Jump to content
Rickey

California Service Center To Texas Service Center

 Share

5,981 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

I feel so badly for everyone (including myself and my dear wife in Indonesia (Lanny). But maybe something good will come out of this. Lets all not lose faith and we will turn to Him for comfort, believing that he has our best interest at heart although it is certainly hard to see it now. But I am sure that He does. (the Lord). He will dry out tears!

Yes! This is so true! I need to snap out of it. God knows what's good and everything happens in his time. Thank you for this reminder. I need not doubt the one who is in control and always delivers!

Thank you so much for this!

Chantéa's USCIS Journey:

2010 Jul 17 -- Filed I-130

2010 Aug 4 -- NOA 1

2010 Aug 9 -- NOA 1 Hardcopy

2010 Nov 2 -- Transferred from CSC to TSC

2010 Nov 24--Touched

2011 Feb 9 -- Touched

2011 Feb 10--Transferred BACK to CSC *rolls eyes*

2011 Feb 11-- Touched AGAIN (uscis office)

2011 Feb 25--email notification of APPROVAL!!!! (Thank ya Jesus)

2011 Mar 3--NOA2 Hardcopy

Your I-130 was approved in 205 days from your NOA1 date.

Chantéa's NVC Journey:

2011 Mar 8--received case # dated Mar 7, sent OPTIN email for electronic processing with attached DS-3032 form.

2011 Mar 9--received IIN and Beneficiary ID #, AOS bill invoiced/paid, submitted DS-261 (Choice of Agent)

2011 Mar 11--AOS bill shows as PAID and IV bill invoiced

2011 Mar 14--paid IV bill

2011 Mar 16-- IV bill shows as PAID

2011 Apr 11--submitted AOS and IV package and resent OPTIN email

2011 Apr 12--received OPTIN acceptance email

2011 Apr 13--received email notifying that my AOS and IV package was received

2011 May 4--received RFE email

2011 May 5--resent both packages

2011 May 14--received RFE email

2011 May 30--sent in missing document

2011 June 6--received CC email (Case Complete) and SIF (Sign in Failed)

2011 June 14-- interview date assigned for July 20!!

2011 Jul 11--Medical at Dr. Seiden & Associates

2011 Jul 20-- The big day

Link to comment
Share on other sites

Yes! This is so true! I need to snap out of it. God knows what's good and everything happens in his time. Thank you for this reminder. I need not doubt the one who is in control and always delivers!

Thank you so much for this!

If you view it as a whole, even an approval is no guarantee at TSC. It's taking at least 30 days to get an NVC case number.

Take a look at Saylin as an example of the streamlined way in which CSC deals with the I-130's. It's my guess the officers have been told simply to APPROVE, and then steer you through to NVC. You may be up there before the TSC crowd.

Edited by Val and Gary

04/2010 - Marriage in Weirsdale, Florida

USCIS

07-07-2010 Filed I-130 - K3

07-12-2010 Priority date

07-23-2010 NOA1 (California Service Centre)

11-03-2010 Transfer to Texas Service Centre

01-24-2011 NOA2 NVC

02-26-2011 Case #

02-28-2011 Docs delivered to NVC

03-06-2011 NVC received docs

03-06-2011 NVC SIF & Expedite approved

04-06-2011 Medical exam - Failed (bad cold - shadow on lung)

06-13-2011 2nd Medical exam - Passed

06-22-2011 Interview at London Embassy - denied due to previous overstay (3 year bar)

07-06-2011 I 601 Waiver accepted at London

07-19-2011 MP & Senator wrote to US Embassy to request expedite

08-13-2011 I 601 approved!

08-22-2011 Visa delivered

09-07-2011 POE Orlando - took 20 minutes to be admitted

I-751

08-15-2013 I-751 Received by Vermont service center

08-21-2013 I-751 Application check cashed

08-22-2013 I-751 NOA1 received dated 08-16-2013

Link to comment
Share on other sites

Filed: Lift. Cond. (pnd) Country: India
Timeline

That raj guy just started another thread on the same one that was closed earlier about the impacts on oct/nov/dec filers: http://www.visajourney.com/forums/topic/295010-impacts-of-tsc-to-csc-transfers-in-novdecjan-applicants/ blink.gif

This time he kicked out Oct filers and added Jan into his concerned list :rofl: :rofl: :rofl: :rofl:

I am almost out of TSC blackhole.

Marriage : 2010-06-27

I-130 NOA1 : 2010-07-14

Transferred to Blackhole : 2010-11-02

NOA2 : Feb 15, 2011

NVC:

2/25/11 - received case number, IIN, and gave e-mail IDs.

2/25/11 - Send DS-3032 E-mail

2/28/11 - I-864 (AOS) bill invoiced and paid

3/01/11 - AOS payment status "PAID"

3/02/11 - DS-3032 : Email accepted

3/04/11 - IV bill invoiced (e-mail at 2:30 AM) and paid

3/07/11 - IV payment status "PAID"

3/08/11 - AOS and IV packet sent

3/22/11 - AOS in the system and reviewed that triggered false RFE for IV packet

3/28/11 - DS-230 in the system and SIF

3/29/11 - Case Completed at NVC

4/13/11 - Interview date assigned

5/17/11 - Interview- Approved

5/18/11 - Passport & Visa Picked up from VFS Delhi

5/31/11 - POE (JFK)

visajourney.gif

Link to comment
Share on other sites

This time he kicked out Oct filers and added Jan into his concerned list :rofl: :rofl: :rofl: :rofl:

Maybe October filers were sent to Nebraska.rofl.gifrofl.gif

04/2010 - Marriage in Weirsdale, Florida

USCIS

07-07-2010 Filed I-130 - K3

07-12-2010 Priority date

07-23-2010 NOA1 (California Service Centre)

11-03-2010 Transfer to Texas Service Centre

01-24-2011 NOA2 NVC

02-26-2011 Case #

02-28-2011 Docs delivered to NVC

03-06-2011 NVC received docs

03-06-2011 NVC SIF & Expedite approved

04-06-2011 Medical exam - Failed (bad cold - shadow on lung)

06-13-2011 2nd Medical exam - Passed

06-22-2011 Interview at London Embassy - denied due to previous overstay (3 year bar)

07-06-2011 I 601 Waiver accepted at London

07-19-2011 MP & Senator wrote to US Embassy to request expedite

08-13-2011 I 601 approved!

08-22-2011 Visa delivered

09-07-2011 POE Orlando - took 20 minutes to be admitted

I-751

08-15-2013 I-751 Received by Vermont service center

08-21-2013 I-751 Application check cashed

08-22-2013 I-751 NOA1 received dated 08-16-2013

Link to comment
Share on other sites

This time he kicked out Oct filers and added Jan into his concerned list :rofl: :rofl: :rofl: :rofl:

Wow didn't notice that headbonk.gif

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

If you view it as a whole, even an approval is no guarantee at TSC. It's taking at least 30 days to get an NVC case number.

Take a look at Saylin as an example of the streamlined way in which CSC deals with the I-130's. It's my guess the officers have been told simply to APPROVE, and then steer you through to NVC. You may be up there before the TSC crowd.

smh. I can't believe they are even taking long to give NVC case numbers! When are we ever in the clear???

Man we still have to encourage each other and remain positive until the day of our interviews...not even that...when we have our official visas in hand, nope not even that, when we reach the POE and get on the plane...ONLY THEN will I believe anything!

This time he kicked out Oct filers and added Jan into his concerned list :rofl: :rofl: :rofl: :rofl:

What is this character up to. I responded to him last night. Did I fall into his trap?

Chantéa's USCIS Journey:

2010 Jul 17 -- Filed I-130

2010 Aug 4 -- NOA 1

2010 Aug 9 -- NOA 1 Hardcopy

2010 Nov 2 -- Transferred from CSC to TSC

2010 Nov 24--Touched

2011 Feb 9 -- Touched

2011 Feb 10--Transferred BACK to CSC *rolls eyes*

2011 Feb 11-- Touched AGAIN (uscis office)

2011 Feb 25--email notification of APPROVAL!!!! (Thank ya Jesus)

2011 Mar 3--NOA2 Hardcopy

Your I-130 was approved in 205 days from your NOA1 date.

Chantéa's NVC Journey:

2011 Mar 8--received case # dated Mar 7, sent OPTIN email for electronic processing with attached DS-3032 form.

2011 Mar 9--received IIN and Beneficiary ID #, AOS bill invoiced/paid, submitted DS-261 (Choice of Agent)

2011 Mar 11--AOS bill shows as PAID and IV bill invoiced

2011 Mar 14--paid IV bill

2011 Mar 16-- IV bill shows as PAID

2011 Apr 11--submitted AOS and IV package and resent OPTIN email

2011 Apr 12--received OPTIN acceptance email

2011 Apr 13--received email notifying that my AOS and IV package was received

2011 May 4--received RFE email

2011 May 5--resent both packages

2011 May 14--received RFE email

2011 May 30--sent in missing document

2011 June 6--received CC email (Case Complete) and SIF (Sign in Failed)

2011 June 14-- interview date assigned for July 20!!

2011 Jul 11--Medical at Dr. Seiden & Associates

2011 Jul 20-- The big day

Link to comment
Share on other sites

smh. I can't believe they are even taking long to give NVC case numbers! When are we ever in the clear???

Man we still have to encourage each other and remain positive until the day of our interviews...not even that...when we have our official visas in hand, nope not even that, when we reach the POE and get on the plane...ONLY THEN will I believe anything!

Indeedy.

At this stage, and with only FOUR cases ever having gotten case numbers from NVC, it may feel bad now, but you just MAY be better off at CSC. Look at it this way, at least you're OUT of Texas. A lot of us still aren't! good.gif

04/2010 - Marriage in Weirsdale, Florida

USCIS

07-07-2010 Filed I-130 - K3

07-12-2010 Priority date

07-23-2010 NOA1 (California Service Centre)

11-03-2010 Transfer to Texas Service Centre

01-24-2011 NOA2 NVC

02-26-2011 Case #

02-28-2011 Docs delivered to NVC

03-06-2011 NVC received docs

03-06-2011 NVC SIF & Expedite approved

04-06-2011 Medical exam - Failed (bad cold - shadow on lung)

06-13-2011 2nd Medical exam - Passed

06-22-2011 Interview at London Embassy - denied due to previous overstay (3 year bar)

07-06-2011 I 601 Waiver accepted at London

07-19-2011 MP & Senator wrote to US Embassy to request expedite

08-13-2011 I 601 approved!

08-22-2011 Visa delivered

09-07-2011 POE Orlando - took 20 minutes to be admitted

I-751

08-15-2013 I-751 Received by Vermont service center

08-21-2013 I-751 Application check cashed

08-22-2013 I-751 NOA1 received dated 08-16-2013

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Mexico
Timeline

If you view it as a whole, even an approval is no guarantee at TSC. It's taking at least 30 days to get an NVC case number.

Take a look at Saylin as an example of the streamlined way in which CSC deals with the I-130's. It's my guess the officers have been told simply to APPROVE, and then steer you through to NVC. You may be up there before the TSC crowd.

I DONT KNOW WHAT TO DO ANYMORE.... I FEEL HELPLESS....

USCIS: I-130

Priority Date- July 1st

I-130 Hardcopy- July 15th

Transfered from CSC to TSC- November 2nd

I-130 sent to "USCIS Office"- November 24th

Touched- November 26, 28 and 29

Touched Feb. 9th

I-130 transfered back to CSC from TSC- Feb. 10th

Transfered to "USCIS" office again- Feb. 10th

Touched- Feb. 11th

APPROVED FINALLY!- FEB. 15th!

Touched- Feb. 26 and 28th

NVC: NVC

Case Number- March 2nd(automated Voice system)

NVC Invoice Number- March 3rd

All NVC fees paid- March 4th

All NVC fee transactions complete- March 7th (pretty much nxt day, except it was a weekend so we had to wait for them to go threw on Monday)

Submitted all documents- March 8th

All documents recieved and processed- March 11th

Case at NVC COMPLETE- March 17th

US Councel in Juarez:

Recieved all documents-

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Did Wade say anything about his interview today?

Chantéa's USCIS Journey:

2010 Jul 17 -- Filed I-130

2010 Aug 4 -- NOA 1

2010 Aug 9 -- NOA 1 Hardcopy

2010 Nov 2 -- Transferred from CSC to TSC

2010 Nov 24--Touched

2011 Feb 9 -- Touched

2011 Feb 10--Transferred BACK to CSC *rolls eyes*

2011 Feb 11-- Touched AGAIN (uscis office)

2011 Feb 25--email notification of APPROVAL!!!! (Thank ya Jesus)

2011 Mar 3--NOA2 Hardcopy

Your I-130 was approved in 205 days from your NOA1 date.

Chantéa's NVC Journey:

2011 Mar 8--received case # dated Mar 7, sent OPTIN email for electronic processing with attached DS-3032 form.

2011 Mar 9--received IIN and Beneficiary ID #, AOS bill invoiced/paid, submitted DS-261 (Choice of Agent)

2011 Mar 11--AOS bill shows as PAID and IV bill invoiced

2011 Mar 14--paid IV bill

2011 Mar 16-- IV bill shows as PAID

2011 Apr 11--submitted AOS and IV package and resent OPTIN email

2011 Apr 12--received OPTIN acceptance email

2011 Apr 13--received email notifying that my AOS and IV package was received

2011 May 4--received RFE email

2011 May 5--resent both packages

2011 May 14--received RFE email

2011 May 30--sent in missing document

2011 June 6--received CC email (Case Complete) and SIF (Sign in Failed)

2011 June 14-- interview date assigned for July 20!!

2011 Jul 11--Medical at Dr. Seiden & Associates

2011 Jul 20-- The big day

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

I haven't heard anything about the interview yet. The last I heard, he said he would post about it tonight.... still nada. Maybe he's had all he can take... and went to pay TSC a visit. :lol:

Did Wade say anything about his interview today?

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

I haven't heard anything about the interview yet. The last I heard, he said he would post about it tonight.... still nada. Maybe he's had all he can take... and went to pay TSC a visit. :lol:

It wouldn't be surprising! They need everyone in this thread standing outside their offices with torches and signs! :wow: :wow: :wow:

Chantéa's USCIS Journey:

2010 Jul 17 -- Filed I-130

2010 Aug 4 -- NOA 1

2010 Aug 9 -- NOA 1 Hardcopy

2010 Nov 2 -- Transferred from CSC to TSC

2010 Nov 24--Touched

2011 Feb 9 -- Touched

2011 Feb 10--Transferred BACK to CSC *rolls eyes*

2011 Feb 11-- Touched AGAIN (uscis office)

2011 Feb 25--email notification of APPROVAL!!!! (Thank ya Jesus)

2011 Mar 3--NOA2 Hardcopy

Your I-130 was approved in 205 days from your NOA1 date.

Chantéa's NVC Journey:

2011 Mar 8--received case # dated Mar 7, sent OPTIN email for electronic processing with attached DS-3032 form.

2011 Mar 9--received IIN and Beneficiary ID #, AOS bill invoiced/paid, submitted DS-261 (Choice of Agent)

2011 Mar 11--AOS bill shows as PAID and IV bill invoiced

2011 Mar 14--paid IV bill

2011 Mar 16-- IV bill shows as PAID

2011 Apr 11--submitted AOS and IV package and resent OPTIN email

2011 Apr 12--received OPTIN acceptance email

2011 Apr 13--received email notifying that my AOS and IV package was received

2011 May 4--received RFE email

2011 May 5--resent both packages

2011 May 14--received RFE email

2011 May 30--sent in missing document

2011 June 6--received CC email (Case Complete) and SIF (Sign in Failed)

2011 June 14-- interview date assigned for July 20!!

2011 Jul 11--Medical at Dr. Seiden & Associates

2011 Jul 20-- The big day

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Thailand
Timeline

Wow, almost 5 more pages to go through........

As stated earlier today, I had an interview with Cindy Carcamo of the Orange County Register about this whole USCIS screw up. The paper took an interest in my story due to my sons health condition. The interview was much longer than I expected, probably because she was "old school" and took notes on a note pad, she did a lot of writing, LOL

I provided her with a copy of the Alert that was posted on USCIS website the other day, all pertinent emails for everyone that I had contacted at USCIS and other documents from USCIS. All in all about 3/4 in thick!!

She took interest in how my Congressman had basically ignored my plea for help, I threw him under the bus big time. Someone that I previously met many years ago and HAD respect for. He lost quite a few votes due to his inaction.

I provided her a link to this thread a few weeks back and she has been here reading.

I brought up waitingonthelords specific situation and Rachel's roller coaster ride yesterday and today.

The article will be in print and online soon, she was not able to give me a specific date but assured me it would be published. I am about to send her some pictures to include in the article, she wants a wedding pic and some other misc pics.

As soon as the article is posted online, I will let you guys know. Although we have some traction now, it would be advisable to comment on the story when it is available.

Good luck all!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

I have a feeling things are starting to turnaround at Texas with the approved petitions being sent to NVC in a more timely manner. :thumbs:

7/2/10- NOA1

2/9/11- NOA2 (transferred to Texas)

NVC

2/28/11- case number received

3/2/11- Paid AOS bill

3/5/11- Paid IV bill

3/12/11- expedite to Bogota consulate approved!!!

3/14/11- left NVC to Bogota for further processing

3/17/11- received by Bogota, emailed consulate and was told to send DS-230 and DS-2100 (packet 3)

3/18/11- packet 3 emailed to Bogota consulate, email confirmation on March 23

3/31/11- Interview date! Approved!!!!!!

Keep the faith, everything works out for the very best

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

not sure why that posted twice, but I see Wade just wrote something!

Edited by cad_bacon

Chantéa's USCIS Journey:

2010 Jul 17 -- Filed I-130

2010 Aug 4 -- NOA 1

2010 Aug 9 -- NOA 1 Hardcopy

2010 Nov 2 -- Transferred from CSC to TSC

2010 Nov 24--Touched

2011 Feb 9 -- Touched

2011 Feb 10--Transferred BACK to CSC *rolls eyes*

2011 Feb 11-- Touched AGAIN (uscis office)

2011 Feb 25--email notification of APPROVAL!!!! (Thank ya Jesus)

2011 Mar 3--NOA2 Hardcopy

Your I-130 was approved in 205 days from your NOA1 date.

Chantéa's NVC Journey:

2011 Mar 8--received case # dated Mar 7, sent OPTIN email for electronic processing with attached DS-3032 form.

2011 Mar 9--received IIN and Beneficiary ID #, AOS bill invoiced/paid, submitted DS-261 (Choice of Agent)

2011 Mar 11--AOS bill shows as PAID and IV bill invoiced

2011 Mar 14--paid IV bill

2011 Mar 16-- IV bill shows as PAID

2011 Apr 11--submitted AOS and IV package and resent OPTIN email

2011 Apr 12--received OPTIN acceptance email

2011 Apr 13--received email notifying that my AOS and IV package was received

2011 May 4--received RFE email

2011 May 5--resent both packages

2011 May 14--received RFE email

2011 May 30--sent in missing document

2011 June 6--received CC email (Case Complete) and SIF (Sign in Failed)

2011 June 14-- interview date assigned for July 20!!

2011 Jul 11--Medical at Dr. Seiden & Associates

2011 Jul 20-- The big day

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...