Timeline

Guys i have a question.I paid AOS 80 $ fee bill by money order ..i sended by post mail like 10 days ago.still showing in the system "not paid".i sended DS3032 Choice of agent by email and they receieved.After that they send me email back where they wrote:

"You have been registered as agent for the immigrant visa petition of ...................... The

Immigrant Visa Processing Fee for each applicant indicated on the enclosed fee bill invoice(s) must be paid

before petition processing can continue. An invoice for each eligible applicant is enclosed."

Amount Due: $404.00

And my question is should i have to wait some paper to send me back from the first payment from 88 $ AOS to come on my door or i can pay right the way this amount 404 $.I heard something how i need some number or code from that paper from the first fee bill.is that true ?

USCIS:

10/13/2010-marriage

11/15/2010-I-130 packet received

11/17/2010-notice date

11/23/2010-last update

04/08/2011-I-130 Approved

04/16/2011-received NOA2 hard copy

NVC:

22/04/2011-received NVC case number

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

That is the IV fee. All information needed for it can be obtained by calling them.

Follow the instructions and send it off. You dont need to wait for them to confirm AOS payment if they have already invoiced it

Its much faster to pay online. Paying online you need the IIN numbers to sign in, which you call them for.

Edited by bigbigblake
Link to comment
Share on other sites

Filed: K-3 Visa Country: Mexico
Timeline

Well,,, today is the 20th business day since electronic submission & acknowledgment by the NVC. I called to inquire on the status of my 3 cases, and all I got was "Sir, we can see that everything is here & is still under review. It can take up to 4 weeks, but you may want to call back in a week to check the status again at that time". Augh! I think I'm going to start calling every day now moving forward! I feel it's close to completion, and no RFE's yet... Come on NVC!! Let's wrap it up! :yes:

USCIS Journey (223 days):

03/31/10: Married mi hermosa angelito!

07/14/10: Notice Date (NOA1)

11/02/10: Transfer Notice (moved to TSC)

11/29/10: Touch

02/17/11: Received e-mail update - Transferring back to CSC

02/23/11: Approval!!/Post Decision Activity

03/01/11: Received hard-copy NOA2 for cases. Has been forwarded to the Dept. of State NVC!

03/09/11: Case(s) at NVC!

NVC Process (78 days)

03/10/11: Case #'s assigned! Woot!

03/31/11: 1 year wedding anniversary!

04/20/11: Attorney submitting IV application to NVC

04/21/11: DS-260 receipt confirmation e-mail received

05/25/11: Received "checklist" e-mail (asking for AOS docs...but already submitted)

05/26/11: SIF when logging-in to payment portal (all 3 cases!)

05/27/11: Case Complete!

Medical / Consulate Interview

06/03/11: Interview date scheduled for July 8, 2011 !!! Augh! Wow!

06/9&13/11: Biometrics (fingerprints) appointment

07/06/11: Physicals in Juarez - Complete!

07/08/11: Consulate Interview = Complete & APPROVED!!

07/15/11: Visa's received!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

Well,,, today is the 20th business day since electronic submission & acknowledgment by the NVC. I called to inquire on the status of my 3 cases, and all I got was "Sir, we can see that everything is here & is still under review. It can take up to 4 weeks, but you may want to call back in a week to check the status again at that time". Augh! I think I'm going to start calling every day now moving forward! I feel it's close to completion, and no RFE's yet... Come on NVC!! Let's wrap it up! :yes:

:thumbs: Seems like NVC is really slowing down now :bonk:

Link to comment
Share on other sites

Filed: Timeline

So does NVC assing all the intervies or the embassy does...

we are goin through Mumbai Embassy...

Digital,

I saw in your timeline that you received a RFE for PCC, what was this RFE about for the PCC? and what should we send for PCC to NVC? and can you let me know all the documents that you sent to NVC with DS-230 and AOS & did you send in the originals?

Edited by raj1975
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Digital,

I saw in your timeline that you received a RFE for PCC, what was this RFE about for the PCC? and what should we send for PCC to NVC? and can you let me know all the documents that you sent to NVC with DS-230 and AOS & did you send in the originals?

Raj... try this link it tells you everything you need to do at NVC...and the police clearance is a must have for the ds 230 documents...not sure why they got rfe for it but you have to be cautious that you are sending a police clearance that still has a valid date and not expired ...might have to obtain another one prior to interview if it expires before then

http://www.visajourney.com/wiki/index.php/Jame%27s_Shortcut

10/02/2010 Nikah/Marriage in Karachi
USCIS JOURNEY
11/10/2010 -Sent
03/24/2011 i 130 approved!!!
NVC JOURNEY
03/30/2011 NVC received case-04/07/2011 NVC Case Number Assigned
05/03/2011 CASE COMPLETE- In Que for INTERVIEW!!-05/17/2011 Received interview letter and info via email
EMBASSY JOURNEY
05/20/2011 Medical Appt/passed
06/15/2011 Interview result AP
06/21/2011 Submitted requested docs..under review
07/25/2011 CO called did phone interview result: PENDING MANDATORY AP/CO told us they have to do namechecks

03/07/2013 Case returned to USCIS waiting for NOIR/reaffirmation

04/18/2013 USCIS received case for review

08/19/2013 Received NOIR to respond by 9/18/2013

9/9/2013 Responded to NOIR/USCIS received documents awaiting response

9/20/2013 USCIS reaffirmed sent to embassy

1/04/14 Case opened for review

8/31/15 Interview- no questions visa approved on the spot

9/8/15 visa status issued

9/10/15 visa received

9/19/15 POE Charlotte

p9WGm4.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Digital,

I saw in your timeline that you received a RFE for PCC, what was this RFE about for the PCC? and what should we send for PCC to NVC? and can you let me know all the documents that you sent to NVC with DS-230 and AOS & did you send in the originals?

Hi Raj...

well as u know u will need ur PCC... and from reading here most of the time people were able to get their PCC just by showing their barcoded page... well my wife is from gujarat and here local police station said she will need a "Checklist letter" from NVC for them to issue a PCC... and the only way u can get that checklist letter is if u get an RFE from NVC...

well i did get the Checklist letter and my wife got her PCC without any problem...

but later i found out that u can submit ur PCC at the time of the interview and u dont have to send it in...

okay with AOS... u will need ur Taxtranscripts for the past 3 yrs..., i also sent in copies of paystubs, Employment letter and since i had a joint sponsor... i had my uncle send in his 2010 tax return and letter of assurance from him..

as for DS-230... original... Marriage Certificate, Birth Certificate, copy of passport Biography page, PCC

and if ur marriage certificate is in anyother language other than english then u will need an attested translation...

in india i think a notary guy can do it...

hope it helps..

USCIS Process - CR-1 Visa

Service Center :: California Service Center

Consulate :: MUMBAI - INDIA

08 / 05 / 2010 :: I-130 Sent

02 / 10 / 2011 :: NOA-2 - TXT and Email ***After Senator Help Was Requested

02 / 19 / 2011 :: Hardcopy Received in Snail Mail

Total 185 Days For Approval

NVC Process - 19 Days to Reach NVC

02 / 28 / 2011 :: NVC Receive

05 / 16 / 2011 :: Sign in Failed

05 / 17 / 2011 :: NVC Case Complete

Total 78 Days for Completion At NVC

Medical / Interview / POE

05 / 26 / 2011 :: Interview Date Received - Packet 4

06 / 07 / 2011 :: Medical - DONE

07 / 05 / 2011 :: VFS Fees Paid

07 / 18 / 2011 :: Interview - APPROVED

07 / 18 / 2011 :: Picked up Visa in the Evening

07 / 23 / 2011 :: P.O.E - Washington DC - Dulles Airport

WIFE IS FINALLY HERE!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

I just called NVC and still nothing yet. I had asked for a supervisor to take a look at my case 2 days ago and nothing is showing up on the system. The operator told me to just resend to be on the safe side. I had sent my supporting documents for the IV on April 18 and I resent it again with a note on May 6 and now he tells me to send it again. For the AOS I had received a checklist and I sent the checklist on May 2 and nothing for that either. I NOW hate NVC!!! :cry2:

USCIS (204 days)

08-05-10: I-130 package sent USPS Express

08-06-10: Package delivered in Chicago (Received Date) (Priority Date)

08-18-2010: NOA1 (Notice Date) Received text & email with case number, Check Cashed

08-21-10: Hardcopy NOA1

11-02-10 Case Transferred from CSC to TSC

11-03-10 Hardcopy Transfer to TSC Notice

11-24-10 Transferred TSC to USCIS Office

02-14-11 Received e-mail & text for RFE

02-18-11 Hard Copy RFE

02-28-11 Mailed RFE overnight

03-03-11 RFE received by TSC

03-10-2011 NOA2 Approved

03-16-11 TSC mailed package to NVC

03-17-11 Hard Copy NOA2

03-18-01 NVC Received package

NVC (Electronic Processing) (87 days)

03-18-2011 Case number assigned, OPTIN e-mailed

03-21-11 Gave e-mails; received IID# BID#; Submitted DS-261

03-22-11 AOS Invoiced, Sent AOS Payment

03-23-11 AOS shows PAID, e-mailed AOS Package

03-25-11 IV Invoiced, Sent IV Payment

03-28-11 IV Shows PAID

03-30-11 Completed DS-260

04-07-11 OPTIN Accepted; AOS Package resent

04-18-11 Submitted Supporting Documents for IV

04-19-11 Received RFE for AOS

04-23-11 Received False RFE for Missing IV

05-02-11 E-mailed AOS RFE

05-06-11 Resent IV

05-23-11 False RFE for Missing AOS RFE; Resent AOS RFE

06-10-11 SIF

06-13-11 Case Complete

Consulate/Medical

06-14-11 Interview Scheduled for 07-18-11

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: France
Timeline

I just called NVC and still nothing yet. I had asked for a supervisor to take a look at my case 2 days ago and nothing is showing up on the system. The operator told me to just resend to be on the safe side. I had sent my supporting documents for the IV on April 18 and I resent it again with a note on May 6 and now he tells me to send it again. For the AOS I had received a checklist and I sent the checklist on May 2 and nothing for that either. I NOW hate NVC!!! :cry2:

Hang in there, CaliforniaGuy, they are full of ####### right up to the day you finally get out! I'm pulling for you to get the interview date you've been hoping for!

Marriage: 09/18/2010 (France)

USCIS (CSC)

10/18/2010 I-130 Sent

10/24/2010 NOA1

03/07/2011 NOA2

NVC

03/24/2011 Case # Assigned

04/17/2011 Received RFE

04/23/2011 Received RFE

05/04/2011 Case Complete

05/13/2011 Interview Date Assigned

Embassy & POE

06/15/2011 Medical Passed

06/21/2011 Interview - APPROVED

06/29/2011 Visa Received

07/02/2011 POE - Calgary

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Hang in there, CaliforniaGuy, they are full of ####### right up to the day you finally get out! I'm pulling for you to get the interview date you've been hoping for!

Thanks and even if I don't get the interview date in the beginning of July I just want to get out of this NVC blackhole. I saw a nighmare last night. Apparently I had called the NVC AVR in my nightmare and I heard a recording that my petition was denied completely. USCIS apparently had canceled my petiton and I tried talking to a human and the number was out of service and I couldn't get a hold of anyone and was going nuts. I was sooo glad to wake up in the middle of the night lol. And its sooo rare that I wake up in the middle of the night from a nightmare. This journey is really taking a toll on our lives.

USCIS (204 days)

08-05-10: I-130 package sent USPS Express

08-06-10: Package delivered in Chicago (Received Date) (Priority Date)

08-18-2010: NOA1 (Notice Date) Received text & email with case number, Check Cashed

08-21-10: Hardcopy NOA1

11-02-10 Case Transferred from CSC to TSC

11-03-10 Hardcopy Transfer to TSC Notice

11-24-10 Transferred TSC to USCIS Office

02-14-11 Received e-mail & text for RFE

02-18-11 Hard Copy RFE

02-28-11 Mailed RFE overnight

03-03-11 RFE received by TSC

03-10-2011 NOA2 Approved

03-16-11 TSC mailed package to NVC

03-17-11 Hard Copy NOA2

03-18-01 NVC Received package

NVC (Electronic Processing) (87 days)

03-18-2011 Case number assigned, OPTIN e-mailed

03-21-11 Gave e-mails; received IID# BID#; Submitted DS-261

03-22-11 AOS Invoiced, Sent AOS Payment

03-23-11 AOS shows PAID, e-mailed AOS Package

03-25-11 IV Invoiced, Sent IV Payment

03-28-11 IV Shows PAID

03-30-11 Completed DS-260

04-07-11 OPTIN Accepted; AOS Package resent

04-18-11 Submitted Supporting Documents for IV

04-19-11 Received RFE for AOS

04-23-11 Received False RFE for Missing IV

05-02-11 E-mailed AOS RFE

05-06-11 Resent IV

05-23-11 False RFE for Missing AOS RFE; Resent AOS RFE

06-10-11 SIF

06-13-11 Case Complete

Consulate/Medical

06-14-11 Interview Scheduled for 07-18-11

Link to comment
Share on other sites

Filed: Timeline

Raj... try this link it tells you everything you need to do at NVC...and the police clearance is a must have for the ds 230 documents...not sure why they got rfe for it but you have to be cautious that you are sending a police clearance that still has a valid date and not expired ...might have to obtain another one prior to interview if it expires before then

http://www.visajourney.com/wiki/index.php/Jame%27s_Shortcut

Thanks for the info EAbbas.

Hi Raj...

well as u know u will need ur PCC... and from reading here most of the time people were able to get their PCC just by showing their barcoded page... well my wife is from gujarat and here local police station said she will need a "Checklist letter" from NVC for them to issue a PCC... and the only way u can get that checklist letter is if u get an RFE from NVC...

well i did get the Checklist letter and my wife got her PCC without any problem...

but later i found out that u can submit ur PCC at the time of the interview and u dont have to send it in...

okay with AOS... u will need ur Taxtranscripts for the past 3 yrs..., i also sent in copies of paystubs, Employment letter and since i had a joint sponsor... i had my uncle send in his 2010 tax return and letter of assurance from him..

as for DS-230... original... Marriage Certificate, Birth Certificate, copy of passport Biography page, PCC

and if ur marriage certificate is in anyother language other than english then u will need an attested translation...

in india i think a notary guy can do it...

hope it helps..

Thanks a lot and good luck with your interview. Please do share your interview experience once done.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: France
Timeline

Thanks and even if I don't get the interview date in the beginning of July I just want to get out of this NVC blackhole. I saw a nighmare last night. Apparently I had called the NVC AVR in my nightmare and I heard a recording that my petition was denied completely. USCIS apparently had canceled my petiton and I tried talking to a human and the number was out of service and I couldn't get a hold of anyone and was going nuts. I was sooo glad to wake up in the middle of the night lol. And its sooo rare that I wake up in the middle of the night from a nightmare. This journey is really taking a toll on our lives.

Yeah I know exactly what you mean sad.gif

The NVC stage has been (by far) the most stressful part of the process for me. I spent so much time talking to/arguing with operators, listening to the AVR and its outdated information, reading stupid RFEs... that kind of stuff has a way of sneaking into your subconscious. Plus, after the "blind" waiting in the USCIS stage, it seems like you are going to have so much more control over what's going on at the NVC, but it's still pretty much a black hole, as you say. I definitely feel your pain.

But if it's any consolation, I always got good news when I least expected it. They like to beat you down as far as possible before letting you celebrate- haha.

Marriage: 09/18/2010 (France)

USCIS (CSC)

10/18/2010 I-130 Sent

10/24/2010 NOA1

03/07/2011 NOA2

NVC

03/24/2011 Case # Assigned

04/17/2011 Received RFE

04/23/2011 Received RFE

05/04/2011 Case Complete

05/13/2011 Interview Date Assigned

Embassy & POE

06/15/2011 Medical Passed

06/21/2011 Interview - APPROVED

06/29/2011 Visa Received

07/02/2011 POE - Calgary

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

I just called NVC and still nothing yet. I had asked for a supervisor to take a look at my case 2 days ago and nothing is showing up on the system. The operator told me to just resend to be on the safe side. I had sent my supporting documents for the IV on April 18 and I resent it again with a note on May 6 and now he tells me to send it again. For the AOS I had received a checklist and I sent the checklist on May 2 and nothing for that either. I NOW hate NVC!!! :cry2:

Hang in there....i got told they didnt have my aos up until my case closed!!!! Just when you think you wont get out you will!!!! Frustrating as everything!!!!! but look at the prize at the end :)) (L)

10/02/2010 Nikah/Marriage in Karachi
USCIS JOURNEY
11/10/2010 -Sent
03/24/2011 i 130 approved!!!
NVC JOURNEY
03/30/2011 NVC received case-04/07/2011 NVC Case Number Assigned
05/03/2011 CASE COMPLETE- In Que for INTERVIEW!!-05/17/2011 Received interview letter and info via email
EMBASSY JOURNEY
05/20/2011 Medical Appt/passed
06/15/2011 Interview result AP
06/21/2011 Submitted requested docs..under review
07/25/2011 CO called did phone interview result: PENDING MANDATORY AP/CO told us they have to do namechecks

03/07/2013 Case returned to USCIS waiting for NOIR/reaffirmation

04/18/2013 USCIS received case for review

08/19/2013 Received NOIR to respond by 9/18/2013

9/9/2013 Responded to NOIR/USCIS received documents awaiting response

9/20/2013 USCIS reaffirmed sent to embassy

1/04/14 Case opened for review

8/31/15 Interview- no questions visa approved on the spot

9/8/15 visa status issued

9/10/15 visa received

9/19/15 POE Charlotte

p9WGm4.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

I will agree with KimSue, NVC is a lot more stressful than USCIS was. At least at USCIS, you just waited for your turn.

All my documents have been at NVC since middle of April and I continue to receive false RFE emails that they don't have all my documents. Very frustrating, which is a nice way to put it without cussing.

The standard answer from NVC operators of waiting 20 days is getting old very fast.

Get your stuff together NVC.

-Fahed

11-22-07: Married

I-130 Stage

11-17-10: I-130 Sent

11-18-10: I-130 Delivered

11-22-10: NOA1

11-26-10: Touched

03-17-11: Touched

03-30-11: NOA2

NVC Stage

04-06-11: Case at NVC

05-24-11: Case Complete and SIF

05-27-11: Interview Date, 07-05-11

Link to comment
Share on other sites

Filed: Country: Canada
Timeline

Thanks and even if I don't get the interview date in the beginning of July I just want to get out of this NVC blackhole. I saw a nighmare last night. Apparently I had called the NVC AVR in my nightmare and I heard a recording that my petition was denied completely. USCIS apparently had canceled my petiton and I tried talking to a human and the number was out of service and I couldn't get a hold of anyone and was going nuts. I was sooo glad to wake up in the middle of the night lol. And its sooo rare that I wake up in the middle of the night from a nightmare. This journey is really taking a toll on our lives.

I'm with ya!! False RFE yesterday that freaked me out, but instead... it's just paprework "NOT YET" put into my file. It's frustrating knowing you did your part, but lord only knows when they'll do theirs. And of course, you and I both need that first week of July date. I'll take what I can get but after this whole journey, that would be icing on the cake.... I say we just keep trucking onward pretending in our minds that we'll both be interviewing in early July (until they tell us otherwise LOL ha ha ha).

Good lucK! (as I check my sign in again)

event.png

Married 09-19-10

I-130 Stage

10-31-10: I-130 Sent

03-16-11: APPROVED!!!!

(132 days from NOA1 to NOA2 at CSC)

NVC Stage

04-01-11: NVC Case Number Assigned/Sent Opt-in Email

04-05-11: Paid AOS Fee ($88) and got confirmation of OPTIN

04-09-11: Sent AOS package (I-864 and supporting documents)

04-11-11: Paid IV Fee ($404) and Choice of Agent confirmed and AOS package confirmed received

05-02-11: DS-260 filled out and submitted

05-06-11: Sent DS-260 Supporting Documents

06-07-11: Case Complete!!

(70 days in NVC)

Medical and Interview

07-27-11: Medical Appt.

08-08-11: Interview (221g) AP

09-15-11: Denied- Inadmissiable 212(a)(2)(A)(i)- CIMT

601-Waiver Process

09-12-12: Filed I-601 Waiver at lockbox (hired lawyer for this)

02-05-13: APPROVED (4 1/2 months)

03-08:13: Sent updated medical/other papers to Montreal

Waiting for VISA

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...