Still here, feeling relieved and trying not to be too impatient waiting for the visa to be delivered.

I too am waiting on the visa before I book a flight for my wife.

USCIS

07-20-2010: I-130 package mailed.

07-22-2010: I-130 Package Received - Priority Date.

07-29-2010: Received text & email from USCIS - Notice Date.

07-30-2010: Check Cashed by USCIS.

08-02-2010: Received NOA1 hard copy.

08-02,04,05: Touched.

09-28-2010: Received text & email - petition approved.

10-04-2010: Received NOA2 hard copy.

NVC

10-13-2010: NVC Case# Received (after calling).

10-15-2010: Emailed DS-3032 to NVC.

10-16-2020: Received the DS-3032 package, IIN number & AOS bill via email.

10-22-2010: Paid AOS bill ($88) - showing IN PROCESS

10-25-2010: AOS fee PAID.

10-27-2010: Express Mail AOS Package.

10-27-2010: Paid IV bill - showing IN PROCESS.

10-28-2010: AOS package delivered.

10-28-2010: IV fee PAID.

10-29-2010: Express Mail IV package.

11-01-2010: IV package delivered.

11-08-2010: AOS packages entered into NVC system.

11-15-2010: IV package entered into NVC system.

11-23-2010: SIF.

11-24-2010: Case Complete.

CONSULATE

12-21-2010: Medical at SLMC - Passed

12-22-2010: Immunization at SLMC

01-04-2011: Interview @USEM ~ Approval

OTHER

02-05-2011: POE at JFK

N-400

05-01-2017: N-400 Sent

05-09-2017: Case accepted

05-15-2017: Biometric appointment scheduled

05-30-2017: Biometric

06-05-2017: Inline for interview

08-15-2017: Interview scheduled

09-19-2017: Interview (approved).

01-19-2018: Oath Ceremony

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: China
Timeline

Where's my VJ family today? I miss you all.

Snowing in Southwest Virginia today. Split up some more firewood today, good stress relief. :blink:

April 2008 Met online ..................... March 2010.. 3 week visit......... 19 Nov...Sent DS230 & I-864

April 2009 Met in Chongqing .......... 09 March 2010 .. Marry.................17Dec...NVC lost 230 and 864

04 May 09 Apply K1 .................... 10 April .. Apply CR1....................20Dec..NVC found 230

18 May 09 NOA 1......................... 20 April... NOA1...........................28Dec..sent more 864 docs

16 Sep 09 NOA 2......................... 06 Oct..... NOA2...........................2011

08 Nov 09 P3................................... 21 Oct..... Have Case #..............21 Jan...SIF

06 Dec 09 P4............................... 30 OCt..... Have DS-3032...............26 Jan .. CC

29 Dec 09. Interview..................... 1 Nov..... email Ds-3032...............1 Apr, 3 week visit

29 Dec,,,,No Visa.......................... 1 Nov......paid AOS.......................4 May Interview.Approved..

9 Aug 2010 I-129F ended.............. 5 Nov......paid IV.........,,,,,,,,,,, ..... 28 June, Received Visa

............................................................................................................22 July, arrive USA..

Link to comment
Share on other sites

Filed: IR-5 Country: India
Timeline

Snowing in Southwest Virginia today. Split up some more firewood today, good stress relief. :blink:

:D

CSC - I-130 for Parents (IR5)

10/11/2011 - Sent to Chicago Lockbox

10/13/2011 - Delivered at Chicago Lockbox

10/17/2011 - Email received with Receipt#, Routed to CSC

10/18/2011 - Cleared the checks $420*2

10/21/2011 - Received NOA1

03/30/2012 - Received NOA2

NVC

04/19/2012 - NVC received

05/01/2012 - Case# generated

05/02/2012 - DS-3032 COA emailed

05/02/2012 - I-864 AOS Fee $88 paid

05/05/2012 - I-864 AOS package mailed to NVC

05/07/2012 - I-864 AOS package received by NVC

05/07/2012 - DS-3032 COA accepted

05/08/2012 - DS-230 IV Fee $230*2 paid

05/09/2012 - DS-230 IV package mailed to NVC

05/11/2012 - DS-230 IV package received by NVC

05/17/2012 - Case Completed

Consulate

07/02/2012 - VFS visit in Cochin

07/04/2012 - Medical in Chennai

07/12/2012 - Interview in Mumbai - Success!

09/08/2012 - POE at JFK, NY

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Interview scheduled for 9am on March 7th!!!!

Met in 2004 at a Dave Matthews Band concert, started dating November 2005, engaged February 2009 and married November 14, 2009. Together in the US on March 19th 2011

CR-1 journey

USCIS: (170 days)

2010-03-27: I-130 sent

2010-09-23: NOA2

NVC: (93 days)

2010-10-06: NVC Case Number assigned

2011-01-05: SIF and Case Completion!

2011-02-15: Medical in Toronto

2011-03-07: Interview approved (335 days from NOA1)

2011-03-10: Passport received

2011-03-19: POE - Buffalo, NY

2011-03-28: SSN received

2011-03-31: USCIS Welcome

2011-04-05: Conditional Green Card received

2012-11-30: Notice to file I-751 received

2012-12-12: I-751 (Remove of Conditions) sent

2013-08-16: Conditions removed. 10 year Permanent Resident Card received

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Interview schd. less than 24 hours from NVC completion

March 4th at 8am :)

10/10/09: Married in Hamilton, Ontario :)

04/01/2010 : I-130 Sent

04/16/10 : NOA1 Issued (Hard Copy)

09/02/2010: File Touched Fingers Crossed

09/24/2010: NOA2 Approval!!!


  • 161 Days since NOA1 - NOA2
    ------------------
    NVC Received File - 10/04/2010
    10/07/2010 Received Case #/Opted into Electronic Processing

    • OPT IN EMAIL CONFIRMATION INTO ELECTRONIC PROCESSING RECEIVED 10/25 TOOK 18 DAYS FROM INITIAL EMAIL SENT
    • DS3032 Sent Following Electronic Proccessing Formats

10/15/2010: I-864(AOS) fee ($88) payment Received

10/18/2010: I-864 (AOS) PAID

10/20/2010: AOS package Sent via Email for Electronic Processing

10/22/2010: IV Bill Invoiced

10/22/2010: IV Bill Paid (Shown Paid Status 8/25/2010)

10/27/2010:DS Forms Emailed Via Email for Electronic Processing

01/06/2011: Sign in Failed

11/23/2010: AOS package review completed

01/05/2011: IV package review completed

01/06/2011: Case Completed (Received case complete Email VIA Electronic Processing)

01/07/2011: Consulate Interview Scheduled

Consulate

02/15/2011: Medical

03/04/2011: Interview

U.S

03/07/2011: POE South of Montreal US-CDN border

03/07/2011: Welcome Letter

03/24/2011: Green Card

Link to comment
Share on other sites

Filed: IR-5 Country: India
Timeline

Interview scheduled for 9am on March 7th!!!!

Congrats Heather&Matt :thumbs:

Loto

CSC - I-130 for Parents (IR5)

10/11/2011 - Sent to Chicago Lockbox

10/13/2011 - Delivered at Chicago Lockbox

10/17/2011 - Email received with Receipt#, Routed to CSC

10/18/2011 - Cleared the checks $420*2

10/21/2011 - Received NOA1

03/30/2012 - Received NOA2

NVC

04/19/2012 - NVC received

05/01/2012 - Case# generated

05/02/2012 - DS-3032 COA emailed

05/02/2012 - I-864 AOS Fee $88 paid

05/05/2012 - I-864 AOS package mailed to NVC

05/07/2012 - I-864 AOS package received by NVC

05/07/2012 - DS-3032 COA accepted

05/08/2012 - DS-230 IV Fee $230*2 paid

05/09/2012 - DS-230 IV package mailed to NVC

05/11/2012 - DS-230 IV package received by NVC

05/17/2012 - Case Completed

Consulate

07/02/2012 - VFS visit in Cochin

07/04/2012 - Medical in Chennai

07/12/2012 - Interview in Mumbai - Success!

09/08/2012 - POE at JFK, NY

Link to comment
Share on other sites

Filed: IR-5 Country: India
Timeline

Interview schd. less than 24 hours from NVC completion

March 4th at 8am :)

Congrats MattyDil :thumbs:

2 Months for Canada interview after NVC is not bad. It looks like Montreal has been sped up from traditional 4 or 5 months period.

I saw even Nigeria is faster now.

Good luck MattyDil!

Loto

CSC - I-130 for Parents (IR5)

10/11/2011 - Sent to Chicago Lockbox

10/13/2011 - Delivered at Chicago Lockbox

10/17/2011 - Email received with Receipt#, Routed to CSC

10/18/2011 - Cleared the checks $420*2

10/21/2011 - Received NOA1

03/30/2012 - Received NOA2

NVC

04/19/2012 - NVC received

05/01/2012 - Case# generated

05/02/2012 - DS-3032 COA emailed

05/02/2012 - I-864 AOS Fee $88 paid

05/05/2012 - I-864 AOS package mailed to NVC

05/07/2012 - I-864 AOS package received by NVC

05/07/2012 - DS-3032 COA accepted

05/08/2012 - DS-230 IV Fee $230*2 paid

05/09/2012 - DS-230 IV package mailed to NVC

05/11/2012 - DS-230 IV package received by NVC

05/17/2012 - Case Completed

Consulate

07/02/2012 - VFS visit in Cochin

07/04/2012 - Medical in Chennai

07/12/2012 - Interview in Mumbai - Success!

09/08/2012 - POE at JFK, NY

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nepal
Timeline

Interview scheduled for 9am on March 7th!!!!

Congrats !

kicking.gif

Interview schd. less than 24 hours from NVC completion

March 4th at 8am :)

wow that's faster than bullet :)

Congrats !

My NVC Journey

10/12/10 –NVC received the file

10/15/10 -NVC case # generated

10/18/10 -Called NVC and gave both beneficiary and petitioner email addresses

10/19/10 - Beneficiary emailed DS-3032 to NVC and also mailed the hard copy

10/26/10 - Called NVC and got the IIN

10/26/10 - Paid AOS fee $ 88.00

10/27/10 - AOS fee status shows "PAID"

10/27/10 - AOS package expressed mailed (next day delivery)

10/30/10 - IV fee bill generated and paid immediately

10/30/10 - Received AOS fee bill and DS-3032 kit and also received the confirmation of receipt of DS-3032

11/04/10 - IV fee bill status shown as "paid"

11/04/10 - Sent IV package (next day delivery)

11/06/10 - Received IV instructions packet (packet 3) via email

11/08/10 - AOS entered into NVC system

11/16/10 - AOS was reviewed and OK'ed

11/18/10 - IV entered into NVC system

11/24/10 - IV package was reviewed and generated artificial RFE for missing photographs (which was actually submitted with the package)

11/26/10 - RFE response mailed out

11/29/10 - RFE response delivered to NVC

12/08/10 - RFE response entered into NVC system

12/15/10 - SIF :)

12/15/10 - Case Complete :)

01/03/11 - Interview date assigned for Feb 15 @ 1:30 PM

01/17/11 - Medical done ! Passed

01/25/11 - Re-scheduled the interview for Feb 1 @ 1:00 PM

02/01/11 - Interview @ 1:00 PM - Approved :)

02/03/11 - Visa picked up from USEM

02/12/11 - POE @ JFK

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Nigeria
Timeline

Interview scheduled for 9am on March 7th!!!!

Interview schd. less than 24 hours from NVC completion

March 4th at 8am :)

Congrats to both of you! Am very happy for you both...those dates are very good considering the Montreal Embassy track record!

CR-1 VISA

2010-06-01: Get Married!!!

2010-06-15: Mail out I-130 - Petition for Alien Relative

2010-06-22: I-130 NOA1
2010-09-30: I-130 NOA2
2011-01-26: Interview - APPROVED! (7 months, 4 days)
2011-02-02: Visa issued and in hand!
2011-02-25: POE - JFK (New York City)
2011-03-14: Received Conditional Green Card
2011-04-01: Received SS Card
2012-03-25: Our son is born!

--------------------------------------------------------------------------------------------
2012-11-27: Mail out I-751 - Removal of conditions
2012-12-03: I-751 NOA1
2013-01-17: Biometrics

2013-05-13: I-751 Approved

2013-05-17: Received 10 year Green Card

--------------------------------------------------------------------------------------------

2013-11-27: Naturalization Eligibility (3 years based on marriage)

2013-11-29: Mail out N-400 - Application for Naturalization

2013-12-03: N-400 NOA1

2013-12-06: Check Cashed

2013-12-31: Biometrics

2014-01-27: Place In-Line for Interview

2014-03-28: Interview Scheduled

2014-04-04: Interview Letter Received

2014-05-06: Interview

2014-05-12: N-400 Approved and Oath Date Scheduled

2014-05-22: Oath Ceremony - Become a naturalized citizen!!!

OUR VISA JOURNEY IS OFFICIALLY OVER!

Link to comment
Share on other sites

Interview scheduled for 9am on March 7th!!!!

Congrats on your interview date

Interview schd. less than 24 hours from NVC completion

March 4th at 8am :)

Congrats on your interview date

Citizenship next step!

Link to comment
Share on other sites

Interview scheduled for 9am on March 7th!!!!

Interview schd. less than 24 hours from NVC completion

March 4th at 8am :)

Congrats to both of you. :dance: :dance:

USCIS

07-20-2010: I-130 package mailed.

07-22-2010: I-130 Package Received - Priority Date.

07-29-2010: Received text & email from USCIS - Notice Date.

07-30-2010: Check Cashed by USCIS.

08-02-2010: Received NOA1 hard copy.

08-02,04,05: Touched.

09-28-2010: Received text & email - petition approved.

10-04-2010: Received NOA2 hard copy.

NVC

10-13-2010: NVC Case# Received (after calling).

10-15-2010: Emailed DS-3032 to NVC.

10-16-2020: Received the DS-3032 package, IIN number & AOS bill via email.

10-22-2010: Paid AOS bill ($88) - showing IN PROCESS

10-25-2010: AOS fee PAID.

10-27-2010: Express Mail AOS Package.

10-27-2010: Paid IV bill - showing IN PROCESS.

10-28-2010: AOS package delivered.

10-28-2010: IV fee PAID.

10-29-2010: Express Mail IV package.

11-01-2010: IV package delivered.

11-08-2010: AOS packages entered into NVC system.

11-15-2010: IV package entered into NVC system.

11-23-2010: SIF.

11-24-2010: Case Complete.

CONSULATE

12-21-2010: Medical at SLMC - Passed

12-22-2010: Immunization at SLMC

01-04-2011: Interview @USEM ~ Approval

OTHER

02-05-2011: POE at JFK

N-400

05-01-2017: N-400 Sent

05-09-2017: Case accepted

05-15-2017: Biometric appointment scheduled

05-30-2017: Biometric

06-05-2017: Inline for interview

08-15-2017: Interview scheduled

09-19-2017: Interview (approved).

01-19-2018: Oath Ceremony

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Canada
Timeline

Interview scheduled for 9am on March 7th!!!!

Interview schd. less than 24 hours from NVC completion

March 4th at 8am :)

Fantastic news! Congratulations. :dance:

YAY! Montreal finally decided to start moving!

USCIS

NOA1 08/19/08

NOA2 01/20/09

NVC

Received 01/26/09

Completed 02/13/09 (19 Days)

Interview Assigned 03/27/09 (6 weeks after NVC completion)

Medical

04/14/09 (Toronto)

Interview

Montreal 05/12/09 (88 days after NVC completion) **APPROVED**

POE

06/16/09 Buffalo

07/02/09 Welcome Letter Received

07/07/09 Applied for SSN

07/10/09 "Card production ordered" email received

07/13/09 SSN received

07/14/09 "Approval notice sent" email received

07/17/09 GREEN CARD received

Removal of Conditions

03/21/11 I-751 mailed to VSC

03/23/11 I-751 received at VSC

03/29/11 Cheque Cashed

03/30/11 NOA1 received (3/24/11)

04/11/11 Biometrics appointment notice received

05/05/11 Biometric appointment

12/13/11 **Approval date** (5 days short of 9 months!)

12/19/11 Approval letter and green card received

Naturalization

05/16/2019 Filed online (estimated completion February 2020)

05/18/2019 Biometrics scheduled

05/21/2019 Receipt notice and biometrics notices posted to online account.05/23/2019 Hard copy of NOA1 received

05/24/2019 Hard copy of biometrics appointment received

06/07/2019 Biometrics appointment (estimated completion January 2020)

12/31/2019 Email received "Interview scheduled"

01/01/2020 Interview date notice posted to online account (02/19/2020)

01/05/2019 Hard copy of interview appointment received

02/19/2020 Interview (**Approved**) and same day Oath Ceremony. 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ghana
Timeline

Congrats MattyDil :thumbs:

2 Months for Canada interview after NVC is not bad. It looks like Montreal has been sped up from traditional 4 or 5 months period.

I saw even Nigeria is faster now.

Good luck MattyDil!

Loto

Loto,

If we can get Ghana to be faster, it will be great. But then again, pigs may fly before that happens.so upset at the embassy.

Marriage: 09-12-2009

USCIS

4-26-10 Sent of I-130

10-07-10 Approved

10-12-10 Received hardcopy of NOA2

NVC

10-12-10: NVC has application but case number yet to be assigned.

10-18-10: Case number assigned.

10-19-10: Provided both email addresses

10-23-10: DS-3032 emailed; no response

10-28-10: Received IIN, dithering around instead of paying the fee

10-30-10: DS3032 Kit and I-864 AOS review fee ($88) online payment; In Process

11-03-10: I-864 AOS status 'PAID"; printed cover sheet and mailed I-846EZ package

11-04-10: I-864EZ AOS received and signed by N. Visa Center

11-05-10: DS-230 IV fee ($404) online payment

11-17-10: AOS entered into the system

12-03-10: IV fee paid ($404); In Process

12-06-10: DS-230 IV status 'PAID',

12-07-10: IV package mailed out

12-08-10: DS-230 IV package delivery; signed by N. Visa Center

12-14-10: DS230 entered into system; yay

12-29-10: SIF

12-30-10: Case Completed @ NVC

Total days @ NVC:79 I-130 to Case Complete 249 days

Consulate

08-25-11: Consulate Interview Schedule

xxxx: Medicals

10-20-11: Interview 8:30AM Need Co-sponsor

11-17-11: Visa granted

12-09-11: Picked up visa from Accra Consulate

filsm5.png

event.png

WZs0m5.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ghana
Timeline

Congratulations Heather & Matt and MatyDil.

I wish you all well in your upcoming and respective interviews.

Marriage: 09-12-2009

USCIS

4-26-10 Sent of I-130

10-07-10 Approved

10-12-10 Received hardcopy of NOA2

NVC

10-12-10: NVC has application but case number yet to be assigned.

10-18-10: Case number assigned.

10-19-10: Provided both email addresses

10-23-10: DS-3032 emailed; no response

10-28-10: Received IIN, dithering around instead of paying the fee

10-30-10: DS3032 Kit and I-864 AOS review fee ($88) online payment; In Process

11-03-10: I-864 AOS status 'PAID"; printed cover sheet and mailed I-846EZ package

11-04-10: I-864EZ AOS received and signed by N. Visa Center

11-05-10: DS-230 IV fee ($404) online payment

11-17-10: AOS entered into the system

12-03-10: IV fee paid ($404); In Process

12-06-10: DS-230 IV status 'PAID',

12-07-10: IV package mailed out

12-08-10: DS-230 IV package delivery; signed by N. Visa Center

12-14-10: DS230 entered into system; yay

12-29-10: SIF

12-30-10: Case Completed @ NVC

Total days @ NVC:79 I-130 to Case Complete 249 days

Consulate

08-25-11: Consulate Interview Schedule

xxxx: Medicals

10-20-11: Interview 8:30AM Need Co-sponsor

11-17-11: Visa granted

12-09-11: Picked up visa from Accra Consulate

filsm5.png

event.png

WZs0m5.png

Link to comment
Share on other sites

Filed: IR-5 Country: India
Timeline

Loto,

If we can get Ghana to be faster, it will be great. But then again, pigs may fly before that happens.so upset at the embassy.

agynyame,

You may be lucky as well to get a faster interview date. I know Accra, Ghana is the slowest in terms of interview scheduling.

Is it still taking 6 to 9 months, after NVC CC?

Loto

CSC - I-130 for Parents (IR5)

10/11/2011 - Sent to Chicago Lockbox

10/13/2011 - Delivered at Chicago Lockbox

10/17/2011 - Email received with Receipt#, Routed to CSC

10/18/2011 - Cleared the checks $420*2

10/21/2011 - Received NOA1

03/30/2012 - Received NOA2

NVC

04/19/2012 - NVC received

05/01/2012 - Case# generated

05/02/2012 - DS-3032 COA emailed

05/02/2012 - I-864 AOS Fee $88 paid

05/05/2012 - I-864 AOS package mailed to NVC

05/07/2012 - I-864 AOS package received by NVC

05/07/2012 - DS-3032 COA accepted

05/08/2012 - DS-230 IV Fee $230*2 paid

05/09/2012 - DS-230 IV package mailed to NVC

05/11/2012 - DS-230 IV package received by NVC

05/17/2012 - Case Completed

Consulate

07/02/2012 - VFS visit in Cochin

07/04/2012 - Medical in Chennai

07/12/2012 - Interview in Mumbai - Success!

09/08/2012 - POE at JFK, NY

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...