Well, Well, Well, We have finally crossed the line and got the VISA. I wanna thank all the VJer's for supporting me and showing me the right way... I remember when i first joined VJ, i was like, What the hell am i doing on this site.... its good for nothing. anyways, the interview overall went very smooth... It took total of 3 hours. not bad at all.

The Officer asked for these questions:

When did we meet?

How did we meet?

who are all in my family?

why did we wait for 2 years?

why did we not get married in those 2 years?

Where does She (I) work?

and then asked for some evidences.. so he showed them our pictures. Thats it for now folks... since i didn't get to talk to him for long as he was on his way to reach home... will call him back in an about 2 hours or so to find out more........ Wish you luck on your journey !!!!!!! Let me do the Happy Dance.... :dance::P

K-1 Journey....

05/15/2006 - Sent to TSC (Day 1)

05/30/2006 - NOA 1

07/21/2006 - NOA 2

08/23/2006 - INTERVIEW SUCCESSFUL!! (Day 99)[/b]

08/24/2006 - Visa Issued......08/30/2006 --- Visa in HAND !!!

09/02/2006 - REUNITED

----------------------------------------------------------------------------------------------------------------------------

09/07/2006 - Married

09/07/2006 - Applied for SSN

09/13/2006 - Picked-up Marriage Certificate's from the COURTHOUSE

09/13/2006 - Vaccinations DONE !!!

09/21/2006 - SSN received

----------------------------------------------------------------------------------------------------------------------------

09/21/2006 - Mailed out I-485 Package to Chicago.

10/02/2006 - NOA recevied

10/06/2006 - Letter Received for Biometrics

10/10/2006 - Biometric's Done !!! Appointment for Biometric's originally was on 10/14/2006

10/23/2006 - Case Transfered to CSC

10/27/2006 - Case received at CSC

11/09/2006 - E-mail recevied from CRIS saying AOS Approved and welcome notice mailed.

11/14/2006 - An approval letter mailed.

11/15/2006 - Green Card Received !!

--------------------------------------------------------------------------------------------------------------------------------

8/15/2008 - Mailed out I-751 Package to Nebreska. (mail fwd to Cali)

8/21/2008 - Package delivered.

8/25/2008 - Check Cashed/Cleared.

8/29/2008 - NOA Received.

Link to comment
Share on other sites

  • Replies 30
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Filed: K-1 Visa Country: Philippines
Timeline

CONGRATS!!!! AND GOD BLESS U BOTH

AOS JOURNEY

2007-05-07 (PM) Married

2007-05-09 AOS package sent

2007-05-10 AOS delivered to Chicago IL (day 1)

2007-05-15 NOA (not rcved in the mail) (day 6)

2007-06-01 Biometrics Notice in the Mail (day 23)

2007-06-27 Biometrics (day 49)

2007-06-20 Interview Notice Issued (day 42)

2007-06-23 Interview Notice in the Mail (day 45)

2007-08-10 Interview 10:00 am Sn Francisco (day 93) Approved

2007-08-21 Greencard received

Removal of Condition

2009-06-19 - sent

2009-06-25 - received

2009-06-26 - cheque cash

2009-07-17 - notice date

2009-08-14 - Biomentrics

2009-09-08 - Approved

2009-09-08 - 09-15 Card production ordered (email)(day 82)

2009-09-17 - Approval notice sent (email)

2009-09-19 - 10 year greencard received (w/wrong information)

2009-09-21 - I-90 sent

2009-11-04 - Card Production Order

2009-11-09 - Approval Notice received

2009-11-10 - Touched

1009-11-14 - Replacement 10 years greencard received (55 days)from filing expired 11/09/2019

Link to comment
Share on other sites

Filed: K-3 Visa Country: India
Timeline

AWESOME!!!!! :dance::dance:

What a burden off the shoulders, eh? Now the excitement begins.

Did your fiance get the stamp and the passport back, or will VFS courier it to him? Or can he pick up his passport?

Thanks,

KP

I-129F TRACK

2006-02-27: I-129 Sent

2006-03-02: NOA1

2006-07-24: NOA2

2006-07-31: Case received by NVC

2006-08-01: Case leaves NVC to New Delhi Consulate via DHL

2006-08-04: Case received by New Delhi Consulate

2006-08-08: Packet 3 mailed out by consulate

2006-08-17: DS-230 Part I couriered to consulate

2006-08-23: Got interview date (email and telephone confirmation)

2006-08-28: Picked-up packet 4 from the consulate, counter 16 (between 2 PM and 3 PM)

2006-09-20: Interview Date (VISA Approved!!!)

2006-09-23: Picked up Passport with VISA from Blue Dot courier office (VFS did not hold it)

2006-09-27: Reached Home!!! (POE Chicago)

I-130 TRACK

2006-02-08: I-130 Sent

2006-02-27: NOA1

2006-05-03: NOA2 (Approved)

2006-06-12: Received and entered into NVC system

2006-07-08: Self Generated DS-3032 and sent to NVC

2006-07-08: Received I-864 bill from attorney

2006-07-11: Paid I-864 bill

2006-07-12: Received IV bill

2006-07-17: Receive I-864 package

2006-07-19: Send back I-864 package

2006-07-19: Pay IV bill (was out on vacation)

2006-07-31: Sent in self-generated DS-230 (after NVC was ready)

2006-08-03: Case being reviewed by NVC (per operator)

2006-09-12: Case sent to New Delhi Consulate

2006-10-04: Emailed Consulate and got Original Interview Date (10/20/06) posponed to April 2007

Link to comment
Share on other sites

Filed: K-3 Visa Country: India
Timeline

wow ....congrats Shalz ..I bet you couldn't sleep out of excitement ......

EAD

-----------

10-05-2006 : NOA1

10-23-2006 : fingerprinting

10-24-2006 : notice that case has moved to Vermont

I-130

--------

05-09-2006 : Mailed I-30 (husband and son)

05-11-2006 : I-130 Received by NSC

05-11-2006 : Receipt Date

05-26-2006 : Notice Date

06-01-2006 : Check cleared

06-02-2006 : Received NOA1 in mail

06-03-2006 : touched (must be payment posted...)

10-07-2006 : approved

129F / K3

--------

06-05-2006 : Mailed I-129F

06-09-2006 : NOA1

07-31-2006 : NOA2

08-10-2006 : NVC number assigned

08-11-2006 : sent to Consulate, India

08-14-2006 : packet 3 sent by embassy

08-28-2006 : pkt 4 collected from embassy

09-20-2006 : interview - approved!!!!

09-30-2006 : Honey I am home !

Link to comment
Share on other sites

Filed: AOS (apr) Country: India
Timeline

Timesnap -- He called up at 1:30am to tell me everything went well... mann I couldn't go back to sleep... took me about 2 hours to fall asleep again.....

KP --- well, the officer said that they don't do the stamp there any longer... so he has decided to pick it up himself... instead of waiting for them to courier it to him... he had contacted the VFS office in Delhi, they said he can either pick it up tomorrow or a day after.. which is not bad at all.

wow ....congrats Shalz ..I bet you couldn't sleep out of excitement ......

K-1 Journey....

05/15/2006 - Sent to TSC (Day 1)

05/30/2006 - NOA 1

07/21/2006 - NOA 2

08/23/2006 - INTERVIEW SUCCESSFUL!! (Day 99)[/b]

08/24/2006 - Visa Issued......08/30/2006 --- Visa in HAND !!!

09/02/2006 - REUNITED

----------------------------------------------------------------------------------------------------------------------------

09/07/2006 - Married

09/07/2006 - Applied for SSN

09/13/2006 - Picked-up Marriage Certificate's from the COURTHOUSE

09/13/2006 - Vaccinations DONE !!!

09/21/2006 - SSN received

----------------------------------------------------------------------------------------------------------------------------

09/21/2006 - Mailed out I-485 Package to Chicago.

10/02/2006 - NOA recevied

10/06/2006 - Letter Received for Biometrics

10/10/2006 - Biometric's Done !!! Appointment for Biometric's originally was on 10/14/2006

10/23/2006 - Case Transfered to CSC

10/27/2006 - Case received at CSC

11/09/2006 - E-mail recevied from CRIS saying AOS Approved and welcome notice mailed.

11/14/2006 - An approval letter mailed.

11/15/2006 - Green Card Received !!

--------------------------------------------------------------------------------------------------------------------------------

8/15/2008 - Mailed out I-751 Package to Nebreska. (mail fwd to Cali)

8/21/2008 - Package delivered.

8/25/2008 - Check Cashed/Cleared.

8/29/2008 - NOA Received.

Link to comment
Share on other sites

Filed: K-3 Visa Country: India
Timeline

Shalz, that is awesome that he can pick it up from the VFS office. I was reading recently on one of the threads that somone had waited for over a week to get the passport (hope they finally got it) -- someone from UK.

I think I will NOT sleep the day of my wife's interview :-)

KP

Timesnap -- He called up at 1:30am to tell me everything went well... mann I couldn't go back to sleep... took me about 2 hours to fall asleep again.....

KP --- well, the officer said that they don't do the stamp there any longer... so he has decided to pick it up himself... instead of waiting for them to courier it to him... he had contacted the VFS office in Delhi, they said he can either pick it up tomorrow or a day after.. which is not bad at all.

wow ....congrats Shalz ..I bet you couldn't sleep out of excitement ......

I-129F TRACK

2006-02-27: I-129 Sent

2006-03-02: NOA1

2006-07-24: NOA2

2006-07-31: Case received by NVC

2006-08-01: Case leaves NVC to New Delhi Consulate via DHL

2006-08-04: Case received by New Delhi Consulate

2006-08-08: Packet 3 mailed out by consulate

2006-08-17: DS-230 Part I couriered to consulate

2006-08-23: Got interview date (email and telephone confirmation)

2006-08-28: Picked-up packet 4 from the consulate, counter 16 (between 2 PM and 3 PM)

2006-09-20: Interview Date (VISA Approved!!!)

2006-09-23: Picked up Passport with VISA from Blue Dot courier office (VFS did not hold it)

2006-09-27: Reached Home!!! (POE Chicago)

I-130 TRACK

2006-02-08: I-130 Sent

2006-02-27: NOA1

2006-05-03: NOA2 (Approved)

2006-06-12: Received and entered into NVC system

2006-07-08: Self Generated DS-3032 and sent to NVC

2006-07-08: Received I-864 bill from attorney

2006-07-11: Paid I-864 bill

2006-07-12: Received IV bill

2006-07-17: Receive I-864 package

2006-07-19: Send back I-864 package

2006-07-19: Pay IV bill (was out on vacation)

2006-07-31: Sent in self-generated DS-230 (after NVC was ready)

2006-08-03: Case being reviewed by NVC (per operator)

2006-09-12: Case sent to New Delhi Consulate

2006-10-04: Emailed Consulate and got Original Interview Date (10/20/06) posponed to April 2007

Link to comment
Share on other sites

Congratulations... you both are so lucky you made it in 3 months... hope we'll be as lucky as you guys, though it's impossible coz it's now 3 months and still got no noa2 :crying::crying::crying: still waiting....

anywayz, safe trip for him

04-14-06 - engaged

04-28-06 - I129f to TSC

05-09-06 - noa1 from CSC

09-29-06 - this case has been APPROVED on 09-28-06 (yessss thank you Dear God)

10-02-06 - got the NOA2 (snail mail)

10-18-06 - email from NVC gave us the case #MNL2006789xxx

10-21-06 - got the NVC letter (snail mail)

10-25-06 - mnl rec'd the case

12-29-06 - got my packet 4

01-25 & 26-07 - medical

02-16-07 - interview APPROVED!!! (Thank you Dear God)

02/23/07 - visa on hand (Thanks God)

03-01-07 - in my honey's arms (Thanks God)

03-09-07 - applied SSN

03-14-07 - got married

03-27-07 - got my SSN Card

05-04-07 - TD shot

AOS

05-26-07 - mailed AOS

05-28-07 - delivered on May 28, 2007 at 8:01 PM in CHICAGO, IL

06-01-07 - NOA1

06-19-07 - RFE (page 3 of form I-864)

06-26-07 - Biometrics

07-03-07 - touch (they got my RFE)

07-18-07 - case transferred to CSC

07-23-07 - application received at CSC

07/31/07 - card production ordered & welcome letter

08/06/07 - got my GC... yepeeeey (67 days from NOA1)

I-751 Removal of Condition

05-15-09 - mailed (VSC)

05-16-09 - delivered @ 12:07pm per usps website

05-20-09 - check cashed

05-28-09 - got my NOA/Extension letter (dated 05-18-09)

06-03-09 - got my Biometric schedule (on 06-17-09)

Link to comment
Share on other sites

Filed: K-3 Visa Country: India
Timeline
Well, Well, Well, We have finally crossed the line and got the VISA. I wanna thank all the VJer's for supporting me and showing me the right way... I remember when i first joined VJ, i was like, What the hell am i doing on this site.... its good for nothing. anyways, the interview overall went very smooth... It took total of 3 hours. not bad at all.

The Officer asked for these questions:

When did we meet?

How did we meet?

who are all in my family?

why did we wait for 2 years?

why did we not get married in those 2 years?

Where does She (I) work?

and then asked for some evidences.. so he showed them our pictures. Thats it for now folks... since i didn't get to talk to him for long as he was on his way to reach home... will call him back in an about 2 hours or so to find out more........ Wish you luck on your journey !!!!!!! Let me do the Happy Dance.... :dance::P

great,congrats :dance::dance:

I-130 Timeline with USCIS

03/13/2006=I-130 MAILED

03/21/2006=I-130 NOA-1 (Notice Date):

03/28/2006=I-130 NOA-1 Received by Mail:

06/22/2006=I-130 NOA-2 Approval E-mail:

07/03/2006=I-130 NOA-2 Approval Received by Mail:

NVC Process of I-130:

7/12/2006=NVC Assigns Case Number:

07/24/2006DS 3032 and AOS Fee Bill Generated:

07/24/2006=emailed choice of agent :

07/25/2006=mailed aso fee

I-129F Timeline with NBC:

03/28/06 =I-129F Sent:

03/30/06 = I-129F NOA-1 (Notice Date):

04/04/2006 =I-129F NOA-1 Received by Mail:

07/02/2006= I-129 rfe received

07/05/2006I-129 rfe sent

07/10/2006=uscis emailed rfe received

07/11/2006=received 2rfe

07/12/2006=second rfe sent visa usps

07/18/2006=contacted atlanta senators office

07/25/2006=received email I129F K3 APPROVED..

07/31/2006=nvc received case and generated a case number

08/01/2006=case left nvc to india consulate via dhl

08/04/2006=case reached chennai embassy

08/07/2006=embassy mailed packet to my wife with interview date.

08/11/2006=packet received

08/28/2006=interview date

08/28/2006 =interview SUCCESSFUL!!!!!!!!!!!!!!!!!!!!!!

9/06/2006 = SHE ARRIVES HERE.ATLANTA GEORGIA.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: England
Timeline
Shalz, that is awesome that he can pick it up from the VFS office. I was reading recently on one of the threads that somone had waited for over a week to get the passport (hope they finally got it) -- someone from UK.

I think I will NOT sleep the day of my wife's interview :-)

KP

Timesnap -- He called up at 1:30am to tell me everything went well... mann I couldn't go back to sleep... took me about 2 hours to fall asleep again.....

KP --- well, the officer said that they don't do the stamp there any longer... so he has decided to pick it up himself... instead of waiting for them to courier it to him... he had contacted the VFS office in Delhi, they said he can either pick it up tomorrow or a day after.. which is not bad at all.

wow ....congrats Shalz ..I bet you couldn't sleep out of excitement ......

12 days to be exact and no we still don't have it.

bar37.gif

Image14.jpg

bar37.gif

Link to comment
Share on other sites

MUST BE A WONDERFUL RELIEF! YES! CONGRAT!

[CLICK HERE] - MANILA EMBASSY K1 VISA GUIDE (Review Post #1)

[CLICK HERE] - VJ Acronyms and USCIS Form Definitions (A Handy Reference Tool)

Manila Embassy K1 Visa Information

4.2 National Visa Center (NVC) | (603) 334-0700 press 1, then 5....

4.3 Manila Embassy (Immigrant Visa Unit) | 011-632-301-2000 ext 5184 or dial 0

4.4 Department of State | (202) 663-1225, press 1, press 0,

4.5 Document Verification | CLICK HERE

4.6 Visa Interview Appointments website | CLICK HERE

4.7 St. Lukes | 011-63-2-521-0020

5.1 DELBROS website | CLICK HERE

6.2 CFO Guidance and Counseling Seminar | MANILA or CEBU

6.3 I-94 Arrival / Departure info | CLICK HERE

Adjustment of Status (AOS) Information

Please review the signature and story tab of my wife's profile, [Deputy Uling].

DISCLAIMER: Providing information does not constitute legal consul nor is intended as a substitute for legal representation.

Link to comment
Share on other sites

Filed: AOS (apr) Country: India
Timeline

Tim and Beth,

Hopefully, we don't have to wait for that long. or else I will just go crazy and start bugging the embassy.

MUST BE A WONDERFUL RELIEF! YES! CONGRAT!

K-1 Journey....

05/15/2006 - Sent to TSC (Day 1)

05/30/2006 - NOA 1

07/21/2006 - NOA 2

08/23/2006 - INTERVIEW SUCCESSFUL!! (Day 99)[/b]

08/24/2006 - Visa Issued......08/30/2006 --- Visa in HAND !!!

09/02/2006 - REUNITED

----------------------------------------------------------------------------------------------------------------------------

09/07/2006 - Married

09/07/2006 - Applied for SSN

09/13/2006 - Picked-up Marriage Certificate's from the COURTHOUSE

09/13/2006 - Vaccinations DONE !!!

09/21/2006 - SSN received

----------------------------------------------------------------------------------------------------------------------------

09/21/2006 - Mailed out I-485 Package to Chicago.

10/02/2006 - NOA recevied

10/06/2006 - Letter Received for Biometrics

10/10/2006 - Biometric's Done !!! Appointment for Biometric's originally was on 10/14/2006

10/23/2006 - Case Transfered to CSC

10/27/2006 - Case received at CSC

11/09/2006 - E-mail recevied from CRIS saying AOS Approved and welcome notice mailed.

11/14/2006 - An approval letter mailed.

11/15/2006 - Green Card Received !!

--------------------------------------------------------------------------------------------------------------------------------

8/15/2008 - Mailed out I-751 Package to Nebreska. (mail fwd to Cali)

8/21/2008 - Package delivered.

8/25/2008 - Check Cashed/Cleared.

8/29/2008 - NOA Received.

Link to comment
Share on other sites

Filed: K-3 Visa Country: India
Timeline

I am so happy for you ..It was really quick ... It must be such a relief..I cant wait for september dates to be out ....By the way were yr interview dates piblished on the delhi embassy site ?

EAD

-----------

10-05-2006 : NOA1

10-23-2006 : fingerprinting

10-24-2006 : notice that case has moved to Vermont

I-130

--------

05-09-2006 : Mailed I-30 (husband and son)

05-11-2006 : I-130 Received by NSC

05-11-2006 : Receipt Date

05-26-2006 : Notice Date

06-01-2006 : Check cleared

06-02-2006 : Received NOA1 in mail

06-03-2006 : touched (must be payment posted...)

10-07-2006 : approved

129F / K3

--------

06-05-2006 : Mailed I-129F

06-09-2006 : NOA1

07-31-2006 : NOA2

08-10-2006 : NVC number assigned

08-11-2006 : sent to Consulate, India

08-14-2006 : packet 3 sent by embassy

08-28-2006 : pkt 4 collected from embassy

09-20-2006 : interview - approved!!!!

09-30-2006 : Honey I am home !

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...