Hello everyone need a little advise, anyone experiencing delays in change of consulate. My wife process has come to a Dead Stop, petition on hold. On Aug 01, I received the AOS Fee Bill for my son and wife; upon receiving the AOS Fee Bill, I noticed that NVC has issued a wrong consulate for my wife, Bangkok Thailand??? instated of Vientiane, Lao.

The NVC was informed immediately by e-mail and over the phone for issuing the wrong consulate for my wife. NVC advised, e-mail a copy of my wife Lao passport and continue with the process and correct consulate will be change soon. On Aug 06, I received the IV Fee Bill for my son and as of today no IV Fee Bill for my wife or any changes to reflect correct consulate.

Anyone know approximately how long we have wait for NVC to make the correction in assigning the correct consulate and generating the IV Fee Bill for my wife? Any feedbacks are greatly appreciated. Thanks.

I got my consulate change after I paid my AOS fee. And it took 5 days to change consulate and 7 days to get the AOS fee status changed to PAID due to change in consulate in the middle of that payment.

USA

01/08/13 - Approved and GC is order for production on 1/8/14

09/12/13 - Case transferred to CSC. NOA2 received on 09/18/13

08/30/13 - Biometrics Done - No walk ins allowed at this LSC (received on 8/16/13).

08/05/13 - NOA1 (received on 08/10/13)

08/01/13 - Mailed I-751 (received on 8/2/13 - check cashed on 8/5/13)

12/28/11 - Received SSN (applied on 12/20/11, as we didn't get based on DS-230 options)
11/28/11 - Received Green Card (Expires on 10/30/13) - Welcome Letter on 11/17/11
10/30/11 - POE - Houston, TX

Chennai Consulate (40 days)
10/28/11 - Received Visa papers and Passport at VFS
10/25/11 - Interview Cleared Successfully (Spouse was not allowed in)

NVC: (90 days from NOA2 to Consulate)
08/31/11 - Case Completed (Interview 10/25/11) - Received at Chennai on 09/19/11
07/22/11 - NVC Case Number

USCIS: (92 days)

6/21/11 - NOA2 (NOA1 on 3/25/11) - took a month to get to NVC
3/21/11 - I-130 sent to USCIS Lockbox, Chicago.

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

DS-3032 accepted yesterday.

Received and paid IV bill this morning.

Hey Dave,

Did you have any trouble paying the AOS fee online? I got the invoice from NVC and followed the instructions, but when I log into the payment site and click on pay selected fees, it doesn't do anything. Has anyone had this problem before? I want to pay online because it's faster that way. Called NVC and I guess they are closed today for some reason. It's not even a holiday!

04-13-11: I-130 sent

04-15-11: NOA1 notification

07-07-11: NOA2 notification

08-09-11: NVC Receipt (case and invoice id numbers received)

08-10-11: Emailed DS-3032

08-12-11: Paid AOS fee online and emailed DS-3032

08-16-11: DS-3032 accepted

08-17-11: Paid IV fee online and mailed AOS packet

08-20-11: Mailed IV packet

08-24-11: AOS packet approved

08-30-11: IV packet approved

08-30-11: Case complete at NVC!!!

10-04-11: Granted an expedite

11-04-11: Interview & APPROVAL - visa received same day

11-08-11: POE - Seattle, WA

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Belgium
Timeline

Ready to pay the IV APP Fee online ..

Can we send both benificary and petitioner documents in 1 packet to NVC?

And, how about translations of police certificates/birthcertificate for the beneficiary? Do I need it translated to English?

It is written in the official language of my homecountry though ..

I dont really understand the translation things ..

thanks for any help

07-29-2009 Arrival in the US
08-05-2009 Senior in highschool - meet Bradley
06-23-2010 Leave US
02-15-2011 Back in US
03-11-2011 My weddingday
03-22-2011 Leave US

USCIS
04-06-2011 Send I 130 Petition
04-08-2011 Delivery at Chicago Lockbox
04-18-2011 Email/Text NOA1 Receipt
04-19-2011 Touched
04-28-2011 Hardcopy NOA1 in the mail
06-27-2011 N0A2! Approval! Yeey! No RFE's!
07-01-2011 Hardcopy NOA2
Total USCIS : 70 days

NVC
08-02-2011 NVC case number
08-04-2011 DS 3032 + IIN + Received I864 Bill + Paid I864 Bill
08-05-2011 Put in DS 3032 File
08-16-2011 Paid IV Bill
08-31-2011 Send in I864 Packet + IV Packet
09-03-2011 NVC Received Packages
09-09-2011 Operator assistance : I864 Approval, one more document missing for DS230 (=RFE)
09-12-2011 Send in RFE
09-21-2011 Approval NVC!!

The Homecoming...
10-06-2011 Medical Exam: Approved!
10-18-2011 Interview at Brussels US Embassy
10-27-2011 Back at Embassy to submit another document
10-27-2011 APPROVAL
01-11-2011 POE
183 days from NOA1 and interview ...
10-31-2011 Hubby leaves with Army
12-15-2011 Reunited, hubby is home: At last :)

*Happy ever after*

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline

Ready to pay the IV APP Fee online ..

Can we send both benificary and petitioner documents in 1 packet to NVC?

And, how about translations of police certificates/birthcertificate for the beneficiary? Do I need it translated to English?

It is written in the official language of my homecountry though ..

I dont really understand the translation things ..

thanks for any help

Lytha, the following is a direct quote from this NVC page:

Translation Requirements

All documents not written in English, or in the official language of the country in which application for a visa is being made, must be accompanied by certified translations and submitted to the NVC. The translation must include a statement signed by the translator stating that the:

Translation is accurate, and

Translator is competent to translate.

Based on this quotation, you don't need to translate documents that will be sent to the NVC as long as they are in an official language of Belgium.

Edited by Ryan H

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Hey Dave,

Did you have any trouble paying the AOS fee online? I got the invoice from NVC and followed the instructions, but when I log into the payment site and click on pay selected fees, it doesn't do anything. Has anyone had this problem before? I want to pay online because it's faster that way. Called NVC and I guess they are closed today for some reason. It's not even a holiday!

Well, I figured things out after doing a little research online. Apparently, the secure site does not support the web browser Safari. So this is a heads up to anyone who uses Safari with Macintosh, remember that you have to use a different browser to make the payment.

04-13-11: I-130 sent

04-15-11: NOA1 notification

07-07-11: NOA2 notification

08-09-11: NVC Receipt (case and invoice id numbers received)

08-10-11: Emailed DS-3032

08-12-11: Paid AOS fee online and emailed DS-3032

08-16-11: DS-3032 accepted

08-17-11: Paid IV fee online and mailed AOS packet

08-20-11: Mailed IV packet

08-24-11: AOS packet approved

08-30-11: IV packet approved

08-30-11: Case complete at NVC!!!

10-04-11: Granted an expedite

11-04-11: Interview & APPROVAL - visa received same day

11-08-11: POE - Seattle, WA

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

IV bill status marked paid will mail off DS-230 packet overnight on monday since I am out of town.

Edited by Dave and Kinnari

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline

Ready to pay the IV APP Fee online ..

Can we send both benificary and petitioner documents in 1 packet to NVC?

thanks for any help

Send AOS with the AOS barcode coverseheet (printed from billing system after its "paid".

Send IV with IV barcode coversheet.

I imagine you can paperclip the individual packets to keep them separate, and mail them both in one postal envelope to save $$$.

(see my signature for link to official NVC instructions about ds-230 documents)

-M

IV bill status marked paid will mail off DS-230 packet overnight on monday since I am out of town.

:dance: :dance: :dance: :dance: way to go, Dave! It's taking about 7 days to review. Speedy progress to you!!!

IR-1/CR-1 Spouse CA Svc Ctr 2011 (82 days) Apr07: NOA1. Jun27: NOA2 text.
Delivery from USCIS to NVC (24 days) Jul21: CSC mailed it to NVC

NVC (43 days)
Jul25: "in the NVC bldg"---->Jul26: NVC Case#,IIN# (1 day in-house, 29 days since NOA2)

AOS i-864.....Jul28: bill rcv'd (2 days)& paid ---->Aug01: "paid"/mailed (4 days). Aug3: AOS in the bldg
Aug 11: phone rep "AOS RFE: 23/24a: no blanks" (pdf won't print n/a"). Fedex'd new copy (arrived Aug 12)
Aug 22: AOS approved

IV ds-230:
Jul26: send DS-3032 ----> Jul29: DS-3032 accepted (3 days)
Aug01: bill rcv'd (2 days)& paid ---->Aug02: "paid"/mailed (1 day)
Aug04:ds-230 delivered ---> Aug 12: "under review"
Aug 15: phone rep "RFE:ds-230 #30." (16th bdate left as "----") Fedex'd new copy (arrived Aug 16)
Aug 30: phone rep: "no military record." me: "it's there!" rep: "15 biz days starting today"
Sep 06: phone rep: "needs review. 15 MORE biz days" me: "no way" Supervisor asks Mgr "open file & verify it's complete since 8/16." 6 hours later: CASE CLOSED!

Consulate
Sep 13: INTERVIEW scheduled, email letter arrived
Sep 15: MEDICAL in Stockholm
Sep 23: Packet Left NVC -> Embassy
Oct 31: INTERVIEW 4-minutes and DONE. APPROVED. Visa is "in the mail"

Nov 27: arrival in USA

DIVORCE: final May 2015 - never whould have married without dating in-person for at least a year.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline

Well.. another week of my life spent in limbo. NVC says my case is still not in the system. Its in house just not entered fully yet. They have changed their standard BS responses to be more in line with their actual processes. Originally they would tell me it takes 15 days... then 15-20 days... then 15-20 BUSINESS days... and yesterday I was told they are really busy and to wait 20-30 BUSINESS days.

July 11th NOA2... August 13 still waiting for NVC

I can generally convince myself not to worry or not to stress, but this process has fried every patient cell in my body. Throw in my crazy work schedule and I am just plain irritated and tired. I want my husband here to give me a big hug! I miss him sooo much :cry:

Edited by ~Hot Mama~

02/06/2011 ~ MARRIED IN REPUBLIC OF GEORGIA

03/31/2011 ~ FILED I-130 & G325A (SENT TO CHICAGO LOCKBOX VIA UPS)

04/09/2011 ~ RECEIVED NOA1 IN MAIL :-)

07/11/2011 ~ APPROVED WOOOOOOOO HOOOOOOOO!!!!!

07/29/2011 ~ NVC RECEIVED CASE

08/22/2011 ~ RECEIVED NVC CASE# AND IIN

08/24/2011 ~ EMAILED DS-3032 SENT VIA HUBBYS EMAIL ACCOUNT

08/25/2011 ~ RECEIVED 3 EMAILS FROM NVC

08/25/2011 ~ PAID AOS FEE $88.00

08/26/2011 ~ AOS FEE SHOWS "PAID" - RECEIPT PRINTED AND READY TO MAIL

08/30/2011 ~ AOS PACKAGE SENT FEDEX OVERNIGHT

09/01/2011 ~ IV BILL INVOICED AND PAID

09/06/2011 ~ AOS PACKAGE APPROVED

09/09/2011 ~ IV PACKAGE SENT TO NVC VIA FEDEX OVERNIGHT

09/15/2011 ~ CASE CLOSED

INTERVIEW DATE ~ 11/30/2011 - APPROVED

12/04/2011 ~ ENTERED USA THROUGH JFK AIRPORT

STILL WAITING FOR GREEN CARD......

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Well.. another week of my life spent in limbo. NVC says my case is still not in the system. Its in house just not entered fully yet. They have changed their standard BS responses to be more in line with their actual processes. Originally they would tell me it takes 15 days... then 15-20 days... then 15-20 BUSINESS days... and yesterday I was told they are really busy and to wait 20-30 BUSINESS days.

July 11th NOA2... August 13 still waiting for NVC

I can generally convince myself not to worry or not to stress, but this process has fried every patient cell in my body. Throw in my crazy work schedule and I am just plain irritated and tired. I want my husband here to give me a big hug! I miss him sooo much :cry:

Man, I thought for sure you would have gotten it this past week!

I REALLY hope you get it soon.

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Well, I figured things out after doing a little research online. Apparently, the secure site does not support the web browser Safari. So this is a heads up to anyone who uses Safari with Macintosh, remember that you have to use a different browser to make the payment.

Sorry Shanna! I was out of town when you posted. In one of my earlier post I do believe I stated something about this as I had issues with Google Chrome.

Glad you got it figured out!

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Well.. another week of my life spent in limbo. NVC says my case is still not in the system. Its in house just not entered fully yet. They have changed their standard BS responses to be more in line with their actual processes. Originally they would tell me it takes 15 days... then 15-20 days... then 15-20 BUSINESS days... and yesterday I was told they are really busy and to wait 20-30 BUSINESS days.

July 11th NOA2... August 13 still waiting for NVC

I can generally convince myself not to worry or not to stress, but this process has fried every patient cell in my body. Throw in my crazy work schedule and I am just plain irritated and tired. I want my husband here to give me a big hug! I miss him sooo much :cry:

I just wanted to say, "Me too!" We have the same date for NOA2, and still no case number. And more than anything? I just want a hug.

USC attempting to obtain GC for Canadian husband


event.png


Apr 11, 2011: I-130 filed
Jul 11, 2011: I-130 approved
Aug 18, 2011: NVC process begins
Oct 6, 2011: NVC process completed
Nov 4, 2011: Interview date assigned
Dec 2, 2011: Interview at Consulate (Result: AP - No reason given on 221g)
Feb 7, 2012: Passport requested by Consulate
(...Husband needed passport for personal reasons during this time...)
Apr 9, 2012: Passport mailed to Consulate
Apr 25, 2012: Visa issued
May 1, 2012: Visa in hand
May 31, 2012: POE at Montreal's Trudeau Airport
Early July: Physical Green Card received in mail. Yes, it's green!

March 13, 2014: ROC filed (went to VSC)

March 17, 2014: NOA

April 22, 2014: Biometrics appointment

December 9, 2014: Case inquiry initiated

December 11, 2014: Response: "The processing of your case has been delayed. A check of our records establishes that your case is not yet ready for decision, as the required security checks remain pending."

March 14, 2014: Received NOA that approval had been given on March 10; expect new GC within 60 days.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I just wanted to say, "Me too!" We have the same date for NOA2, and still no case number. And more than anything? I just want a hug.

My NOA2-07/08.. BUT STILL NO CASE NUMBER

USCIS

3-23-2011- I-130 Application Mailed to Chicago Lockbox

3-28-2011- Package Received

07-08-2011- NOA2 Status Update(Priority Date)

07-11-2011- NOA2 Hard Copy Received

NVC

8-01-2011- NVC Received

8-22-2011- NVC Case# & IIN Received by email from NVC & E-mails Exchanged (After44 Days)

8-22-2011- DS-3032 Email sent

8-24-2011- DS-3032 mail accepted

8-25-2011- Received Bill & Paid for I-864

8-28-2011- Received Bill & Paid for DS-230

8-29-2011- Paid status for I-864

8-30-2011- Paid status for DS-230

9-02-2011- I-864 Delivered At NVC

9-06-2011- DS-230 Mailed

9-08-2011- I-864 Approved

9-08-2011- DS-230 delivered at NVC

9-13-2011- DS-230 Approved & Case completed

11-10-2011-Interview date!!!!!!!!!12-13-2011

11-23-2011- Medical completed

12-13-2011- Interview date....Approved today...........:)

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: India
Timeline

Just mailed off the DS-230 Packet.

Lets hope for no RFE'S and a close date before the end of the month!

USCIS- (77 Days)
I-130 Sent : 04-05-2011
I-130 NOA1 : 04-08-2011
I-130 NOA2 : 06-24-2011

NVC- (29 Days)
NVC Received : 07-25-2011

NVC Case Closed: 08-23-2011
Medical/VFS/Interview
Interview Date Recieved: 09-02-2011
Medical Completed: 09-16-2011
VFS Fees Paid and Documents Submitted: 10-21-2011
Interview: 11-10-2011

Interview Status: Approved
Visa In Hand: 11-10-2011

USA

P.O.E- Chicago, IL: 12-16-11
Recieved Welcome Letter: 01-03-2012
Received Green Card: 01-19-2012
Re-applied for SSN: 01-23-2012
Received SSN: 01-27-2012

Apply for Removal of Conditions: 09-17-13

ROC- (112 Days)

I-751 Sent (CSC): 11-22-13

Check Cashed: 11-27-13

I-751 NOA1: 11-30-13

Biometrics: 12-23-13
Case Status: Approved
Green Card Issued: 3-14-14

Green Card In Hand: 3-20-14

CITIZENSHIP

Apply For N-400: 1-28-15

Check Cashed: 02-5-15

NOA: 02-11-15

Biometrics: 03-2-15

In Line Interview: 06-10-15

Interview: 07-20-15

Interview Status: Approved

Oath Ceremony: 08-20-15

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: China
Timeline

Just mailed off the DS-230 Packet.

Lets hope for no RFE'S and a close date before the end of the month!

:thumbs:

Our journey:

Spoiler

September 2007: Met online via social networking site (MySpace); began exchanging messages.
March 26, 2009: We become a couple!
September 10, 2009: Arrived for first meeting in-person!
June 17, 2010: Arrived for second in-person meeting and start of travel together to other areas of China!
June 21, 2010: Engaged!!!
September 1, 2010: Switched course from K1 to CR-1
December 8, 2010: Wedding date set; it will be on February 18, 2011!
February 9, 2011: Depart for China
February 11, 2011: Registered for marriage in Wuhan, officially married!!!
February 18, 2011: Wedding ceremony in Shiyan!!!
April 22, 2011: Mailed I-130 to Chicago
April 28, 2011: Received NOA1 via text/email, file routed to CSC (priority date April 25th)
April 29, 2011: Updated
May 3, 2011: Received NOA1 hardcopy in mail
July 26, 2011: Received NOA2 via text/email!!!
July 30, 2011: Received NOA2 hardcopy in mail
August 8, 2011: NVC received file
September 1, 2011: NVC case number assigned
September 2, 2011: AOS invoice received, OPTIN email for EP sent
September 7, 2011: Paid AOS bill (payment portal showed PAID on September 9, 2011)
September 8, 2011: OPTIN email accepted, GZO number assigned
September 10, 2011: Emailed AOS package
September 12, 2011: IV bill invoiced
September 13, 2011: Paid IV bill (payment portal showed PAID on September 14, 2011)
September 14, 2011: Emailed IV package
October 3, 2011: Emailed checklist response (checklist generated due to typo on Form DS-230)
October 6, 2011: Case complete at NVC
November 10, 2011: Interview - APPROVED!!!
December 7, 2011: POE - Sea-Tac Airport

September 17, 2013: Mailed I-751 to CSC

September 23, 2013: Received NOA1 in mail (receipt date September 19th)

October 16, 2013: Biometrics Appointment

January 28, 2014: Production of new Green Card ordered

February 3, 2014: New Green Card received; done with USCIS until fall of 2023*

December 18, 2023:  Filed I-90 to renew Green Card

December 21, 2023:  Production of new Green Card ordered - will be seeing USCIS again every 10 years for renewal

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline

THANKS DAVE AND TERCERERO!

I called this morning and sat on hold forever only to get the rudest lady ever who told be to give them 30-45 business days from August 1st. I said what happened to the 15-20 business days? She said 15-20 days is for them to receive the case from CSC.. then another 30-45 business days for them to enter it. Case in point... they know they are slow and they are telling people whatever to get them off the phone. :bonk:

I really hope something happens this week as I can no longer speak nicely to those moorons!

02/06/2011 ~ MARRIED IN REPUBLIC OF GEORGIA

03/31/2011 ~ FILED I-130 & G325A (SENT TO CHICAGO LOCKBOX VIA UPS)

04/09/2011 ~ RECEIVED NOA1 IN MAIL :-)

07/11/2011 ~ APPROVED WOOOOOOOO HOOOOOOOO!!!!!

07/29/2011 ~ NVC RECEIVED CASE

08/22/2011 ~ RECEIVED NVC CASE# AND IIN

08/24/2011 ~ EMAILED DS-3032 SENT VIA HUBBYS EMAIL ACCOUNT

08/25/2011 ~ RECEIVED 3 EMAILS FROM NVC

08/25/2011 ~ PAID AOS FEE $88.00

08/26/2011 ~ AOS FEE SHOWS "PAID" - RECEIPT PRINTED AND READY TO MAIL

08/30/2011 ~ AOS PACKAGE SENT FEDEX OVERNIGHT

09/01/2011 ~ IV BILL INVOICED AND PAID

09/06/2011 ~ AOS PACKAGE APPROVED

09/09/2011 ~ IV PACKAGE SENT TO NVC VIA FEDEX OVERNIGHT

09/15/2011 ~ CASE CLOSED

INTERVIEW DATE ~ 11/30/2011 - APPROVED

12/04/2011 ~ ENTERED USA THROUGH JFK AIRPORT

STILL WAITING FOR GREEN CARD......

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...