Jump to content
Navyk

CSC - NOA2 to NVC Delay

 Share

886 posts in this topic

Recommended Posts

LOL....

Second time? Care to explain what happened the first time?

We went through the K1 visa process. Got the visa...now husband came over and his mom got really sick. We had a big wedding planned and whatnot. So because his mom was ill and we didn't want to have a justice of the peace wedding he decided to go back home and take care of things. Soooo he came back last October and we had our wedding then and had to start this lovely process all over lol. What can I say we are glutton for punishment! Egits is what we are.

10-16-2010 Married

03-17-2011 I-130 sent

03-19-2011 I-130 received

03-23-2011 NOA1

03-25-2011 Touch

06-16-2011 NOA2

07-18-2011 NVC Received

07-19-2011 Emailed DS 3032

07-29-2011 Emailed DS 3032 AGAIN-still no response

08-03-2011 AOS Bill Generated

08-03-2011 AOS Bill Paid

08-03-2011 Emailed DS 3032 Yet Again!!!

08-05-2011 Mailed AOS packet

08-08-2011 AOS packet delivered

08-08-2011 DS 3232 accepted

08-09-2011 IV Bill Generated/Paid

08-10-2011 IV marked PAID

08-10-2011 IV packet Mailed

08-11-2011 IV packet delivered

08-16-2011 AOS package processed

08-22-2011 IV packet processed

08-22-2011 SIF/Case Closed

08-25-2011 Interview date received

10-13-2011 Interview-APPROVED

l198oyeua.png

d1emrulw6.png

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

We went through the K1 visa process. Got the visa...now husband came over and his mom got really sick. We had a big wedding planned and whatnot. So because his mom was ill and we didn't want to have a justice of the peace wedding he decided to go back home and take care of things. Soooo he came back last October and we had our wedding then and had to start this lovely process all over lol. What can I say we are glutton for punishment! Egits is what we are.

Oh man that does suck!

Sometimes things are meant to be though.

Karma is a big thing I believe in and it is engraved into my culture (hinduism). Doing what he did and sacrificing what you have done will always pay off in the end. Positive thoughts! :)

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

That was kinda my way of thinking god for bid something really really bad happened and he didn't go home he would never forgive himself and he would never forgive me for asking him to stay so that was really the only choice we had. I do think that because of having to go through all of this for so long we know we belong together. Why on earth would you put yourself through this for any other reason?? Thankfully he's a cool cucumber and I'm the only one that wants to freak out so he keeps me grounded and just says don't worry it can't be too much longer lol. I lose sleep when I finally go to bed and I know he's already snoring in la la land lol.

I called early this morning and the supervisor said she was going to send it to a manager for review because she didn't know why I haven't received anything. How long do you think I should wait to call back. I really want to call back straight away in the morning but I don't know if I should or not lol. I'm probably black listed now!

10-16-2010 Married

03-17-2011 I-130 sent

03-19-2011 I-130 received

03-23-2011 NOA1

03-25-2011 Touch

06-16-2011 NOA2

07-18-2011 NVC Received

07-19-2011 Emailed DS 3032

07-29-2011 Emailed DS 3032 AGAIN-still no response

08-03-2011 AOS Bill Generated

08-03-2011 AOS Bill Paid

08-03-2011 Emailed DS 3032 Yet Again!!!

08-05-2011 Mailed AOS packet

08-08-2011 AOS packet delivered

08-08-2011 DS 3232 accepted

08-09-2011 IV Bill Generated/Paid

08-10-2011 IV marked PAID

08-10-2011 IV packet Mailed

08-11-2011 IV packet delivered

08-16-2011 AOS package processed

08-22-2011 IV packet processed

08-22-2011 SIF/Case Closed

08-25-2011 Interview date received

10-13-2011 Interview-APPROVED

l198oyeua.png

d1emrulw6.png

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

That was kinda my way of thinking god for bid something really really bad happened and he didn't go home he would never forgive himself and he would never forgive me for asking him to stay so that was really the only choice we had. I do think that because of having to go through all of this for so long we know we belong together. Why on earth would you put yourself through this for any other reason?? Thankfully he's a cool cucumber and I'm the only one that wants to freak out so he keeps me grounded and just says don't worry it can't be too much longer lol. I lose sleep when I finally go to bed and I know he's already snoring in la la land lol.

I called early this morning and the supervisor said she was going to send it to a manager for review because she didn't know why I haven't received anything. How long do you think I should wait to call back. I really want to call back straight away in the morning but I don't know if I should or not lol. I'm probably black listed now!

I'd give it a day if it were me. Call back first thing Wed. AM.

CSC has really mucked things up for a lot of us by holding back on our cases (at least the conclusion we were able to draw from the various operators answers).

I really hope I get it this week. I still see a late October interview date a possibility with an NVC complete date near the tail end of August. 31 day month FOR THE WIN!

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

I said to the gal who I spoke to this morning the only way I'm going to get an October interview is if these bills go out this week and get paid. From looking at timelines it seems like it takes anywhere from 1-3 weeks for them to close the case so it's gonna be a hard push really to get the case closed if they are taking 5 days to process payments. I'm in customer service so I take calls ALL day and I go out of my way to be as nice as possible even though my head is about to pop off when I'm talking to them. Blahhhhh just get with the program already lol. It took a little over a month for me to get my case number and IIN so you've GOT to be getting yours soon. We shouldn't complain really the last I looked there will still 25 people in the March queue that haven't received their NOA2 so I guess we just need to keep that in mind. At least we aren't still waiting for that :)

10-16-2010 Married

03-17-2011 I-130 sent

03-19-2011 I-130 received

03-23-2011 NOA1

03-25-2011 Touch

06-16-2011 NOA2

07-18-2011 NVC Received

07-19-2011 Emailed DS 3032

07-29-2011 Emailed DS 3032 AGAIN-still no response

08-03-2011 AOS Bill Generated

08-03-2011 AOS Bill Paid

08-03-2011 Emailed DS 3032 Yet Again!!!

08-05-2011 Mailed AOS packet

08-08-2011 AOS packet delivered

08-08-2011 DS 3232 accepted

08-09-2011 IV Bill Generated/Paid

08-10-2011 IV marked PAID

08-10-2011 IV packet Mailed

08-11-2011 IV packet delivered

08-16-2011 AOS package processed

08-22-2011 IV packet processed

08-22-2011 SIF/Case Closed

08-25-2011 Interview date received

10-13-2011 Interview-APPROVED

l198oyeua.png

d1emrulw6.png

Link to comment
Share on other sites

Filed: Citizen (apr) Country: India
Timeline

I'd give it a day if it were me. Call back first thing Wed. AM.

CSC has really mucked things up for a lot of us by holding back on our cases (at least the conclusion we were able to draw from the various operators answers).

I really hope I get it this week. I still see a late October interview date a possibility with an NVC complete date near the tail end of August. 31 day month FOR THE WIN!

If you are ready with all your documents, you can definitely make it by August end. And I am sure you are all ready. Hope you get your case number soon.

USA

01/08/13 - Approved and GC is order for production on 1/8/14

09/12/13 - Case transferred to CSC. NOA2 received on 09/18/13

08/30/13 - Biometrics Done - No walk ins allowed at this LSC (received on 8/16/13).

08/05/13 - NOA1 (received on 08/10/13)

08/01/13 - Mailed I-751 (received on 8/2/13 - check cashed on 8/5/13)

12/28/11 - Received SSN (applied on 12/20/11, as we didn't get based on DS-230 options)
11/28/11 - Received Green Card (Expires on 10/30/13) - Welcome Letter on 11/17/11
10/30/11 - POE - Houston, TX

Chennai Consulate (40 days)
10/28/11 - Received Visa papers and Passport at VFS
10/25/11 - Interview Cleared Successfully (Spouse was not allowed in)

NVC: (90 days from NOA2 to Consulate)
08/31/11 - Case Completed (Interview 10/25/11) - Received at Chennai on 09/19/11
07/22/11 - NVC Case Number

USCIS: (92 days)

6/21/11 - NOA2 (NOA1 on 3/25/11) - took a month to get to NVC
3/21/11 - I-130 sent to USCIS Lockbox, Chicago.

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

If you are ready with all your documents, you can definitely make it by August end. And I am sure you are all ready. Hope you get your case number soon.

All ready to go man. Just need to freshly print out coversheets with the correct date and sign and date all the documents.

I said to the gal who I spoke to this morning the only way I'm going to get an October interview is if these bills go out this week and get paid. From looking at timelines it seems like it takes anywhere from 1-3 weeks for them to close the case so it's gonna be a hard push really to get the case closed if they are taking 5 days to process payments. I'm in customer service so I take calls ALL day and I go out of my way to be as nice as possible even though my head is about to pop off when I'm talking to them. Blahhhhh just get with the program already lol. It took a little over a month for me to get my case number and IIN so you've GOT to be getting yours soon. We shouldn't complain really the last I looked there will still 25 people in the March queue that haven't received their NOA2 so I guess we just need to keep that in mind. At least we aren't still waiting for that :)

Oh man, NOA2.....cringe. LOL. Thank God we are over that hump.

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline

Given what I have read here about the AVR, I think I'll quit wasting time calling it, the last couple of times I called, I did expect to hear the "not in the system" message. I'll give it a couple of days and then I'll start speaking to the operators.

Edited by Ryan H

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Link to comment
Share on other sites

Well now I'm just plane worried!!!!! This is the email I received this morning and no one can tell me what is going on

Dear Sir/Madam:

We sent a follow up email to USCIS about the progression on your case.

Please allow ample time for USCIS to respond to us.

Sincerely,

Morgan

National Visa Center

Written Inquiry Unit

Serco Inc., Support Contractor

NVCResearch@state.gov

02/22/2011-Married!!!!
03/02/2011-Sent I-130
03/03/2011-NOA1 text&email
03/07/2011-Touched
03/13/2011-NOA1 hardcopy

03/25/2011-Spontaneous visit to my Honey!!!!
06/10/2011-Honeymoon Visit!!!6/13-6/18-Puerto Plata
06/19/2011-Back to the waiting game sad.png

06/23/2011-NOA2 Email
08/08/2011-NVC Received my case
08/17/2011-Got Case #

08/18/2011-Received DS3032/AOS fee Email
08/18/2011-Paid AOS fee/Emailed DS3032 template

08/22/2011-DS-3032 Accepted!!!
08/24/2011-Received IV Bill
08/24/2011-Paid IV Bill!!!!

08/29/2011-Mailed DS-230 package
09/02/2011-NVC Received DS-230 (waiting on AOS)
10/12/2011-Finally sent I-864(waiting on sponsor)
10/13/2011-NVC received I-864 package

10/18/2011-Case complete!!!!
12/08/2011-Interview Date!!!!!!!!(VISA APPROVED FINALLY!!!!)
12/16/2011-POE Orlando FL
03/28/2013-NOA1 for both Stepdaughters

01/06/2014-NOA2 for stepdaughters

01/21/2014-NVC received both cases

02/27/2014-Received case #ers

03/04/2014-Received AOS Bill/DS-261 Email(system won't allow me to pay bill cray5ol.gif )

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Given what I have read here about the AVR, I think I'll quit wasting time calling it, the last couple of times I called, I did expect to hear the "not in the system" message. I'll give it a couple of days and then I'll start speaking to the operators.

Expect a good wait (30 days) before you get any word of your case being received at NVC Ryan.

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Well now I'm just plain worried!!!!! This is the email I received this morning and no one can tell me what is going on

Dear Sir/Madam:

We sent a follow up email to USCIS about the progression on your case.

Please allow ample time for USCIS to respond to us.

Sincerely,

Morgan

National Visa Center

Written Inquiry Unit

Serco Inc., Support Contractor

NVCResearch@state.gov

02/22/2011-Married!!!!
03/02/2011-Sent I-130
03/03/2011-NOA1 text&email
03/07/2011-Touched
03/13/2011-NOA1 hardcopy

03/25/2011-Spontaneous visit to my Honey!!!!
06/10/2011-Honeymoon Visit!!!6/13-6/18-Puerto Plata
06/19/2011-Back to the waiting game sad.png

06/23/2011-NOA2 Email
08/08/2011-NVC Received my case
08/17/2011-Got Case #

08/18/2011-Received DS3032/AOS fee Email
08/18/2011-Paid AOS fee/Emailed DS3032 template

08/22/2011-DS-3032 Accepted!!!
08/24/2011-Received IV Bill
08/24/2011-Paid IV Bill!!!!

08/29/2011-Mailed DS-230 package
09/02/2011-NVC Received DS-230 (waiting on AOS)
10/12/2011-Finally sent I-864(waiting on sponsor)
10/13/2011-NVC received I-864 package

10/18/2011-Case complete!!!!
12/08/2011-Interview Date!!!!!!!!(VISA APPROVED FINALLY!!!!)
12/16/2011-POE Orlando FL
03/28/2013-NOA1 for both Stepdaughters

01/06/2014-NOA2 for stepdaughters

01/21/2014-NVC received both cases

02/27/2014-Received case #ers

03/04/2014-Received AOS Bill/DS-261 Email(system won't allow me to pay bill cray5ol.gif )

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Just called NVC no case number still...crying.gif

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline

Well NVC says they have my case this morning. She said to allow 15-21 days for it to be input into the system. :wacko: I explained that I have already waited and she told me to email a supervisor named Sue explaining that our case was expedited and once she receives that email it "should go pretty fast" :rofl: whatever NVC just do your jobs

02/06/2011 ~ MARRIED IN REPUBLIC OF GEORGIA

03/31/2011 ~ FILED I-130 & G325A (SENT TO CHICAGO LOCKBOX VIA UPS)

04/09/2011 ~ RECEIVED NOA1 IN MAIL :-)

07/11/2011 ~ APPROVED WOOOOOOOO HOOOOOOOO!!!!!

07/29/2011 ~ NVC RECEIVED CASE

08/22/2011 ~ RECEIVED NVC CASE# AND IIN

08/24/2011 ~ EMAILED DS-3032 SENT VIA HUBBYS EMAIL ACCOUNT

08/25/2011 ~ RECEIVED 3 EMAILS FROM NVC

08/25/2011 ~ PAID AOS FEE $88.00

08/26/2011 ~ AOS FEE SHOWS "PAID" - RECEIPT PRINTED AND READY TO MAIL

08/30/2011 ~ AOS PACKAGE SENT FEDEX OVERNIGHT

09/01/2011 ~ IV BILL INVOICED AND PAID

09/06/2011 ~ AOS PACKAGE APPROVED

09/09/2011 ~ IV PACKAGE SENT TO NVC VIA FEDEX OVERNIGHT

09/15/2011 ~ CASE CLOSED

INTERVIEW DATE ~ 11/30/2011 - APPROVED

12/04/2011 ~ ENTERED USA THROUGH JFK AIRPORT

STILL WAITING FOR GREEN CARD......

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Well NVC says they have my case this morning. She said to allow 15-21 days for it to be input into the system. :wacko: I explained that I have already waited and she told me to email a supervisor named Sue explaining that our case was expedited and once she receives that email it "should go pretty fast" :rofl: whatever NVC just do your jobs

Just seems like a bunch of bollocks to me.

I am starting to get frustrated now. There should be no reason why I should have my case number by now, it's been over a week since they scanned it into the system now. It's been a painful 38 days since I have gotten my NOA2.

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Hi,

So I can now log in to the NVC payment site with my Case number and Invoice ID number. Also the AVR has been updated.

But it states the AOS fees have not been invoiced and the box is greyed out. Is this because they haven't accepted the DS-3032 yet? Should I email it again?

thanks, you are all so much help.

@Dave I think you will get it today. :)

Filling for CR1 Visa

USCIS: I-130 CSC

03/18/2011 - Mailed I-130

03/21/2011 - I-130 signed for at Chicago Lockbox

03/24/2011 - NOA1 California Service Center

03/29/2011 - NOA1 hard copy received

06/29/2011 - NOA2 Received

07/05/2011- NOA2 hard copy received

Your I-130 was approved in 97 days from your NOA1 date.

NVC

07/26/2011 - Case received by NVC

08/01/2011 - Received NVC Case # and IIN

08/01/2011 - Emailed DS-3032

08/03/2011 - Emailed DS-3032 (Again, noticed an error on the first one)

08/08/2011 - AOS Bill generated and PAID

08/08/2011 - NVC received DS-3032

08/09/2011 - AOS Status changed to paid - cover page printed

08/09/2011 - IV Bill generated and PAID

08/10/2011 - IV Status changed to paid - cover page printed

08/10/2011 - IV Package Sent

08/11/2011 - IV Package Delivered

08/15/2011 - AOS Package Sent

08/16/2011 - AOS Package Delivered

08/18/2011 - IV Package Approved

08/18/2011 - False RFE for AOS package

08/23/2011 - AOS Package Approved

08/23/2011 - CASE COMPLETE!

Case completed 55 days from your NOA2 date.

08/25/2011 - Interview date assigned

10/05/2011 - Interview - APPROVED

10/07/2011 - Visa Received

10/09/2011 - POE San Francisco

Finally complete in 205 days !! 6 Months 3 Weeks

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...