We have been keeping our hopes high for an early expedition of our case because of my daughter's age-ing out (21 this january 2007). We sent an email to NVC relative to this last September 6 after we received our physical NOA2 (Sept. 5; email NOA2 approval decision was sent to us August 31 telling us that our case has been approved August 30). We were hoping that they could assign a case number immediately then facilitate it's expedition at the U.S. Embassy in Manila.

However, we received an odd email from NVC...what is happening????...is our case lost in the mail????

"NVC Inquiry" <NVCInquiry@state.gov>

09/11/2006 01:33 PM

To: XXXXXXXXXXXXXXXXX

Subject

RE: I129F, PETITION FOR FIANCE Case Status Receipt NumberWACXXXXXXXXXXX

Dear Sir,

The National Visa Center has received your inquiry regarding Wac-XX-XXX-XXXXX. After searching our records, no information was found regarding this case. Please contact U.S. Citizenship and Immigration Services (CIS- formerly known as INS) to verify the status of this petition.

Regards,

National Visa Center

cph /tkm

We have seen posts of VJ members whose NOA2's were immediately received by NVC from USCIS...we intend to call USCIS but we want to know from VJ members their ideas on this delay...Your advises on this matter will be deeply appreciated....especially on the next steps that we need to do at this point.

Sincerely,

jo&john (F)

Edited by jo&john

04/22/06:I-129F -TSC
04/25/06:I-129F -CSC;NOA1(Rcvd Date)
05/01/06:NOA1(Notice Date)
06/23/06:Email fr CSC-IMBRA RFE
06/30/06:IMBRA RFE mail)
07/05/06:I-RFE reply
07/17/06:USCIS rcvd I-RFE reply
08/30/06:NOA2 Approved!
09/05/06:NOA2(mail)
09/26/06:Email fr NVC-to Emb;case #:MNL2006764XXX
10/06/06:VISA APPT:*ANY WORKDAY 0700AM*daughter age-ing out
10/16-17:St. Luke's Medical Ext Clinic
10/18/06:Emb Intrvw APPROVED!
10/25/06:VISAS(K1&K2s)delivered;CFO for stickers
11/08/06:To the U.S.!
11/14/06:WEDDING!
11/22/06:Applied SSN(married name)
11/15/06:INFOPASS appt (for 3):AOS-DORA
11/27/06:Applied AOS w/ 2daughters;got accepted;interviewed same day(D1)
12/09/06:Received by mail 3 NOA1s
12/15/06:SSN print-out picked up
12/18/06:SS card&Biometrics appt notices in mail(D22)
12/26/06:Biometrics at ASC,USCIS Dallas-North(D30)
01/26/07:Email:Notice mailed 1/25 welcoming the new PR(K1&K2-9y/o)(D61)
01/31/07:Welcome letters(mail)(D66)
02/01/07:Card production ordered 1/30(D67)
02/05/07:Email:Approval notice sent 2/04(D71)
02/06/07:GC's in the mail! (D72)
12/11/08:Sent application for removal of conditions (I-751)
12/19/08:Received by mail receipt notice
12/30/08:Received by mail biometrics appointment for Jo and receipt notice for daughter
01/05/09:Received by mail biometrics appointment of daughter
01/13/09:Biometrics appointment of Jo and daughter
06/17/09:Email:Card production ordered
06/30/09:Email:Approval notice sent
07/06/09:Ten-year GC's in the mail!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline
We have been keeping our hopes high for an early expedition of our case because of my daughter's age-ing out (21 this january 2007). We sent an email to NVC relative to this last September 6 after we received our physical NOA2 (Sept. 5; email NOA2 approval decision was sent to us August 31 telling us that our case has been approved August 30). We were hoping that they could assign a case number immediately then facilitate it's expedition at the U.S. Embassy in Manila.

However, we received an odd email from NVC...what is happening????...is our case lost in the mail????

"NVC Inquiry" <NVCInquiry@state.gov>

09/11/2006 01:33 PM

To: XXXXXXXXXXXXXXXXX

Subject

RE: I129F, PETITION FOR FIANCE Case Status Receipt NumberWACXXXXXXXXXXX

Dear Sir,

The National Visa Center has received your inquiry regarding Wac-XX-XXX-XXXXX. After searching our records, no information was found regarding this case. Please contact U.S. Citizenship and Immigration Services (CIS- formerly known as INS) to verify the status of this petition.

Regards,

National Visa Center

cph /tkm

We have seen posts of VJ members whose NOA2's were immediately received by NVC from USCIS...we intend to call USCIS but we want to know from VJ members their ideas on this delay...Your advises on this matter will be deeply appreciated....especially on the next steps that we need to do at this point.

Sincerely,

jo&john (F)

Maybe NVC hasnt received your papers yet.It took my fiance more than 2 weeks to get a letter from NVC telling him that they got our papers and have given our new case number.

Timeline

Jan 22, 2007 Arrived in USA

Jan 27, 2007 Wedding Day

---- AOS -------

March 31, 2007----- Submitted AOS and EAD package

April 6, 2007 ------ Package received at USCIS

April 11, 2007 ----- NOA1 ( AOS and EAD )

April 25, 2007 ------ Biometrics

April 26, 2007 ------ Touched

May 21, 2007 ------- NOA 2 ( AOS )

June 13, 2007------- Receive email from Cris, EAD Card Production ordered

June 14, 2007 ------ EAD touched

June 18, 2007 ------ EAD touched

June 21, 2007 ------ EAD email from Cris, USCIS has sent notice on the mail that EAD is approved

June 23, 2007 ------ EAD card received in the mail

July 11, 2007 ------- Initial interview ( Denver, CO ) approved- Thank God

July 17, 2007 ------- Received Welcome Notice in the mail

July 18, 2007 ------- Email Notice from Cris " Production of Card Ordered"

July 27, 2007 ------- Green Card received- God is so Good!

115590570280508.gif

Link to comment
Share on other sites

Filed: K-1 Visa Country: Canada
Timeline

I just got off the phone with an operator who told me that it can take up to 4 weeks. We were approved Aug. 30 too.

Edited by hockeygal

04/13/06 - I-129F mailed

04/18/06 - NOA1

08/30/06 - NOA2

09/26/06 - received at NVC

09/27/06 - forwarded to consulate

20/11/06 - visa in my pocket!

14/01/07 - POE

13/04/07 - marriage

27/04/07 docs sent in for AOS, EAD, AP

26/06/07 - biometrics appointment

02/17/07 - AP and EAD arrive

03/03/08 - Infopass - where the heck is my AOS interview?? No one knows!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Brazil
Timeline
yes it can take a little while for the petition to be assigned a case number. check back in a few days

Especially when it's CSC forwarding the cases to NVC.

I only offer advice - not even legal. Just the plain and simple kind.

Timeline (incompleta)

Link to comment
Share on other sites

Filed: K-1 Visa Country: Colombia
Timeline

NVC can take up to four weeks to receive the petition from CSC and assign a case number. CSC sent ours on August 18. We are still waiting.

It seems tha cases sent from the service centers between the 1st and the middle of the month take longer to process and those sent towards the end of the month only a week.

US1.GIFCOL.GIF

04-19-06 Sent I-129F

04-24-06 I-129F received at CSC

04-27-06 Received NOA1

07-03-06 Received RFE from CSC

07-03-06 Returned RFE to CSC

07-08-06 RFE received at CSC

07-31-06 Touched

08-05-06 Received second RFE from CSC

08-05-06 Returned RFE to CSC

08-07-06 Touched

08-09-06 RFE received at CSC

08-14-06 Touched

08-15-06 E-mail from CSC stating RFE received

08-16-06 Touched

08-18-06 NOA2 APPROVED- I-129F sent to NVC

08-19-06 Touched

08-25-06 NVC Received I-129F

09-01-06 NVC sent I-129F to embassy

09-05-06 Received at embassy

09-11-06 Packet 3 sent from embassy

10-06-06 Received Packet 3. Long delay in receiving the packet was due to postal miscue

10-06-06 Returned Packet 3

10-09-06 Received at embassy

10-31-06 Received Packet 4

11-14-06 Interview date

11-18-06 Travel to the States

Link to comment
Share on other sites

Thank God! so no cause for alarm at this point! :D Thank you all! And praying that all "in the mail" NOA2s get at NVC soon and expedited!

Sincerely,

jo&john (F)

04/22/06:I-129F -TSC
04/25/06:I-129F -CSC;NOA1(Rcvd Date)
05/01/06:NOA1(Notice Date)
06/23/06:Email fr CSC-IMBRA RFE
06/30/06:IMBRA RFE mail)
07/05/06:I-RFE reply
07/17/06:USCIS rcvd I-RFE reply
08/30/06:NOA2 Approved!
09/05/06:NOA2(mail)
09/26/06:Email fr NVC-to Emb;case #:MNL2006764XXX
10/06/06:VISA APPT:*ANY WORKDAY 0700AM*daughter age-ing out
10/16-17:St. Luke's Medical Ext Clinic
10/18/06:Emb Intrvw APPROVED!
10/25/06:VISAS(K1&K2s)delivered;CFO for stickers
11/08/06:To the U.S.!
11/14/06:WEDDING!
11/22/06:Applied SSN(married name)
11/15/06:INFOPASS appt (for 3):AOS-DORA
11/27/06:Applied AOS w/ 2daughters;got accepted;interviewed same day(D1)
12/09/06:Received by mail 3 NOA1s
12/15/06:SSN print-out picked up
12/18/06:SS card&Biometrics appt notices in mail(D22)
12/26/06:Biometrics at ASC,USCIS Dallas-North(D30)
01/26/07:Email:Notice mailed 1/25 welcoming the new PR(K1&K2-9y/o)(D61)
01/31/07:Welcome letters(mail)(D66)
02/01/07:Card production ordered 1/30(D67)
02/05/07:Email:Approval notice sent 2/04(D71)
02/06/07:GC's in the mail! (D72)
12/11/08:Sent application for removal of conditions (I-751)
12/19/08:Received by mail receipt notice
12/30/08:Received by mail biometrics appointment for Jo and receipt notice for daughter
01/05/09:Received by mail biometrics appointment of daughter
01/13/09:Biometrics appointment of Jo and daughter
06/17/09:Email:Card production ordered
06/30/09:Email:Approval notice sent
07/06/09:Ten-year GC's in the mail!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Brazil
Timeline
NVC can take up to four weeks to receive the petition from CSC and assign a case number. CSC sent ours on August 18. We are still waiting.

It seems tha cases sent from the service centers between the 1st and the middle of the month take longer to process and those sent towards the end of the month only a week.

Yeah, apparently they mail out stuff in batches.

I only offer advice - not even legal. Just the plain and simple kind.

Timeline (incompleta)

Link to comment
Share on other sites

Filed: K-1 Visa Country: Romania
Timeline

NVC can take up to four weeks to receive the petition from CSC and assign a case number. CSC sent ours on August 18. We are still waiting.

It seems tha cases sent from the service centers between the 1st and the middle of the month take longer to process and those sent towards the end of the month only a week.

Yeah, apparently they mail out stuff in batches.

I would not be too concerned... I kept checking at the NVC to see if they received our case. 21 Days after our NOA2 I sent an email to the NVC regarding our case and asked them to check it out. Day 28, after receiving our NOA2, I received and email saying that the case was processed and sent on to the Embassy. NVC did not even acknowledge receipt of our papers. On the upside, after receiving the email reply, we received packet 3 only 2 business days after they replied to my email. :)

Be patient, it takes a lot of work for them to be inefficient. Good luck

Living in NE Romania with Fiance and her Son.

3-27-2006 I-129F Sent : to Nebraska Service Center

4-12-2006 I-129F NOA1 :

6-1-2006 Touched sort of...... sent to CSC (California Service Center) like many others

6-14-2006 CSC emailed me a notice of receipt of my 129f (transfered from NSC)

6-17-2006 Touched

7-3-2006 IMBRA RFE received at home

7-5-2006 Mailed IMBRA RFE back, Also my file was touched for the first time since 6-17

7-13-2006 Received email that IMBRA RFE was received by CSC

7-14-2006 Touched

8-10-2006 I-129F NOA2 APPROVED !!! (no touches before approval, as many have spoke of)

9-08-2006 NVC case approved:

: I started calling the NVC automated line about 2 weeks after NOA2. They never had any information for me or acknoledged that they received our case, so I sent an email to the NVC on 9-01-2006. On 9-08-2006 I received a reply to that email saying that our case was processed and forwarded to the US Embassy (Romania) on 8-31-2006. They also included the case number in the reply to my email inquiry. I guess I would have not been notified by the NVC..... very strange.

9-6-2006 Romanian Embassy received our K1 paperwork.

9-11-2006 Received packet 3 in the mail

10-11-2006 Set appointment for interview by calling the Romanian Embassy !!! ONLY SET AN APPOINTMENT AFTER HAVE ALL DOCMUMENTS ARE COMPLETE !!!

10-18-06 Visa interview - Visa granted :)

11-7-06 Welcome to America

Link to comment
Share on other sites

i'm still waiting here... and it gets me so impatient and sometimes i realized what is 4 weeks of waiting compared to 4 months just to wait for the noa2...lol... still i want to have a case# now :blush:

Citizenship N-400

4/15/2010- sent my N-400 via fedex overnight

4/16/2010- signed and delivered

4/29/2010- check cleared

Link to comment
Share on other sites

well it took 3 weeks from our NOA2 to the NVC recieving it.. I have found the best time to call them though... 11:36am EST and the options are easy.... press 1 then 2 :D

29/12/06 Married
05/01/08 Alexander Mark is born 16:27
07/05/08 Alexander Mark is offically an USA citizen
21/05/08 Alex's passport arrives
02/06/10 I-130 sent to London
22/08/08 I-130 Approved
09/22/08 Packet 3 Recieved
10/04/08 Packet 3 Sent
11/01/08 Packet 4 Recieved
11/14/08 Interview APPROVED
12/03/08 Visa Recieved
12/16/08 We Arrive Back In USA
08/01/10 Isadora Rose is Born
12/17/10 ROC Filed
01/25/11 Bio Appointment Sioux Falls SD
08/03/11 Conditions Lifted
10/10/12 N-400 Mailed to Phoenix
10/24/12 Fee Waiver Approved
10/26/12 NOA Recieved
11/06/12 Bio Appointment Sioux Falls SD
03/08/13 Interview and Testing, Sioux Falls SD

04/04/14 Oath Time APPROVED

Link to comment
Share on other sites

We have been keeping our hopes high for an early expedition of our case because of my daughter's age-ing out (21 this january 2007). We sent an email to NVC relative to this last September 6 after we received our physical NOA2 (Sept. 5; email NOA2 approval decision was sent to us August 31 telling us that our case has been approved August 30). We were hoping that they could assign a case number immediately then facilitate it's expedition at the U.S. Embassy in Manila.

However, we received an odd email from NVC...what is happening????...is our case lost in the mail????

"NVC Inquiry" <NVCInquiry@state.gov>

09/11/2006 01:33 PM

To: XXXXXXXXXXXXXXXXX

Subject

RE: I129F, PETITION FOR FIANCE Case Status Receipt NumberWACXXXXXXXXXXX

Dear Sir,

The National Visa Center has received your inquiry regarding Wac-XX-XXX-XXXXX. After searching our records, no information was found regarding this case. Please contact U.S. Citizenship and Immigration Services (CIS- formerly known as INS) to verify the status of this petition.

Regards,

National Visa Center

cph /tkm

We have seen posts of VJ members whose NOA2's were immediately received by NVC from USCIS...we intend to call USCIS but we want to know from VJ members their ideas on this delay...Your advises on this matter will be deeply appreciated....especially on the next steps that we need to do at this point.

Sincerely,

jo&john (F)

It is possible that NVC has received the petition and is entering it into its computer system. As soon as it is done, NVC will assign a case number for you. You can email them at: NVCINQUIRY@state.gov

to find out about your case. Make sure, you put your USCIS receipt number on the subject line when you email them.

I-130 Timeline with USCIS:

It took 92 days for I-130 to get approved from the filing date

NVC Process of I-130:

It took 78 days to complete the NVC process

Interview Process at The U.S. Embassy

Interview took 223 days from the I-130 filing date. Immigrant Visa was issued right after the interview

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline

I was approved August 18, they received my petition September 5

Date I-129F Sent : 03/17/2006

Date I-129F NOA1: 04/03/2006

I-129F RFE(s) : 08/10/2006

I-129F RFE Reply(s) : 08/17/2006

Date I-129F NOA2 (Approved) : 08/18/2006

Date Package Received By NVC : 09/05/2006

Date Sent to Embassy: 09/18/2006 assigned number MNL2006743xxx

Date Embassy received 09/26/2006

letter-touched 10/17/2006

information on medical and interview 11/17/2006

Packet with Information 11/29/2006

Medical 1/12/2007

Interview 1/19/2007

Link to comment
Share on other sites

Filed: Lift. Cond. (pnd) Country: Peru
Timeline

It took mine 3 weeks. Don't fret :D

ONE DAY AT A TIME....

REMOVAL OF CONDITIONS

12/30/2008: Overnighted I-751 package to VSC

01/06/2009: Check cashed

01/06/2009: NOA (arrived 01/09/09)

01/23/2009: Biometrics appt letter received

01/31/2009: Biometrics scheduled

05/20/2009: APPROVED

06/23/2009: 10 Year Green Card arrived

Link to comment
Share on other sites

It took mine 3 weeks. Don't fret :D

:D ... will just wait then. :yes:

(F)

04/22/06:I-129F -TSC
04/25/06:I-129F -CSC;NOA1(Rcvd Date)
05/01/06:NOA1(Notice Date)
06/23/06:Email fr CSC-IMBRA RFE
06/30/06:IMBRA RFE mail)
07/05/06:I-RFE reply
07/17/06:USCIS rcvd I-RFE reply
08/30/06:NOA2 Approved!
09/05/06:NOA2(mail)
09/26/06:Email fr NVC-to Emb;case #:MNL2006764XXX
10/06/06:VISA APPT:*ANY WORKDAY 0700AM*daughter age-ing out
10/16-17:St. Luke's Medical Ext Clinic
10/18/06:Emb Intrvw APPROVED!
10/25/06:VISAS(K1&K2s)delivered;CFO for stickers
11/08/06:To the U.S.!
11/14/06:WEDDING!
11/22/06:Applied SSN(married name)
11/15/06:INFOPASS appt (for 3):AOS-DORA
11/27/06:Applied AOS w/ 2daughters;got accepted;interviewed same day(D1)
12/09/06:Received by mail 3 NOA1s
12/15/06:SSN print-out picked up
12/18/06:SS card&Biometrics appt notices in mail(D22)
12/26/06:Biometrics at ASC,USCIS Dallas-North(D30)
01/26/07:Email:Notice mailed 1/25 welcoming the new PR(K1&K2-9y/o)(D61)
01/31/07:Welcome letters(mail)(D66)
02/01/07:Card production ordered 1/30(D67)
02/05/07:Email:Approval notice sent 2/04(D71)
02/06/07:GC's in the mail! (D72)
12/11/08:Sent application for removal of conditions (I-751)
12/19/08:Received by mail receipt notice
12/30/08:Received by mail biometrics appointment for Jo and receipt notice for daughter
01/05/09:Received by mail biometrics appointment of daughter
01/13/09:Biometrics appointment of Jo and daughter
06/17/09:Email:Card production ordered
06/30/09:Email:Approval notice sent
07/06/09:Ten-year GC's in the mail!

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...