Hi Everyone,

Is there any specifics to how RFE's are submitted to NVCElectronic.

My question goes to the Checklist PDF they send from NVCINQUIRY for a EP case.

In an email back to NVCElectronic does one send the coverpage PDF as a seperate attachment along with the missing documentation or embed the coversheet in each of the PDF of the missing documents PDFs or send just one PDF with everything missing along with the coversheet included in the one PDF that may have multiple documents?

Any history RFE submittion(s) from the EP filers both now and in the past would be very helpful.

Thank you!!!!!!!!!!!!!!!!!!!!!!

Eric

"If we are facing in the right direction, all we have to do is keep on walking" Buddhist Proverb

05/04/2010 Married in Nanjing

USCIS

05/25/2010 I-130 sent

05/27/2010 USPS Confirmation received - Chicago Lockbox

06/02/2010 USCIS Text, Email received, case sent to CSC, Check Cleared

06/07/2010 Touched 10/26/2010 NOA2 Notice Date

10/29/2010 Received I-797 NOA2 Approval Letter (Very Happy)

NVC

11/03/2010 NVC Received CaseFile *

11/04/2010 NVC Casefile Number Issued *

11/14/2010 Request DS-3032 Kit from NVC *

11/14/2010 IIN received via email from NVC, as part of AOS Fee Bill EMAIL.

11/09/2010 OPTIN EMAIL SENT TO NVC +

11/10/2010 AOS FEE BILL PAID ONLINE &

11/12/2010 AOS Fee Bill Marked Paid []

11/22/2010 OPTIN ACCEPTED by NVC

11/12/2010 AOS CoverSheets Generated &

11/15/2010 IV Fee Bill Showing as 'Payable' []

11/15/2010 IV FEE BILL PAID ONLINE &

11/16/2010 IV Fee Bill marked as PAID []

12/16/2010 IV CoverSheets Generated &

11/19/2010 AOS email packet sent +

11/27/2010 IV email packet sent +

12/23/2010 NVC reports 'Case Completed' *

12/23/2010 'Sign in Fail' at the Online Payment Portal &

12/30/2010 Appointment Letter Received via Email

01/27/2011 Document Day

01/28/2011 Interview Day! PINK!!!!!

Link to comment
Share on other sites

Filed: Other Country: China
Timeline

Hi Everyone,

Is there any specifics to how RFE's are submitted to NVCElectronic.

My question goes to the Checklist PDF they send from NVCINQUIRY for a EP case.

In an email back to NVCElectronic does one send the coverpage PDF as a seperate attachment along with the missing documentation or embed the coversheet in each of the PDF of the missing documents PDFs or send just one PDF with everything missing along with the coversheet included in the one PDF that may have multiple documents?

Any history RFE submittion(s) from the EP filers both now and in the past would be very helpful.

Thank you!!!!!!!!!!!!!!!!!!!!!!

Eric

Send a single PDF file including all documents requested, using the cover page as page one of the file. This requires a full version of Adobe to accomplish unless you're scanning multiple printed pages to a single file.

Facts are cheap...knowing how to use them is precious...
Understanding the big picture is priceless. Anonymous

Google Who is Pushbrk?

A Warning to Green Card Holders About Voting

http://www.visajourney.com/forums/topic/606646-a-warning-to-green-card-holders-about-voting/

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

Send a single PDF file including all documents requested, using the cover page as page one of the file. This requires a full version of Adobe to accomplish unless you're scanning multiple printed pages to a single file.

Thank you for your reply. I'm using CutePDF Professional which will be accomplishing the same thing.

Eric

"If we are facing in the right direction, all we have to do is keep on walking" Buddhist Proverb

05/04/2010 Married in Nanjing

USCIS

05/25/2010 I-130 sent

05/27/2010 USPS Confirmation received - Chicago Lockbox

06/02/2010 USCIS Text, Email received, case sent to CSC, Check Cleared

06/07/2010 Touched 10/26/2010 NOA2 Notice Date

10/29/2010 Received I-797 NOA2 Approval Letter (Very Happy)

NVC

11/03/2010 NVC Received CaseFile *

11/04/2010 NVC Casefile Number Issued *

11/14/2010 Request DS-3032 Kit from NVC *

11/14/2010 IIN received via email from NVC, as part of AOS Fee Bill EMAIL.

11/09/2010 OPTIN EMAIL SENT TO NVC +

11/10/2010 AOS FEE BILL PAID ONLINE &

11/12/2010 AOS Fee Bill Marked Paid []

11/22/2010 OPTIN ACCEPTED by NVC

11/12/2010 AOS CoverSheets Generated &

11/15/2010 IV Fee Bill Showing as 'Payable' []

11/15/2010 IV FEE BILL PAID ONLINE &

11/16/2010 IV Fee Bill marked as PAID []

12/16/2010 IV CoverSheets Generated &

11/19/2010 AOS email packet sent +

11/27/2010 IV email packet sent +

12/23/2010 NVC reports 'Case Completed' *

12/23/2010 'Sign in Fail' at the Online Payment Portal &

12/30/2010 Appointment Letter Received via Email

01/27/2011 Document Day

01/28/2011 Interview Day! PINK!!!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

So when NVC sends a checklist and is a combination (regular mail process and EP) in one and the correspondence instructions read:

______CORRESPONDENCE INSTRUCTIONS:_________________________________ For electronic processing, all forms and documents that we request and require from you should be scanned and e-mailed to NVC as Adobe Portable Document Format (PDF) files. The documents should be sent as attachments with your e-mail response and not in a web file. NVC is unable to process documents submitted in web files. Forms and documents should not be mailed through the postal service.The applicant must present all original forms and documents to the Consular officer at the visa interview. Failure to present the required originals at the visa interview will result in a denial or delay in obtaining a visa for the sponsored applicant. Any questions regarding your petition should continue to be directed to NVCElectronic@state.gov _________

Are they are in error stating "The documents should be sent as attachnments" with attachments being plural?

Eric

Edited by esd2004

"If we are facing in the right direction, all we have to do is keep on walking" Buddhist Proverb

05/04/2010 Married in Nanjing

USCIS

05/25/2010 I-130 sent

05/27/2010 USPS Confirmation received - Chicago Lockbox

06/02/2010 USCIS Text, Email received, case sent to CSC, Check Cleared

06/07/2010 Touched 10/26/2010 NOA2 Notice Date

10/29/2010 Received I-797 NOA2 Approval Letter (Very Happy)

NVC

11/03/2010 NVC Received CaseFile *

11/04/2010 NVC Casefile Number Issued *

11/14/2010 Request DS-3032 Kit from NVC *

11/14/2010 IIN received via email from NVC, as part of AOS Fee Bill EMAIL.

11/09/2010 OPTIN EMAIL SENT TO NVC +

11/10/2010 AOS FEE BILL PAID ONLINE &

11/12/2010 AOS Fee Bill Marked Paid []

11/22/2010 OPTIN ACCEPTED by NVC

11/12/2010 AOS CoverSheets Generated &

11/15/2010 IV Fee Bill Showing as 'Payable' []

11/15/2010 IV FEE BILL PAID ONLINE &

11/16/2010 IV Fee Bill marked as PAID []

12/16/2010 IV CoverSheets Generated &

11/19/2010 AOS email packet sent +

11/27/2010 IV email packet sent +

12/23/2010 NVC reports 'Case Completed' *

12/23/2010 'Sign in Fail' at the Online Payment Portal &

12/30/2010 Appointment Letter Received via Email

01/27/2011 Document Day

01/28/2011 Interview Day! PINK!!!!!

Link to comment
Share on other sites

Filed: Other Country: China
Timeline

So when NVC sends a checklist and is a combination (regular mail process and EP) in one and the correspondence instructions read:

______CORRESPONDENCE INSTRUCTIONS:_________________________________ For electronic processing, all forms and documents that we request and require from you should be scanned and e-mailed to NVC as Adobe Portable Document Format (PDF) files. The documents should be sent as attachments with your e-mail response and not in a web file. NVC is unable to process documents submitted in web files. Forms and documents should not be mailed through the postal service.The applicant must present all original forms and documents to the Consular officer at the visa interview. Failure to present the required originals at the visa interview will result in a denial or delay in obtaining a visa for the sponsored applicant. Any questions regarding your petition should continue to be directed to NVCElectronic@state.gov _________

Are they are in error stating "The documents should be sent as attachnments" with attachments being plural?

Eric

You'll email documents more than once so plural is correct but I'm advising you to send one file per email, so it's perfectly clear what you sent.

Facts are cheap...knowing how to use them is precious...
Understanding the big picture is priceless. Anonymous

Google Who is Pushbrk?

A Warning to Green Card Holders About Voting

http://www.visajourney.com/forums/topic/606646-a-warning-to-green-card-holders-about-voting/

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

You'll email documents more than once so plural is correct but I'm advising you to send one file per email, so it's perfectly clear what you sent.

I understand what your saying now.

so in my case this is my second checklist email for the same information I sent already to them in the first checklist email and also prior. Both human beings at NVC, the AVR and the checklist letters said the info is missing even though the information has already been sent over the course of weeks.

so I will send them two emails.

One email for the Financial Evidence (my I864EZ documents and other documents I sent in one email) already sent on 11/19, 12/09, and on 12/14

One email for my wife's Norway Police Certificate (that was sent on 11/27 with her IV Packet, and sent on 12/13 and on 12/17.

The operators at NVC told me these documents were missing??? the AVR said these documents were missing ??? and the two checklists that I received said these were missing ???

If I have to send documents 300 times I will. Hopefully it does come to this.

Thank you,

Eric

"If we are facing in the right direction, all we have to do is keep on walking" Buddhist Proverb

05/04/2010 Married in Nanjing

USCIS

05/25/2010 I-130 sent

05/27/2010 USPS Confirmation received - Chicago Lockbox

06/02/2010 USCIS Text, Email received, case sent to CSC, Check Cleared

06/07/2010 Touched 10/26/2010 NOA2 Notice Date

10/29/2010 Received I-797 NOA2 Approval Letter (Very Happy)

NVC

11/03/2010 NVC Received CaseFile *

11/04/2010 NVC Casefile Number Issued *

11/14/2010 Request DS-3032 Kit from NVC *

11/14/2010 IIN received via email from NVC, as part of AOS Fee Bill EMAIL.

11/09/2010 OPTIN EMAIL SENT TO NVC +

11/10/2010 AOS FEE BILL PAID ONLINE &

11/12/2010 AOS Fee Bill Marked Paid []

11/22/2010 OPTIN ACCEPTED by NVC

11/12/2010 AOS CoverSheets Generated &

11/15/2010 IV Fee Bill Showing as 'Payable' []

11/15/2010 IV FEE BILL PAID ONLINE &

11/16/2010 IV Fee Bill marked as PAID []

12/16/2010 IV CoverSheets Generated &

11/19/2010 AOS email packet sent +

11/27/2010 IV email packet sent +

12/23/2010 NVC reports 'Case Completed' *

12/23/2010 'Sign in Fail' at the Online Payment Portal &

12/30/2010 Appointment Letter Received via Email

01/27/2011 Document Day

01/28/2011 Interview Day! PINK!!!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

I received an email 18 Dec from NVC that documents were missing, and on 20 Dec I received another email that the documents were not missing. Today 23 Dec received an email, they need more 864 documents that I sent. I put the case number at the top right corner of each document I sent, but they still lose things. Todays email says they want a P3 Supplement, Packet 3 Suppplement sheet, what ever that is. :wacko:

April 2008 Met online ..................... March 2010.. 3 week visit......... 19 Nov...Sent DS230 & I-864

April 2009 Met in Chongqing .......... 09 March 2010 .. Marry.................17Dec...NVC lost 230 and 864

04 May 09 Apply K1 .................... 10 April .. Apply CR1....................20Dec..NVC found 230

18 May 09 NOA 1......................... 20 April... NOA1...........................28Dec..sent more 864 docs

16 Sep 09 NOA 2......................... 06 Oct..... NOA2...........................2011

08 Nov 09 P3................................... 21 Oct..... Have Case #..............21 Jan...SIF

06 Dec 09 P4............................... 30 OCt..... Have DS-3032...............26 Jan .. CC

29 Dec 09. Interview..................... 1 Nov..... email Ds-3032...............1 Apr, 3 week visit

29 Dec,,,,No Visa.......................... 1 Nov......paid AOS.......................4 May Interview.Approved..

9 Aug 2010 I-129F ended.............. 5 Nov......paid IV.........,,,,,,,,,,, ..... 28 June, Received Visa

............................................................................................................22 July, arrive USA..

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

I received an email 18 Dec from NVC that documents were missing, and on 20 Dec I received another email that the documents were not missing. Today 23 Dec received an email, they need more 864 documents that I sent. I put the case number at the top right corner of each document I sent, but they still lose things. Todays email says they want a P3 Supplement, Packet 3 Suppplement sheet, what ever that is. :wacko:

Hi Bob g.,

I got 2 of the same exact RFE checklist email. One that was dated on Dec 14th and was sent after my talk with and NVC operator.

the 2nd RFE check was asking for the same exact thing dated Dec 17th and I received it on Sat.

I ignored the second one becuase I included the checklist pdf with the attachements they were asking from the Dec 14th one and emailed it to NVCElectronic on Dec 17th.

The Packet 3 is a form that was talked about a few times on the forum and Darnell talked about it:

http://www.visajourney.com/forums/topic/252487-worried-about-nvc-process/page__st__30

Eric

"If we are facing in the right direction, all we have to do is keep on walking" Buddhist Proverb

05/04/2010 Married in Nanjing

USCIS

05/25/2010 I-130 sent

05/27/2010 USPS Confirmation received - Chicago Lockbox

06/02/2010 USCIS Text, Email received, case sent to CSC, Check Cleared

06/07/2010 Touched 10/26/2010 NOA2 Notice Date

10/29/2010 Received I-797 NOA2 Approval Letter (Very Happy)

NVC

11/03/2010 NVC Received CaseFile *

11/04/2010 NVC Casefile Number Issued *

11/14/2010 Request DS-3032 Kit from NVC *

11/14/2010 IIN received via email from NVC, as part of AOS Fee Bill EMAIL.

11/09/2010 OPTIN EMAIL SENT TO NVC +

11/10/2010 AOS FEE BILL PAID ONLINE &

11/12/2010 AOS Fee Bill Marked Paid []

11/22/2010 OPTIN ACCEPTED by NVC

11/12/2010 AOS CoverSheets Generated &

11/15/2010 IV Fee Bill Showing as 'Payable' []

11/15/2010 IV FEE BILL PAID ONLINE &

11/16/2010 IV Fee Bill marked as PAID []

12/16/2010 IV CoverSheets Generated &

11/19/2010 AOS email packet sent +

11/27/2010 IV email packet sent +

12/23/2010 NVC reports 'Case Completed' *

12/23/2010 'Sign in Fail' at the Online Payment Portal &

12/30/2010 Appointment Letter Received via Email

01/27/2011 Document Day

01/28/2011 Interview Day! PINK!!!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

Thanks Eric, The NVC email gave me a link that come up blank.

The P3 Supplement looks like a simple cover letter. thanks, Bob

April 2008 Met online ..................... March 2010.. 3 week visit......... 19 Nov...Sent DS230 & I-864

April 2009 Met in Chongqing .......... 09 March 2010 .. Marry.................17Dec...NVC lost 230 and 864

04 May 09 Apply K1 .................... 10 April .. Apply CR1....................20Dec..NVC found 230

18 May 09 NOA 1......................... 20 April... NOA1...........................28Dec..sent more 864 docs

16 Sep 09 NOA 2......................... 06 Oct..... NOA2...........................2011

08 Nov 09 P3................................... 21 Oct..... Have Case #..............21 Jan...SIF

06 Dec 09 P4............................... 30 OCt..... Have DS-3032...............26 Jan .. CC

29 Dec 09. Interview..................... 1 Nov..... email Ds-3032...............1 Apr, 3 week visit

29 Dec,,,,No Visa.......................... 1 Nov......paid AOS.......................4 May Interview.Approved..

9 Aug 2010 I-129F ended.............. 5 Nov......paid IV.........,,,,,,,,,,, ..... 28 June, Received Visa

............................................................................................................22 July, arrive USA..

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

I was following the LingChe guide lines, and I did not see anything about P3 Supplement. Talked to a couple friends ahead of me on this process, that did not know anything about the P3 Supplement.

April 2008 Met online ..................... March 2010.. 3 week visit......... 19 Nov...Sent DS230 & I-864

April 2009 Met in Chongqing .......... 09 March 2010 .. Marry.................17Dec...NVC lost 230 and 864

04 May 09 Apply K1 .................... 10 April .. Apply CR1....................20Dec..NVC found 230

18 May 09 NOA 1......................... 20 April... NOA1...........................28Dec..sent more 864 docs

16 Sep 09 NOA 2......................... 06 Oct..... NOA2...........................2011

08 Nov 09 P3................................... 21 Oct..... Have Case #..............21 Jan...SIF

06 Dec 09 P4............................... 30 OCt..... Have DS-3032...............26 Jan .. CC

29 Dec 09. Interview..................... 1 Nov..... email Ds-3032...............1 Apr, 3 week visit

29 Dec,,,,No Visa.......................... 1 Nov......paid AOS.......................4 May Interview.Approved..

9 Aug 2010 I-129F ended.............. 5 Nov......paid IV.........,,,,,,,,,,, ..... 28 June, Received Visa

............................................................................................................22 July, arrive USA..

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

I received an email 18 Dec from NVC that documents were missing, and on 20 Dec I received another email that the documents were not missing. Today 23 Dec received an email, they need more 864 documents that I sent. I put the case number at the top right corner of each document I sent, but they still lose things. Todays email says they want a P3 Supplement, Packet 3 Suppplement sheet, what ever that is. :wacko:

GUZ IV P3 Supplemental form covered in the wiki page, DL link is there. Have you seen the NVC EP wiki page here at VJ ?

http://www.visajourney.com/wiki/index.php/NVC_Electronic_Processing

Edited by Darnell

Sometimes my language usage seems confusing - please feel free to 'read it twice', just in case !
Ya know, you can find the answer to your question with the advanced search tool, when using a PC? Ditch the handphone, come back later on a PC, and try again.

-=-=-=-=-=R E A D ! ! !=-=-=-=-=-

Whoa Nelly ! Want NVC Info? see http://www.visajourney.com/wiki/index.php/NVC_Process

Congratulations on your approval ! We All Applaud your accomplishment with Most Wonderful Kissies !

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

I did not see the P3 before. I did go with the electronic process. My computer is not very reliable, and neither is my brain.

April 2008 Met online ..................... March 2010.. 3 week visit......... 19 Nov...Sent DS230 & I-864

April 2009 Met in Chongqing .......... 09 March 2010 .. Marry.................17Dec...NVC lost 230 and 864

04 May 09 Apply K1 .................... 10 April .. Apply CR1....................20Dec..NVC found 230

18 May 09 NOA 1......................... 20 April... NOA1...........................28Dec..sent more 864 docs

16 Sep 09 NOA 2......................... 06 Oct..... NOA2...........................2011

08 Nov 09 P3................................... 21 Oct..... Have Case #..............21 Jan...SIF

06 Dec 09 P4............................... 30 OCt..... Have DS-3032...............26 Jan .. CC

29 Dec 09. Interview..................... 1 Nov..... email Ds-3032...............1 Apr, 3 week visit

29 Dec,,,,No Visa.......................... 1 Nov......paid AOS.......................4 May Interview.Approved..

9 Aug 2010 I-129F ended.............. 5 Nov......paid IV.........,,,,,,,,,,, ..... 28 June, Received Visa

............................................................................................................22 July, arrive USA..

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

I did not see the P3 before. I did not go with the electronic process. My computer is not very reliable, and neither is my brain.

My typing skills are terrible also. I believe I have this old timers thingy going on.

April 2008 Met online ..................... March 2010.. 3 week visit......... 19 Nov...Sent DS230 & I-864

April 2009 Met in Chongqing .......... 09 March 2010 .. Marry.................17Dec...NVC lost 230 and 864

04 May 09 Apply K1 .................... 10 April .. Apply CR1....................20Dec..NVC found 230

18 May 09 NOA 1......................... 20 April... NOA1...........................28Dec..sent more 864 docs

16 Sep 09 NOA 2......................... 06 Oct..... NOA2...........................2011

08 Nov 09 P3................................... 21 Oct..... Have Case #..............21 Jan...SIF

06 Dec 09 P4............................... 30 OCt..... Have DS-3032...............26 Jan .. CC

29 Dec 09. Interview..................... 1 Nov..... email Ds-3032...............1 Apr, 3 week visit

29 Dec,,,,No Visa.......................... 1 Nov......paid AOS.......................4 May Interview.Approved..

9 Aug 2010 I-129F ended.............. 5 Nov......paid IV.........,,,,,,,,,,, ..... 28 June, Received Visa

............................................................................................................22 July, arrive USA..

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

ah - the cure for that - is to rent time with a teenager over 15 years of age. No, I am not being funny - I am DEAD SERIOUS.

Sometimes my language usage seems confusing - please feel free to 'read it twice', just in case !
Ya know, you can find the answer to your question with the advanced search tool, when using a PC? Ditch the handphone, come back later on a PC, and try again.

-=-=-=-=-=R E A D ! ! !=-=-=-=-=-

Whoa Nelly ! Want NVC Info? see http://www.visajourney.com/wiki/index.php/NVC_Process

Congratulations on your approval ! We All Applaud your accomplishment with Most Wonderful Kissies !

 

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...