, they also said they TRIED to schedule, and said all I could do was wait! The case is not even in the Embassy by this time, so as a matter of fact, what CAN I do?

They never even told me that we could contact the embassy ourselves?

I am sooo lost on what to do right now?

hi all..

my case was completed on Sep 7th 2011.. and stil i didnt recieve email from NVC.... i called them and they said that Sep is full and OCT 2... and that i should call them on the 2nd week of Oct to know if my interview on Nov or no.. I hope it will be on Nov.. :( ... i mean r they honest or jusy saying that...

and what the different between case completed or case closed.. i would like to know.. thx

Mine was complete on Sept 21st. And still no news. Also said 'call back second week of Oct. But they sure cant tell me when I would get an interview. From what I read on here, so many ppl get so many diffrent info on this by so many diffrent operators! This is frustrating, I'm lost on what to do really!

07-29-2009 Arrival in the US
08-05-2009 Senior in highschool - meet Bradley
06-23-2010 Leave US
02-15-2011 Back in US
03-11-2011 My weddingday
03-22-2011 Leave US

USCIS
04-06-2011 Send I 130 Petition
04-08-2011 Delivery at Chicago Lockbox
04-18-2011 Email/Text NOA1 Receipt
04-19-2011 Touched
04-28-2011 Hardcopy NOA1 in the mail
06-27-2011 N0A2! Approval! Yeey! No RFE's!
07-01-2011 Hardcopy NOA2
Total USCIS : 70 days

NVC
08-02-2011 NVC case number
08-04-2011 DS 3032 + IIN + Received I864 Bill + Paid I864 Bill
08-05-2011 Put in DS 3032 File
08-16-2011 Paid IV Bill
08-31-2011 Send in I864 Packet + IV Packet
09-03-2011 NVC Received Packages
09-09-2011 Operator assistance : I864 Approval, one more document missing for DS230 (=RFE)
09-12-2011 Send in RFE
09-21-2011 Approval NVC!!

The Homecoming...
10-06-2011 Medical Exam: Approved!
10-18-2011 Interview at Brussels US Embassy
10-27-2011 Back at Embassy to submit another document
10-27-2011 APPROVAL
01-11-2011 POE
183 days from NOA1 and interview ...
10-31-2011 Hubby leaves with Army
12-15-2011 Reunited, hubby is home: At last :)

*Happy ever after*

Link to comment
Share on other sites

I got my case closed Sept 21!

Called NVC couple times last week, they also said they TRIED to schedule, and said all I could do was wait! The case is not even in the Embassy by this time, so as a matter of fact, what CAN I do?

They never even told me that we could contact the embassy ourselves?

I am sooo lost on what to do right now?

Mine was complete on Sept 21st. And still no news. Also said 'call back second week of Oct. But they sure cant tell me when I would get an interview. From what I read on here, so many ppl get so many diffrent info on this by so many diffrent operators! This is frustrating, I'm lost on what to do really!

Unfortunately all you can really do in this situation is wait for the NVC to contact you.

Basically the Embassy will send available interview dates to the NVC, the NVC will then assign different applicants to different dates. If the NVC have filled all the dates given to them by the Embassy their hands are tied, there is nothing you can do.

You may hear back from them in a week or the second week of October or whenever, either way you will hear from them eventually.

WHEN you do hear from the NVC with an interview date you can then email the Embassy directly to reschedule the interview, if you have a good reason. I hope this helps and good luck on the rest of your journey.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jordan
Timeline

I got my case closed Sept 21!

Called NVC couple times last week, they also said they TRIED to schedule, and said all I could do was wait! The case is not even in the Embassy by this time, so as a matter of fact, what CAN I do?

They never even told me that we could contact the embassy ourselves?

I am sooo lost on what to do right now?

Mine was complete on Sept 21st. And still no news. Also said 'call back second week of Oct. But they sure cant tell me when I would get an interview. From what I read on here, so many ppl get so many diffrent info on this by so many diffrent operators! This is frustrating, I'm lost on what to do really!

hey... did u get SIF,, because till now ,, i can open the portal pay :bonk:

USCIS Journey

Jun 27, 2010 Married

Jan 21, 2011 I-130 Sent

Jan 24, 2011 USCIS NOA1

May 24, 2011 I-130 RFE

Jun 08, 2011 I-130 RFE Sent

Jun 16, 2011 I-130 Approved

NVC Journey

Jul 16, 2011 NVC Received

Jul 17, 2011 NVC case number assigned & invoice number given

Jul 20, 2011 DS-3032 sent

Jul 30, 2011 IV Paid

Aug 02, 2011 IV Shows paid

Aug 05, 2011 AOS paid

Aug 08, 2011 AOS Shows paid

Aug 08, 2011 IV Package sent

Aug 23, 2011 Checklist letter for IV missing papers and AOS

Aug 23, 2011 RFE sent

Aug 24, 2011 AOS Package sent

Sep 07, 2011 Case complete

Oct 07, 2011 NVC send us an email for appointment letter

Oct 07, 2011 Case sent to the embassy

U.S. Embassy

Oct 12, 2011 Embassy recieved

Oct 12, 2011 Medical- DONE!!!!

Oct 20, 2011 Interview (Approved) :D YAAAAAAAAAAY

Oct 24, 2011 visa received

Dec 02, 2011 USA entry :D NEW LIFE

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...