Filed: Lift. Cond. (apr) Country: India
Timeline
Posted

A big congrats to you! how did you find out?

I hope I get my approval soon and interview date before October 31st. I would like to be home before that, otherwise I'll have to miss my husband again due to Army. Good luck to you, 'home' is close now!

NVC or DOS.

At the time I called NVC's computers were down, they told me call back in 30 min. I was way too anxious to find out so I called DOS and the operator there told me the date.

It's unfortunate that we did not get an earlier interview date, but just like the U.S. India is packed with holidays towards the end of the year. I'll take what I can get.

Good Luck to you Lytha!

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Filed: Citizen (apr) Country: Belgium
Timeline
Posted

NVC or DOS.

At the time I called NVC's computers were down, they told me call back in 30 min. I was way too anxious to find out so I called DOS and the operator there told me the date.

It's unfortunate that we did not get an earlier interview date, but just like the U.S. India is packed with holidays towards the end of the year. I'll take what I can get.

Good Luck to you Lytha!

thank you! I hope Belgium will be able to interview me sooner than that, i want this over with so bad! Are you; or better were you, stressed out about it all the time too? I know i have to have confidence and what not, but heck, its a 'big thing!' .. And i wonna go hooommmmeee :D lol

07-29-2009 Arrival in the US
08-05-2009 Senior in highschool - meet Bradley
06-23-2010 Leave US
02-15-2011 Back in US
03-11-2011 My weddingday
03-22-2011 Leave US

USCIS
04-06-2011 Send I 130 Petition
04-08-2011 Delivery at Chicago Lockbox
04-18-2011 Email/Text NOA1 Receipt
04-19-2011 Touched
04-28-2011 Hardcopy NOA1 in the mail
06-27-2011 N0A2! Approval! Yeey! No RFE's!
07-01-2011 Hardcopy NOA2
Total USCIS : 70 days

NVC
08-02-2011 NVC case number
08-04-2011 DS 3032 + IIN + Received I864 Bill + Paid I864 Bill
08-05-2011 Put in DS 3032 File
08-16-2011 Paid IV Bill
08-31-2011 Send in I864 Packet + IV Packet
09-03-2011 NVC Received Packages
09-09-2011 Operator assistance : I864 Approval, one more document missing for DS230 (=RFE)
09-12-2011 Send in RFE
09-21-2011 Approval NVC!!

The Homecoming...
10-06-2011 Medical Exam: Approved!
10-18-2011 Interview at Brussels US Embassy
10-27-2011 Back at Embassy to submit another document
10-27-2011 APPROVAL
01-11-2011 POE
183 days from NOA1 and interview ...
10-31-2011 Hubby leaves with Army
12-15-2011 Reunited, hubby is home: At last :)

*Happy ever after*

Filed: Lift. Cond. (apr) Country: India
Timeline
Posted (edited)

thank you! I hope Belgium will be able to interview me sooner than that, i want this over with so bad! Are you; or better were you, stressed out about it all the time too? I know i have to have confidence and what not, but heck, its a 'big thing!' .. And i wonna go hooommmmeee :D lol

I am the USC so I will not be interviewing. My wife will be. I was super stressed and nervous but after getting a date and educating myself of the process I am not as stressed as I once was.

I literally just talked to my wife about all the medical and other police clearance cert we need. She is getting it done early so she has time to prepare for the interview. We are just happy to have a date to count down to and no dates to count up to... :)

Edited by Dave and Kinnari

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Filed: Citizen (apr) Country: Belgium
Timeline
Posted

I am the USC so I will not be interviewing. My wife will be. I was super stressed and nervous but after getting a date and educating myself of the process I am not as stressed as I once was.

I literally just talked to my wife about all the medical and other police clearance cert we need. She is getting it done early so she has time to prepare for the interview. We are just happy to have a date to count down to and no dates to count up to... :)

Im on countdown to approval,, i'm the beneficary but i'm the only one that knows about the process, husband is always busy with military, but helps when he can :) i'll just be glad to have that approval and the interview, i dont expect it to be that bad... But it is true they can just deny you and all the work would of been for nothing, right?

07-29-2009 Arrival in the US
08-05-2009 Senior in highschool - meet Bradley
06-23-2010 Leave US
02-15-2011 Back in US
03-11-2011 My weddingday
03-22-2011 Leave US

USCIS
04-06-2011 Send I 130 Petition
04-08-2011 Delivery at Chicago Lockbox
04-18-2011 Email/Text NOA1 Receipt
04-19-2011 Touched
04-28-2011 Hardcopy NOA1 in the mail
06-27-2011 N0A2! Approval! Yeey! No RFE's!
07-01-2011 Hardcopy NOA2
Total USCIS : 70 days

NVC
08-02-2011 NVC case number
08-04-2011 DS 3032 + IIN + Received I864 Bill + Paid I864 Bill
08-05-2011 Put in DS 3032 File
08-16-2011 Paid IV Bill
08-31-2011 Send in I864 Packet + IV Packet
09-03-2011 NVC Received Packages
09-09-2011 Operator assistance : I864 Approval, one more document missing for DS230 (=RFE)
09-12-2011 Send in RFE
09-21-2011 Approval NVC!!

The Homecoming...
10-06-2011 Medical Exam: Approved!
10-18-2011 Interview at Brussels US Embassy
10-27-2011 Back at Embassy to submit another document
10-27-2011 APPROVAL
01-11-2011 POE
183 days from NOA1 and interview ...
10-31-2011 Hubby leaves with Army
12-15-2011 Reunited, hubby is home: At last :)

*Happy ever after*

Filed: Lift. Cond. (apr) Country: India
Timeline
Posted

Im on countdown to approval,, i'm the beneficary but i'm the only one that knows about the process, husband is always busy with military, but helps when he can :) i'll just be glad to have that approval and the interview, i dont expect it to be that bad... But it is true they can just deny you and all the work would of been for nothing, right?

You have to have some serious red flags for them to outright deny you or lifetime banning you from ever getting a visa to the USA.

You might be put on Administrative Processing asking for more evidence and they will look further into your case. This happens to a lot of people.

You should have nothing to worry about. If your relationship is genuine, you have a clean record and your relationship was not forced to obtain improper immigration benefits into the USA, you have nothing to worry about.

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Filed: Citizen (apr) Country: Belgium
Timeline
Posted

You have to have some serious red flags for them to outright deny you or lifetime banning you from ever getting a visa to the USA.

You might be put on Administrative Processing asking for more evidence and they will look further into your case. This happens to a lot of people.

You should have nothing to worry about. If your relationship is genuine, you have a clean record and your relationship was not forced to obtain improper immigration benefits into the USA, you have nothing to worry about.

Well that all is not the case, we love eachother, and can't wait to start our lives in the US. Right now the hubby is almost here in BE with me for 2 months, evidence enough i'd think :)i cant wait to hear from acceptance of files or approval to move on and have 'some' peace lol :)

07-29-2009 Arrival in the US
08-05-2009 Senior in highschool - meet Bradley
06-23-2010 Leave US
02-15-2011 Back in US
03-11-2011 My weddingday
03-22-2011 Leave US

USCIS
04-06-2011 Send I 130 Petition
04-08-2011 Delivery at Chicago Lockbox
04-18-2011 Email/Text NOA1 Receipt
04-19-2011 Touched
04-28-2011 Hardcopy NOA1 in the mail
06-27-2011 N0A2! Approval! Yeey! No RFE's!
07-01-2011 Hardcopy NOA2
Total USCIS : 70 days

NVC
08-02-2011 NVC case number
08-04-2011 DS 3032 + IIN + Received I864 Bill + Paid I864 Bill
08-05-2011 Put in DS 3032 File
08-16-2011 Paid IV Bill
08-31-2011 Send in I864 Packet + IV Packet
09-03-2011 NVC Received Packages
09-09-2011 Operator assistance : I864 Approval, one more document missing for DS230 (=RFE)
09-12-2011 Send in RFE
09-21-2011 Approval NVC!!

The Homecoming...
10-06-2011 Medical Exam: Approved!
10-18-2011 Interview at Brussels US Embassy
10-27-2011 Back at Embassy to submit another document
10-27-2011 APPROVAL
01-11-2011 POE
183 days from NOA1 and interview ...
10-31-2011 Hubby leaves with Army
12-15-2011 Reunited, hubby is home: At last :)

*Happy ever after*

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline
Posted

Does anyone know what we can do when the NVC goes beyond the "15 biz days" they tell us to wait?

Technically, they did not fully "process" our original ds-230 - they neglected to enter the military record.

NVC realized the missing data on Aug 30, blamed it on us, and now have bought themselves another 15 biz days.

Phone rep Jean figured it all out on Friday (what a sweetheart), but now AVR says there was an RFE sent Sept 2.

I am trying to figure out what tactic to take when I call at 7:30AM EST on Tuesday.

How do I hold NVC accountable for NVC clerical ommission from >15 biz days, and motivate someone to fetch the case file from records and settle it??

IR-1/CR-1 Spouse CA Svc Ctr 2011 (82 days) Apr07: NOA1. Jun27: NOA2 text.
Delivery from USCIS to NVC (24 days) Jul21: CSC mailed it to NVC

NVC (43 days)
Jul25: "in the NVC bldg"---->Jul26: NVC Case#,IIN# (1 day in-house, 29 days since NOA2)

AOS i-864.....Jul28: bill rcv'd (2 days)& paid ---->Aug01: "paid"/mailed (4 days). Aug3: AOS in the bldg
Aug 11: phone rep "AOS RFE: 23/24a: no blanks" (pdf won't print n/a"). Fedex'd new copy (arrived Aug 12)
Aug 22: AOS approved

IV ds-230:
Jul26: send DS-3032 ----> Jul29: DS-3032 accepted (3 days)
Aug01: bill rcv'd (2 days)& paid ---->Aug02: "paid"/mailed (1 day)
Aug04:ds-230 delivered ---> Aug 12: "under review"
Aug 15: phone rep "RFE:ds-230 #30." (16th bdate left as "----") Fedex'd new copy (arrived Aug 16)
Aug 30: phone rep: "no military record." me: "it's there!" rep: "15 biz days starting today"
Sep 06: phone rep: "needs review. 15 MORE biz days" me: "no way" Supervisor asks Mgr "open file & verify it's complete since 8/16." 6 hours later: CASE CLOSED!

Consulate
Sep 13: INTERVIEW scheduled, email letter arrived
Sep 15: MEDICAL in Stockholm
Sep 23: Packet Left NVC -> Embassy
Oct 31: INTERVIEW 4-minutes and DONE. APPROVED. Visa is "in the mail"

Nov 27: arrival in USA

DIVORCE: final May 2015 - never whould have married without dating in-person for at least a year.

Filed: Lift. Cond. (apr) Country: India
Timeline
Posted

Thanks!

Thanks Ryan!

Thanks Hitu! I figured it was as Diwali is right at the end of the month. Thanks for all your help!

Thanks Shanna! Any word on your end? I found out by calling DOS. I called NVC earlier but they were having issues and they told me call back in an hour. I was too anxious to find out so I called DOS.

I also go the Interview e-mail Friday afternoon/evening.

No date for us yet, but I'm hoping for November as well. I called NVC, but they don't have it yet. I don't know what DOS is - do you still have the number? I'm so happy for you. I still feel like we're in limbo because there's no end date in sight yet. I keep on praying!!!

04-13-11: I-130 sent

04-15-11: NOA1 notification

07-07-11: NOA2 notification

08-09-11: NVC Receipt (case and invoice id numbers received)

08-10-11: Emailed DS-3032

08-12-11: Paid AOS fee online and emailed DS-3032

08-16-11: DS-3032 accepted

08-17-11: Paid IV fee online and mailed AOS packet

08-20-11: Mailed IV packet

08-24-11: AOS packet approved

08-30-11: IV packet approved

08-30-11: Case complete at NVC!!!

10-04-11: Granted an expedite

11-04-11: Interview & APPROVAL - visa received same day

11-08-11: POE - Seattle, WA

Filed: Lift. Cond. (apr) Country: China
Timeline
Posted

I don't know what DOS is - do you still have the number?

202-663-1225; Press 1 then 0 for an operator.

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Posted

Well, I called NVC and it turns out that USCIS approved my petition on 7-23. I didn't find out until 9-2. So that means I was in the dark for about 6 weeks.

I'm sure those 6 weeks of unnecessary stress will cut 6 weeks from the end of my life! Haha

And by the way, USCIS website still says I'm under "Initial Review"!

TIMELINE

12.31.10 - Married

04.27.11 - I-130 Sent

04.29.11 - NOA1

07.23.11 - NOA2 (85 Days)

09.02.11 - Received NVC Case # and IIN

09.03.11 - DS-3032 Email Sent

09.03.11 - Received and Paid I-864 Bill

09.08.11 - DS-3032 Accepted

09.08.11 - Received and Paid IV Bill

09.12.11 - Sent IV Package

09.16.11 - Sent AOS Package

09.23.11 - Case Complete (21 Days)

09.30.11 - Assigned Interview Date

10.04.11 - Medical

11.10.11 - Interview

11.??.11 - Visa in Hand

01.17.12 - POE Guam

Filed: Citizen (apr) Country: Belgium
Timeline
Posted

DOS ? Did i miss something? just tracked our packages, they have arrived in NVC Sept 3rd.

Is this the time to call them

Automated voicemessage is apperently not up to date!

Thanks for any advice

/Lytha

07-29-2009 Arrival in the US
08-05-2009 Senior in highschool - meet Bradley
06-23-2010 Leave US
02-15-2011 Back in US
03-11-2011 My weddingday
03-22-2011 Leave US

USCIS
04-06-2011 Send I 130 Petition
04-08-2011 Delivery at Chicago Lockbox
04-18-2011 Email/Text NOA1 Receipt
04-19-2011 Touched
04-28-2011 Hardcopy NOA1 in the mail
06-27-2011 N0A2! Approval! Yeey! No RFE's!
07-01-2011 Hardcopy NOA2
Total USCIS : 70 days

NVC
08-02-2011 NVC case number
08-04-2011 DS 3032 + IIN + Received I864 Bill + Paid I864 Bill
08-05-2011 Put in DS 3032 File
08-16-2011 Paid IV Bill
08-31-2011 Send in I864 Packet + IV Packet
09-03-2011 NVC Received Packages
09-09-2011 Operator assistance : I864 Approval, one more document missing for DS230 (=RFE)
09-12-2011 Send in RFE
09-21-2011 Approval NVC!!

The Homecoming...
10-06-2011 Medical Exam: Approved!
10-18-2011 Interview at Brussels US Embassy
10-27-2011 Back at Embassy to submit another document
10-27-2011 APPROVAL
01-11-2011 POE
183 days from NOA1 and interview ...
10-31-2011 Hubby leaves with Army
12-15-2011 Reunited, hubby is home: At last :)

*Happy ever after*

Filed: Lift. Cond. (apr) Country: China
Timeline
Posted

Is this the time to call them

Automated voicemessage is apperently not up to date!

AVR is rarely, if ever, up to date.

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Filed: Citizen (apr) Country: Belgium
Timeline
Posted

AVR is rarely, if ever, up to date.

Calling NVC right now... they must be busy cuz i'v been on hold for 15 min ...

07-29-2009 Arrival in the US
08-05-2009 Senior in highschool - meet Bradley
06-23-2010 Leave US
02-15-2011 Back in US
03-11-2011 My weddingday
03-22-2011 Leave US

USCIS
04-06-2011 Send I 130 Petition
04-08-2011 Delivery at Chicago Lockbox
04-18-2011 Email/Text NOA1 Receipt
04-19-2011 Touched
04-28-2011 Hardcopy NOA1 in the mail
06-27-2011 N0A2! Approval! Yeey! No RFE's!
07-01-2011 Hardcopy NOA2
Total USCIS : 70 days

NVC
08-02-2011 NVC case number
08-04-2011 DS 3032 + IIN + Received I864 Bill + Paid I864 Bill
08-05-2011 Put in DS 3032 File
08-16-2011 Paid IV Bill
08-31-2011 Send in I864 Packet + IV Packet
09-03-2011 NVC Received Packages
09-09-2011 Operator assistance : I864 Approval, one more document missing for DS230 (=RFE)
09-12-2011 Send in RFE
09-21-2011 Approval NVC!!

The Homecoming...
10-06-2011 Medical Exam: Approved!
10-18-2011 Interview at Brussels US Embassy
10-27-2011 Back at Embassy to submit another document
10-27-2011 APPROVAL
01-11-2011 POE
183 days from NOA1 and interview ...
10-31-2011 Hubby leaves with Army
12-15-2011 Reunited, hubby is home: At last :)

*Happy ever after*

Filed: Lift. Cond. (apr) Country: India
Timeline
Posted

Calling NVC right now... they must be busy cuz i'v been on hold for 15 min ...

First day back after a long weekend...I expect them to be busy today.

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Filed: Citizen (apr) Country: Belgium
Timeline
Posted

First day back after a long weekend...I expect them to be busy today.

Got them online, they said to wait 20 days for it to get to their system... will call back Friday I think ...

07-29-2009 Arrival in the US
08-05-2009 Senior in highschool - meet Bradley
06-23-2010 Leave US
02-15-2011 Back in US
03-11-2011 My weddingday
03-22-2011 Leave US

USCIS
04-06-2011 Send I 130 Petition
04-08-2011 Delivery at Chicago Lockbox
04-18-2011 Email/Text NOA1 Receipt
04-19-2011 Touched
04-28-2011 Hardcopy NOA1 in the mail
06-27-2011 N0A2! Approval! Yeey! No RFE's!
07-01-2011 Hardcopy NOA2
Total USCIS : 70 days

NVC
08-02-2011 NVC case number
08-04-2011 DS 3032 + IIN + Received I864 Bill + Paid I864 Bill
08-05-2011 Put in DS 3032 File
08-16-2011 Paid IV Bill
08-31-2011 Send in I864 Packet + IV Packet
09-03-2011 NVC Received Packages
09-09-2011 Operator assistance : I864 Approval, one more document missing for DS230 (=RFE)
09-12-2011 Send in RFE
09-21-2011 Approval NVC!!

The Homecoming...
10-06-2011 Medical Exam: Approved!
10-18-2011 Interview at Brussels US Embassy
10-27-2011 Back at Embassy to submit another document
10-27-2011 APPROVAL
01-11-2011 POE
183 days from NOA1 and interview ...
10-31-2011 Hubby leaves with Army
12-15-2011 Reunited, hubby is home: At last :)

*Happy ever after*

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...