Is it ok to get PCC from local police station from now, as there might be a less than a month left for approval .??

Just want to get ready for NVC stage. Any one from Gujarat, India can share their exp. that would be great. All other suggestions are also welcome.

K

Atlanta, GA (MM-DD-YYYY)
I-130 (IR-1) TIMELINE [MUMBAI CONSULATE]
07-02-2020 - I-130 SENT
06-01-2021 - APPROVED

NVC
06-06-2021 - Recevied NVC case no. - case entered into nvc's system

06-08-2021 - AOS fee
06-08-2021 - IV fee
07-05-2021 - IV & AOS documents submitted online

07-19-2021 - received message from NVC about case can not be processed unless all civil documents are submitted (was missing police clearance)

08-12-2021 - submitted police clearance certificate - which was last document submitted to NVC

11-05-2021 - Case completed at NVC - DQ

03-31-2022 - Interview letter received

04-28-2022 - Interview date at mumbai embassy

 

Filed: IR-5 Country: India
Timeline
Posted

Hey Folks,

Is it ok to get PCC from local police station from now, as there might be a less than a month left for approval .??

Just want to get ready for NVC stage. Any one from Gujarat, India can share their exp. that would be great. All other suggestions are also welcome.

K

Of course, you should get it now. Normally to get PCC in India would take typically a couple of weeks to a month or so. Indian PCC is valid for 6 months from the issuance, I think.

Loto

CSC - I-130 for Parents (IR5)

10/11/2011 - Sent to Chicago Lockbox

10/13/2011 - Delivered at Chicago Lockbox

10/17/2011 - Email received with Receipt#, Routed to CSC

10/18/2011 - Cleared the checks $420*2

10/21/2011 - Received NOA1

03/30/2012 - Received NOA2

NVC

04/19/2012 - NVC received

05/01/2012 - Case# generated

05/02/2012 - DS-3032 COA emailed

05/02/2012 - I-864 AOS Fee $88 paid

05/05/2012 - I-864 AOS package mailed to NVC

05/07/2012 - I-864 AOS package received by NVC

05/07/2012 - DS-3032 COA accepted

05/08/2012 - DS-230 IV Fee $230*2 paid

05/09/2012 - DS-230 IV package mailed to NVC

05/11/2012 - DS-230 IV package received by NVC

05/17/2012 - Case Completed

Consulate

07/02/2012 - VFS visit in Cochin

07/04/2012 - Medical in Chennai

07/12/2012 - Interview in Mumbai - Success!

09/08/2012 - POE at JFK, NY

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

Hey Folks,

Is it ok to get PCC from local police station from now, as there might be a less than a month left for approval .??

Just want to get ready for NVC stage. Any one from Gujarat, India can share their exp. that would be great. All other suggestions are also welcome.

K

Local police station in Baroda will issue the PCC within minutes. So that wont be much of an issue to get. its the PCC from the AMD passport office that is the problem.

NVC

10/04/2010: Case# received, Both email id provided

10/05/2010: DS-3032 COA emailed to NVC

10/11/2010: IIN received

10/11/2010: AOS review fee ($88) online payment - IN PROCESS

10/14/2010: AOS status 'PAID'

10/16/2010: DS-230 IV fee ($404) online payment - IN PROCESS

10/19/2010: DS-230 IV status 'PAID'

10/20/2010: AOS & DS-230 IV package sent

10/22/2010: AOS & DS-230 IV package delivered. Signed by: J Desmond.

11/10/2010: SIF!!!

11/14/2010: received checklist for missing passport office PCC.

11/10/2010: NVC Completion

12/09/2010: NVC Forwards Case to Consulate

CONSULATE

11/22/2010: Passport Office PCC to be in hand

12/22/2010: Medical Completed

12/28/2011: VFS Office Visit - Submit all required documents

01/10/2011: Interview Date - APPROVED

j1/11/2011: Passport arrived at home.

01/25/2011: Wife Comes to USA (POE: Newark, NJ)

event.png

i6qembf7x.png

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted (edited)

Local police station in Baroda will issue the PCC within minutes. So that wont be much of an issue to get. its the PCC from the AMD passport office that is the problem.

One of my friend recently applied for PCC at ahmedabad office, and he told me his experience:

They won't issue passport clearance certificate without looking at the missing document cheaklist OR interview letter itself. Even security person won't allow you inside without having either of these letters in hand. My sister-in-law at NVC stage recently went and experienced this. So we called NVC and inquired about this specific matter. NVC told that you should send DS-230 and all other supporting documents As soon as you pay IV fee's and when you get barcode cover sheet. They will then review all documents and then only they will generate missing document cheaklist.

And PCC at ahmedabad office doesn't take more than 2 weeks-3 weeks (including appilcation and getting in hand). So I am not worried for passport clearance certificate now as I know the process. Only thing is I want to send out DS-230 and police clearance certificate and other supporting documents to my spouse before time.

Edited by kruz_patz

Atlanta, GA (MM-DD-YYYY)
I-130 (IR-1) TIMELINE [MUMBAI CONSULATE]
07-02-2020 - I-130 SENT
06-01-2021 - APPROVED

NVC
06-06-2021 - Recevied NVC case no. - case entered into nvc's system

06-08-2021 - AOS fee
06-08-2021 - IV fee
07-05-2021 - IV & AOS documents submitted online

07-19-2021 - received message from NVC about case can not be processed unless all civil documents are submitted (was missing police clearance)

08-12-2021 - submitted police clearance certificate - which was last document submitted to NVC

11-05-2021 - Case completed at NVC - DQ

03-31-2022 - Interview letter received

04-28-2022 - Interview date at mumbai embassy

 

Filed: IR-5 Country: India
Timeline
Posted

Local police station in Baroda will issue the PCC within minutes. So that wont be much of an issue to get. its the PCC from the AMD passport office that is the problem.

I have heard from the beginning onwards that Gujrat PP office will ask purpose of the PCC in a written form such as NVC documents etc. Is that correct?

If yes, one from Gujrat needs to enter and collect the NVC details as well.

Please let me know if it is correct or not.

Loto

CSC - I-130 for Parents (IR5)

10/11/2011 - Sent to Chicago Lockbox

10/13/2011 - Delivered at Chicago Lockbox

10/17/2011 - Email received with Receipt#, Routed to CSC

10/18/2011 - Cleared the checks $420*2

10/21/2011 - Received NOA1

03/30/2012 - Received NOA2

NVC

04/19/2012 - NVC received

05/01/2012 - Case# generated

05/02/2012 - DS-3032 COA emailed

05/02/2012 - I-864 AOS Fee $88 paid

05/05/2012 - I-864 AOS package mailed to NVC

05/07/2012 - I-864 AOS package received by NVC

05/07/2012 - DS-3032 COA accepted

05/08/2012 - DS-230 IV Fee $230*2 paid

05/09/2012 - DS-230 IV package mailed to NVC

05/11/2012 - DS-230 IV package received by NVC

05/17/2012 - Case Completed

Consulate

07/02/2012 - VFS visit in Cochin

07/04/2012 - Medical in Chennai

07/12/2012 - Interview in Mumbai - Success!

09/08/2012 - POE at JFK, NY

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

Good thinking. I have asked my wife to have everything filled out for me. She is getting her name changed on the passport (submitting forms today) so once she gets that in hand, she will be mailing me all the documents. I know its kind of late but I dont expect to hear from CSC for another two weeks. So this gives me enough time to have my wife's passport in hand and then all the documents as well.

NVC

10/04/2010: Case# received, Both email id provided

10/05/2010: DS-3032 COA emailed to NVC

10/11/2010: IIN received

10/11/2010: AOS review fee ($88) online payment - IN PROCESS

10/14/2010: AOS status 'PAID'

10/16/2010: DS-230 IV fee ($404) online payment - IN PROCESS

10/19/2010: DS-230 IV status 'PAID'

10/20/2010: AOS & DS-230 IV package sent

10/22/2010: AOS & DS-230 IV package delivered. Signed by: J Desmond.

11/10/2010: SIF!!!

11/14/2010: received checklist for missing passport office PCC.

11/10/2010: NVC Completion

12/09/2010: NVC Forwards Case to Consulate

CONSULATE

11/22/2010: Passport Office PCC to be in hand

12/22/2010: Medical Completed

12/28/2011: VFS Office Visit - Submit all required documents

01/10/2011: Interview Date - APPROVED

j1/11/2011: Passport arrived at home.

01/25/2011: Wife Comes to USA (POE: Newark, NJ)

event.png

i6qembf7x.png

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

That is absolutely right......read above post.

I have heard from the beginning onwards that Gujrat PP office will ask purpose of the PCC in a written form such as NVC documents etc. Is that correct?

If yes, one from Gujrat needs to enter and collect the NVC details as well.

Please let me know if it is correct or not.

Loto

Atlanta, GA (MM-DD-YYYY)
I-130 (IR-1) TIMELINE [MUMBAI CONSULATE]
07-02-2020 - I-130 SENT
06-01-2021 - APPROVED

NVC
06-06-2021 - Recevied NVC case no. - case entered into nvc's system

06-08-2021 - AOS fee
06-08-2021 - IV fee
07-05-2021 - IV & AOS documents submitted online

07-19-2021 - received message from NVC about case can not be processed unless all civil documents are submitted (was missing police clearance)

08-12-2021 - submitted police clearance certificate - which was last document submitted to NVC

11-05-2021 - Case completed at NVC - DQ

03-31-2022 - Interview letter received

04-28-2022 - Interview date at mumbai embassy

 

Filed: IR-5 Country: India
Timeline
Posted

One of my friend recently applied for PCC at ahmedabad office, and he told me his experience:

They won't issue passport clearance certificate without looking at the missing document cheaklist OR interview letter itself. Even security person won't allow you inside without having either of these letters in hand. My sister-in-law at NVC stage recently went and experienced this. So we called NVC and inquired about this specific matter. NVC told that you should send DS-230 and all other supporting documents As soon as you pay IV fee's and when you get barcode cover sheet. They will then review all documents and then only they will generate missing document cheaklist.

And PCC at ahmedabad office doesn't take more than 2 weeks-3 weeks (including appilcation and getting in hand). So I am not worried for passport clearance certificate now as I know the process. Only thing is I want to send out DS-230 and police clearance certificate and other supporting documents to my spouse before time.

This is what exactly I was looking for and hearing since 2008.

Thanks

Loto

CSC - I-130 for Parents (IR5)

10/11/2011 - Sent to Chicago Lockbox

10/13/2011 - Delivered at Chicago Lockbox

10/17/2011 - Email received with Receipt#, Routed to CSC

10/18/2011 - Cleared the checks $420*2

10/21/2011 - Received NOA1

03/30/2012 - Received NOA2

NVC

04/19/2012 - NVC received

05/01/2012 - Case# generated

05/02/2012 - DS-3032 COA emailed

05/02/2012 - I-864 AOS Fee $88 paid

05/05/2012 - I-864 AOS package mailed to NVC

05/07/2012 - I-864 AOS package received by NVC

05/07/2012 - DS-3032 COA accepted

05/08/2012 - DS-230 IV Fee $230*2 paid

05/09/2012 - DS-230 IV package mailed to NVC

05/11/2012 - DS-230 IV package received by NVC

05/17/2012 - Case Completed

Consulate

07/02/2012 - VFS visit in Cochin

07/04/2012 - Medical in Chennai

07/12/2012 - Interview in Mumbai - Success!

09/08/2012 - POE at JFK, NY

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted (edited)

This is what exactly I was looking for and hearing since 2008.

Thanks

Loto

Yes, this is very much confirmed as I have seen two live recent cases. By the way local PCC at baroda won't take more than a week. If you have a link, it will only take 2 days.

Edited by kruz_patz

Atlanta, GA (MM-DD-YYYY)
I-130 (IR-1) TIMELINE [MUMBAI CONSULATE]
07-02-2020 - I-130 SENT
06-01-2021 - APPROVED

NVC
06-06-2021 - Recevied NVC case no. - case entered into nvc's system

06-08-2021 - AOS fee
06-08-2021 - IV fee
07-05-2021 - IV & AOS documents submitted online

07-19-2021 - received message from NVC about case can not be processed unless all civil documents are submitted (was missing police clearance)

08-12-2021 - submitted police clearance certificate - which was last document submitted to NVC

11-05-2021 - Case completed at NVC - DQ

03-31-2022 - Interview letter received

04-28-2022 - Interview date at mumbai embassy

 

Filed: IR-5 Country: India
Timeline
Posted

Good thinking. I have asked my wife to have everything filled out for me. She is getting her name changed on the passport (submitting forms today) so once she gets that in hand, she will be mailing me all the documents. I know its kind of late but I dont expect to hear from CSC for another two weeks. So this gives me enough time to have my wife's passport in hand and then all the documents as well.

Is it required to change the name at this time? It is up to you, but is it required? Will it conflict the name specified in I-130? Just a thought.

If she wants, she can change her name during Naturalization - another option.

Loto

CSC - I-130 for Parents (IR5)

10/11/2011 - Sent to Chicago Lockbox

10/13/2011 - Delivered at Chicago Lockbox

10/17/2011 - Email received with Receipt#, Routed to CSC

10/18/2011 - Cleared the checks $420*2

10/21/2011 - Received NOA1

03/30/2012 - Received NOA2

NVC

04/19/2012 - NVC received

05/01/2012 - Case# generated

05/02/2012 - DS-3032 COA emailed

05/02/2012 - I-864 AOS Fee $88 paid

05/05/2012 - I-864 AOS package mailed to NVC

05/07/2012 - I-864 AOS package received by NVC

05/07/2012 - DS-3032 COA accepted

05/08/2012 - DS-230 IV Fee $230*2 paid

05/09/2012 - DS-230 IV package mailed to NVC

05/11/2012 - DS-230 IV package received by NVC

05/17/2012 - Case Completed

Consulate

07/02/2012 - VFS visit in Cochin

07/04/2012 - Medical in Chennai

07/12/2012 - Interview in Mumbai - Success!

09/08/2012 - POE at JFK, NY

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted (edited)

Is it required to change the name at this time? It is up to you, but is it required? Will it conflict the name specified in I-130? Just a thought.

If she wants, she can change her name during Naturalization - another option.

Loto

I won't go opposite with this suggestion. But some at VJ some has to say that they have changed it and never faced difficulty. But my dear friend john.....it's always better to keep everything under same name as in the application.

But well one thing is sure, she has to change the name before she arrives in america, because she will otherwise get everything in maiden name.

That's me.

Edited by kruz_patz

Atlanta, GA (MM-DD-YYYY)
I-130 (IR-1) TIMELINE [MUMBAI CONSULATE]
07-02-2020 - I-130 SENT
06-01-2021 - APPROVED

NVC
06-06-2021 - Recevied NVC case no. - case entered into nvc's system

06-08-2021 - AOS fee
06-08-2021 - IV fee
07-05-2021 - IV & AOS documents submitted online

07-19-2021 - received message from NVC about case can not be processed unless all civil documents are submitted (was missing police clearance)

08-12-2021 - submitted police clearance certificate - which was last document submitted to NVC

11-05-2021 - Case completed at NVC - DQ

03-31-2022 - Interview letter received

04-28-2022 - Interview date at mumbai embassy

 

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

One of my friend recently applied for PCC at ahmedabad office, and he told me his experience:

They won't issue passport clearance certificate without looking at the missing document cheaklist OR interview letter itself. Even security person won't allow you inside without having either of these letters in hand. My sister-in-law at NVC stage recently went and experienced this. So we called NVC and inquired about this specific matter. NVC told that you should send DS-230 and all other supporting documents As soon as you pay IV fee's and when you get barcode cover sheet. They will then review all documents and then only they will generate missing document cheaklist.

And PCC at ahmedabad office doesn't take more than 2 weeks-3 weeks (including appilcation and getting in hand). So I am not worried for passport clearance certificate now as I know the process. Only thing is I want to send out DS-230 and police clearance certificate and other supporting documents to my spouse before time.

Yep, NVC operator told me the same. Seems like such a waste of time!

Wish ahemdadbad wouldnt be so strict on the police clearance. Its almost as if their rules are saying you need to fail the visa process before we issue you the papers that you need. Oye!

Blah.

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

Yep, NVC operator told me the same. Seems like such a waste of time!

Wish ahemdadbad wouldnt be so strict on the police clearance. Its almost as if their rules are saying you need to fail the visa process before we issue you the papers that you need. Oye!

Chaa karta kitli gaaaraam...... :lol:

Atlanta, GA (MM-DD-YYYY)
I-130 (IR-1) TIMELINE [MUMBAI CONSULATE]
07-02-2020 - I-130 SENT
06-01-2021 - APPROVED

NVC
06-06-2021 - Recevied NVC case no. - case entered into nvc's system

06-08-2021 - AOS fee
06-08-2021 - IV fee
07-05-2021 - IV & AOS documents submitted online

07-19-2021 - received message from NVC about case can not be processed unless all civil documents are submitted (was missing police clearance)

08-12-2021 - submitted police clearance certificate - which was last document submitted to NVC

11-05-2021 - Case completed at NVC - DQ

03-31-2022 - Interview letter received

04-28-2022 - Interview date at mumbai embassy

 

Filed: Lift. Cond. (pnd) Country: Japan
Timeline
Posted

you can get the regular pcc now but india has special stuff for all that.

contact other indian members!

USCIS JOURNEY

12-08-09 - I-130 Delivered to Chicago Lockbox

12-11-09 - Notice of Action (NOA1)

02-25-10 - Notice of Action 2 (NOA2) ~CA service center~

03-23-10 - PCC Applied - GET 04/01

Your I-130 was approved in 76 days from your NOA1 date

NVC JOURNEY

03-03-10 - NVC Case Number Assigned

03-05-10 - Email give

03-09-10 - AOS bill; Agent Email Get

03-10-10 - Paid AOS Bill; Email/Mail DS-3032

03-12-10 - AOS Bill Status: PAID

03-15-10 - IV Bill Email Get; Pay IV Bill

03-16-10 - IV Bill Status: PAID; AOS @ NVC

04-07-10 - IV Pack @ NVC

04-12-10 - IV Pack Enters AVR

04-20-10 - Log-in Fail

04-21-10 - Case Complete

04-30-10 - Interview Date Assigned

05-07-10 - NVC Forwards Case to Embassy, Tokyo

Your case was complete in 50 days at NVC

EMBASSY JOURNEY

04-16-10 - Medical Exam ($400) - PASSED

05-10-10 - Embassy Receives Case from NVC

06-28-10 - INTERVIEW - Moved

06-21-10 - INTERVIEW - APPROVED!

06-22-10 - Visa Received

Your interview took 192 days from your I-130 NOA1 date

USA JOURNEY

07-05-10 - US Entry

07-26-10 - Request SSC @ SS office

07-28-10 - Welcome Letter (2nd on 8/9)

08-02-10 - SSC GET

08-12-10 - Green Card GET -38 days

04-05-2012 - File I-751: APPROVED 10/17

nihonamerica.jpg

Posted

Hey Folks,

Is it ok to get PCC from local police station from now, as there might be a less than a month left for approval .??

Just want to get ready for NVC stage. Any one from Gujarat, India can share their exp. that would be great. All other suggestions are also welcome.

K

Cmon man Lets get this straight, PCC is valid for six months from the date it was issued,so yeah lets get it going..!!!!

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...