This is a reference for preparing packages for NVC. Hope this will help you with a NO Checklist. I do not have a checklist and AOS was approved. Still waiting for IV package to be reviewed.

Here is what I submitted for AOS Package:

  • Petitioner
  • AOS bar-coded cover sheet
  • Form I-864 (signed and dated)
  • 2013 Tax Transcript with W2
  • 2012 Tax Transcript with W2
  • 2011 Tax Transcript with W2
  • Online Employment Verification from https://www.theworknumber.com --> only if your company participate in it.
  • 4 months of pay stubs
  • Copy US Citizenship Certificate
  • Co-sponsor (if needed)
  • AOS bar-coded cover sheet
  • Form I-864A (signed and dated)
  • 2013 Tax Transcript with W2
  • 2012 Tax Transcript with W2
  • 2011 Tax Transcript with W2
  • Letter of Employment
  • 4 months of pay stubs
  • Photocopy of Marriage Certificate <-- if your spouse is a co-sponsor
  • Photocopy of US Citizenship Certificate

Here is what I submitted for IV Package:

  • IV bar-coded cover sheet
  • Two (2) passport-size photographs of beneficiary (case number, beneficiary’s full name, and date of birth are written on back of both)
  • Photocopy of the biographic data page of beneficiary’s passport
  • Certified copy of the birth certificate of beneficiary
  • Certified copy of the marriage certificate of beneficiary
  • Original police clearance certificate of beneficiary
  • Certified copy of the birth certificate of petitioner
  • Certified copy of Marriage Certificate of petitioner
  • Copy of US Citizenship Certificate of petitioner

I already submitted my AOS docs and on the website it did say that if you submit IRS transcripts you do not need to submit W2 I hope i don't get a checklist because of that....I also did not submit my citizenship cert with AOS or paystubs but i did submit my proof of current employment (print out from the work number as well). I'm going to go ahead and submit a copy with the IV docs, luckily I haven't sealed the envelope yet.

You do not need to submit DS260 with IV Package

Thanks, I ended up reading a little and realized that it is not even available until the payment clears and it was just invoiced and paid today. I already have all other docs and have made copies. I have originals on one side and copies on the next (trying to be as organized as possible).

Edited by gazaslimaz876

USCIS Step
01/22/15 I130 sent via UPS to Chicago Lockbox
01/23/15 Delivered
01/26/15 NOA1 email and text received.. sent to VSC.
01/27/15 Check cleared.
02/02/15 NOA1 hardcopy received.. priority date 01/23/2015
02/12/15 Approved (17 days from NOA1)
02/17/15 NOA2 email and text received
02/18/15 NOA2 hardcopy received
NVC Step
03/02/15 NVC Received (18 days from NOA2)
03/05/15 Case number assigned (3 days from NVC receipt)
03/06/15 DS261 & AOS billed
03/09/15 Completed DS261
03/25/15 DS261 Reviewed and accepted over the phone
03/26/15 IV fee invoiced
04/08/15 Paid AOS and IV fee
04/09/15 Payment cleared and D260 available.
04/13/15 Documents sent via UPS overnight
04/14/15 Documents received at NVC and DS260 Completed
04/16/15 NVC scanned documents
05/11/15 Checklist over phone
05/13/15 Mailed out corrected AOS via UPS overnight
05/14/15 Checklist documents received at NVC
05/18/15 NVC scanned checklist documents
06/18/15 Flagged for Supervisor review (past 30days review timeframe)
06/29/15 Hubby's Case Complete :rolleyes: , daughter's still pending :(
07/07/15 Baby girl's Case Complete
09/30/15 Interview Scheduled for 11/05/2015
10/01/15 P4 Email received

ConsulateStep
10/14/15 Case shows "ready"
10/22/15 Medical Completed
11/05/15 Interview - APPROVED

11/06/15 Case shows "Administrative Processing"

11/09/15 Case shows "Issued"

11/11/15 Visa Ready for pick up...picked up on 11/13/15

11/19/15 US Entry (POE Atlanta GA)

<p>USCIS Step (for mom)//09/30/2013 I-130 sent via UPS to Chicago Lockbox/10/06/2013 NOA1 email received10/09/2013/ NOA1 hardcopy received with PD 10/02/2013/03/07/2014 Email received that case being transferred/03/10/2014 Hardcopy received, case transferred to VSC/03/17/2014 NOA2 received via email/03/21/2014 NOA2 hardcopy received. NVC Step ../03/25/2014 NVC received case/ 04/25/2014 Case number, IIN and Beneficiary ID# received (Entered in system on 04/24/2014)/05/01/2014 Checked CEAC website and DS-261 available...completed DS-261/05/01/2014 AOS fee invoiced and paid/05/02/2014 AOS documents sent via UPS/05/05/2014 AOS packet delivered and signed for AND AOS fee status shows as paid./05/07/2014 Called NVC and DS-261 accepted. AOS packet not yet showing in system/05/08/2014 IV fee invoiced and paid. IV documents sent via UPS/05/09/2014 IV packet delivered by UPS AND AOS documents entered into system/05/09/2014 IV fee shows paid AND DS-260 available/05/13/2014 Submitted DS-260/05/30/2014 AOS approved (no checklists)/06/05/2014 Case Complete and I did it with no checklists.....YAYYYYY/06/10/2014 Interview Scheduled for 7/15/2014/06/12/2014 P4 received via email.Consulate Step //06/16/2014 Case status shows "In Transit"/06/17/2014 Case status shows " Ready"/06/30/2014 Medical Complete/07/15/2014 Interview-Approved/07/16/2014 Case Status shows "Administrative Processing"/07/17/2014 Case Status shows "Issued" 07/21/2014 Passport ready for pickup/07/23/2014 Visa in Hand<p>

Link to comment
Share on other sites

Filed: IR-5 Country: Cambodia
Timeline

I already submitted my AOS docs and on the website it did say that if you submit IRS transcripts you do not need to submit W2 I hope i don't get a checklist because of that....I also did not submit my citizenship cert with AOS or paystubs but i did submit my proof of current employment (print out from the work number as well). I'm going to go ahead and submit a copy with the IV docs, luckily I haven't sealed the envelope yet.

Thanks, I ended up reading a little and realized that it is not even available until the payment clears and it was just invoiced and paid today. I already have all other docs and have made copies. I have originals on one side and copies on the next (trying to be as organized as possible).

I called NVC a few times and all of them said the same thing on what should be in the AOS and IV. So far, I have no checklist on AOS and it was approved. Hopefully, the same to IV package :)

I-130 for both parents:
USCIS Journey (9 months NOA2)
05/13/2013 Sent, 05/17/2013 NOA1
12/16/2013 Cases transferred from NBC to NSC
02/18/2014 NOA2 Hardcopy, 02/20/2014 USCIS sent to DoS
NVC Journey: NVC Process (4 months from NOA2 - case completed)
04/04/2014 Call NVC and got both parents case # and IIN #
04/07/2014 Complete DS-261 for both parents (Choice of Agent), Got email from NVC to pay Affidavit of Support (AOS), AOS Paid online, $88 fee
04/09/2014 IV Paid online, $460 fee both parents
04/12/2014 Complete DS-260 for both parents
04/16/2014 Express Mail AOS and IV Package (mail all these in one envelope)
05/07/2014 Both parents AOS approved
05/19/2014 Both parents IV get a checklist (need certified birth cert, marriage cert, and petitioner certified marriage cert)
06/11/2014 Express Mail Checklist package
07/02/2014 Received email from NVC that both CASE are COMPLETED
07/15/2014 Mail ALL packets to parents (copy of I-130, NOA2, IV, AOS, & DS260 confirmation page), my original marriage & birth certificate to parents
07/17/2014 Checklist on DS260, Part 1 - fault alarm, 07/29/2014 Checklist on DS260, Part 1 - fault alarm
10/09/2014 NVC email INTERVIEW DATE 11/25 @ 7am - 17mths from USCIS / Doctor Postpone Interview
Consulate Step:
10/28/2014 Consulate Received package from NVC
11/13/2014 Postpone Interview date due to waiting for medical review (est 2mths for result)
01/12/2015 INTERVIEW DATE 01/22 @ 7:30am

01/22/2015 Interviewed: Administrative Processing because the criminal record translation missing one digit of Employee's ID. Meet again at 2pm Monday
01/26/2015 Gave corrected Criminal Record to consulate. Consulate asked parents to pick up VISA on Feb 6th at 11AM

02/03/2015 CEAC Status: Visa Issued, Visa pick up change to Feb 13th @ 11AM

03/10/2015 POE JFK
VISA APPROVED

GeenCard/SS#:

02/13/2015 Green Card paid online

03/10/2015 POE JFK

04/08/2015 Green Card is being produced

04/13/2015 Green Card mailed

04/17/2015 Both Green Card Received

03/20/2015 Apply SS#

03/27/2015 SS# received

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

I called NVC a few times and all of them said the same thing on what should be in the AOS and IV. So far, I have no checklist on AOS and it was approved. Hopefully, the same to IV package :)

I'm praying I won't get any checklists..especially since I had all the w2s and paystubs ready and ended up not sending them because the website said w2s are not needed if sending IRS tax transcripts....Everything else was good though...My employment letter showed the same date I sent the packet so hopefully that will suffice, especially since paystubs and employment letter was more optional than required.

USCIS Step
01/22/15 I130 sent via UPS to Chicago Lockbox
01/23/15 Delivered
01/26/15 NOA1 email and text received.. sent to VSC.
01/27/15 Check cleared.
02/02/15 NOA1 hardcopy received.. priority date 01/23/2015
02/12/15 Approved (17 days from NOA1)
02/17/15 NOA2 email and text received
02/18/15 NOA2 hardcopy received
NVC Step
03/02/15 NVC Received (18 days from NOA2)
03/05/15 Case number assigned (3 days from NVC receipt)
03/06/15 DS261 & AOS billed
03/09/15 Completed DS261
03/25/15 DS261 Reviewed and accepted over the phone
03/26/15 IV fee invoiced
04/08/15 Paid AOS and IV fee
04/09/15 Payment cleared and D260 available.
04/13/15 Documents sent via UPS overnight
04/14/15 Documents received at NVC and DS260 Completed
04/16/15 NVC scanned documents
05/11/15 Checklist over phone
05/13/15 Mailed out corrected AOS via UPS overnight
05/14/15 Checklist documents received at NVC
05/18/15 NVC scanned checklist documents
06/18/15 Flagged for Supervisor review (past 30days review timeframe)
06/29/15 Hubby's Case Complete :rolleyes: , daughter's still pending :(
07/07/15 Baby girl's Case Complete
09/30/15 Interview Scheduled for 11/05/2015
10/01/15 P4 Email received

ConsulateStep
10/14/15 Case shows "ready"
10/22/15 Medical Completed
11/05/15 Interview - APPROVED

11/06/15 Case shows "Administrative Processing"

11/09/15 Case shows "Issued"

11/11/15 Visa Ready for pick up...picked up on 11/13/15

11/19/15 US Entry (POE Atlanta GA)

<p>USCIS Step (for mom)//09/30/2013 I-130 sent via UPS to Chicago Lockbox/10/06/2013 NOA1 email received10/09/2013/ NOA1 hardcopy received with PD 10/02/2013/03/07/2014 Email received that case being transferred/03/10/2014 Hardcopy received, case transferred to VSC/03/17/2014 NOA2 received via email/03/21/2014 NOA2 hardcopy received. NVC Step ../03/25/2014 NVC received case/ 04/25/2014 Case number, IIN and Beneficiary ID# received (Entered in system on 04/24/2014)/05/01/2014 Checked CEAC website and DS-261 available...completed DS-261/05/01/2014 AOS fee invoiced and paid/05/02/2014 AOS documents sent via UPS/05/05/2014 AOS packet delivered and signed for AND AOS fee status shows as paid./05/07/2014 Called NVC and DS-261 accepted. AOS packet not yet showing in system/05/08/2014 IV fee invoiced and paid. IV documents sent via UPS/05/09/2014 IV packet delivered by UPS AND AOS documents entered into system/05/09/2014 IV fee shows paid AND DS-260 available/05/13/2014 Submitted DS-260/05/30/2014 AOS approved (no checklists)/06/05/2014 Case Complete and I did it with no checklists.....YAYYYYY/06/10/2014 Interview Scheduled for 7/15/2014/06/12/2014 P4 received via email.Consulate Step //06/16/2014 Case status shows "In Transit"/06/17/2014 Case status shows " Ready"/06/30/2014 Medical Complete/07/15/2014 Interview-Approved/07/16/2014 Case Status shows "Administrative Processing"/07/17/2014 Case Status shows "Issued" 07/21/2014 Passport ready for pickup/07/23/2014 Visa in Hand<p>

Link to comment
Share on other sites

Filed: IR-5 Country: Cambodia
Timeline

Damn,, I get a checklist on IV but the documents i sent was all original and/or certified.

______5 - MARRIAGE CERTIFICATE:____________________________________
The document you submitted is not an original or certified copy of an original issued by the appropriate
government authority. The document must be an original, or a certified copy of the original, bearing the
original seal or stamp from the issuing authority.
______3 - BIRTH CERTIFICATE:_______________________________________ <-- is this for petition or beneficiary
The document you submitted is not an original or certified copy of an original issued by the appropriate
government authority. The document must be an original, or a certified copy of the original, bearing the
original seal or stamp from the issuing authority.
______F - PETITIONER MARRIAGE CERTIFICATE:_________________________
The document submitted for the petitioner is not an original or certified copy of an original issued by
the appropriate government authority. The document must be an original, or a certified copy of the
original, bearing the original seal or stamp from the issuing authority.
[LBL 05/08/2014]

Edited by unknowKhmer

I-130 for both parents:
USCIS Journey (9 months NOA2)
05/13/2013 Sent, 05/17/2013 NOA1
12/16/2013 Cases transferred from NBC to NSC
02/18/2014 NOA2 Hardcopy, 02/20/2014 USCIS sent to DoS
NVC Journey: NVC Process (4 months from NOA2 - case completed)
04/04/2014 Call NVC and got both parents case # and IIN #
04/07/2014 Complete DS-261 for both parents (Choice of Agent), Got email from NVC to pay Affidavit of Support (AOS), AOS Paid online, $88 fee
04/09/2014 IV Paid online, $460 fee both parents
04/12/2014 Complete DS-260 for both parents
04/16/2014 Express Mail AOS and IV Package (mail all these in one envelope)
05/07/2014 Both parents AOS approved
05/19/2014 Both parents IV get a checklist (need certified birth cert, marriage cert, and petitioner certified marriage cert)
06/11/2014 Express Mail Checklist package
07/02/2014 Received email from NVC that both CASE are COMPLETED
07/15/2014 Mail ALL packets to parents (copy of I-130, NOA2, IV, AOS, & DS260 confirmation page), my original marriage & birth certificate to parents
07/17/2014 Checklist on DS260, Part 1 - fault alarm, 07/29/2014 Checklist on DS260, Part 1 - fault alarm
10/09/2014 NVC email INTERVIEW DATE 11/25 @ 7am - 17mths from USCIS / Doctor Postpone Interview
Consulate Step:
10/28/2014 Consulate Received package from NVC
11/13/2014 Postpone Interview date due to waiting for medical review (est 2mths for result)
01/12/2015 INTERVIEW DATE 01/22 @ 7:30am

01/22/2015 Interviewed: Administrative Processing because the criminal record translation missing one digit of Employee's ID. Meet again at 2pm Monday
01/26/2015 Gave corrected Criminal Record to consulate. Consulate asked parents to pick up VISA on Feb 6th at 11AM

02/03/2015 CEAC Status: Visa Issued, Visa pick up change to Feb 13th @ 11AM

03/10/2015 POE JFK
VISA APPROVED

GeenCard/SS#:

02/13/2015 Green Card paid online

03/10/2015 POE JFK

04/08/2015 Green Card is being produced

04/13/2015 Green Card mailed

04/17/2015 Both Green Card Received

03/20/2015 Apply SS#

03/27/2015 SS# received

Link to comment
Share on other sites

Filed: IR-5 Country: Cambodia
Timeline

Update:

Just call NVC and they said that my married license was a copy?? lol. Don't they feel the stamp? I told them I got this from Register of Wills Clerk of the Orphans’ Court and they stamp on it. I said maybe they only look at the copy side cuz I put in a 2 pocket folder and wrote a big letter on it saying Orginal (right pocket) and Copy (left pocket).. They told me to ignore the checklist for now and they will have the supervisor review again.

Is there a higher level I can talk to like USCIS teir 2?

I-130 for both parents:
USCIS Journey (9 months NOA2)
05/13/2013 Sent, 05/17/2013 NOA1
12/16/2013 Cases transferred from NBC to NSC
02/18/2014 NOA2 Hardcopy, 02/20/2014 USCIS sent to DoS
NVC Journey: NVC Process (4 months from NOA2 - case completed)
04/04/2014 Call NVC and got both parents case # and IIN #
04/07/2014 Complete DS-261 for both parents (Choice of Agent), Got email from NVC to pay Affidavit of Support (AOS), AOS Paid online, $88 fee
04/09/2014 IV Paid online, $460 fee both parents
04/12/2014 Complete DS-260 for both parents
04/16/2014 Express Mail AOS and IV Package (mail all these in one envelope)
05/07/2014 Both parents AOS approved
05/19/2014 Both parents IV get a checklist (need certified birth cert, marriage cert, and petitioner certified marriage cert)
06/11/2014 Express Mail Checklist package
07/02/2014 Received email from NVC that both CASE are COMPLETED
07/15/2014 Mail ALL packets to parents (copy of I-130, NOA2, IV, AOS, & DS260 confirmation page), my original marriage & birth certificate to parents
07/17/2014 Checklist on DS260, Part 1 - fault alarm, 07/29/2014 Checklist on DS260, Part 1 - fault alarm
10/09/2014 NVC email INTERVIEW DATE 11/25 @ 7am - 17mths from USCIS / Doctor Postpone Interview
Consulate Step:
10/28/2014 Consulate Received package from NVC
11/13/2014 Postpone Interview date due to waiting for medical review (est 2mths for result)
01/12/2015 INTERVIEW DATE 01/22 @ 7:30am

01/22/2015 Interviewed: Administrative Processing because the criminal record translation missing one digit of Employee's ID. Meet again at 2pm Monday
01/26/2015 Gave corrected Criminal Record to consulate. Consulate asked parents to pick up VISA on Feb 6th at 11AM

02/03/2015 CEAC Status: Visa Issued, Visa pick up change to Feb 13th @ 11AM

03/10/2015 POE JFK
VISA APPROVED

GeenCard/SS#:

02/13/2015 Green Card paid online

03/10/2015 POE JFK

04/08/2015 Green Card is being produced

04/13/2015 Green Card mailed

04/17/2015 Both Green Card Received

03/20/2015 Apply SS#

03/27/2015 SS# received

Link to comment
Share on other sites

Filed: IR-5 Country: Pakistan
Timeline

Damn,, I get a checklist on IV but the documents i sent was all original and/or certified.

The birth certificate is for the applicant or the beneficiary. You can always send in your copy of the birth certificate as oart fo initial packet for IV but they are actually looking for certified copy or original for the benficiary. And when I say certified, it has be certified by the same issuing authority that initially issued the birth certificate.

I am saying this becuase this just happened to me. And so they asked me to send in the original becuase the person who certified although notary public was a person from one of the local courts and not the person from where the birth certificate was actually issed. So I had to send in the original. Now I am wiaitng for them to review and approve me case ...... hopefully soon.

USCIS Step:
04/19/2013: NOA1 for both parents
04/17/2013: PD
11/26/2013: Transferred to California Service Center

01/14/2014: Reply to RFE Received by CSC

01/28/2014: Email Update/Txt Received for Approval

02/01/2014: Approval Notice received in Mail

****** Both I-130s approved in about 9.5 months ******

NVC Step:

02/07/2014: Case Received by NVC

03/17/2014: Received Case/Invoice Number

03/18/2014: Submitted DS261

03/19/2014: Paid AOS online (one payment for both cases)

03/22/2014: Sent AOS Packages to NVC (separately for each parent)

03/24/2014: AOS Packages delivered to NVC (as per the USPS Tracking)

03/27/2014: IV Fees Available and Paid Online

04/05/2014: IV Documents sent to NVC

04/06/2014: DS260 submitted online

04/07/2014: IV Documents delivered to NVC

05/01/2014: AOS Approved

05/29/2014: Case Complete !!!

06/11/2014: Interview Letter Received via email

****** Took about 4 months at this NVC stage ******

06/18/2014: Medical/Physical Exam Completed

07/03/2014: Interview Completed

07/09/2014: Visas Issued :dancing:

********** Entire process took 14 Months 2 weeks and 6 days *************

Link to comment
Share on other sites

Filed: IR-5 Country: United Kingdom
Timeline

Update:

Just call NVC and they said that my married license was a copy?? lol. Don't they feel the stamp? I told them I got this from Register of Wills Clerk of the Orphans’ Court and they stamp on it. I said maybe they only look at the copy side cuz I put in a 2 pocket folder and wrote a big letter on it saying Orginal (right pocket) and Copy (left pocket).. They told me to ignore the checklist for now and they will have the supervisor review again.

Is there a higher level I can talk to like USCIS teir 2?

This is the same BS that I dealt with. Email the NVC asking them to case complete you as they are all certified copies/originals and the original reviewer should be held accountable for not looking properly. I put mine to the attention of the DR and was case completed in 24 hours.

I-130 for both parents

March 28th 2013 - Priority date/ NOA 1
November 14th 2013 - Transferred to Nebraska Service Center

January 7th 2014 - Case changed online to approved for both

January 8th 2014 - case changed to shipped to NVC

January 9th 2014 - case changed to NOA 2 mailed

January 10th 2014 - Received the hardcopy of the NOA 2 stating that NVC would issue a case number in 30 days approx.

January 21st 2014 - Case Received at NVC

February 26th 2014 - Case numbers and IIN number received - Wrong embassy code assigned...now waiting for new case numbers.

March 3rd 2014 - Filled in DS-261 for both parents

March 5th 2014- AOS available, paid and submitted AOS packet.

March 6th 2014 - USPS shows packet was delivered at NVC

March 10th 2014 - AOS shows as paid in the CEAC portal/AOS logged into system as being received by NVC.

March 11th 2014 - New case number assigned for my Dad.

March 20th 2014 - Paid IV fee for my Mum.

March 25th 2014 - AOS accepted by NVC with no checklist.

March 26th 2014 - Filled in and submitted DS-260 for my Mum

March 31st 2014 - AOS found in my Mum's file for my Dad - accepted and placed into his file/IV fee available for my Dad and Paid.

April 1st - Mailed all civil documents to NVC for both parents.

April 3rd: IV fee shows as paid in portal/submitted DS-260 for my Dad.

April 22nd: checklist issued for civil documents - NVC error ...

April 23rd: sent another certified copy of my marriage certificate

April 24th: Case complete! :)

April 30th 2014 - Medical scheduled for parents at Knightsbridge in London

June 11th: Interview at London Embassy - Approved :)

Link to comment
Share on other sites

Filed: IR-5 Country: Cambodia
Timeline

This is the same BS that I dealt with. Email the NVC asking them to case complete you as they are all certified copies/originals and the original reviewer should be held accountable for not looking properly. I put mine to the attention of the DR and was case completed in 24 hours.

If you don't mind, may i have a sample of how you email them or what did you say. Is this the email, NVCInquiry@state.gov

Thanks.

Edited by unknowKhmer

I-130 for both parents:
USCIS Journey (9 months NOA2)
05/13/2013 Sent, 05/17/2013 NOA1
12/16/2013 Cases transferred from NBC to NSC
02/18/2014 NOA2 Hardcopy, 02/20/2014 USCIS sent to DoS
NVC Journey: NVC Process (4 months from NOA2 - case completed)
04/04/2014 Call NVC and got both parents case # and IIN #
04/07/2014 Complete DS-261 for both parents (Choice of Agent), Got email from NVC to pay Affidavit of Support (AOS), AOS Paid online, $88 fee
04/09/2014 IV Paid online, $460 fee both parents
04/12/2014 Complete DS-260 for both parents
04/16/2014 Express Mail AOS and IV Package (mail all these in one envelope)
05/07/2014 Both parents AOS approved
05/19/2014 Both parents IV get a checklist (need certified birth cert, marriage cert, and petitioner certified marriage cert)
06/11/2014 Express Mail Checklist package
07/02/2014 Received email from NVC that both CASE are COMPLETED
07/15/2014 Mail ALL packets to parents (copy of I-130, NOA2, IV, AOS, & DS260 confirmation page), my original marriage & birth certificate to parents
07/17/2014 Checklist on DS260, Part 1 - fault alarm, 07/29/2014 Checklist on DS260, Part 1 - fault alarm
10/09/2014 NVC email INTERVIEW DATE 11/25 @ 7am - 17mths from USCIS / Doctor Postpone Interview
Consulate Step:
10/28/2014 Consulate Received package from NVC
11/13/2014 Postpone Interview date due to waiting for medical review (est 2mths for result)
01/12/2015 INTERVIEW DATE 01/22 @ 7:30am

01/22/2015 Interviewed: Administrative Processing because the criminal record translation missing one digit of Employee's ID. Meet again at 2pm Monday
01/26/2015 Gave corrected Criminal Record to consulate. Consulate asked parents to pick up VISA on Feb 6th at 11AM

02/03/2015 CEAC Status: Visa Issued, Visa pick up change to Feb 13th @ 11AM

03/10/2015 POE JFK
VISA APPROVED

GeenCard/SS#:

02/13/2015 Green Card paid online

03/10/2015 POE JFK

04/08/2015 Green Card is being produced

04/13/2015 Green Card mailed

04/17/2015 Both Green Card Received

03/20/2015 Apply SS#

03/27/2015 SS# received

Link to comment
Share on other sites

Filed: IR-5 Country: Pakistan
Timeline

If you don't mind, may i have a sample of how you email them or what did you say. Is this the email, NVCInquiry@state.gov

Thanks.

Yeah you do that. Whats the harm in sending them an email. Its jsut that they are not very efficient in replying back. Everytime I send them an email, I think they take like a month or more to reply. But still its good to send an email and then perhaps followup the next day just to make sure someone actually read and acted on that email.

USCIS Step:
04/19/2013: NOA1 for both parents
04/17/2013: PD
11/26/2013: Transferred to California Service Center

01/14/2014: Reply to RFE Received by CSC

01/28/2014: Email Update/Txt Received for Approval

02/01/2014: Approval Notice received in Mail

****** Both I-130s approved in about 9.5 months ******

NVC Step:

02/07/2014: Case Received by NVC

03/17/2014: Received Case/Invoice Number

03/18/2014: Submitted DS261

03/19/2014: Paid AOS online (one payment for both cases)

03/22/2014: Sent AOS Packages to NVC (separately for each parent)

03/24/2014: AOS Packages delivered to NVC (as per the USPS Tracking)

03/27/2014: IV Fees Available and Paid Online

04/05/2014: IV Documents sent to NVC

04/06/2014: DS260 submitted online

04/07/2014: IV Documents delivered to NVC

05/01/2014: AOS Approved

05/29/2014: Case Complete !!!

06/11/2014: Interview Letter Received via email

****** Took about 4 months at this NVC stage ******

06/18/2014: Medical/Physical Exam Completed

07/03/2014: Interview Completed

07/09/2014: Visas Issued :dancing:

********** Entire process took 14 Months 2 weeks and 6 days *************

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

Guys,

I just completed DS-260 for my mom but at the end of it, it says even if it is prepared by someone else it has to be signed by the applicant. Does this mean my mom (not computer savvy in the least) has to sign it?

USCIS Step
01/22/15 I130 sent via UPS to Chicago Lockbox
01/23/15 Delivered
01/26/15 NOA1 email and text received.. sent to VSC.
01/27/15 Check cleared.
02/02/15 NOA1 hardcopy received.. priority date 01/23/2015
02/12/15 Approved (17 days from NOA1)
02/17/15 NOA2 email and text received
02/18/15 NOA2 hardcopy received
NVC Step
03/02/15 NVC Received (18 days from NOA2)
03/05/15 Case number assigned (3 days from NVC receipt)
03/06/15 DS261 & AOS billed
03/09/15 Completed DS261
03/25/15 DS261 Reviewed and accepted over the phone
03/26/15 IV fee invoiced
04/08/15 Paid AOS and IV fee
04/09/15 Payment cleared and D260 available.
04/13/15 Documents sent via UPS overnight
04/14/15 Documents received at NVC and DS260 Completed
04/16/15 NVC scanned documents
05/11/15 Checklist over phone
05/13/15 Mailed out corrected AOS via UPS overnight
05/14/15 Checklist documents received at NVC
05/18/15 NVC scanned checklist documents
06/18/15 Flagged for Supervisor review (past 30days review timeframe)
06/29/15 Hubby's Case Complete :rolleyes: , daughter's still pending :(
07/07/15 Baby girl's Case Complete
09/30/15 Interview Scheduled for 11/05/2015
10/01/15 P4 Email received

ConsulateStep
10/14/15 Case shows "ready"
10/22/15 Medical Completed
11/05/15 Interview - APPROVED

11/06/15 Case shows "Administrative Processing"

11/09/15 Case shows "Issued"

11/11/15 Visa Ready for pick up...picked up on 11/13/15

11/19/15 US Entry (POE Atlanta GA)

<p>USCIS Step (for mom)//09/30/2013 I-130 sent via UPS to Chicago Lockbox/10/06/2013 NOA1 email received10/09/2013/ NOA1 hardcopy received with PD 10/02/2013/03/07/2014 Email received that case being transferred/03/10/2014 Hardcopy received, case transferred to VSC/03/17/2014 NOA2 received via email/03/21/2014 NOA2 hardcopy received. NVC Step ../03/25/2014 NVC received case/ 04/25/2014 Case number, IIN and Beneficiary ID# received (Entered in system on 04/24/2014)/05/01/2014 Checked CEAC website and DS-261 available...completed DS-261/05/01/2014 AOS fee invoiced and paid/05/02/2014 AOS documents sent via UPS/05/05/2014 AOS packet delivered and signed for AND AOS fee status shows as paid./05/07/2014 Called NVC and DS-261 accepted. AOS packet not yet showing in system/05/08/2014 IV fee invoiced and paid. IV documents sent via UPS/05/09/2014 IV packet delivered by UPS AND AOS documents entered into system/05/09/2014 IV fee shows paid AND DS-260 available/05/13/2014 Submitted DS-260/05/30/2014 AOS approved (no checklists)/06/05/2014 Case Complete and I did it with no checklists.....YAYYYYY/06/10/2014 Interview Scheduled for 7/15/2014/06/12/2014 P4 received via email.Consulate Step //06/16/2014 Case status shows "In Transit"/06/17/2014 Case status shows " Ready"/06/30/2014 Medical Complete/07/15/2014 Interview-Approved/07/16/2014 Case Status shows "Administrative Processing"/07/17/2014 Case Status shows "Issued" 07/21/2014 Passport ready for pickup/07/23/2014 Visa in Hand<p>

Link to comment
Share on other sites

Filed: IR-5 Country: Philippines
Timeline

I have the same question^.

I was planning to download the DS-260 and send the last part to my dad so he can sign it. However, if there's a way to complete and submitting on CEAC. I would much rather do that.

Another question. I'm also planning to accompany my dad on his interview day. Is it possible that they will let me?

Edited by J3MJ3M

***I-130 Father***

USCIS

03/25/2013 Mailed I-130 Application to Chicago Lockbox

03/28/2013 NOA 1

11/13/2013 NOA 2 Case Transferred to CSC for speed up process.

12/03/2013 Request For Evidence

01/08/2014 Mailed Required Documents

02/03/2014 Additional Evidence Required

*Decided to take DNA Test*

03/01/2014 Paid $850 to DNA Lab

03/12/2014 DNA Lab received both of our samples

03/13/2014 DNA Result Completed/Result Sent to USCIS

03/14/2014 USCIS Received Result

03/21/2014 NOA 3 approved and forwarded to NVC

NVC

3/31/2014 Case Received

5/01/2014 Case & IID # Assigned

5/08/2014 AOS Fee/DS-261 Completed

5/09/2014 AOS Showed PAID on CEAC

05/10/2014 Mailed AOS Packet

05/13/2014 AOS Packet Delivered/Received

05/16/2014 Received IV Fee Invoice (email)

05/20/2014 IV Fee showed PAID

05/23/2014 IV Packet Mailed

05/27/2014 Submitted DS-260 on CEAC

06/11/2014 Received AOS checklist (Forgot to sign I-864a)

06/12/2014 Checklist Mailed

08/11/2014 Case Complete

09/11/2014 INTERVIEW DATE

10/24/2014 Case closed/Arrived in Hawai'i safe and sound ^_^!

Link to comment
Share on other sites

Filed: IR-5 Country: Philippines
Timeline

I have the same question^.

I was planning to download the DS-260 and send the last part to my dad so he can sign it. However, if there's a way to complete and submitting on CEAC. I would much rather do that.

Another question. I'm also planning to accompany my dad on his interview day. Is it possible that they will let me?

DS-260 can be done online tru CEAC.STATE.GOV U can fill up on his behalf. u just need info from him

IR-5 (PETITION MY DAD)


USCIS

11/23/13 Send FORM I-130 TO USCIS CHICAGO LOCKBOX
11/26/13 PD- USCIS RECEIVED PAPERS
11/27/13 NOA 1 RECEIVED smile.png TRANSFERED CASE TO USCIS NSC
12/02/13 RFE (NEEDED MY BC AND MARRIAGE CERT COZ OF MY NAME CHANGED)
12/06/13 SENT RFE NEEDED BY USCIS
5/01/14 IL(P4) RCV'D TRU EMAIL & FORWARDED TO NVC

01/07/14 USCIS APPROVED MY PAPERS AND SEND TO NVC FOR VISA PROCESSING!!

01/10/14 NOA 2

NVC


1/21/14 NVC RECEIVED APPROVED PAPERS smile.png
2/22/14 CASE ENTERED IN SYSTEM

2/24/14 CASE # & INVOICE ID # ASSIGNED

3/03/14 SUBMITTED DS-261 (CHOICE OF ADDRESS AND AGENT)

3/05/14 AOS FEE PAID $88

3/11/14 MAILED AOS PACKET & AOS SHOWED PAID ON CEAC

3/14/14 AOS PACKET DELIVERED AT NVC

3/20/14 DAD'S EARLY MEDICAL EXAM @ ST. LUKES.. PASSED!! TOOK 2 DAYS MEDICAL EXAM..

3/25/14 IV FEE PAID $230 ON CEAC..

3/26/14 MAILED IV D0CUMENTS

3/27/14 DS-260 SUBMITTED & IV FEE SH0WED PAID, CEAC

3/28/14 IV D0CUMENTS DELIVERED @ NVC

3/31/14 A0S CHECKLIST (ASKING HUBBY'S PAYSTUBS & BUSINESS LICENSE F0RG0T T0 INCLUDE)

4/02/14 MAILED A0S CHECKLIST

4/04/14 A0S CHECKLIST DELIVERED @ NVC

4/17/14 IV FALSE CHECKLIST

4/23/14 CASE COMPLETE!!

5/01/14 IL(P4) RCV'D TRU EMAIL & FORWARDED TO US EMBASSY MANILA...

5/06/14 DAD'S CASE SHOWED @ CEAC "IN TRANSIT" TO U.S EMBASSY MANILA

5/08/14 RCV'D CASE @ US EMBASSY, "READY" AS PER CEAC.

6/11/14 INTERVIEW DATE @ 6:15AM, US EMBASSY MANILA. :) APPROVED!! BUT ON AP!

7/02/14 AP CHANGED TO ISSUED

7/08/14 VISA 0N HAND! :dancing:

7/14/14 DAD'S PD0S

7/15/14 FLIGHT TO U.S (P0E-MINNEAPOLIS MSP)

Link to comment
Share on other sites

Filed: IR-5 Country: Pakistan
Timeline

DS260 is all online. It cannot be printed or singned by hand. Everything is electronic. Once its done and submitted you must print out the application for your records and also to send to the beneficiary (if you want). The petitioner can always fill out the application on behalf of applicant. You just need to disclose it at the end that you and not the applicant filled out this application.

USCIS Step:
04/19/2013: NOA1 for both parents
04/17/2013: PD
11/26/2013: Transferred to California Service Center

01/14/2014: Reply to RFE Received by CSC

01/28/2014: Email Update/Txt Received for Approval

02/01/2014: Approval Notice received in Mail

****** Both I-130s approved in about 9.5 months ******

NVC Step:

02/07/2014: Case Received by NVC

03/17/2014: Received Case/Invoice Number

03/18/2014: Submitted DS261

03/19/2014: Paid AOS online (one payment for both cases)

03/22/2014: Sent AOS Packages to NVC (separately for each parent)

03/24/2014: AOS Packages delivered to NVC (as per the USPS Tracking)

03/27/2014: IV Fees Available and Paid Online

04/05/2014: IV Documents sent to NVC

04/06/2014: DS260 submitted online

04/07/2014: IV Documents delivered to NVC

05/01/2014: AOS Approved

05/29/2014: Case Complete !!!

06/11/2014: Interview Letter Received via email

****** Took about 4 months at this NVC stage ******

06/18/2014: Medical/Physical Exam Completed

07/03/2014: Interview Completed

07/09/2014: Visas Issued :dancing:

********** Entire process took 14 Months 2 weeks and 6 days *************

Link to comment
Share on other sites

Filed: IR-5 Country: United Kingdom
Timeline

If you don't mind, may i have a sample of how you email them or what did you say. Is this the email, NVCInquiry@state.gov

Thanks.

This is what I wrote:
Dear Sir/Madam,
With reference to the above mentioned case, I am emailing to request that this case is immediately reviewed for the checklist that I received. The checklist stated that my marriage certificate was not an original or certified copy. The certificate is a certified copy and has the embossed stamp on it, provided by the Johnson county clerk office in Texas.
Additionally, it was requested for my mother to furnish an IRELAND police clearance certificate. The Immigrant Visa packet contained a police certificate from NORTHERN IRELAND which is part of Great Britain. My mother is not Irish and she does not live and never has lived in Ireland. Northern Ireland is part of GREAT BRITAIN and the embassy chargeability is LONDON. She therefore does not need an Irish police clearance certificate. The British certificate clearly meets the requirements.
I am requesting for my mother's file to be immediately reviewed for this checklist as it is not my error. My priority date on this case is 28th March 2013 and I have had numerous delays due to the wrong embassy case number being issued and now this recent issue. I highly recommend that the personnel who review the files are aware of the difference between Northern Ireland and Ireland, as this has cost my family additional time and money and I am sure has also been an unnecessary waste of time for the personnel who has to review the case numerous times for errors made by the NVC personnel.
Thank you for your time and consideration.
Katrina

I-130 for both parents

March 28th 2013 - Priority date/ NOA 1
November 14th 2013 - Transferred to Nebraska Service Center

January 7th 2014 - Case changed online to approved for both

January 8th 2014 - case changed to shipped to NVC

January 9th 2014 - case changed to NOA 2 mailed

January 10th 2014 - Received the hardcopy of the NOA 2 stating that NVC would issue a case number in 30 days approx.

January 21st 2014 - Case Received at NVC

February 26th 2014 - Case numbers and IIN number received - Wrong embassy code assigned...now waiting for new case numbers.

March 3rd 2014 - Filled in DS-261 for both parents

March 5th 2014- AOS available, paid and submitted AOS packet.

March 6th 2014 - USPS shows packet was delivered at NVC

March 10th 2014 - AOS shows as paid in the CEAC portal/AOS logged into system as being received by NVC.

March 11th 2014 - New case number assigned for my Dad.

March 20th 2014 - Paid IV fee for my Mum.

March 25th 2014 - AOS accepted by NVC with no checklist.

March 26th 2014 - Filled in and submitted DS-260 for my Mum

March 31st 2014 - AOS found in my Mum's file for my Dad - accepted and placed into his file/IV fee available for my Dad and Paid.

April 1st - Mailed all civil documents to NVC for both parents.

April 3rd: IV fee shows as paid in portal/submitted DS-260 for my Dad.

April 22nd: checklist issued for civil documents - NVC error ...

April 23rd: sent another certified copy of my marriage certificate

April 24th: Case complete! :)

April 30th 2014 - Medical scheduled for parents at Knightsbridge in London

June 11th: Interview at London Embassy - Approved :)

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...